Structural Selection Report (final) Annex-A-1

Robe-Gassera-Ginir Road Project


Detailed Engineering Design and Tender Document Preparation

Annex A: Response and Clarifications to Comments on Draft Structural Selection Report

Item
Reference Page Comments Action Taken (Clarification / Response)
No.
1. General Report  The report title should be Structural  The comment is noted and included in the Report.
Title Selection Report not Structural
Selection and Preliminary Selection
Report.
2. General TOR  As per the TOR the following points
requirement should also be included:
- Environmental constraints shall  Diverting the river to construct a pier at mid span will destroy some land that is being
be considered. Therefore, what used for the purpose of grazing and farm. Trees have to be cut down when a new
will be the impact of each channel is constructed for the diversion. This will have an adverse impact on the
alternative on the surrounding environment. Hence the alternative of using double span girder bridge is considered to
environment? have an adverse impact on the environment compared to using the single span bridge.

- Propose also adjustments to  All the three alternatives of the bridge site location are either on the existing alignment
profile alignment and grade or at a very close distance to it. Hence there will be no major profile or grade alteration
necessary to accommodate near the bridge location.
bridge location.

- Also include references used in  The comment is noted and included in the Report
preparing the report.
3. Page 9  The estimates of quantity and cost  The estimation of quantity and cost are made not for the purpose of giving the Client
Section 4.1 presented in section 4 are summary. the final quantity and cost of the structures but only for the purpose of comparing the
Please present the detailed cost different alternatives as to show which one is the most economical alternative.
breakdown for each item. Accordingly, unit prices of items are taken from recent similar construction works.
The detailed cost breakdown of each item is to be done in the future on Task No. 125.
4. Page 11  The Consultant recommends  This alternative crossing is at a 20m distance upstream of the existing bailey bridge.
Section 6 alternative three which is in the There is ROW problem that will be incorporated due to shifting the alignment but it is
upstream side of the existing belly insignificant when compared to the advantages that could be achieved from using the
bridge. Hence, how far is the Bailey bridge as detour and improving the curves at the approaches.
alternative from the existing belly  A 25m span RC Girder Bridge is proposed to be designed on alternative three crossing
bridge? Is there any ROW problem site.
Associated Engineering Consultants Ethiopian Roads Authority
May 2007
Structural Selection Report (final) Annex-A-2
Robe-Gassera-Ginir Road Project
Detailed Engineering Design and Tender Document Preparation

Item
Reference Page Comments Action Taken (Clarification / Response)
No.
in the area? Please also specify the
exact span length rather than saying
20 to 25m.
5. Editorial Error  On page 2, last paragraph 3rd line,  The comment is noted and included in the final Report
constriction should be corrected as
construction.

 One page 10 & 11, title  The comment is noted and included in the final Report
recommendation should be corrected
as recommendation.

Associated Engineering Consultants Ethiopian Roads Authority


May 2007