Reasons for Changing Design

• Impasse with railroads led us to seek new solutions at six at-grade


crossings (Duke, Blackwell, Mangum, Dillard, Fayetteville, and Grant)
• NCDOT Rail Division hosted workshop in October to develop strategies
for grade-separating crossings (Duke St, Fayetteville St, Grant St)
• Norfolk Southern communicated “better, but not good enough”
• At end of November, Federal Transit Administration identified that a
long negotiation with railroads was the light-rail project’s top risk.
• To stay on schedule, FTA gave us until December 14 to provide
additional information to address identified risks, including a new
strategy to resolve conflicts with railroads.
• Concurrently, many downtown stakeholders had raised concerns about
closing the Blackwell Street railroad crossing, and discomfort with the
signature civic space mitigation.
Options Evaluated
• Two initial options developed between November 30 and December
10:
o Trenches under Blackwell/Mangum and under Dillard/Fayetteville
o Bridges over Blackwell/Mangum and over Dillard/Fayetteville
o Choices are independent in the two locations
• On December 12th, FTA historic and environmental resource specialists
advised us that either option would have an adverse impact on the W.
T. Blackwell building, a National Historic Landmark , a national historic
landmark.
• Covered trench, aka “a tunnel,” was developed for review at December
13th stakeholder workshop and submittal to FTA on December 14th
• Proposing the tunnel with a bridge over Dillard and Fayetteville
t
t

roS
S
N

NA
m
G

ND

u
re

lsto
g

b
gs

n
u

t
x

rdS
on

o
k

a
t

nA
NM
ll S

NR
eS
i
St lH

illa

v
t
pe

e
ND
a
h
C
E

Ma t
inS a
EM t
inS
WMa
inS
t W

amse rS
u t
Wa
Rmse
u rS
t B
elo
w g
radeER
B
elo
w g
rade A
tgra
d e A
tgra
d e
A
tgra
d e
We
P re
ttig t
wS
Bla
c kwell/Mangum
Durham E
lev
a dERam
te
Statio
n(p rop
o sed) seu
S

Statio
n rS
G

(Below grade) t
re

(A
tg rade)
gs
on

St rdS
illa t
ill
St

H SD
el
hap St D
illa
rdS treet

SM
C o n
s Statio
n
W ck
Ja

a
t
wS

n
(Ele
v ated) A
tgra
d e e re
ttig

g
EP

um
r
nD E
lev
ate
d

S
b so
in 147

t
ieRo
ck
Ja A
lstonAv e
n ue
147 ve

B
adA S
tatio
n

la
rehe

ck
o
EM (Atgrade) R

w
elo
cate
d
SD

ell S
P
ettig
rewS
t

G
uk

ra

SA
t
eS

ntS

lsto
t

F
St

t
n

nA
o

e
s
ck

tte
Ja

v
e
ville
St
ve
adA
e
reh

S
o
M

Rox
bo
ro
St

G
rantS
t
S
o u
rce
:Esri, D
igita
lGlo
be,G
eoE
ye,E
arth
sta
rGe
o g
raph
ics, C
N E
S /A
irb
usD
S,U
SDA
,US
G S
,Ae
roGR
ID, IG
N ,a
n dth
eGISU
serC
omm
unity

P
reliminaryPettig
rew Stre
et L
R Ttra
ck L
R Tsta
tio
ns
con c
e p
tsu n
de re v
alu
ation A
tgra
d e E
xistin
gLRTa
lig
nme
n t
Mapo fpropo
se dPettigrewS tree
tDu rha
m -O rangeLightRail T
ransitalignme nt B
elo
wgra
d e
asofD ece
m ber18,2 0 18.A lig n
m entisdrafta n
dsu bje
cttoch a n
ge ,an dis E
lev
a te
d 0 1
,00
0 2
,00
0 4
,00
0
sub
jecttoenviron
m en tal re
v ie wanda pprova lbyth
eF ederalT ransitAdm in
istratio
n. Fee
t
Initial Preliminary Cost Estimate

• +$ 10,000,000 for Duke St. underpass.


• +$ 55,000,000 for tunnel at Blackwell St. and Mangum St.
• +$ 12,000,000 for bridge at Dillard St and Fayetteville St . and
Fayetteville St.
• +$ 3,000,000 for Grant St. connectivity improvements.
• +$ 8,000,000 for design costs.
• - $20,000,000 for signature bridge.
• Total preliminary net impact (Duke St. to Grant St.) +$ 68,000,000.
• Estimates are in 2018 dollars.
• Total estimate includes roughly $25,000,000 in contingency.
Other Submitted Information

• Preliminary adjustments to the anticipated construction schedule.


o Adjustments do not change overall timeline.
o Revenue operations still anticipated early 2028.
• Preliminary adjustments to the Project’s scope.
o Conceptual plans for design elements along Pettigrew St.
o Typical section of the tunnel under Blackwell St.
o Brief explanation of constraints that have led to the adjustments.
Next Steps

• Continue consultation with FTA on environmental evaluation.


o Analyze potential vibration impacts from construction.
o Share simple renderings of design near Old Bull and Venable.
• Secure confirmation from railroads that this design concept is
acceptable.
o Executive meeting will be held later today.
• Advance the design.
o Advisory Panel/Public meetings in late January and following
months for updates and input on station areas.
• Consult with Durham County and City on funding options.