PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 18/03/2017 &
Item Description:TAIL FRAME Date : 19/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2000 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 18/03/2017 18/03/2017 19/03/2017 19/03/2017 ACC
10.00 AM 03.50 PM 9.30 AM 11.35
*** Refer attached annexure AM
for DFT ***
01 TO 14 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2000 TAIL FRAME


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 14 65 65 56 65 60 62.2 170 175 178 174 170 173.4 51 52 52 51 51 51.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 02/04/2017 &
Item Description:TAIL FRAME GUARD Date : 04/04/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2001 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 02/04/2017 02/04/2017 02/04/2017 04/04/2017 ACC


11.30 AM 01.30 PMRefer attached
*** 04.30 PM
annexure11.35 AM
for DFT ***
01 TO 13 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2001 TAIL FRAME GUARD


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 13 63 65 65 65 66 64.8 170 170 170 174 170 170.8 51 51 54 51 54 52.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description:DECK PLATE DETAILS Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2002 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 09/04/2017 09/04/2017 09/04/2017 10/04/2017 ACC
10.30 AM 01.30***
PMRefer attached
04.30 PM 11.35
annexure AM
for DFT ***
01 TO 03 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2002 DECK PLATE DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 03 62 65 65 61 61 62.8 172 172 172 170 170 171.2 52 51 54 54 55 53.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 05/02/2017 &
Item Description:NON STD SHORT SUPPORT STRINGER DTLS(NSTD-1) Date : 06/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2005 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/02/2017 05/02/2017 05/02/2017 06/02/2017 ACC


10.00 AM 12.00 PM 04.30 PM 10.35
*** Refer attached annexure for DFT AM
readings ***
01 TO 07 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2005 NON STD SHORT SUPPORT STRINGER DTLS(NSTD-1)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 07 63 54 59 55 68 59.8 165 175 173 173 172 171.6 52 52 54 54 55 53.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:NON STD SHORT SUPPORT STRINGER Inspection 05/02/2017 &
DTLS(NSTD-2) Date : 06/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2006 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/02/2017 05/02/2017 05/02/2017 06/02/2017 ACC


10.00 AM 12.00 PM 04.30 PM 10.35
*** Refer attached annexure AM
for DFT ***
01 TO 07 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2006 NON STD SHORT SUPPORT STRINGER DTLS(NSTD-2)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 10,15 64 64 64 65 66 64.6 178 178 173 172 170 174.2 54 51 51 54 58 53.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 05/02/2017 &
Item Description:NON STD STRINGER DTLS(NSTD-3) Date : 06/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2007 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/02/2017 05/02/2017 05/02/2017 06/02/2017 ACC


10.00 AM 12.00 PM 04.30 PM 10.35
*** Refer attached annexure for DFT AM
readings ***
01 TO 10,15 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2007 NON STD STRINGER DTLS(NSTD-3)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 10,15 69 56 54 55 66 60 168 178 174 170 170 172 50 54 54 52 52 52.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 05/02/2017 &
Item Description:NON STD STRINGER DTLS(NSTD-4) Date : 06/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2008 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/02/2017 05/02/2017 05/02/2017 06/02/2017 ACC


10.00 AM 12.00*** Refer attached annexure10.35
PM 04.30 PM AM
for DFT ***
01 TO 13,18 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2008 NON STD STRINGER DTLS(NSTD-4)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 13,18 65 65 65 62 62 63.8 170 170 170 174 171 171 51 51 54 58 55 53.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 05/02/2017 &
Item Description:NON STD STRINGER DTLS(NSTD-5) Date : 06/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2009 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/02/2017 05/02/2017 05/02/2017 06/02/2017 ACC


10.00 AM 12.00 PM 04.30 PM 10.35
*** Refer attached annexure AM
for DFT ***
01 TO 13,18 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2009 NON STD STRINGER DTLS(NSTD-5)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 13,18 50 51 52 58 58 53.8 168 170 178 174 170 172 50 50 52 54 54 52
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:NON STD STRINGER DTLS(NSTD-6) Date : 07/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2010 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.00 AM 12.00***PM 04.30 PMannexure
Refer attached 10.35 AM
for DFT ***
01 TO 13,18 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2010 NON STD STRINGER DTLS(NSTD-6)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 13,18 60 61 63 65 68 63.4 170 179 174 174 170 173.4 51 54 54 55 58 54.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:NON STD STRINGER DTLS(NSTD-7) Date : 07/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2011 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.00 AM 12.00***
PMRefer 04.30 PM 10.35
attached annexure AM
for DFT ***
01 TO 16,21,22 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2011 NON STD STRINGER DTLS(NSTD-7)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 16,21,22 64 64 64 65 68 65 175 170 171 171 170 171.4 54 54 54 54 55 54.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:NON STANDARD STRINGER DETAILS Date : 07/02/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2012 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.00 AM 12.00
*** Refer attached annexure for10.35
PM 04.30 PM AM
DFT readings ***
01 TO 16,21,22 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2012 NON STANDARD STRINGER DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 16,21,22 62 62 65 62 62 62.6 174 174 178 174 170 174 54 51 51 50 50 51.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:NON STANDARD STRINGER DETAILS Date : 07/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2013 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.00 AM 12.00 PM
*** 04.30 PMannexure10.35
Refer attached AM
for DFT ***
01 TO 16,21 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2013 NON STANDARD STRINGER DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 16,21 60 61 60 61 60 60.4 175 178 174 171 171 173.8 54 54 51 52 52 52.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:NON STANDARD STRINGER DETAILS Date : 07/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2014 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.30 AM 12.30 PM 04.30 PM 11.35
*** Refer attached annexure for DFT AM
readings ***
01 TO 14 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2014 NON STANDARD STRINGER DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 14 63 63 62 61 61 62 170 171 174 178 174 173.4 51 51 50 50 52 50.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 03/01/2017 &
Item Description:NON STANDARD STRINGER DETAILS Date : 04/01/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2015 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 03/01/2017 03/01/2017 03/01/2017 04/01/2017 ACC


10.00 AM 12.00 PM 04.30 PM 11.35
*** Refer attached annexure for DFT AM
readings ***
01 TO 07 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2015 NON STANDARD STRINGER DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 07 60 60 61 64 64 61.8 172 172 170 171 170 171 50 51 57 50 55 52.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:NON STANDARD STRINGER DETAILS Date : 07/02/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2016 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC
10.30 AM 12.30
*** Refer attached annexure for11.35
PM 04.30 PM AM
DFT readings ***
01 TO 13,20,21 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2016 NON STANDARD STRINGER DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 13,20,21 54 55 64 63 62 59.6 170 173 172 174 170 171.8 51 52 59 54 58 54.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:NON STANDARD STRINGER DETAILS- NSTD12 Date : 07/02/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2017 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.30 AM 12.30 PM attached
*** Refer 04.30 PM
annexure for11.35 AM
DFT readings ***
01 TO 6 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2017 NON STANDARD STRINGER DETAILS-NSTD-12


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 6 60 64 62 68 65 63.8 175 178 174 170 170 173.4 54 54 51 53 52 52.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 07/02/2017 &
Item Description:NON STANDARD STRINGER DETAILS- NSTD13 Date : 08/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2018 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 07/02/2017 07/02/2017 07/02/2017 08/02/2017 ACC


11.30 AM 12.30 PM 05.30 PM 10.35
*** Refer attached annexure AM
for DFT ***
01 TO 9 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2018 NON STANDARD STRINGER DETAILS-NSTD-13


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 9 62 65 68 62 62 63.8 170 172 172 171 171 171.2 50 50 51 52 52 51
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description:NON STANDARD STRINGER DETAILS- NSTD14 Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2019 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 07/02/2017 07/02/2017 07/02/2017 08/02/2017 ACC


11.30 AM 12.30*** Refer attached annexure10.35
PM 05.30 PM AM
for DFT ***
01 TO 7 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2019 NON STANDARD STRINGER DETAILS-NSTD-14


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)-50 Min
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2 3 4 5 Avg.
01 TO 7 60 60 61 62 62 61 170 170 174 174 178 173.2 50 51 58 54 51 52.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:NON STANDARD STRINGER DETAILS- NSTD- Inspection
18,19,20 Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2020 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 07/02/2017 07/02/2017 07/02/2017 08/02/2017 ACC


11.30 AM 12.30 PM 05.30 PM 10.35
*** Refer attached annexure AM
for DFT ***
01 TO 7 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2020 NON STANDARD STRINGER DETAILS-NSTD-18,19,20


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 14 60 62 65 62 66 63 172 172 175 175 170 172.8 48 55
DETAILS-NSTD-18,19,20
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
54 54 52 52.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description:HEAD FRAME Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2021 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time ACC


07/02/2017 07/02/2017 07/02/2017 08/02/2017
11.30 AM 12.30
*** Refer attached annexure10.35
PM 05.30 PM AM
for DFT ***
01 TO 09,16,17 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2021 HEAD FRAME


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 09,16,17 60 60 62 65 62 61.8 170 170 174 174 170 171.6 55 58
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
53 52 52 54
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 22/03/2017 &
Item Description:VERTICAL TAKE UP GUIDE DETAILS Date : 23/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2027 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 22/03/2017 22/03/2017 22/03/2017 23/03/2017 ACC


11.30 AM 12.30 PM 05.30 PM 10.35
*** Refer attached annexure for AM
DFT ***
01 TO 15 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2027 VERTICAL TAKE UP GUIDE DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 15 60 60 62 62 63 61.4 170 170 172 174 170 171.2 50 51
ETAILS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
50 50 55 51.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 12/03/2017 &
Item Description:BEND PULLEY SUPPORTING STRUCTURE Date : 13/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2029 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 12/03/2017 12/03/2017 13/03/2017 13/03/2017 ACC
10.00 AM 03.50
*** Refer attached annexure for 11.35
PM 9.30 AM AM
DFT readings ***
01 TO 7 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2029 BEND PULLEY SUPPORTING STRUCTURE


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 7 61 64 60 60 62 61.4 170 170 175 175 174 172.8 50 54
STRUCTURE
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
50 50 52 51.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:STANDARD STRINGER DETAILS STD -2 Date : 07/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2039 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

Surface DFT Toatal DFT


Item / part No. preparati Avg(in Result
on Primer Coat Intermediate final Coat microns)
06/02/20 Coat
17 10.30 06/02/2017 06/02/2017 07/02/2017
Date / Time AM 12.30 PM attached
04.30 PM for DFT
11.35 AM *** ACC
*** Refer annexure readings
01 TO 7 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2039 STANDARD STRINGER DETAILS STD -2


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 7 60 64 65 65 68 64.4 170 178 174 171 171 172.8 51 50
LS STD -2
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
55 51 52 51.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 06/02/2017 &
Item Description:STANDARD STRINGER DETAILS STD -3 Date : 07/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2040 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.30 AM 12.30 PM 04.30 PM 11.35
*** Refer attached annexure AM
for DFT ***
01 TO 7 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2040 STANDARD STRINGER DETAILS STD -3


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 7 60 60 60 65 66 62.2 172 173 174 170 170 171.8 50 54
LS STD -3
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
51 52 50 51.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:NON STANDARD STRINGER DETAILS NSTD Inspection 06/02/2017 &
-21&22 Date : 07/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2041 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.30 AM 12.30 PM 04.30 PM 11.35
*** Refer attached annexure AM
for DFT ***
01 TO 8 SA 2 1/2 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2041 NON STANDARD STRINGER DETAILS NSTD -21&22


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 8 60 64 62 65 66 63.4 178 170 175 174 170 173.4 54 52
DETAILS NSTD -21&22
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
54 54 55 53.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:NON STANDARD STRINGER DETAILS NSTD Inspection 06/02/2017 &
-23,24,25 Date : 07/02/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2042 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 06/02/2017 06/02/2017 06/02/2017 07/02/2017 ACC


10.30 AM 12.30 PM attached
*** Refer 04.30annexure
PM for11.35 AM
DFT readings ***
01 TO 9 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2042 NON STANDARD STRINGER DETAILS NSTD -23,24,25


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
01 TO 9 61 61 62 62 60 61.2 173 173 170 172 170 171.6 49 60
DETAILS NSTD -23,24,25
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
58 50 51 53.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 16/02/2017 &
Item Description:24.101 M GANTRY DETAILS Date : 17/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2101 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38.8 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 16/02/2017 16/02/2017 16/02/2017 17/02/2017 ACC
10.30 AM 12.30
*** Refer attached annexure for 11.35
PM 04.30 PM AM
DFT readings ***
24.101 M GANTRY SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2101 24.101 M GANTRY DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
24.101 M
GANTRY 60 61 62 68 66 63.4 170 174 176 174 170 172.8 56 55
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

48 45 52 51.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 16/02/2017 &
Item Description:24.101 M GANTRY DETAILS Date : 17/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2101 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38.8 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 16/02/2017 16/02/2017 16/02/2017 17/02/2017 ACC
10.30 AM 12.30
*** Refer attached annexure for 11.35
PM 04.30 PM AM
DFT readings ***
24.101 M GANTRY SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2101 24.101 M GANTRY DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
24.101 M
GANTRY 60 61 62 68 66 63.4 170 174 176 174 170 172.8 56 55
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

48 45 52 51.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 09/03/2017 &
Item Description:24.086 M OPEN BEND GANTRY DETAILS Date : 11/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2104 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 09/03/2017 09/03/2017 11/03/2017 11/03/2017 ACC
10.00 AM 04.50 PM 9.30 AM 11.35 AM ***
24.086 M OPEN BEND SA 2 1/2 *** Refer attached annexure for DFT
GANTRY readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2104 24.086 M OPEN BEND GANTRY DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

24.086 M OPEN
BEND GANTRY 60 61 68 62 62 62.6 170 174 175 170 170 171.8 51 53
RY DETAILS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

52 52 55 52.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 18/03/2017 &
Item Description:STANDARD GANTRY DETAILS 30 MTS Date : 19/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2108 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 18/03/2017 18/03/2017 19/03/2017 19/03/2017 ACC
10.00 AM 03.50 PM 9.30 AM 11.35 AM ***
STANDARD GANTRY 30 SA 2 1/2 *** Refer attached annexure for DFT readings
MTS ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2108 STANDARD GANTRY DETAILS 30 MTS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

STANDARD
GANTRY 30
MTS 58 62 62 62 63 61.4 172 170 170 174 170 171.2 50 54
S 30 MTS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

53 52 52 52.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 11/02/2017 &
Item Description:TWO LEGGED TRESTLE (2.342 MTS) Date : 12/02/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2125 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 11/02/2017 11/02/2017 11/02/2017 12/02/2017 ACC
10.30 AM 12.30 PM 02.30 PM 10.35 AM ***

TWO LEGGED TRESTLE SA 2 1/2 *** Refer attached annexure for DFT
(2.342 MTS) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2125 TWO LEGGED TRESTLE (2.342 MTS)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TWO LEGGED
TRESTLE (2.342
MTS) 60 64 62 62 66 62.8 169 165 178 170 170 170.4 51 53
2 MTS)
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

52 53 52 52.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 09/02/2017 &
Item Description:TWO LEGGED TRESTLE (3.838 MTS) Date : 10/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2126 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 09/02/2017 09/02/2017 09/02/2017 10/02/2017 ACC
10.30 AM 12.30 PM 04.30 PM 2.35 PM ***
TWO LEGGED TRESTLE SA 2 1/2 *** Refer attached annexure for DFT readings
(3.838 MTS) ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2126 TWO LEGGED TRESTLE (3.838 MTS)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TWO LEGGED
TRESTLE (3.838
MTS) 60 60 61 69 62 62.4 170 170 174 178 175 173.4 50 51
8 MTS)
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

59 53 52 53
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description:TRESTLE CD-2.15 AND GCD-2.15 Date :

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2127 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 11/02/2017 11/02/2017 11/02/2017 12/02/2017 ACC


10.30 AM 12.30 PM 02.30 PM 10.35 AM ***
TRESTLE CD-2.15 AND SA 2 1/2 *** Refer attached annexure for DFT readings
GCD-2.15 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2127 TRESTLE CD-2.15 AND GCD-2.15


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE CD-
2.15 AND GCD-
2.15 58 62 61 62 66 61.8 169 170 174 172 170 171 60 58
2.15
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

51 51 51 54.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 14/04/2017 &
Item Description:TRESTLE ASSEMBLY CD-2.17/2.18 Date : 15/04/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2130 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 14/04/2017 14/04/2017 15/04/2017 15/04/2017 ACC
11.30 AM 2.30 PM 10.30 AM 2.35 PM ***
TRESTLE ASSEMBLY CD- SA 2 1/2 *** Refer attached annexure for DFT readings
2.17/2.18 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2130 TRESTLE ASSEMBLY CD-2.17/2.18


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE
ASSEMBLY CD-
2.17/2.18 60 60 62 65 61 61.6 170 172 171 178 170 172.2 58 53
/2.18
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

50 51 52 52.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 12/01/2017 &
Item Description:TRESTLE DETAILS AT FDN CD-2.19 AND GCD-2.19 Date : 13/01/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2134 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 12/01/2017 12/01/2017 12/01/2017 30/01/2017 ACC


11.30 AM 1.30 PM 03.30 PM 11.35 AM ***

TRESTLE DETAILS AT
FDN CD-2.19 AND SA 2 1/2 *** Refer attached annexure for DFT
GCD-2.19 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2134 TRESTLE DETAILS AT FDN CD-2.19 AND GCD-2.19


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE -CD-
2.19 AND GCD-
2.19 59 55 60 61 68 60.6 168 170 171 174 177 172 53 58
-2.19 AND GCD-2.19
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

54 52 52 53.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 21-01-2017 &
Item Description:TRESTLE CD 2.20&GCD 2.20 DETAILS Date : 22/01/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2136 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 37.5 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 21/01/2017 21/01/2017 21/01/2017 22/01/2017 ACC


11.30 AM 2.30 PM 04.30 PM 11.35 AM ***

TRESTLE CD 2.20&GCD SA 2 1/2 *** Refer attached annexure for DFT


2.20 DETAILS readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2136 TRESTLE CD 2.20&GCD 2.20 DETAILS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE CD
2.20&GCD 2.20 59 55 68 62 63 61.4 171 169 180 174 170 172.8 51 50
DETAILS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

51 52 53 51.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description:: TWO LEGGED TRESTLE(27M) Date :

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2137 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

Surface DFT Toatal DFT


Item / part No. preparati Avg(in Result
on Primer Coat Intermediate final Coat microns)
Coat
Date / Time *** ACC

TWO LEGGED SA 2 1/2 *** Refer attached annexure for DFT readings
TRESTLE(27M) ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2137 TWO LEGGED TRESTLE(27M)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
TWO LEGGED
TRESTLE(27M) 59 64 60 62 66 62.2 170 165 174 172 170 170.2 50 58
)
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

55 52 52 53.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 29/01/2017 &
Item Description:: TRESTLE DETAILS (31.51 MTS) Date : 30/01/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2140 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 36 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation
Primer Coat Intermediate final Coat microns)
Coat
Date / Time 29/01/2017 29/01/2017 29/01/2017 30/01/2017 ACC
10.30 AM 2.30 PM 04.30 PM 1.35 PM ***
TRESTLE DETAILS SA 2 1/2 *** Refer attached annexure for DFT
(31.51 MTS) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2140 TRESTLE DETAILS (31.51 MTS)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE
DETAILS (31.51
MTS) 60 61 64 68 62 63 170 175 163 168 165 168.2 45 54
S)
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

53 52 52 51.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 13/03/2017 &
Item Description:: TWO LEGGED TRESTLE DETAILS (35.678 MTS) Date : 14/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2143 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 36.8 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 13/03/2017 13/03/2017 13/03/2017 14/03/2017 ACC
10.30 AM 12.30 PM 03.30 PM 11.35 AM ***

TWO LEGGED TRESTLE SA 2 1/2 *** Refer attached annexure for DFT
DETAILS (35.678 MTS) readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2143 TWO LEGGED TRESTLE DETAILS (35.678 MTS)


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TWO LEGGED
TRESTLE -
(35.678 MTS) 55 60 68 63 62 61.6 168 172 175 170 170 171 62 56
ILS (35.678 MTS)
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

54 55 50 55.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:: TRESTLE DETAILS AT FDN CD2-2.24 AND GCD2- Inspection 09/02/2017 &
2.24 Date : 10/02/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2145 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38.5 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 09/02/2017 09/02/2017 09/02/2017 10/02/2017 ACC


10.30 AM 12.30 PM 04.30 PM 2.35 PM ***

TRESTLE DETAILS AT
FDN CD2-2.24 AND SA 2 1/2 *** Refer attached annexure for DFT
GCD2-2.24 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2145 TRESTLE DETAILS AT FDN CD2-2.24 AND GCD2-2.24


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE
DETAILS AT FDN
CD2-2.24 AND
GCD2-2.24 65 55 68 62 65 63 165 175 172 173 172 171.4 50 51
2-2.24 AND GCD2-2.24
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

52 65 55 54.6
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 05/03/2017 &
Item Description:: TRESTLE CD2-2.25 AND GCD2-2.25 Date : 06/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2148 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat
Date / Time 05/03/2017 05/03/2017 05/03/2017 06/03/2017 ACC
10.30 AM 11.30 AM 03.30 PM 11.50 AM ***
TRESTLE CD2-2.25 AND SA 2 1/2 *** Refer attached annexure for DFT
GCD2-2.25 readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2148 TRESTLE CD2-2.25 AND GCD2-2.25


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE CD2-
2.25 AND
GCD2-2.25 55 64 68 62 60 61.8 168 165 170 178 175 171.2 50 55
2-2.25
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

60 50 52 53.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 03/03/2017 &
Item Description:: STANDARD GANTRY DETAILS 23.65 MTS Date : 04/03/2017

Paint Spec 19260008-PRC-ME-GNR-


Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2155 No: 0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 03/03/2017 03/03/2017 04/03/2017 04/03/2017 ACC


10.00 AM 3.50 PM 010.30 AM 10.35 AM ***
STANDARD GANTRY SA 2 1/2 *** Refer attached annexure for DFT
DETAILS 23.65 MTS readings ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2155 STANDARD GANTRY DETAILS 23.65 MTS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

STANDARD
GANTRY
DETAILS 23.65
MTS 50 55 60 62 66 58.6 169 172 170 765 175 290.2 50 52
S 23.65 MTS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

54 50 55 52.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 17/04/2017 &
Item Description:: NON STANDARD GANTRY DETAILS 11.244 MTS Date : 18/04/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2162 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 17/04/2017 17/04/2017 18/04/2017 18/04/2017 ACC


10.00 AM 3.50 PM 09.30 PM 04.35 AM ***

NON STANDARD
GANTRY DETAILS SA 2 1/2 *** Refer attached annexure for DFT readings
11.244 MTS ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE
DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2162 NON STANDARD GANTRY DETAILS 11.244 MTS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

NON
STANDARD
GANTRY
-11.244 MTS 66 65 68 69 62 66 175 178 174 175 178 176 55 58
ETAILS 11.244 MTS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

54 57 56 56
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection
Item Description:: NON STANDARD GANTRY DETAILS 23.65 MTS 7/05/2017 & 9/05/2017
Date :

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2167 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 7/05/2017 7/05/2017 08/05/2017 9/05/2017 ACC


11.00 AM 4.10 PM 10.30 PM 9.35 AM ***
NON STANDARD SA 2 1/2 *** Refer attached annexure for DFT readings
GANTRY ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2167 NON STANDARD GANTRY DETAILS 23.65 MTS


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

NON
STANDARD
GANTRY -23.65
MTS 62 64 65 67 63 64.2 175 178 175 176 172 175.2 58 57
ETAILS 23.65 MTS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

56 54 55 56
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:: STANDARD GANTRY WALK WAY ASSLY & Inspection 23/03/2017 &
DETAILS Date : 24/03/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2156 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 23/03/2017 23/03/2017 24/03/2017 24/03/2017 ACC


10.00 AM 3.10
*** Refer attached annexure for02.35
PM 11.30 AM PM
DFT readings ***
05 TO 07 SA 2 1/2 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2156 STANDARD GANTRY WALK WAY ASSLY & DETAILS
PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
05 TO 07 63 65 64 69 68 65.8 178 174 172 170 170 172.8 54 54
WAY ASSLY & DETAILS
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
55 56 52 54.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 11/08/2017 &
Item Description:: STANDARD GANTRY DETAILS-5.743 Date : 12/08/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2158 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 11/08/2017 11/08/2017 12/08/2017 11/08/2017 ACC


10.00 AM 4.10 PM 11.30 AM 05.35 PM ***
STANDARD GANTRY SA 2 1/2 *** Refer attached annexure for DFT readings
DETAILS-5.743 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2158 STANDARD GANTRY DETAILS-5.743


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

STANDARD
GANTRY
DETAILS-5.743 63 60 62 61 60 61.2 170 171 174 172 170 171.4 52 54
S-5.743
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

58 59 57 56
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Inspection 27/06/2017 &
Item Description:: TRESTLE CD2-2.26 AND GCD2-2.26 Date : 28/06/2017

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2158 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 27/06/2017 27/06/2017 28/06/2017 28/06/2017 ACC


10.00 AM 3.40 PM 10.30 AM 03.35 PM ***
TRESTLE CD2-2.26 SA 2 1/2 *** Refer attached annexure for DFT readings
AND GCD2-2.26 ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2152 TRESTLE CD2-2.26 AND GCD2-2.26


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2

TRESTLE CD2-
2.26 AND
GCD2-2.26 65 64 68 67 62 65.2 174 172 173 175 174 173.6 54 58
2-2.26
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

57 59 54 56.4
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:: TRESTLE STOOL DETAILS AT FDN CD2/GCD2-2.24 Inspection 8/5/2017
Date :

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2146 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/08/2017 05/08/2017 05/08/2017 05/08/2017 ACC


10.00 AM 12.40 PM 02.30 PM 05.35 PM ***

SA 2 1/2 *** Refer attached annexure for DFT readings


TRESTLE STOOL ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2146 TRESTLE STOOL DETAILS AT FDN CD2/GCD2-2.24


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
TRESTLE
STOOL 63 64 68 67 62 64.8 175 178 172 174 175 174.8 56 54
FDN CD2/GCD2-2.24
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

52 58 54 54.8
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:: TRESTLE STOOL DETAILS AT FDN CD2/GCD2-2.25 Inspection 8/5/2017
Date :

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2149 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/08/2017 05/08/2017 05/08/2017 05/08/2017 ACC


10.00 AM 12.40 PM 02.30 PM 05.35 PM ***

SA 2 1/2 *** Refer attached annexure for DFT readings


TRESTLE STOOL ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2149 TRESTLE STOOL DETAILS AT FDN CD2/GCD2-2.25


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
TRESTLE
STOOL 65 64 67 68 65 65.8 175 174 172 178 174 174.6 54 58
FDN CD2/GCD2-2.25
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

52 53 54 54.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:: TTRESTLE STOOL DETAILS AT FDN CD2/GCD2- Inspection 8/5/2017
2.17 & 2.18 Date :

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2132 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 05/08/2017 05/08/2017 05/08/2017 05/08/2017 ACC


10.00 AM 12.40 PM 02.30 PM 05.35 PM ***

SA 2 1/2 *** Refer attached annexure for DFT readings


TRESTLE STOOL ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2132 TRESTLE STOOL DETAILS AT FDN CD2/GCD2-2.17 & 2


PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
TRESTLE
STOOL 68 64 62 60 60 62.8 178 172 173 174 175 174.4 55 55
FDN CD2/GCD2-2.17 & 2.18
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.

59 58 54 56.2
PAINTING INSPECTION REPORT

PROJECT WAGON LOADING STATION PHASE -I


Manufacturer ARDEE ENGINEERING COMPANY Report No :
Item Description:: WALK WAY DETAILS FOR 24.086M OPEN BEND Inspection 9/18/2017
GANTRY Date :

Ref.DWG/Documents 192-60-001-DRW-ME-CD2-2105 Paint Spec No: 19260008-PRC-ME-GNR-


0002-Rev 0

Used Measuring and test Equipment Ref.(if applicable) : DFT Meter SL NO:150

PAINT DETAILS
PRIMER COAT INTERMEDIATE COAT FINAL COAT
Manufacturer HEMPEL HEMPEL HEMPEL
Description Hempardur avent guard Mastic grey Hempathane
PIGMENT:076113064 BASE :077024315 BASE :77091962
Batch No
BINDER :'076071510 HARD :076102884 HARD :77081656
OBSERVATIONS
Temperature 38 deg C Relative Humidity ~ 67-80 %

DFT Toatal DFT


Surface
Item / part No. Avg(in Result
preparation microns)
Primer Coat Intermediate final Coat
Coat

Date / Time 19/09/2017 19/09/2017 19/09/2017 19/09/2017 ACC


10.00 AM 12.40 PM 02.30 PM 05.35 PM ***

SA 2 1/2 *** Refer attached annexure for DFT readings


WALKWAY ***

REMARKS:

PREPARED BY WITNESSED BY VERIFIED BY


ORGANIZATIONS
ARDEE ENGINEERING TUV-SUD KPCL
NAME Mr.K.SIVA KUMAR P.JAGADEESH KUMAR

SIGNATURE

DATE
WAGON LOADING STATION PHASE-I

ANNEXURE OF PAINTING REPORT No:AEC/PIR/

DRAWING Nos 192-60-001-DRW-ME-CD2-2105 WALK WAY DETAILS FOR 24.086M OPEN BEND GANT
PART Nos: PRIMER(HEMPADUR AVANTGUARD)-60 Min INTERMEDIATE(MASTIC GREY)-170 Min FINAL(HEMPATHANE)
SPOTS 1 2 3 4 5 Avg. 1 2 3 4 5 Avg. 1 2
WALKWAY 60 62 65 59 65 62.2 174 170 170 174 165 170.6 55 65
086M OPEN BEND GANTRY
FINAL(HEMPATHANE)-50 Min
3 4 5 Avg.
51 50 50 54.2