MAINTENANCE OF AC FOR THE MONTH OF .................

cheacking of swing operaton


Display card/PCB/checking
Cleaning of cooling pipe
Sl.No Date Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


Cleaning of condencer
Cleaning of Filter
CCR Second Floor VC
1 Room Split AC 2 TON
CCR Second Floor ED
2 Chamber Split AC 2 TON
CCR Second Floor
3 Chamber-1 Split AC 1.5 TON
CCR Second Floor
4 Chamber-2 Split AC 1.5 TON
CCR Second Floor
5 Chamber-3 Split AC 1.5 TON
CCR Second Floor
6 Chamber-4 Split AC 1.5 TON
CCR Second Floor
7 Chamber-5 Split AC 1.5 TON
MAINTENANCE OF AC FOR THE MONTH OF .................

cheacking of swing operaton


Display card/PCB/checking
Cleaning of cooling pipe
Sl.No Date Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


Cleaning of condencer
Cleaning of Filter
CCR Second Floor
8 Chamber-6 Split AC 2 TON
CCR Second Floor
9 Chamber-7 Split AC 2 TON
CCR Second Floor
10 Chamber-8 Split AC 2 TON
CCR Second Floor
11 Chamber-9 Split AC 1 TON
CCR Second Floor
12 Chamber-10 Split AC 1 TON
CCR Second Floor
13 Chamber-11 Split AC 1 TON
CCR Second Floor Center Cassette AC 4
14 Area Cubicle TON
Sl.No

15
Date

Area Cubicle
Floor/Area

TON
CCR Second Floor Center Cassette AC 4
Equipment Detail

Cleaning of Filter

Cleaning of condencer

Cleaning of cooling pipe

Display card/PCB/checking

Cheak for water leaker

cheacking of Air throw

cheacking of swing operaton


MAINTENANCE OF AC FOR THE MONTH OF .................
MAINTENANCE OF AC FOR THE MONTH OF .................

cheacking of swing operaton


Display card/PCB/checking
Cleaning of cooling pipe
Sl.No Date Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


Cleaning of condencer
Cleaning of Filter
CCR Second Floor Center Cassette AC 4
16 Area Cubicle TON
CCR Second Floor Center Cassette AC 4
17 Area Cubicle TON
CCR Second Floor Center Cassette AC 4
18 Area Cubicle TON
CCR Second Floor Center Cassette AC 4
19 Area Cubicle TON
CCR Second Floor PLC Cassette AC 4
20 Room TON
CCR Second Floor PLC Cassette AC 4
21 Room TON
CCR Second Floor Control Cassette AC 4
22 Room TON
MAINTENANCE OF AC FOR THE MONTH OF .................

cheacking of swing operaton


Display card/PCB/checking
Cleaning of cooling pipe
Sl.No Date Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


Cleaning of condencer
Cleaning of Filter
CCR Second Floor Control Cassette AC 4
23 Room TON
CCR Second Floor Control Cassette AC 4
24 Room TON
CCR Second Floor XRF Cassette AC 4
25 Room TON
CCR Second Floor XRF Package AC 4
26 Room TON
CCR Second Floor XRF Package AC 4
27 Room TON
CCR First Floor
28 Conference Hall Split AC 2 TON
CCR First Floor
29 Conference Hall Split AC 2 TON
MAINTENANCE OF AC FOR THE MONTH OF .................

cheacking of swing operaton


Display card/PCB/checking
Cleaning of cooling pipe
Sl.No Date Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


Cleaning of condencer
Cleaning of Filter
CCR First Floor
30 Conference Hall Split AC 2 TON
CCR First Floor
31 Conference Hall Split AC 2 TON
CCR First Floor Center
32 area Cubicle Split AC 2 TON
CCR First Floor Center
33 area Cubicle Split AC 2 TON
CCR First Floor Center
34 area Cubicle Split AC 2 TON
MAINTENANCE OF AC FOR THE MONTH OF .................

cheacking of swing operaton


Display card/PCB/checking
Cleaning of cooling pipe
Sl.No Date Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


Cleaning of condencer
Cleaning of Filter
CCR First Floor Center
35 area Cubicle Split AC 2 TON
CCR First Floor Center
36 area Cubicle Split AC 2 TON
CCR First Floor Center
37 area Cubicle Split AC 2 TON
CCR 1st Floor New
38 discussion Room Split AC 2 TON
CCR 1st Floor New
39 Drawing Office Split AC 2 TON
CCR 1st Floor New
40 Drawing Office Split AC 2 TON
CCR First Floor New
41 Chamber-1 Split AC 1.5 TON
MAINTENANCE OF AC FOR THE MONTH OF .................

cheacking of swing operaton


Display card/PCB/checking
Cleaning of cooling pipe
Sl.No Date Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


Cleaning of condencer
Cleaning of Filter
CCR First Floor New
42 Chamber-2 Split AC 1.5 TON
CCR First Floor New
43 Chamber-3 Split AC 1.5 TON
CCR First Floor New
44 Chamber-4 Split AC 1.5 TON
CCR First Floor New
45 Chamber-5 Split AC 1.5 TON
CCR First Floor New
46 Chamber-6 Split AC 1.5 TON
CCR G. Floor New C&I
47 Room Split AC 2 TON
TOTAL 39

COMPLETED
Sl.No

COMMENTS IF ANY
Date
Floor/Area
Equipment Detail

Cleaning of Filter

Cleaning of condencer

Cleaning of cooling pipe

Display card/PCB/checking

Cheak for water leaker

cheacking of Air throw

cheacking of swing operaton


MAINTENANCE OF AC FOR THE MONTH OF .................
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
39
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


H OF ..................................(CCR) OWNER- Mr. P Das

Remarks

user Sign

Engg Sign
Cleaning of Filter
Sl.No Date Floor/AreaEquipment Detail

Split AC 1.5
1 132 KV MRSS Ton
LC-1 Room Package AC
2 KHD 11 Ton
LC-1 Room Package AC
3 KHD 11 Ton
Civil Office Window AC
4 KHD 1.5
Civil Office Window AC
5 KHD 1.5
Civil Office Window AC
6 KHD 1.5
Civil Office Window AC
7 KHD 1.5
Kiln Mech Split AC 1.5
8 KHD Ton
Kiln Mech Split AC 1.5
9 KHD Ton
CB Analyser
10 KHD Split AC 2 Ton
Analyser
room Coal
11 Mill KHD Split AC 2 Ton
Analyser
room VRM
12 KHD Split AC 2 Ton
Analyser
Room Inlet
13 KHD Split AC 2 Ton

Analyser
Room 3rd
Floor KHD Pre
14 Heater Split AC 2 Ton
Analyser
Room 3rd
Floor KHD Pre Window AC
15 Heater 1.5 Ton
Stacker/Reclai
mer office Window AC
16 KHD 1.5 Ton
Stacker
Reclaimer Split AC 1.5
17 office KHD Ton

LC-2 Battery
18 Room KHD Split AC 2 Ton

LC-2 Battery
19 Room KHD Split AC 2 Ton
CMBH
ANALYSER Split AC 1.5
20 ROOM MCC8 Ton

CMBH
ANALYSER Split AC 1.5
21 ROOM MCC8 Ton
Blower room
22 KHD Split AC 2 Ton

Kiln Inlet Window AC


23 Analyser KHD 1.5 Ton

CCTV Cemera Package AC 4


24 Top KHD Ton
CCTV Cemera Package AC 4
25 KHD Ton
452BL4 room
26 KHD Split AC 2 Ton

New Lab
27 building KHD Split AC 2 Ton

New Lab
28 building KHD Split AC 2 Ton

New Lab
29 building KHD Split AC 2 Ton
New Lab Split AC 1.5
30 building KHD Ton

New Lab Split AC 1.5


31 building KHD Ton

New Lab Split AC 1.5


32 building KHD Ton

New Lab Split AC 1.5


33 building KHD Ton

New Lab Split AC 1.5


34 building KHD Ton
New Lab Split AC 1.5
35 building KHD Ton

New Lab Split AC 1.5


36 building KHD Ton
Package AC
37 MCC9 11 Ton

TOTAL 33

COMPLETED

COMMENTS IF ANY
Cleaning of condencer

Cleaning of cooling pipe

Display card/PCB/checking

Cheak for water leaker

cheacking of Air throw


MAINTENANCE OF AC FOR THE MONTH OF …………
cheacking of swing operaton

Cheacking for abnormal sound/vib

Current measurement
………............(KHD) OWNER- Mr. P Das

Voltage measurement

Temperature measurement
Any phyisical damage

Remarks

User Sign

Engg Sign
MAINTENANCE OF AC FOR THE MONTH OF …………............(CVRM) O

Display card/PCB/checking
Sl.N Date

Cleaning of cooling pipe


Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


o

Cleaning of condencer
Cleaning of Filter
1 CVRM Mech Office Window AC 1.5 Ton

2 CVRM Mech Office Window AC 1.5 Ton

3 CVRM Elect Office Window AC 1.5 Ton

4 CVRM Elect Office Window AC 1.5 Ton

5 SPRS Room Split AC 2 Ton


6 SPRS Room Split AC 2 Ton

7 SPRS Room Split AC 2 Ton

8 SPRS Room Split AC 2 Ton

9 Hot air Duct Drive room Split AC 2 Ton

10 Hot air Duct Drive room Split AC 2 Ton

11 Hot air Duct Drive room Split AC 1.5 Ton

12 Battery Room Split AC 1.5 Ton

TOTAL 12

COMPLETED

COMMENTS IF ANY
cheacking of swing operaton

Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement
.....(CVRM) OWNER- Mr. A. Banerjee

Temperature measurement

Any phyisical damage


Remarks

User Sign

Engg Sign
MAINTENANCE OF AC FOR THE MONTH OF ................

Display card/PCB/checking
Sl.N Date

Cleaning of cooling pipe


Floor/Area Equipment Detail

Cheak for water leaker

cheacking of Air throw


o

Cleaning of condencer
Cleaning of Filter
1 Clinker Silo Split AC 2 Ton

2 Clinker Silo Split AC 2 Ton

3 Common room(PH DISPATCH OFFICE) Split AC 2 Ton

4 Common room(PH DISPATCH OFFICE) Split AC 2 Ton

5 Common room(PH DISPATCH OFFICE) Split AC 2 Ton


6 Mechanical Office Window AC 1.5 Ton

7 Mechanical Office Window AC 1.5 Ton

8 DO Office Split AC 2 Ton

9 DO Office Window AC 1.5 Ton

10 Clay Gate Split AC 2 Ton

11 Clay Gate Window AC 1.5 Ton

12 Weigh Bridge 100T Split AC 2 Ton

13 Weigh Bridge 40T Split AC 2 Ton

14 Weigh Bridge 100T Split AC 2 Ton

15 Inmotion weigh bridge Railway yard Window AC 1.5 Ton


PH NEW PCC
16 PACKAGE AC 4 Ton
PH NEW PCC
17 PACKAGE AC 4 Ton
18 ROTO PACKER6 Split AC 2 Ton

19 ROTO PACKER6 Split AC 2 Ton


20 New Raw Material Office Split AC 2 Ton

TOTAL 19

COMPLETED

COMMENTS IF ANY
cheacking of swing operaton

Cheacking for abnormal sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


MONTH OF ..................................(Packing House) OWNER- Mr.a. Banerjee

Remarks

User Sign
19
Engg Sign
MAINTENANCE OF AC FOR THE MONTH OF ...........

Display card/PCB/checking
Cleaning of cooling pipe

Cheak for water leaker


Cleaning of condencer
Sl.No Date Floor/Area Equipment Detail

Cleaning of Filter
1 Room-1 Split AC 1.5 Ton

2 Room-2 Split AC 2 Ton

3 Room-3 Split AC 1.5 Ton

4 Room-3 Split AC 1.5 Ton

5 Room-4 Split AC 1.5 Ton

6 Purchase office Hall Split AC 2 Ton

7 Purchase office Hall Split AC 2 Ton

8 Purchase office Hall Split AC 2 Ton


9 Purchase office Hall Split AC 2 Ton

10 Purchase Discussion Room Window AC 1.5 Ton

11 Common Hall Split AC 2 Ton

12 Common Hall Split AC 2 Ton

13 Purchase HOD Room Split AC 1.5 Ton

14 Purchase office UPS Room Split AC 1.5 Ton

15 Purchase Room-2 Window AC 1.5 Ton

16 Water Supply Engineer Room Window AC 1.5 Ton

17 Mill House IO Panel room Split AC 1.5 Ton

18 Mill House 3 & 4 WF Room Split AC 2 Ton

19 Mill House 3 & 4 WF Room Split AC 2 Ton

20 Railway Office Split AC 2 Ton

21 Railway Office Split AC 2 Ton

22 Railway Office Split AC 2 Ton


23 Railway Office Split AC 1.5 Ton

TOTAL
COMPLETED
COMMENTS IF ANY
cheacking of Air throw

cheacking of swing operaton

Cheacking for abnormal


sound/vibraton

Current measurement

Voltage measurement

Temperature measurement

Any phyisical damage


ONTH OF ..................................(Common) OWNER- Mr. V.K Choubey

Remarks

User Sign
21
Engg Sign

You might also like