DOI 10.1007/s00170-003-1936-z
ORIGINAL ARTICLE
Received: 19 April 2003 / Accepted: 3 September 2003 / Published online: 20 February 2004
Springer-Verlag London Limited 2004
Abstract This paper presents that performance management of quality, responsiveness and flexibility [32]; encourage local opti-
contemporary companies has to be oriented towards optimisation misation [10, 12]; encourage managers to minimise the variances
of total productivity as it has a very strong impact on compet- from standard rather than seek to improve continually [30, 37];
itiveness. Four contingent performance management strategies and fail to provide information on what customers want and how
for total productivity optimisation have been modelled using the competitors are performing [5, 18, 38]. However, financial per-
non-linear mathematical programming approach. A case study formance measures are necessary for the purpose of accounting
is presented to demonstrate the applications. Some significant and audit; but are definitely not sufficient if viewed from the
learning points have been highlighted to provide direction for the ever-emancipating platform of competition. Primarily, they are
managerial practice community. the ends from the stockholders’ sustainability point of view but
are not entirely capable of providing either diagnostic mech-
Keywords Optimisation · Performance management systems · anisms to critically examine the means that achieve the ends
Strategic total productivity management or prescriptive solutions in the context of dynamic competition.
Furthermore, these are both too simplistic and historically fo-
cused [8] to formulate strategic pathways. If a company’s ex-
1 Total productivity as an important measure of
isting performance management system is largely financial, it
performance may not be possible to make optimal decisions in relation to
Only during the past few years, an extraordinarily predomi- resource allocation and control the organisational innumerable
nant socio-economic-political phenomenon; known as globali- complex work processes. They may undercut a company’s op-
sation has changed the structural configuration of the business erational strategy, if the company is positioned in a competi-
world and operational paradigms of the manufacturing indus- tive space. Kaplan and Norton [18] proposed an integrated ap-
tries. All organisations across the globe are now being com- proach known as ‘balanced scorecard’ to objectively view per-
pelled to develop their performance management systems in line formance in terms of customer and stakeholder satisfaction, in-
with the increasingly complex external environment and im- ternal processes and the organisation’s ability to learn and im-
peratives of competition, regardless of their size and location. prove. Stainer [34] suggested six fundamental inter-linking areas
Historically, financial performance indicators, such as Return on in performance management: profitability to money, productiv-
Investment, Return on Assets, Operating Profit Margin, Profit ity to output/input relationship, quality to customer satisfac-
after Tax, Earning Per Share etc. have been used. Traditional tion, innovation to adapting to change, co-operation to employee
financial measures are criticised because they encourage short- satisfaction and business ethics to impact on society and the
termism [3, 16]; lack strategic focus and fail to provide data on environment.
Ashton [2] and Sanger [29] have mentioned that productiv-
A. Rathore ity is the most important performance indicator in the pursuit of
Department Of Mechanical Eng., National Institute Of Technology, organisational excellence. The world competitiveness report [36]
Jaipur, India suggests that:
R.P. Mohanty
The Associated Cement Companies Ltd., Mumbai, India Competitiveness = (competitive assets)
A.C. Lyons × (competitive processes) (1)
Department Of Engineering, University Of Liverpool, UK
Competitive assets = f [technology, human resources, regulatory
N. Barlow
Liverpool Business School, John Moores University, UK assets, functional assets, positional assets, cultural assets] (2)
1021
Competitive process = f [quality, quantity, timeliness and measurement and evaluation; the other is related to productivity
resource utilization] (3) planning and improvement. Most organisations focus their efforts
on applying productivity measurement and evaluation models.
In order to attain the twin objectives of growth and survival, it has Singh et al. [31] also mentioned that the improvements in method-
become an imperative that performance management strategies ology of productivity measurement have been diverse and piece-
are in alignment with productivity of assets and processes. Com- meal at best. It has been observed that very seldom companies
panies have been measuring costs, quality, outputs, cycle time, prepare for optimising productivity by way of strategic planning
resource utilisation efficiency etc. of assets, processes, products exercises. Hoque and Falk [17] have expressed that greater envi-
and services. ronmental uncertainty in future organisations will call for strate-
Total productivity measures are increasingly being recog- gic considerations in total productivity management.
nised and utilised for organisational restructuring of assets and
continuous improvement of business processes [13]. Productiv-
ity is concerned with establishing congruency between organi- 2 The objective and scope of the paper
sational goals and societal aspirations through input-output rela-
tionships. Productivity is the culminating result of interactions of In this paper, we intend to develop a set of mathematical models
the organisational management systems with the external envi- for optimisation of total productivity and use these models as
ronmental factors [23]. strategy support rather than mere operational decision support.
Productivity, as the discipline propounded by academics, and We submit that strategy support models are intended to influence
used in industry, commerce, and government throughout the managerial actions across the organisation for total productivity
world, is the broadest of all the modern management functions. planning, execution, monitoring and improvement.
Although, the very functional nature of the discipline has un- The mathematical programming procedure generally esti-
dergone changes historically, fundamentally the concepts have mates a multi-surface production frontier based on different
surrounded “speeding up actions to improve performance in mul- combinations of input/output ratios. Sumanth [35] provided an
tiple dimensions”. The discipline has been made rich by synthe- approach for optimising productivity within a feasible output
sising knowledge from other disciplines and, at the same time, range, but it deals with aggregate terms and does not consider the
many sub-disciplines such as TQM, JIT, BPR, CIMS etc. have specific levels of input variables. Though Hawaleshka and Mo-
emerged. Today, all these in conjunction represent a very wide hammed [14] proposed to have constraints for the values of input
umbrella embedding the generic discipline. variables, their model does not consider any relationship between
Managers directing the efforts of an organisation have a re- output and inputs. The model considers both to be independent of
sponsibility to know how, when, and where to institute a wide each other. In another model, Hawaleshka and Mohammed [15]
range of changes to optimise productivity of assets and pro- did consider a relationship between input (although only labour
cesses. These changes cannot be sensibly implemented with- and capital) and output using the Cobb-Douglas production func-
out knowledge of the appropriate information upon which they tion, but they ignored all internal and external constraints. Land
are based. Performance productivity measures quantitatively tell et al. [19] and Cooper et al. [6] introduced stochastic consid-
something about products, services, and the processes that pro- erations in inputs and outputs. However, all these mathematical
duce them. They enable organisations to know: models do suffer from lack of strategy support. Further, if man-
agers are interested in making some intervention to deduce con-
• How well the organisation is doing. sequences of a strategy, these models are not prescriptive.
• Is the organisation meeting its envisioned goals? Rastogi and Mohanty [28] constructed a set of strategic total
• Are the resources optimally being utilised? productivity optimisation models. Their propositions relate to
• Is there the scope for improvement? the investigation of four possible strategies positioned in four
• If and where improvements are necessary. clusters in relation to degree of competition in the business envi-
Enhanced competitiveness depends on factors such as: identify- ronment and growth in market demand as shown in Fig. 1 below:
ing the important measures of performance for a given strategy,
understanding the inter-relationships of these measures, focusing
on measures which truly predict the long-term financial success
of the business.
We view here like Miller [20]; Belcher and John [4]; Al-
Darrab [1]; Mohanty and Rastogi [22]; that profitability of a firm
is directly proportional to productivity of operational processes.
There have been a number of recent studies [9, 11, 26, 39–41] un-
dertaken to address the concept of total productivity [7] at an or-
ganisational level. Mohanty [24] discussed the issues of consen-
sus and conflicts in understanding productivity from a strategic
perspective. Literature on productivity models can be classified
into two distinct classes [28]. One class deals with productivity Fig. 1. Clustering productivity optimisation strategy
1022
3.1 Some significant observations the planned value of 72% for the study period, the firm could
achieve 68.5% labour productivity.
• The company often faces varying market conditions in dif- • A comparison of the first half of the year 1998 with the cor-
ferent countries in which it does business. The products responding figures in 1997 indicates that despite having a
are highly custom-made and customers demand a high de- huge backlog of the orders (equal to 5 months sale), the com-
gree of quality and reliability. But, sometimes, for doing pany could increase its sales by 1.65%. Labour productivity
business, some trade-offs are desirable between price and has gone up to 68.6% from 67.8% in terms of standard hours
quality. but the manufacturing payroll has also gone up by 7.12%.
• The quality of incoming materials is controlled through what This is primarily due to increase in head count from 188
is known as the traffic light system. A defective lot gives an to 198 in 1998. Against the planned sales of £ 9 881 923 for
amber light to the vendor. With the next defective lot, the the first half of 1998,the company could achieve sales of
light for that vendor is turned red indicating termination of £ 9 545 510 a shortfall of around 3.5%.
relationship with the vendor. Despite having this stringent re- • As can be seen from above, the company establishes ef-
quirement for quality, the cost of rework has gone up by 88% fectiveness of the operation by measuring a host of partial
against the planned value for the study period. A comparison measures. A close analysis of these measures indicates that
of January–June 97 and January–June 98 figures also shows at present the company focuses only on budgetary control
an increase in the value of rework by 7.1%. Often the suppli- apart from measuring partial productivity, i.e., labour. At best
ers trace the fault to changed specifications. these measures can be used to control the cost but provide no
• The company occasionally finds itself not meeting delivery strategic direction to the management. The data are primarily
schedule. On average, it takes five months to process an collected to satisfy the needs of the corporate office that does
order, which is considered to be high by industry standards. the analysis and tells the company which efficiency to im-
Late delivery forces customers to delay picking up the mate- prove upon. No attempt has so far been made by the company
rial as they shift their resources to other areas of operations. to quantify overall performance in terms of total productivity.
This results in a large inventory of finished goods that ties up
precious working capital.
• The off-balance delivery schedule can be attributed to the 3.2 Data collection
way elevators are fabricated. On the assembly lines, it was
Data were collected on a monthly basis for a period of 18 months,
found that few machines were idle most of the time (under-
from January 97 to June 98, under the headings of purchased ma-
utilised capacities) whereas one or two resources were hav-
terial, direct labour hours (regular and overtime) total payroll, cap-
ing piles of inventories in front of them (bottleneck).
ital, energy, burden, shipping expenses, transportation expenses,
• Producing less and consuming from the existing stockpile on
other expenses and output. All inputs were recorded in terms of
inventory can increase inventory turnover. Moreover, it does-
their monetary value except labour, which was recorded in terms
n’t tell anything about the way resources are utilised.
of costs and labour hours. Monetary value of labour included both
• Inventory control of incoming material is done through the
direct and indirect costs. Burden is the material handling costs
Kanban system. However, no such system is used for the in-
involved in the transportation of materials to the shop floor. The
process inventory.
collected data are shown in Tables 1 and 2.
• At present, the company measures inventory turnover, manu-
facturing variance, material burden variance, shipping vari-
ance, transport variance, purchase price variance, net profit 3.3 Developing the production frontier equation
margin, factory overtime and direct labour productivity on
a monthly basis. Variance (Manufacturing, Material burden, Multiple regression analysis using the SPSS software package
Shipping, Transport) analysis is done to check how much de- was used to develop a production frontier equation. The regres-
viation there is between the predicted value and actual value. sion process was undertaken using five input variables, namely:
It is basically a budgeting control tool rather than a perform- material, capital, labour hours, energy and burden, as these were
ance management system. the five major variables affecting the output of the process. Man-
• Factory overtime analysis is another budgeting tool to control agement regarded shipping, transportation and the remaining
funds allocated for overtime. For the analysis period, it has inputs to be sufficiently insignificant to be excluded from the re-
exceeded the target by 66%. gression process.
• Net profit margin is an ‘after the fact’ analysis that can’t be In the first iteration, three variables, burden, capital and en-
used as a diagnostic tool. ergy, were eliminated and an equation was obtained in two in-
• Direct labour productivity analysis measures output per man- dependent variables Mat and labour. A high-adjusted R squared
hour against standard output per man-hour. It’s a partial value coupled with very small values of Signif F and Sig T
measure and not very effective in the absence of other mea- were obtained. This indicated a good fit of this model to the
sures. A high labour productivity does not necessarily mean sample but the histogram of the frequencies of regression-stand-
high profit. Use of automation/outsourcing improves labour ardised residuals was not normal, indicating that this particular
productivity but may increase total cost of product. Against regression equation was not applicable to the population. Cook’s
1024
No. Month Output Purchased Total Direct Energy Capital Burden Shipping Transport Others
Material Payroll Labour-Hrs Expenses Expenses
All figures are expressed in £ 000’s except labour, which is expressed in thousands of hours
Table 2. Limits of the input variables independent variable direct labour hours (referred to as dir_hrs)
was not linear. It tapered downward at higher values of dir_hrs.
Variable Lower limit Upper limit Present value This indicated that a power term of dir_hrs should be included in
(000’s) (000’s) (000’s)
the model.
In the fourth iteration a new variable Rthrs (the reciprocal
Mat 832 2044 1362
Dir_hrs 15 27 19 of the root of dir_hrs) was created and introduced in the regres-
Cap 17 56 43 sion process in the place of dir_hrs. The variable burden was also
Burden 15 40 25 re-introduced. The results were satisfactory for this iteration: an
equation containing four parameters, indicating the goodness of
fit of this model to the sample and the population were also sat-
distance and Mahalanobis distance were recorded in this itera- isfactory and almost comparable to that of the previous iteration;
tion. A relatively high value of Cook’s distance for the June 97, but the partial residual plot of capital was not linear but similar
September 97 and November 97 indicated that these were influ- to that of dir_hrs in the previous iteration. This indicated that one
ential cases, the presence of which may have distorted the model. should use a power term for the capital variable.
The three influential cases detected in the first iteration were In the fifth iteration a new variable Rtcap (the reciprocal of
removed and an equation containing four independent variables, the root of capital) was created and introduced in the regression
material, labour capital and burden was then obtained. The ad- process in the place of the capital variable. The model produced
justed R squared value improved considerably and Signif F and an equation between the dependent variable output and four in-
Sig T values were very small. The histogram of the frequencies dependent variables material, Rthrs, Rtcap and burden. The ad-
was also slightly better than the previous one but it was not sat- justed R squaredvalue was 0.96244, which was high enough to
isfactory. A close look at the Sig T values revealed that the Sig T indicate a very good fit of this model to the sample data. Sig F
value was highest for the burden variable. value was 0 and all Sig T values were very small which sup-
Burden was deliberately removed from the regression pro- ported the conformance of the fit to the sample data.
cess to see the effect in the third iteration. Although this time The following points provide the evidences of the goodness
the equation had two variables, material and labour, the over- of the fit of this model to the population:
all results were satisfactory. The adjusted R squared value was
slightly less than that of the previous iteration yet it was high • The histogram of the frequencies of the regression-standard-
enough to be considered as satisfactory. Sig F and Sig T values ised residuals is normal. Also the plot between output and
were very low. These indices indicated that this model fitted the regression-standardised predicted value gives a linear trend.
sample. However, the most important result of this iteration was • The scatter plots of regression-standardised residuals with
an approximately normal histogram of the frequencies of the regression-standardised predicted values and dependent vari-
regression-standardised residuals, which confirmed the fit. able output is random.
In the next step, the partial residual plots were examined. The • The partial residual plots of the dependent variable output
partial residual plot between the dependent variable output and with various independent variables shows a linear trend.
1025
Thus, the following equation was regarded as a suitable expres- As per this strategy, increasing both output and input but
sion of output in terms of key input factors: increasing the output relatively more, that is, can improve pro-
ductivity:
Output = 0.978(mat) + 510.760(dir_hrs)0.5 + 142.063(cap)0.5
−13.506(burden) − 2090.078 (4) Maximise: P = O/I (7)
pany management. These are the values of the variables within + 13.506(Burden) + 4079.078 < 0 (13)
which they are expected to operate in the next planning period
(one-year). Table 1 lists the input data for the case study. 0.978(Mat) + 510.760(Dir_hrs) 0.5
+ 142.063(Cap) 0.5
3.5 Results and discussion 3. While it’s important to have a plan, what counts is the real-
life actions and decisions made by management towards op-
The optimum levels of productivity and input variables under the timisation of total productivity. These actions will determine
four strategies as obtained by solving the NLP models are shown whether a business strategy is successful or not. The pattern
in Table 3. By using any of the strategy, the company can im- of actions derived out of such optimisation studies reveals
prove the total productivity to a significant extent. The following the real performance management strategy of the company
observations are worth mentioning: as well as the portfolio of manufacturing capabilities. These
• The variable burden has a negative coefficient in the output/ are the special abilities that a company has in manufacturing.
input(s) relationship. Burden expenditure is the cost incurred Some examples of manufacturing capabilities include cost,
in materials handling. It does not add any value to the prod- quality, quantity and timeliness, which have a very strong
uct. Efforts should be made to minimize it. bearing on marketing and financial performances. Managers
• Material consumption has been reduced in almost all the should emphasise those capabilities at which the company
strategies from the existing level. excels. For example, if a company has the ability to make
• Capacity utilisation has improved in the cases of techni- products more cheaply than competitors, that ability should
cal efficiency, management effectiveness and overall growth be exploited. A company needs to develop programmes to
strategy. However, there is a marginal reduction in capacity improve manufacturing capabilities needed to succeed in the
utilization in the case of the cost reduction strategy. Solu- marketplace. For example, a company may need to find ways
tions to all but the cost reduction strategy suggest that the to cut costs in manufacturing if competitors can offer less ex-
organisation should increase its capital investment in adding pensive products in the marketplace. Managers need to find
capacity. In physical terms that would mean higher utiliza- ways to evaluate how their company is doing at meeting its
tion of capacity with increased working capital to sustain strategic goals. For example, a business that stresses rapid de-
increased output levels. livery of products needs to find ways to measure and reward
• Solutions to each of the strategies suggest that the organi- delivery performance within the company.
sation should reduce its raw material cost and increase its 4. Total productivity optimisation helps an organisation to
expenditure on labour. achieve superior performance (in terms of financial as well
• If one carries out an intensive analysis of Table 3, one can ob- as non-financial measures). Strategic business objectives
serve that there is a trade-off between the extent of increase in can only be achieved as a cumulative result of continuous
output and the maximum value of total productivity attained. improvement and renewal of organisational capabilities fos-
Depending upon the market position, the management can tered through optimisation of assets and processes.
make a compromise choice between the two.
• The company is in a strong competitive position but in a sec-
tor with a relatively low growth rate. Management believes
that a reduction in plant output is likely in future years. Cost 4 Conclusions
reduction strategy is being recommended for the next plan-
ning year after which time depending upon external factors Total productivity has a very strong impact on the drivers of fu-
the strategy can be reviewed and a more appropriate strategy ture competition, but has largely been ignored in contemporary
for the next planning period be selected. performance management systems. An attempt was made in this
study to establish some strategic directions towards total pro-
ductivity management, as maximisation of total productivity is
3.6 Some learning points the only means for enhancing profitability of a globally com-
peting enterprise. To attain this end, four appropriate strategies
1. Many companies develop plans to help guide what they hope were selected and mathematically modelled. In order to opera-
to achieve in their manufacturing process. The problem is tionalise these strategies into implementable action imperatives,
that many companies believe having a plan is the same as the models were validated in the case of an elevator manufac-
having a strategy. Just having a business plan is not enough to turing company in the UK. These models and results allow the
ensure success; it is necessary that the business plan be linked management to make a normative choice of appropriate total
to performance productivity management. productivity optimisation strategy as well as fixing targets for
2. One of the reasons why many companies have fallen be- the various resource inputs. It is hoped that such models will
hind Japanese competitors is that manufacturing has taken enable strategy support in a general sense and will make the
a subordinate role to marketing and finance functions. This most important tasks of productivity planning and improvements
means manufacturing is always reacting to decisions by other more objective oriented. For an economy, a nation or a com-
units of the company and is always concerned with short- pany to achieve pre-eminent position and superior status, there is
term issues. To be proactive, companies must anticipate the an emergent need to pioneer the culture of measuring perform-
potential of performance productivity management practices ance through total productivity and to promote the discipline.
and systems and make sure that manufacturing is involved in Our thesis is that society’s collective vision of enterprise man-
major engineering and marketing decisions. agement is undergoing a fundamental shift. Such a profound shift
1027
requires a transformational approach to critically scrutinise our 24. Mohanty RP (1992) Consensus and conflicts in understanding produc-
assumptions about how successful companies must work. It af- tivity. Int J Prod Econ 28:95–106
25. Mohanty RP (1999) Value innovation perspectives in Indian Organisa-
fects values, structures, roles, processes, competencies and the tions. Participation Empowerment Int J 4:88–103
nature of interactions. This emerging new age of competition is 26. Phillips AR (1987) Department-level productivity measurement in
as radical a development for business enterprises as the refor- a manufacturing organisation. Productivity Management Frontier, pp
mulation of productivity engineering theory and practice. It has 73–83
27. Rao SS (1992) Optimization: Theory and Applications, Wiley
always been the concern of many researchers and practitioners 28. Rastogi SC, Mohanty RP (1994) An industrial application for total pro-
that the theory be revitalised, in order to provide proactive chal- ductivity optimization. Prod Plann Control 5:219–228
lenges and motivation to the world of practice. Towards this goal, 29. Sanger M (1998) Supporting the balanced scorecard. Work Study
this paper is merely oriented. 47:197–200
30. Schmenner RW (1988) Escaping the black holes of cost accounting.
Bus Horiz January–February:66–72
31. Singh S, Motwani J, Kumar A (2000) A review and analysis of the state-
of-the-art research on productivity measurement. Ind Manage Data Syst
100(5):234–241
References 32. Skinner W (1974) The decline, fall, and renewal of manufacturing. Ind
Eng October:32–38
1. Al-Darrab IA (2000) Relationships between productivity, efficiency, 33. Stainer A (1997) Productivity, quality and performance measurement
utilisation and quality. Work Study 49(3):97–103 for advanced manufacturing technology. Int J Mater Prod Technol
2. Ashton C (1997) Strategic Performance Measurement: Transforming 12:27–36
Corporate Performance by Measuring and Managing the Drivers of 34. Stainer A (1999) Productivity and performance – prologue and prescrip-
Business Success. Business Intelligence Ltd., Wimbledon tion. Int J Technol Manage 17:725–727
3. Banks RL, Wheelwright SC (1979) Operations versus strategy – trading 35. Sumanth DJ (1984) Productivity Engineering and Management. McGraw-
tomorrow for today. Harvard Business Review, May–June:112–20 Hill, New York
4. Belcher Jr, John G (1984) The productivity management process. Amer- 36. The World Competitiveness Report (1993) IMD and World Economic
ican Productivity Centre, TX Forum
5. Camp RC (1989) Benchmarking – the search for industry best practices 37. Turney PBB, Anderson B (1989) Accounting for continuous improve-
that lead to superior performance. ASQS Quality Press, Milwaukee, WI ment. Sloan Manage Rev 30(2):37–48
6. Cooper WW, Huang Z, Li S (1995) Satisficing DEA models under 38. White GP (1996) A survey and taxonomy of strategy-related perform-
chance constraints. Annals Oper Res ance measures for manufacturing. Int J Oper Prod Manage 16(3):42–61
7. Craig CE, Harris CR (1973) Total productivity measurement at the firm 39. Williams K, Haslam C, Williams J, Sukhdev J (1994) Deconstruction
level. Sloan Manage Rev 14(3):13–29 car assembler productivity. Int J Prod Econ 34:253–265
8. Dixon JR, Nanni AJ, Vollmann TE (1990) The new performance chal- 40. Wolff LA (1990) Productivity : How do you measure it? CIM Bull
lenge – Measuring operations for World-class competition. Dow Jones- 120–124
Irwin, Homewood, IL 41. Yousif ASH, Dale BG (1993) Measuring company productivity: a lon-
9. Ghobadian A, Husband T (1990) Measuring total productivity using gitudinal study. Int J Vehicle Des 14:445–456
production functions. Int J Prod Res 28:1435–1446
10. Goldratt EM, Cox J (1986) The Goal: Beating the competition. Creative
outputs books, Hounslow
11. Gunasekran A (1994) Improving Productivity & Quality in Manufactur-
ing Organisation. Int J Prod Econ 36:169–183
12. Hall RW (1983) Zero Inventories. DowJones-Irwin, Homewood, IL
5 Appendix: The mathematical formulation of
13. Hammer RW, Champy J (1993) Re-engineering the Corporation: different strategies
A Manifesto for Business Revolution. Nicholas Brealey, London
14. Hawaleshka O, Mohammed AM (1987) Mathematical programming ap-
proach to the optimisation of total productivity. Proceedings of the 9th Organisational Effectiveness Oriented Strategy. In this strategy,
International Conference on Production Research, Ohio
15. Hawaleshka Q, Mohamed A (1987) Evaluation of productivity and the objective function is to maximise the output at the current
technology measures in manufacturing industries. Eng Manage Int level of inputs. Let Tot be the output in the planned period t
4:133–142 and ai be the coefficient of the input variable Xi as given by
16. Hayes RH, Abernathy WJ (1980) Managing our way to economic de-
cline. Harvard Business Review, July–August:67–77
the regression equation. Let ao be the value of the constant at-
17. Hoque Z, Falk H (2000) Industry characteristics and productivity tached to the regression equation, then the output is expressed as:
measurement systems: An empirical investigation in New Zealand- Tot = ao + Σi ai · Xit . If bi is the cost coefficient of the input vari-
based manufacturing organisations. Int J Oper Prod Manage 20(11): able Xi , then the total input = Tio = bo + Σi bi · Xit , where bo is
1278–1292
18. Kaplan RS, Norton DP (1992) The balanced scorecard – measures that the fixed cost associated with the organisation.
drive performance. Harvard Business Review, January–February:71–79 The model can be written as:
19. Land K, Lovell CAK, Thore S (1990) Chance constrained data envelop-
ment analysis. Manage Decis Econ 14:541–554
20. Miller D (1984) Profitability = productivity + price recover. Harvard Maximise Tot = ao + i ai ·Xit
Business Review 62(3):145–153 Subject to:
21. Mohanty RP, Rastogi SC (1986) An action research approach to produc-
tivity measurement. Int J Oper Prod Manage 6(2):47–61 bo + i bi · Xit = Tio
22. Mohanty RP, Rastogi SC (1988) Assessment of relationship between Xit ≤ Xi max
productivity and profitability: an Indian example. J Produktiviti
4(6):46–61 Xit ≥ Xi min
23. Mohanty RP (1988) Factors Affecting Productivity: Perceptions of In-
dian Managers. Ind Manage Data Syst July–Aug Xit ≥ 0
1028
Xit is the ith key input variable in time period t. Xi max and can be written as:
Xi min refers to the maximum and minimum value of the vari-
ables in the planned period. Tot ≤ C
Or ao + Σi ai Xit ≤ C
Technical Efficiency Oriented Strategy. In this strategy, the ob- Or Σi ai · Xit ≤ Co, which is a constant.
jective function is to minimise the value of the total input at the
current level of the output. If Tit is the value of total input in the Productivity Constraint: The total productivity measure of a
planned period t then mathematically the model is expressed as: planned period ‘t’ should be more than or equal to the total pro-
ductivity measure of the current period ‘t − 1’, i.e.:
Minimise Tit = bo + i bi Xit
Subject to : TPMt ≥ TPMt−1
ao + i ai .Xit = Tot or [ao + Σi ai Xit ]/[bo + Σi bi Xit ] ≥ TPMt−1
Xit ≤ Xi max Since bo + Σi bi Xit ≥ 0
Xit ≥ Xi min ao + Σi ai Xit ≥ (TPMt−1 )(bo + Σi bi Xit )
Xit ≥ 0 Σi ai Xit − (TPMt−1 )(Σi bi Xit ) ≥ (TPMt−1 )(bo) − ao
Σi (ai − TPMt−1 · bi ) · Xit ≥ (TPMt−1 )(bo) − ao
Growth oriented strategy and cost reduction strategy aim to max-
imise the total productivity measure (TPM), which is defined as Σi di Xit ≥ D
the ratio of output to input. As it attempts to maximise a ratio,
Where di = ai − TPMt−1 · bi and D = (TPMt−1 · bo) − ao
the model cannot be treated as a simple Non-linear Programming
Other Constraints: Other constraints pertaining to upper and
problem. Two Fractional Programming models are developed for
lower limits of the input variables are the same as in the case of
these strategies.
strategies 1 and 2.
After considering all the above constraints, the Growth Strat-
Growth Oriented Strategy. The strategy guides the management
egy can be written as:
to maximise TPM in such a way that the major focus is on in-
creasing output. This can be written as: Maximise TPMt = [ao + Σi ai Xit ]/[bo + Σi bi Xit ]
Maximise TPMt = [ao + Σi ai Xit ]/[bo + Σi bi Xit ] Subject to : Σi ai · Xit ≥ Too Output Constraint
Σbi · Xit ≥ Tio Input Constraint
Subject to: Σai · Xit ≤ Co Capacity Constraint
Output Constraint: The total output in the planned period ‘t’ Σdi · Xit ≥ D Productivity Constraint
is greater than the total output in the current period ‘t − 1’; Xit ≤ Xi max
Tot ≥ βTot−1 , Where β ≥ 1 is the level of efficiency. Xit ≥ Xi min Other Constraints
Xit ≥ 0
ao + Σi ai Xit ≥ βTot−1
or Σi ai Xit ≥ βTot−1 − ao
Total Cost Management Strategy. The aim here is to reduce the
or Σi ai Xit ≥ Too; where, Too = [βTot−1 − ao] = A constant output but the reduction in input is more than the reduction in
output. Mathematically, it can be stated as:
Input Constraint: Input in the planned period ‘t’ has to be more
than or equal to the input in period ‘t − 1’. Therefore, it can be Maximise TPMt = [ao + Σi ai Xit ]/[bo + Σi bi Xit ]
written as: bo + Σi bi Xit ≥ Tit−1
Subject to : Σi ai · Xit ≤ Too
or Σi bi Xit ≥ Tit−1 − bo Σbi · Xit ≤ Tio
Σdi · Xit ≥ D
or Σbi Xit ≥ Tio where, [Tit−1 − bo] = Tio = A Constant
Xit ≤ Xi max
Capacity Constraint: The planned output in period ‘t’ cannot ex- Xit ≥ Xi min
ceed the capacity ‘C’ of the plant. Therefore mathematically it Xit ≥ 0