You are on page 1of 341

PROJECT:- BANQUET, ALIGARH

FIRE FIGHTING WORKS


S. NO. DESCRIPTION OF ITEM AMOUNT

A Main Building Rs. 209,075

TOTAL AMOUNT Rs. 209,075

Note:- GST shall we charged extra as applicable.


PROJECT:- ALIGARH BANQUET
BILL OF QUANTITY FOR FIRE FIGHTING WORK
Sr. No. Description Of Item Unit Qty
FIRE PUMPS & ACCESSORIES
Supply,Installations, Testing & Commissioning of :

1 Supplying, Installation, Testing and Commissioning of Electric Driven Terrace


Pump suitable for auto operation and consisting of following: complete in all
respect as required.
Horizontal type, centrifugal end suction type pump of cast iron body & bronze
impeller with stainless steel shaft, factory fitted mechanical seal and flow of
450 Ipm at 50 Mtr head confirming to IS:1520. motor control panel at terrace
level and remote push button for OFF/ON operation in Fire Control Room.
(Fire pump on terrace)

Suitable HP (Minimum 10.0 HP) squirrel cage induction motor TEFC type
suitable for operation on 415 volts ± 10%, 3 phase 50 Hz. AC with IP 55 class
of protection for enclosure, horizontal foot mounted type with Class-'F'
insulation, confirming to IS:325.

M.S. fabricated Common base frame, flexible coupling, coupling guard,


foundation bolts and pressure gauge with valve etc. Suitable cement concrete
foundation duly plastered with anti vibration pads.etc. complete as per
manufacturer's design & standards and as per detailed specifications.
(including all civil works)
The Pump set should be factory fitted and contractor should submit the orginal
test certificates from the company.

Pump shall be enclosed with M.S. sheet to protect from weather at terrace. Each 1

FIRE FIGHTING SYSYTEM


2 Providing and fixing 63 mm dia. 15m long rubberized lined hose including
SS304 male and female instantaneous type coupling approved by fire Nos. 8
authority, machine wound with copper wire complete in all respects. Hose shall
conform to IS 636 Type-A and coupling to IS 903 -1975 ( ISI marked)
Sr. No. Description Of Item Unit Qty
3 Providing and fixing Gun Metal Single headed landing valve conforming to
IS -5290 with 63 mm dia. single instantaneous female coupling on the outlet
Gun metal blank cap and chain, necessary companion flanges, nuts, bolts, Nos. 4
washer and gasket complete as per specification. (ISI marked). All parts and
body shall be of Gun Metal as per IS:5290.

4 Supplying, installation, testing and commissioning of weather proof M.S


cabinet size 1200 mm x 2100 mm x 800mm deep fabricated from 1.6mm Nos 4
thick M.S. sheets and M.S angle 40mmx40mmx6mm complete with glass,
locking arrangements to accommodate the following: -
a) Gunmetal single headed Hydrant valve - 1 No.
b) Fire Hoses 63mm, 15 M long with accessories - 2 Nos.
c) Short branch - 1 No.
d) First Aid hose Reel - 1 No.
e) Fire Extinguisher - 2 Nos.
f) Fireman's Axe - 1 No.
g) Pressure Gauge - 1 No.
The cabinet shall be painted with one coat of primer and 2 coats of synthetic
enamel paint of approved shade.(including all civil works)

5 Supplying and Fixing First Aid Hose Reel, wall mounting swinging type
complete with drum & bracket of MS construction, spray painted in Post office
Red, confirming to IS 884/1995 with upto date amendments, complete with the Nos. 4
following as required.
(a) 40 Meter long 25 mm dia water hose Thermoplastic (Textile reinforced) Type -
2 as per IS : 12585
(b) 25 mm dia ball valve & nozzle.
(c) Drum and brackets for fixing the equipments on wall.
(d) Connection from riser with stop valve (gun metal) & M.S. Pipe

6 Supplying and fixing Gun Metal branch pipe with 20mm dia nozzle
conforming to IS:903. suitable for installation connections to hose coupling etc. Nos. 4
as required.
Sr. No. Description Of Item Unit Qty
7 Supplying and Fixing Orifice Plate made of 6 mm thick, upto 200 mm outer
dia. stainless steel with orifice (internal dia.) of required size in between flange Nos. 0
& landing valve of external and internal hydrant to reduce pressure to working
pressure of 3.5 Kg / cm2 complete as per specifications as required.

8 Supply, Installation, Testing and Commissioning of 150 mm dia Bourden type,


Stainless Steel dial type Pressure Gauge including brass isolation valve and Nos. 4
siphon pipe having calibration of 0 - 16 Kg / cm2
9 Supplying and Fixing of Fire Man's axe with heavy insulated rubber. Nos. 4

10 Supplying, laying, fixing, testing and commissioning of following sizes (NB) of


ISI marked heavy 'C' class M.S. ERW pipes with including cutting, threading,
welding etc. and providing all fittings e.g. elbows, reducers, clamps, hangers,
supports, flanges, gaskets, nuts, bolts and washers etc. including painting of
pipes and fittings with red paint over a coat of ready mixed primer, both of
approved quality and shade including cutting holes and chases in brick or
RCC walls/slabs and making good the same etc. complete in all respect as
a) 200 mm dia
required. above 150mm dia Pipe thikness 6.35mm. Rmt.
b) 150 mm dia Rmt.
c) 100 mm dia Rmt. 45
d) 80 mm dia Rmt. 5
e) 65 mm dia Rmt.

11 Supplying, Installation, Testing and Commissioning of Butterfly valves of PN


16 rating of following sizes with nitrile Bronze / G.M. seat duly ISI marked and
stainless steel stem with lever/gear operation and cast iron body in powder
coated finish for fire fighting application complete in all respects confirming to
IS: 13095 as required.
c) 100 mm dia Nos. 7

12 Providing, Installation, Testing and Commissioning of double flanged cast iron


Non-Return Valve, PN 16 of following sizes confirming to IS : 5312 complete
with rubber gasket, Gl bolts, nuts, washers etc. as required.

c) 100 mm dia Nos. 2


Sr. No. Description Of Item Unit Qty

13 Providing and fixing "Y" suction strainer with flanged connection 150 mm
dia. suitable for 2280 lpm discharge with stainless steel 20 mesh complete
including companion flanges etc. suitable for 150 dia. inlet and 150 dia. Nos. 1
outlet including inside with rubberized paint and outside with two coats of
enamel paint of approved shade after surface preparation necessary stainless
steel nuts, bolts, washers etc..
14 Providing and fixing of Float type Sensor with panel including all accessories
as required. Nos.

15 Providing and fixing dual type pressure switch suitable for 1-20 Kg/cm2
including electrical connections setting of Cut-In and cut-Off pressure complete Nos. 1
in all respects.

16 Providing and fixing gunmetal collecting head with 63 mm dia instataneous


type inlet and 150/100 mm dia flanged outlet with built in check valve for fire
brigade connection to fire tank and fire risers (IS:904-1965) including 16 guage
thick M.S. sheet enclosure stocve enameled with 8 mm thick glass
a) Two way Nos. 0

17 Providing and fixing single acting air valve with screwed inlet 25 mm dia. Nos. 1

FIRE EXTINGUISHER SYSTEM


18 Providing and fixing portable fire extinguisher, dry powder type (gas cartridge)
with cylinder initially fully charged with dry powder (ABC type) of 4 Kg. Nos. 4
complete with standard discharge valve with tube, CI bracket for wall mounting
etc. conforming IS : 15683:20061

19 Supply, installation, testing and commissioning of ISI marked (IS:15638)


portable chemical fire extinguisher, water (gas pressure) type capacity 9 litres Nos. 4
with gun metal cap and nozzle and complete in all respects including initial fill
and wall suspension brackets as required as per specifications.
Sr. No. Description Of Item Unit Qty
20 Providing and fixing fire extinguisher of carbon dioxide type consisting of brand
new high pressure steel cylinder bearing IS: 15683 mark wheel type valve
bearing internal discharge tube, 1 meter long high pressure discharge hose, Nos. 4
non conducting horn, suspension bracket, fully charged bearing IS: making
fixed to wall as directed.
4.5kg capacity cylinder

MISCELLANEOUS ITEMS

21 Providing and fixing rubber expansion joint (to provide relief from stresses at
pipe flanges) as per specification of the manufacturers and direction of
Engineer in chief PN-16 rating (EJ+SRR &CONTROL)
a) 150 mm dia Nos.
b) 100 mm dia Nos. 2

22 Providing and fixing brass ball valve (full-bore type) with plastic coated lever
and screwed female ends tested to 20 Kg/ cm2 of approved quality as
specified.
a) 50mm dia Nos. 1
b) 25mm dia Nos.

23 Providing and fixing air cushion tank comprising of single acting heavy duty
spring type brass air valve screwed to 250 mm Dia and 900 mm long tank Nos. 2
fabricated from 5 mm thick sheet with dished ends, 65mm dia ball valves for
connection & drain off including painting, both sides with zinc chromate
primer complete.
SPRINKLER SYSTEM
Sr. No. Description Of Item Unit Qty
24 Supply, installation, testing and commissioning of MS Pipe class 'C' (heavy
duty) conforming to IS:1239 including all accessories such as screwed/welded
joints, flanges, tees, reducers, structural steel supports and clamps etc.
including lift to all heights, welding, jointing, painting and inserted rubber
gaskets, nuts, bolts etc. as required. Pipes shall be painted with two coats of
primer & two coats of post office red synthetic enamel paint over two coats of
red oxide zinc chromate primer. Prior to application of primer surface to be
cleaned including painting of legends both direction arrow as per approval of
Project Manager and shall be fixed in ceiling, walls, columns for all heights
with hangers/supports and fasteners all as per drawing including chasing of
walls/columns /ceiling etc. and making good the same as required. G.I.
pipe/PVC sleeve of suitable higher size shall be provided whenever the pipes
are crossing the walls/floors and sealing the sleeves with glass wool in
a) 25mm dia.
between & fire sealant compound at either end all as per Project Rmt. 182
b) Manager/Consultant
32mm dia. requirement. Rmt. 6
c) 40mm dia Rmt. 16.4
d) 50mm dia Rmt. 61
e) 65 mm dia. Rmt. 18
f) 80 mm dia. Rmt. 22
g) 100 mm dia. Rmt. 264
h) 150 mm dia. Rmt.
Notes :
i) For Pipe up to 50 mm dia standard threaded forged steel fitting and Pipe
above 50 mm dia standard MS fitting with welded joint shall be used.
ii) Steel Structural Supports are included in this item.
iii) G.I. pipe sleeve of suitable higher size shall be provided wherever the pipe are
crossing the wall/floors and sealing the sleeves with glass wool in between
and fire sealant compound at either end all as per Project Manager's
requirement.

25 Providing & fixing brass quartzoid sprinklers (UL listed approved approved)of
15 mm dia size, suitable for sustaining the pressure on the seat & water
hammer effect. The type & temperature rating shall be as follows :
a) Pendent / Upright ( 68 deg.C) sprinkler quick response Nos. 85
Sr. No. Description Of Item Unit Qty
26 Providing and fixing UL listed finish Escutcheon plate complete including fixing
in position on pipe and ceiling complete in all respects. (Size=15NB)

a) 700mm Length Nos. 10


b) 1000mm Length Nos. 1

27 Providing and fixing 25 mm dia inspecting & testing assembly with gunmetal
valve, gunmetal sight glass(if required), bypass valve & connected to drain Nos. 1
line.

28 Providing and fixing of UL listed electrically operated flow indicating switch


(Saddle Type) diameter of 6" to 8" with threaded connection with flexible full Nos. 1
bore paddle & NO/NC contact terminals as specified complete with all
accessories and necessary wiring.

29 Fire Fighting Panel (450 LPM)


Incoming:
One (1) No. 32A, 4P MCB (25kA).
Metering & Indication:
Combined Ammeter/Voltmeter with Selector Switch and 40/5A, CL-1, 10VA
CTs and 2A control MCB.
Sets of phase indicating lamp with 2A control MCBs.

Bus Bar:
Electrolytic high conductivity Aluminium three pole and neutral busbars rated
at 63 amps(after deration) having a maximum current density of 0.8 amp per
sq mm insulated with heat shrinkable PVC sleeves.
Outgoing:
One(2) Nos. 32A TPN MPCB (25-KA).
One (1) No. 32A, TPN MPCB (25-kA). For Spare only.
The Switchboard shall be complete with all interconnections, risers, internal
wiring, labels etc complete as required.
Sr. No. Description Of Item Unit Qty
Fully automatic DOL starters (for 7.5 H.P motors) with push buttons and
on/off indicating lights with MN type relay, contactors, direct type ammeter
(for 7.5 HP), single phase preventors for all motors, with selector switch and
fuses overload relay as required.
Up to 7.5 HP DOL Starter - 1 Nos. Starter
Spare N.O. - N.C. contacts for each starter - 1 Set.
G.I. strip 25 x 3 mm throughout the length of MCC.
All internal wiring with colour coding from incoming mains to various
switchgear, starter, meter, indicating lamp and bus bar.
All starters shall be compatible for remote operation.All Switch gears offered
must be compatible with the H.P. of the motors offered
Fire Fighting Panel described as above Each 1

Power & Control Cables

30 Suppplying and laying of XPLE insulated ,PVC sheathed copper conductor


cables 1.1 KVA grade of following sizes including brass compression gland &
Cu. lugs and all other accessories as required on surface/In existing cable tray
duly clamped including all necessary as required.
4C X 2.5 sq. mm Rmt. 20
TOTAL AMOUNT
NAME OF WORK: CONSTRUCTION OF PROPOSED ESIC Hospital
BOQ As per DSR 2014
Sl. No. Item No. Description of the work

SUB-HEAD I - Carriage of Materials

1.1.2 Carriage of Earth by Mechanical transport Including loading


unloding and stacking

0 to 2 KM
5KM to 10KM

10KM to 20 KM

SUBHEAD II : Earth Work


2.6 Earth work in excavation by mechanical means (Hydraulic
excavator) /manual means in foundation over areas
(exceeding 30cm in depth , 1.5 m in width or 10 sqm on
plan), including disposal of excavated earth, for all leads and
lifts, disposed earth to be levelled and neatly dressed.All kind
of soil.

2.7 Earth work in excavation by mechanical means (Hydraulic


excavator) /manual means in foundation over areas
(exceeding 30cm in depth , 1.5 m in width or 10 sqm on
plan), including disposal of excavated earth, for all leads and
lifts, disposed earth to be levelled and neatly dressed.

2.7.3 Hard rock(Blasting Prohibited)


2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides of foundations etc. in layers not exceeding 20cm
in depth, consolidating each deposited layer by ramming and
watering, lead up to 50 m and lift upto 1.5 m.

Extra for every additional lift of i.5m or part thereof in


2.26 excavation/banking excavated or stacked material

2.27 Supplying and filling in plinth with jamuna sand under floors,
including watering,ramming consolidating and dressing
complete

2.31 Clearing jungla uprooting of rank vegitation-


=199.99x155=30998.00sqm

3
2.34 Supplying Chemical emulsion --------------
2.34.1 Chlorphriphos Lindane----------------
Peremeter of external
wall=2x199.99+155x2=709.98m@2.25 litres/linear meter
=1597.46 litres
2.35 Diluting and injecting Chemical emulsion----------
2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1% concentration

SUB HEAD-III --CONCRETE WORK


4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate
40 mm nominal size)
4.11 Providing and laying 50mm thick DPC----------

4.13 Applying a coat of residual petrolium-----------------

4.17 Making plinth protection 50 mm thick of cement concrete


1:3:6 (1 cement:
3 coarse sand : 6 graded stone aggregate 20 mm nominal
size) over
75mm thick bed of dry brick ballast 40 mm nominal size, well
rammed and
consolidated and grouted with fine sand, including finishing
the top
smooth

SUB HEAD-IV RCC WORK


5.9.1 Centering and shuttering including strutting, propping etc.
and removal of form for : Foundations, footings, bases of
columns, etc. for mass concrete
5.9.2 Centering and shuttering including strutting, propping etc.
and removal of form for : Walls (any thickness) including
attached pilasters, butteresses, plinth and string courses etc.

5.9.6 Centering and shuttering including strutting, propping etc.


and removal of form for :Columns, Pillars, Piers, Abutments,
Posts and Struts

4
5.9.5 Centering and shuttering including strutting, propping etc.
and removal of form for : Lintels, beams, plinth beams,
girders, bressumers and cantilevers

5.9.7 Centering and shuttering including strutting, propping etc.


and removal of form for : Stairs, (excluding landings) except
spiral-staircases
Suspended floors,roofs,landings,balconies and access
5.9.20 platform with water proof ply 12mm thick

5.22.6 Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
upto plinth level . Thermo-Mechanically Treated bars

5.22 A Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
above plinth level . Thermo-Mechanically Treated bars

5.33.1 Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works upto plinth level

5.33.2 Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works above plinth
level upto floor V level

5
5.34.1 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-30 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-30 is @ 340 kg/ kg/cum)

5.34.2 Extra for providing richer mixes at all floor levels.Note:-


Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-35 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-35 is @ 350 kg/ kg/cum)

5.34.3 Extra for providing richer mixes at all floor levels.Note:-


Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-40 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-40 is @ 360kg/ kg/cum)

SUBHEAD VI-SUBHEAD V-BRICK WORK


6.1 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:
6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)
6.4.2 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in super structure above
plinth level upto floor V level

6.2.4 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.12 Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundation and
plinth in:
6.12.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.13 Half b masonry work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in super structure
above plinth level upto floor V level

6.13.2 Cement mortar 1:6 (1 cement : 6 coarse sand)


6.15 Extra for providing and placing in position 2 nos.6mm dia.MS
bars at every third course of half brick masonry

SUBHEAD VII-MARBLE & GRINITE WORK

6
8.2 Providing and fixing 18 mm thick gang saw cut, mirror
polished, premoulded
and prepolished, machine cut for kitchen platforms, vanity
counters, window
sills , facias and similar locations of required size, approved
shade, colour
and texture laid over 20 mm thick base cement mortar 1:4 (1
cement : 4
coarse sand), joints treated with white cement, mixed with
matching pigment,
epoxy touch ups, including rubbing, curing, moulding and
polishing to edges
to give high gloss finish etc. complete at all levels

8.2.2 Granite of any colour and shade


8.2.2.2 Area of slab over 0.50 sqm

8.3 Providing edge moulding to 18mm thick marble stone


counters,vanities etc. including machine polishing to edge to
give high gloss finish etc.complete as per design approved by
Engineer-In-Charge.

8.3.2 Granite work

8.5 Extra for providing opening of required size & shape for wash
basin/ kitchen
sink in kitchen platform, vanity counter and similar location in
marble/
Granite/stone work, including necessary holes for pillar taps
etc. including
moulding, rubbing and polishing of cut edges etc. complete

8.6 Mirror polishing on marble work/Granite work/Stone work


where ever required to give high gloss finish complete.

8.12 Providing and laying flamed finish Granite stone flooring in


required design and patterns, in linear as well as curvilinear
portions of the building all complete as per the architectural
drawings with 18 mm thick stone slab
over 20 mm (average) thick base of cement mortar 1:4 (1
cement : 4 coarse sand) laid and jointed with cement slurry
and pointing with white cement slurry admixed with pigment
of matching shade including rubbing, curing
and polishing etc. all complete as specified and as directed
by the Engineerin-In-Charge :

a Flamed finish granite stone slab Jet Black, Cherry Red, Elite
Brown, Cat Eye or equivalent

7
SUBHEAD VIII-Wood Work
9.84 Providing and fixing aluminium extruded section body tubular
type universal hydraulic door closer (having brand logo with
ISI, IS : 3564, embossed on the body, door weight upto 36 kg
to 80 kg and door width from 701 mm to 1000 mm), with
double speed adjustment with necessary accessories and
screws etc. complete.

9.103 Providing and fixing bright finished brass 100 mm mortice


latch and lock, ISI marked, with six levers and a pair of
anodised (anodic coating not less than grade AC 10 as per IS
: 1868) aluminium lever handles of approvedquality with
necessary screws etc. complete.

SUBHEAD IX-STEEL WORK


10.28 P/F stainless steel (Grade 304) railing made of hollow
tubes,channels,plates etc.including welding
,grinding,buffing,polishing and making curvature(wherever
required)and fitting the same with necessary stainless steel nuts
and bolts complete i/c fixing the railing with necessary accessories
and stainless steel dash fastners,stainless steel bolts etc. of
required size ,on the top of the floor or side of waste slab with
suitable arrangement as per approval of Engineer-In-Charge(For
payment purpose only weight of stainless steel members shall be
considered excluding fixing accessories such as nuts,bolts fastners
etc.)

SUBHEAD X-Flooring
11.19 Chequered terrazo tiles 22 mm thick with graded marble
chips of size up
to 6 mm in floors, jointed with neat cement slurry mixed with
pigment to
match the shade of the tiles, including rubbing and polishing
complete, on
20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse
sand) :

11.19.2 Medium shade pigment using 50% white cement, 50%


ordinary cement

11.23 Marble stone flooring-----------------


11.23.5 Udaipur Green Marble
11.26 kota stone slab flooring over 20mm (average thick base laid
over and jointed with grey cement slutty mixed with pigment
to match the shade of the slab including rubbing and
polishing complete with base of cement mortar 1: 4 (1 cement
: 4 coarse sand):

8
11.26.1 25mm thick
11.36 Providing and fixing Ist quality ceramic glazed wall tiles
conforming to IS : 15622 (thickness to be specified by the
manufacturer ) of approved make in all colours, shades
except burgundy, bottle green, black of any size as approved
by Engineer-in-Charge, in skirting, risers of steps and dados
over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @ 3.3kg
per sqm including pointing in white cement mixed with
pigment of matching shade complete.

11.37 P/L Ceramic Glazed floor tiles


11.41 Providing and laying vitrified floor tiles in different sizes
(thickness to be
specified by the manufacturer) with water absorption less
than 0.08%
and conforming to IS : 15622, of approved make, in all
colours and shades,
laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
sand), including
grouting the joints with white cement and matching pigments
etc.,
complete.

11.41.2 Size of Tile 600x600 mm

11.48 Grouting the joints of flooring tiles having joints of 3mm


width ,using epoxy grout mix of 0.70 kg of organic coated
filler of desired shade (0.10 kg of hardener and 0.20 kg of
resin per kg)including filling /grouting and finishing complete
as per the direction of Engineer-In-Charge.

11.48.2 Size if Tile 600x600 mm

11.5 62 mm thick cement concrete flooring with concrete hardener


topping,under layer 50 mm thick cement concrete 1:2:4 (1
cement : 2 coarse sand : 4 graded stone aggregate 20mm
nominal size) and top layer 12mm thick cement hardener
consisting of mix 1:2 (1 cement hardener mix : 2 graded
stone aggregate, 6mm nominal size) by volume, hardening
compound mixed @ 2 litre per 50 kg of cement or as per
manufacture’s specifications. This includes cost of cement
slurry, but excluding the cost of nosing of steps etc. complete.

SUBHEAD XI- ROOFING

9
12.21 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement
: 2 coarse sand : 4 stone aggregate 10 mm and down
gauge), including finishing with cement mortar 1:3 (1 cement :
3 fine sand) as per standard design

12.21.1 In 75x75 mm deep chase


12.22 Making khurras 45x45 cm with average minimum thickness of
5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate of 20 mm nominal size) over P.V.C.
sheet 1 m x1 m x 400 micron, finished with 12 mm cement
plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat
cement, rounding the edges and making and finishing the
outlet complete

12.52 Providing and fixing tiled false ceiling of approved materials


of size 595x595 mm in true horizontal level, suspended on
inter locking metal grid of hot dipped galvanized steel
sections ( galvanized @ 120 grams/ sqm, both side inclusive)
consisting of main “T” runner with suitably spaced joints to
get required length and of size 24x38 mm made from 0.30
mm thick(minimum) sheet, spaced at 1200 mm center to
center and cross “T” of size 24x25 mm made of 0.30 mm
thick (minimum) sheet, 1200 mm long spaced between main
“T” at 600 mm center to center to form a grid of 1200x600
mm and secondary cross “T” of length 600 mm and size
24x25 mm made of 0.30 mm thick (minimum) sheet to be
interlocked at middle of the 1200x600 mm panel to form grids
of 600x600 mm and wall angle of size 24x24x0.3 mm and
laying false ceiling tiles of approved texture in the grid
including, required cutting/making, opening for services like
diffusers,grills, light fittings, fixtures, smoke detectors etc.
Main “T” runners to be suspended from ceiling using GI
slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling
with 12.5 mm dia and 50 mm long dash fasteners, 4 mm GI
adjustable rods with galvanised butterfly level clips of size 85
x 30x 0.8 mm spaced at 1200 mm center to center along
main T, bottom exposed width of 24 mm of all T-sections shall
be pre-painted with polyester paint, all complete for all
heights as per specifications, drawings and as directed by
Engineer-in-charge.

12.52.1 GI Metal Ceiling Lay in plain Tegular edge Global white color
tiles of size 595x595 mm, and 0.5 mm thick with 8 mm
drop;made of G I sheet having galvanizing of 100 gms/sqm
(both sides inclusive) and electro statically polyester powder
coated of thickness 60 microns (minimum), including factory
painted after bending.

10
12.55 Providing and fixing Heat Resistant Terrace Tiles (300 mm x
300 mm x 20 mm) with SRI (solar refractive index) > 78, solar
reflection > 0.70 and initial emittance > 0.75 on waterproof
and sloped surface of terrace, laid on 20 mm thick cement
sand mortar in the ratio of 1:4 (1 cement : 4
coarse sand) and grouting the joints with mix of white cement
& marble powder in ratio of 1:1, including rubbing and
polishing of the surface upto 3 cuts complete, including
providing skirting upto 150 mm height along the parapet walls
in the same manner.

SUBHEAD XII- Finishing


13.4 12 mm cement plaster of mix :
13.4.2 1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick
13.5 wall of mix :

1:6 (1 cement: 6 coarse sand)


13.5.2
13.16.1 6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
13.22 Extra for plastering exterior walls of height more than 10m
from ground level for every additional height of 3m or part
thereof.

13.41 Distempering with oil bound washable distemper of approved


brand and
manufacture to give an even shade

13.41.1 New work (two or more coats) over and including water
tinnable priming coat with cement primer
13.45 Finishing walls with textured exterior paint of required shade

13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm)
over and including priming coat of exterior primer applied @
2.20kg/ 10 sqm

13.78 Providing and applying 12mm thick gypsum light weight


plaster------------
13.83 Wall painting with remium acrylic imulsion paint of interior
grade------------
13.83.2
Two coats

11
SUB HEAD XIII Aluminium Work
21.1 Providing and fixing aluminium work for doors, windows,
ventilators and partitions with extruded built up standard
tubular sections/ appropriate Z sections and other sections of
approved make conforming to IS: 733 and IS: 1285, fixing
with dash fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top, bottom
and sides with required EPDM rubber/ neoprene gasket etc.
Aluminium sections shall be smooth, rust free, straight, mitred
and jointed mechanically wherever required including cleat
angle, Aluminium snap beading for glazing / paneling, C.P.
brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-
charge. (Glazing, paneling and dash fasteners to be paid for
separately) :

21.1.1 For fixed portion


21.1.1.2 Powder coated aluminium (minimum thickness of powder
coating 50 micron

21.1.2 For shutters of doors,windows & ventilators including


providing and fixing hinges/pivots and making provision for
fixing of fittings wherever required including the cost of EPDM
rubber/neoprene gasket required(Fittings shall be paid for
seperately)

21.1.2.2 Powder coated aluminium (minimum thickness of powder


coating 50 micron

21.8 Filling the gap in between aluminium frame & adjacent


RCC/Brick/Stone work by providing weather silicon sealent
over backer rod of approved quality as per architectural
drawings and direction of Engineer-In-Charge

21.8.1 Upto 5mm depth and 5mm width


21.10 P/F double glazed hermetically sealed glazing in
aluminium----------
21.13 P/F 100mm Brass lock---------------------
21.15 P/F aluminium casement window---------

21.15.2 Powder coated------------


21.16 P/F aluminium round shape handles--------
21.16.2 Powder coated------------

12
Sub Head XIV: Water Proofing
22.3 Providing and laying water proofing treatment to vertical and
horizontal surfaces of depressed portions of W.C., kitchen
and the like consisting of:
(i) Ist course of applying cement slurry @ 4.4 kg/sqm mixed with
water proofing compound conforming to IS 2645 in
recommended proportions including rounding off junction of
vertical and horizontal surface.
(ii) IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse
sand) mixed with water proofing compound in recommended
proportion including rounding off junction of vertical and
horizontal surface.
(iii) IIIrd course of applying blown or residual bitumen applied hot
at 1.7 kg. per sqm of area.
(iv) IVth course of 400 micron thick PVC sheet. (Overlaps at
joints of PVC sheet should be 100 mm wide and pasted to
each other with bitumen @ 1.7 kg/sqm).
22.7 Providing and laying integral cement based water proofing
treatment including preparation of surface as required for
treatment of roofs,balconies, terraces etc consisting of
following operations: a) Applying a slurry coat of neat cement
using 2.75 kg/sqm of cement admixed with water proofing
compound conforming to IS. 2645 and approved by
Engineer-in-charge over the RCC slab including adjoining
walls upto 300mm height including cleaning the surface
before treatment. b) Laying brick bats with mortar using
broken bricks/brick bats 25 mm to 115 mm size with 50% of
cement mortar 1:5 (1 cement : 5 coarse sand) admixed with
water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge over 20 mm thick layer of
cement mortar of mix 1:5(1 cement :5 coarse sand ) admixed
with water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge to required
slope and treating similarly the adjoining walls upto 300 mm
height including rounding of junctions of walls and slabs c)
After two days of proper curing applying a second coat of
cement slurry using 2.75 kg/ sqm of cement admixed jointless
cement mortar of mix 1:4 (1 cement :4 coarse
sand) admixed with water proofing compound conforming to
IS : 2645 and approved by Engineer-in-charge including
laying glass fibre cloth of approved quality in top layer of
plaster and finally finishing the surface with trowel with neat
cement slurry and making pattern of 300x300 mm square
3 mm deep. e) The whole terrace so finished shall be flooded
with water for a minimum period of two weeks for curing and
22.7.1 With average thickness of 120 mm and minimum thickness at
khurra as 65 mm.

Sub Head XV: Road Work

13
16.43 providing and laying design mix cement concrete of m-30
grade in roads/ taxi tracks/runways using cement content as
per design…..
16.44 extra for providing and mixing hardening compound of
approved quaility as per manufacture's specification in
cement conccrete
16.45
providing and fixing in position pre-moulded joint filler in
expansion joints

16.81 Providing and erecting 2.00 metre high temporary barricading


at site as per drawing/ direction of Engineer-in-Charge which
includes writing and painting,arrangement for traffic diversion
such as traffic signals during construction at site for day and
night, glow lamps, reflective signs, marking, flags, caution
tape as directed by the Engineer-in- Charge. The barricading
provided shall be retained in position at site continuously i/c
shifting of barricading from one location to another location
as many times as required during the execution of the entire
work till its completion. Rate include its maintenance for
damages, painting, all incidentals, labour materials,
equipments and works required to execute the job. The
barricading shall not be removed without prior approval of
Engineer-in-Charge.

(Note :- One time payment shall be made for providing


barricading from start of work till completion of work i/c
shifting. The barricading provided shall remain to be the
property of the contractor on completion of the work).

Sub Head XVI:STRUCTURAL GLAZING AND ALUMINIUM


COMPOSITE PANEL

26.7 Design,fabricating,testing and fixing in position curtain Wall


with aluminium composite panel cladding with open grooves
for linear as well as curvilinear portion of the building for all
heights and all levels etc.

a) Structural analysis & design and preparation of shop


drawings for pressure equalisation or rain screen principle as
required ,proper drainage of water to make it watertight
including checking of all the structural and functional design.

14
b) Providing,fabricating and supplying and fixing panels of
aluminium composite panel clading in pan shape in metalic
colour of approved shades made out of 4mm thick aluminium
composite panel material consisting of 3mm thick FR grade
mineral core sandwiched between two alumonium sheets
(each 0.5mm thick).The aluminium composite panel cladding
sheet shall be coil coated ,with Kynar 500 based
PVDF/Lumiflon based fluoropolymer(Service) coating on face
# 2 as specified using stainless steel
screws,nuts,bolts,washers,cleats ,weather silicone
sealant,backer rods etc.

c) The fastening brackets of aluminium alloys 6005 T5/MS with


Hot dip galvanised with serrations and serrated washers to
arrest the wind load movement ,fasteners,SS 316 pins and
anchors bolts of approved make in SS 316 ,Nylon seperators
to prevent bi-metallic contacts all complete required to
perform as per specificationd and drawings .The items
includes cost of all materials and labour components,the cost
of all mock ups at site, cost of all samples of the indivisual
components for testing in an approved laboratory ,field tests
on the assembled workin curtain wall with aluminium
composite panel cladding ,cleaning and protection of the
curtain wall with aluminium composite panel cladding till
handing over of the building for occupation .Base frame work
for ACP cladding is payable under the relevant aluminium
items.The contractor shall provide curtain wall with aluminium
composite panel cladding ,having all the performance
characteristics all completeas per the Architectural
drawings,as per item description ,as specified ,as per the
approved shop drawingsand as directed by the Engineer-In-
Charge.However,for the purpose of payment,only the actual
area on the external face of the curtain wall with aluminium
composite panel cladding (including width of groove)shall be
measured in sqm.,upto two decimal places

Sub Head XVII: Non Scheduled


NS 1 Providing and laying Antiskid floor tiles of size 450x300 mm
(thickness to be specified by the manufacturer), of 1st quality
conforming of approved make, in all colours, shades, laid on
20 mm thick bed of cement mortar1:4 (1 Cement : 4 Coarse
sand), including pointing the joints with white cement and
matching pigments etc., complete(Basic price of the tile
shall not be less than Rs.55/Sqft.)

15
Providing & fixing frameless glass doors with 40% covering
with 3m3 film crystal with 12mm thick toughened clear glass
door shutter with edge polished with fitting of approved make
including provision for fixing aceess coutrol system device
wherever required. the door shutter should have necessary
NS-20 patch fitting SS door handle 600mm high on each side with
floor spring with striking plate SS door stopper lock
etc.complete in all shape + size as per dirction of Engineer in
charge.

NS-3 P/F 3M film doors of approved make as per the


instruction of Engineer-In-Incharge as of Rs. 70/Sqft

NS-4 Providing and fixing Glass Reinforced Concrete


jali(GRC) screen in approved
size,pattern,design,thickness and color.The jali shall be
made from 53 grade white portland cement/43 grade
OPC or PPC grey cement manufactured by J.K. cement
or equivalent,quartz,fine silica sand ,Alkali resistance
glass fiber manufactured by Sant Gobin or
equivalent,super plasticiser and polymer manufactured
by BASF,sika as per the manufacturar;s specifications
and as per the directions of Engineer-In-Charge

35mm thick GRC jali

TOTAL NON-SCHEDULED ITEMS

16
PROPOSED ESIC Hospital at SURAT

Unit Qty. Rate Amount

Cum 400 113.29 45316.00


Cum 200 57.70 11540.00

Cum 500 48.00 24000.00


Total 80856.00

Cum 5593 155.6 870202.71

Cum 2641 618.1 1632326.80

Cum 7623 112.1 854535.00

Cum
76 82.95 6263.23

Cum 0.00 910.25 0.00

100 Sqm 30998.00 642.00 199007.16

17
Liters 1597.46 185.95 297047.69

Mtrs. 580.46 22.72 13188.05

Sqm 167.00 118.90 19856.30

Total 3892427

Cum 219.57 4301.15 944403.51


Sqm 143.06 314.85 45042.44

SQM 143.06 132.00 18883.92

Sqm 0.00 419.30 0.00


Total 944403.51

SQM 16.20 196.45 3182.49

SQM 100.00 360.80 36080.00

SQM 72.36 453.35 32804.41

18
SQM 1358.61 332.15 451262.31

SQM 720.00 396.65 285588.00

SQM 192.00 493.55 94761.60

KG 0 68.10 -

KG 449865 68.10 30,635,807

CUM 2.43 6296.15 15299.64

CUM 30.60 7014.55 214645.23

19
CUM 81.00 76.50 6196.50

CUM 0.00 152.95 0.00

CUM 81.00 229.45 18585.45


Total 31794212.13

cum 388.47 4677.25 1816971.31

cum 74.83 5426.15 406041.52

Sqm 0.00 584.75 0.00

Sqm 0.00 665.80 0.00

Sqm 0.00 69.50 0.00

Total 2223012.83

20
Sqm 14.74 3907.40 57579.45

Metre 42.70 230.55 9844.49

Each 24.00 386.60 9278.40

Sqm 24.08 212.85 5125.43

Sqm 24.08 3244.35 78123.95


TOTAL 159951.71

21
each 402.00 1043.6 419527.20

each 402.00 815.45 327810.90


Total 747338.10

Kg 25000.00 472.40 11810000.00


Total 11810000.00

Sqm 120.00 943.70 113244.00

Sqm 789.30 1757.60 1387273.68

22
sqm 24.25 1141.40 27673.36

sqm 1871.10 836.65 1565455.82

sqm 1582.00 785.40 1242502.80

Sqm 24.08 1405.95 33855.28

Sqm 0.00 187.95 0.00

Sqm 2281.43 588.90 1343536.13


Total 5713541.06

23
Rm 511.46 143.10 73189.93

Each 429.00 186.65 80072.85

Sqm 9233.76 1551.55 14326640.33

24
Sqm 3989.56 1133.85 4523561.70
Total 19003464.80

sqm 0.00 149.45 0.00

sqm 17678.00 172.80 3054758.40

Sqm 24.08 134.70 3243.58

Sqm 4168.94 37.95 158211.42

Sqm -789.03 89.70 -70775.99

Sqm 9321.11 146.45 1365075.97

Sqm 43813.00 244.35 10705706.55

Sqm 14452.15 74.40 1075239.90

Total 16291459.83

25
kg 3900.00 377.75 1473225.00

kg 35116.00 435.75 15301797.00

metre 3273.20 88.75 290496.50

Sqm 1612.32 3487.10 5622321.07


Each 161.00 418.65 67402.65

Each 482.00 55.15 26582.30

Each 322.00 55.15 17758.30


Total 17065518.50

26
sqm 1982.95 522.90 1036884.56

Sqm 3989.56 1019.05 4065560.30


Total 5102444.86

27
cum 750.00 6795.00 5096250.00

litre 750.00 46.45 34837.50

per cm
depth/width/
length 130400.00 2.45 319480.00

metre 6000.00 5868.00 35208000.00


Total 35208000.00

28
sqm 500.00 3775.30 1887650.00
Total 1887650.00

Sqm 658.99 1252.00 825052.35

29
sqm 300.00 15000.00 4500000.00

SQM 300.00 1500 450,000

Sqm 1000 4819 4,819,000

10594052.35

30
NAME OF WORK: CONSTRUCTION OF PROPOSED ESIC Hospital at Raipur

MEASUREMENTS FOR ACADEMIC BLOCK,ESIC,


DSR,2016 Unit Nos. Length
RAIPUR

SUB-HEAD I - Carriage of Materials


1.1.2 Carriage of Earth by Mechanical transport
Including loading unloding and stacking
0 to 2 KM Cum
5KM to 10KM Cum
10KM to 20 KM Cum

SUBHEAD II : Earth Work


2.6 EARTH WORK
Column footings
FT-1 6 4.05
FT-2 43 4.05
FT-3 7 4.35
FT-4 1 4.35
CFT-1 2 6.41
CFT-2 1 8.25
CFT-3 13 7.35
CFT-4 25 7.55
CFT-5 2 7.23
CFT-6 2 9.95
CFT-7 2 6.95
CFT-8 3 8.59
Plinth beam 1 1450

Add 1%
TOTAL
2.7 Earth work in excavation by mechanical means
(Hydraulic excavator) /manual means in
foundation over areas (exceeding 30cm in
depth , 1.5 m in width or 10 sqm on plan),
including disposal of excavated earth, for all
leads and lifts, disposed earth to be levelled and
neatly dressed.

2.7.3 Hard rock(Blasting Prohibited)


Peremeter of Walls 1 1689
2.8 Earth work in excavation by mechanical
means(Hydraulic excavator)/ manual means in
foundation trenches or drains(not exceeding
1.5m in width or 10 sqm on plan) including
dressing of sides and ramming of bottoms, lift up
to 1.5m, including getting out the excavated soil
and disposal of surplus excavated soil as
directed, within a lead of 50m.

HOSP.-12
2.8.1 -All kinds of soil cum 157.50 299.60
2.25 Filling available excavated earth (excluding rock)
in trenches, plinth,sides of foundations etc. in
layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming
and watering, lead up to 50 m and lift upto 1.5 m.

Total excavation
Less Qty.of RCC and Columns in foundation
Less Qty.of Brick work in foundation
Less Qty.of PCC in foundation
TOTAL
Extra for every additional lift of i.5m or part thereof in
2.26 excavation/banking excavated or stacked material Cum

Column footings
FT-1 6 4.05
FT-2 43 4.05
FT-3 7 4.35
FT-4 1 4.35
CFT-1 2 6.41
CFT-2 1 8.25
CFT-3 13 7.35
CFT-4 25 7.55
CFT-5 2 7.23
CFT-6 2 9.95
CFT-7 2 6.95
CFT-8 3 8.59
TOTAL
2.27 Supplying and filling in plinth with fine sand under
floors, including watering,ramming consolidating
and dressing complete Cum
Total carpet area at Ground floor 4250
TOTAL

SUB HEAD-III --CONCRETE WORK


4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone
aggregate 40 mm nominal size) Cum
Total carpet area at Ground floor 2641.61
FT-1 6 3.65
FT-2 43 3.65
FT-3 7 3.95
FT-4 1 3.95
CFT-1 2 6.01
CFT-2 1 7.85
CFT-3 13 6.95
CFT-4 25 7.15
CFT-5 2 6.83
CFT-6 2 9.55
CFT-7 2 6.55

HOSP.-13
CFT-8 3 8.19
Plinth beam 1 1450
Below walls foundation 1 1689

TOTAL
4.17 Making plinth protection 50 mm thick of cement
concrete 1:3:6 (1 cement: 3 coarse sand : 6
graded stone aggregate 20 mm nominal size)
over 75mm thick bed of dry brick ballast 40 mm
nominal size, well rammed and consolidated and
grouted with fine sand, including finishing the top
smooth

Sqm
Length FOR Plinth protection 1 465
TOTAL

4.11 P/L 50mm th. DPC----------


Ground Floor:
Length of 230mm th.outer wall 1 465
Length of 230mm th. Internal walls 1 622
Length of 115 mm th. wall 1 394
TOTAL
4.13 Applying a coat of residual petrolium-----------------
Length of 230mm th.outer wall 1 465
Length of 230mm th. Internal walls 1 622
Length of 115 mm th. wall 1 394
TOTAL

RCC WORK

5.9.1 Foundation,footings,basis of columns------------------------


Column footings
FT-1 6 13.2
FT-2 43 13.8
FT-3 7 14.4
FT-4 1 15
CFT-1 2 17.3
CFT-2 1 19.7
CFT-3 13 20.3
CFT-4 25 21.3
CFT-5 2 20.1
CFT-6 2 26.1
CFT-7 2 30.6
CFT-8 3 21.2
C1 8 1.5
C2 8 1.8
C3 40 1.8
C4 80 1.8
C5 70 1.8
C6 4 1.8

HOSP.-14
C7 6 1.8
Plinth beam 2 1450
TOTAL

5.9.20 Suspended floors,roofs,landings,balconies etc.----- Sqm

Total floor area 3 4031


Landing 24 4.33
Waste slab 72 5
Mumty 8 6
Machine room 8 6
Total

5.9.5 Lintels,beams,plinth beams--------------(GF,FF,&S.F)


D-1(Bottom) 68 1.8
D-1(Sides 136 2.1
D-2(Bottom) 56 1.5
D-2sides 112 1.8
D-3(Bottom) 42 1.5
D-3 Sides 84 1.8
D-4(Bottom) 39 1.1
D-4 Sides 78 1.4
D-5(Bottom) 50 1
D-5 Sides 100 1.3
D-6(Bottom) 70 0.9
D-6 Sides 140 1.2
D-7(Bottom) 162 0.75
D--7 Sides 324 1.05
Length of plinth beams . Sides 2 1689.5
Length offloor beams at GF,FF & SF . Bottom 3 1969
Length offloor beams at GF,FF & SF . Sides 2 1969
Total

5.9.6 Columns
C1 8 1.5
C2 8 1.8
C3 40 1.8
C4 80 1.8
C5 70 1.8
C6 4 1.8
C7 6 1.8
Total

5.9.7 Stairs (Excluding landing)-----------------


Landing 24 4.33
Steps 600 1.5
Waste slab 72 5

HOSP.-15
Sides of waste slab 104
TOTAL

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide RM


Peremeter of slab at all floors 3 465
TOTAL

5.22. Stee reinforcement for RCC work in foundation and pli Kg


RCC Raft =929.79 cumx80 kg/cum=78340.80 kg RCC in
Columns=236.47 cum@ 180kg/cum=42564.60 kg

5.22A Stee reinforcement for RCC work above plinth level

5 RCC Work
5.33.1 RCC upto plinth level
Column footings
FT-1 6 4.05
FT-2 43 4.05
FT-3 7 4.35
FT-4 1 4.35
CFT-1 2 6.41
CFT-2 1 8.25
CFT-3 13 7.35
CFT-4 25 7.55
CFT-5 2 7.23
CFT-6 2 9.95
CFT-7 2 6.95
CFT-8 3 8.59
C1 8 0.3
C2 8 0.45
C3 40 0.45
C4 80 0.45
C5 70 0.45
C6 4 0.45
C7 6 0.45
Plinth beam 1 1450
TOTAL
5.33.2 RCCabove plinth level upto floor V level

C1 8 0.3
C2 8 0.45
C3 40 0.45
C4 80 0.45
C5 70 0.45

HOSP.-16
C6 4 0.45
C7 6 0.45
Floor Beams GF,FF & SF 3 1689
FloorSlabs GF,FF & SF( Area of slab for one
3 4011.57
slab=4011.57 Sqm)
Landing 24 4.33
Steps 0.5 600 1.5
Waste slab 24 5
Mumty slab 8 7.46
TOTAL

5.34.1 Extra for providing richer mixes at all floor


levels.Note:- Excess/less cement over the
specified cement content used is payable
/recoverable separately. Providing M-30 grade
concrete instead of M-25 grade BMC / RMC.
(Note:- Cement content considered in M-30 is @
340 kg/ kg/cum)
CUM
5.34.2 Extra for providing richer mixes at all floor
levels.Note:- Excess/less cement over the
specified cement content used is payable
/recoverable separately. Providing M-35 grade
concrete instead of M-25 grade BMC / RMC.
(Note:- Cement content considered in M-35 is @
350 kg/ kg/cum)
CUM
5.34.3 Extra for providing richer mixes at all floor
levels.Note:- Excess/less cement over the
specified cement content used is payable
/recoverable separately. Providing M-40 grade
concrete instead of M-25 grade BMC / RMC.
(Note:- Cement content considered in M-40 is @
360kg/ kg/cum)
CUM

6.1 Brick work with common burnt clay -------------


6.1.2 IN foundation and plinth--- 1 1689

Providing and laying autoclaved aerated cement


6.4 blocks masonry with 100
mm thick AAC blocks in super structure above plinth
level up to floor V
level in cement mortar 1:4 (1 cement : 4 coarse
sand ). The rate includes
providing and placing in position 2 Nos 6 mm dia M.S.
bars at every third
course of masonry work.
Ground Floor:
Length of 230mm th.outer wall 1 579.02

HOSP.-17
Length of 230mm th. Internal walls 1 622
First floor
Length of 230mm th.outer wall 1 579.02
Length of 230mm th. Internal walls 1 504
Second floor
Length of 230mm th.outer wall 1 579.02
Length of 230mm th. Internal walls 1 504
Perapet wall 1 579.02
Less for doors of GF,FF and Second floor
D-1 55 1.8
D-2 44 1.5
D-3 25 1.5
D-4 1 1.1
D-5 23 1
D-6 11 0.9
D-7 2 0.75
Outer window GF,FF and Second floor 241 0.75
TOTAL

MARBLE WORK
8.2 P/F 18mm thick granite top---------
8.2.2 Granite of any colour and shade Sqm
8.2.2.1 Area of slab over 0.50 sqm

Ladies & Gents toilet (10 Nos.) Ground floor 10 3.07


Ladies & Gents toilet (8 Nos.) first floor 8 3.07
Ladies & Gents toilet (10 Nos.) Second floor 10 3.07
TOTAL

8.3 Providing edge moulding----------


8.3.2 Granite work
Ladies & Gents toilet (10 Nos.) Ground floor 10 4.27
Ladies & Gents toilet (8 Nos.) first floor 8 4.27
Ladies & Gents toilet (10 Nos.) Second floor 10 4.27
Corridoor(Length of corridoor at GF,First floor and
second floor) 3 263.1
TOTAL

8.4 Extra for facia work------------


QUANTITY AS PER ITEM NO.8.3.2 AS ABOVE Metre

8.5 Extra for providing opening of required size


QUANTITY AS PER Plumbing ITEM
Ladies & Gents toilet (10 Nos.) Ground floor 10 3
Ladies & Gents toilet (8 Nos.) first floor 8 3
Ladies & Gents toilet (10 Nos.) Second floor 10 3
TOTAL

HOSP.-18
8.10 P/F mbarble stone urinal partition walls----------------
Gents toilet (5 Nos.) Ground floor Sqm 20 0.75
Gents toilet (4 Nos.) first floor Sqm 16 0.75
Gents toilet (5 Nos.) Second floor Sqm 20 0.75
TOTAL
8.12 P/and laying flamed finished Granite stone flooring----
a) Flamed finished granite----------- Sqm
Ground Floor
Main entrance lobby 2 16.43
Main entrance lobby(Skirting) 2 55.32
Waiting Area-1 1 6.78
Waiting Area-1(Skirting) 1 27.12
Waiting Area-2 1 7.11
Waiting Area-2(Skirting) 1 28.22
Waiting Area-3 1 7.11
Waiting Area-3(Skirting) 1 28.44
Waiting Area-4 1 7.11
Waiting Area-4(Skirting) 1 21.56
Waiting Area-5 1 3.5
Waiting Area-5(Skirting) 1 3.5
Minor OT 1 7.00
Minor OT 1 22.00
Emergency ward 1 12.13
Emergency ward(Skirting) 1 38.26
CMO Room 1 7.00
CMO Room(Skirting) 1 21.00
X-Ray 1 7.00
X-Ray(skirting) 1 21.76
X-Ray supporting Area 1 7.00
X-Ray supporting Area(Skirting) 1 20.00
First Floor
OT-01 1 7.23
OT-01(skirting) 1 28.68
OT-02 &03 2 7.11
OT-02 &03(skirting) 2 13.89
Waiting Area 2 7.22
Waiting Area(skirting) 2 28.66
Waiting Area-02 2 6.78
Waiting Area-02(skirting) 1 27.12
Waiting Area-03 1 7.22
Waiting Area-03(Skirting) 1 28.66
Waiting Area-04 2 7.23
Waiting Area-04(skirting) 2 7.23
Waiting Area-05 2 7
Waiting Area-05(skirting) 1 28
Waiting Area-06 1 7.11
Waiting Area-06(skirting) 1 21.56
Doctors Lounge 1 7.11
Doctors Lounge(skirting) 1 28.68

HOSP.-19
Wards 6 7
Wards (Skirting) 6 28
Nursing Station 1 7.23
Nursing Station(skirting) 1 28.46
Nursing Station 2 7.23
Nursing Station(skirting) 1 28.46
Nicu/Picu/Nursery SICU/MICU

SICU 1 14.56
SICU(skirting) 1 43.12
MICU 1 11.15
MICU(skirting) 1 36.3
SECOND FLOOR
Nursing Station-01 1 7.23
Nursing Station-01,skirting 1 28.46
Nursing Station-01 1 7.23
Nursing Station-01,skirting 1 28.46
DMS ROOM 1 7.11
DMS ROOM,skirting 1 22.16
DMS ROOM,skirting 1 22.16
MS ROOM 1 7.11
MS ROOM ,skirting 1 22.16
Laboratories and offices 1 24.12
Laboratories and offices(Skirting) 1 62.24
Conference roos room for Doctors 1 7.11
Conference roos room for Doctors,skirting 1 28.08
Doctor room /Doctor duty room/HOD Rooms 1 4.39
Doctor room /Doctor duty room/HOD Rooms(Skirting) 1 14.38
HOD-01 2 3.5
HOD-01(Skirting) 2 14.04
HOD-02 4 3.5
HOD-02(Skirting) 4 13.6
Lift lobby-01 1 3.77
Lift lobby-01(skirting) 1 12.48
Lift lobby-02 1 7.23
Lift lobby-02(skirting) 1 28.46
Eclampsia Room 1 7.11
Eclampsia Room(Skirting) 1 22.12
Septic table 1 7
Septic table(skirting) 1 20.88
TOTAL

WOOD WORK
9.161 P/F Fire resistant door frame
IN stair cases from GF to 2nd Floor M 27 1.5
Electrical 6 1.2
AHU 12 1.8

HOSP.-20
9.162 P/F Fire Door shutter
IN stair cases from GF to 2nd Floor Sqm 27 1.5
Electrical 6 1.2
AHU 12 1.8

9.138 P/F glazing in fire resistant door --------------


Quantity same as per item no. Sqm 27 0.3

9.139 P/F panic bar---------------------------------------


For fire resistant doors Nos. 45

10.0 STEEL WORK

P/F stainless steel (Grade 304) railing made of hollow


10.28 sections--------------
For stair cases(5 nos.)=6.71x1.00x5 nos.x3
floors=100.50 sqm @ 25 kg/sqm KG 1000
IN corridoors=2x3x272.45=5 kg/m=8173.50kg
TOTAL

FLOORING
11.23 Marble stone flooring-----------------
11.23.5 Udaipur Green Marble Sqm
Ground Floor
OPD consulting Cubicles 16 3.55
OPD consulting Cubicles(skirting) 16 13.98
Staircase Landing 16 4.33
Staircase Landing ,skirting 16 11.66
Treads 176 4.33
Risers 184 4.33
skirting along staicase 4 5.66

Corridoor(Length of corridoor at GF) 2 263.1


Corridoor(Length of corridoor at GF), skirting 2 263.1
Security office 1 4
Security office(skirting) 1 14.92
Dispensary/Pharmacy(Medical store) 1 7.11
Dispensary/Pharmacy(Medical store),skirting 1 23.98
Kitchen 2 12.66
Kitchen(skirting) 2 39.32
Medical store 1 7.38
Medical store (skirting) 1 28.98
Medical store 2 14.34
Medical store(skirting)
First Floor
Intensive Care Unit

HOSP.-21
MICU 1 11.15
MICU (skirting) 1 32.52
SICU 2 14.56
SICU (skirting) 1 43.12
Pre operation room 1 14.01
Pre operation room (skirting) 1 42.24
Post Operation Room 1 14.01
Post Operation Room(skirting) 1 42.24
Staircase Landing 16 11.66

Treads 176 4.33

Risers 184 4.33


skirting along staicase 4 5.66
Corridoor(Length of corridoor at GF) 1 263.1
Corridoor(Length of corridoor at GF), skirting 2 263.1
O.P.D Consulting Cubicles 16 3.44
O.P.D Consulting Cubicles (skirting) 16 13.54
WARDS 6 7
WARDS skirting 6 28
Examination/ Treatment / Injection Room

Injection Room 1 7
Injection Room skirting 1 20.64
Treatment Room 1 7
Treatment Room skirting 1 20.88

Second Floor
General Wards/ Gynae Wards

Gynae ward-01 2 7
Gynae ward-01 skirting 2 27.9
Gynae ward-02 2 7.17
Gynae ward-02 skirting 2 28.34
General Wards 8 7
General Wards skirting 6 28
O.P.D Consulting Cubicles 18 3.44
O.P.D Consulting Cubicles (skirting) 18 13.54
Admin Area 1 7.11
Admin Area skirting 1 27.64
Accounts room 1 10.83
Accounts room skirting 1 35.66
Medical Record Department 1 7.11
Medical Record Department skirting 1 28.42
Non Medical Stores 1 9.56
Non Medical Stores skirting 1 33.12
store-01 1 4.39
store-01 skirting 1 11.92

HOSP.-22
Store 1 7
Store skirting 1 20.64
Examination / Treatment/ Injection Room 1 4.39
Examination / Treatment/ Injection Room (skirting) 1 13.78

Staircase Landing 16 11.66

Treads 176 4.33

Risers 184 4.33

Corridoor(Length of corridoor at GF) 1 263.1


Corridoor(Length of corridoor at SF), skirting 2 263.1
Services 1 7.22
TOTAL

11.36 P/L Ceramic Glazed wall tiles


Ground Floor

Toilets Skirting 10 29.7


First Floor
Toilets Skirting 10 29.7
Second Floor
Toilets (skirting) 10 29.7
TOTAL

11.37 P/L Ceramic Glazed floor tiles


Ground Floor
Toilets 10 7.85
First Floor
Toilets 10 7
Second Floor
Toilets 10 7.85
TOTAL

NS P/L Anti skid floor tiles


Ground Floor
Phsiyotherapy room 1 8.33
Phsiyotherapy room skirting 1 30.88
Plaster /Dressing Room 1 7
Plaster /Dressing Room skirting 1 20.76
Doctor;s Duty room 1 7.11
Doctor;s Duty room skirting 1 21.1
First Floor
Tiolets 10 7.85
Tiolets skirting 10 29.7
Nurse Duty Room 1 7.11
Nurse Duty Room skirting 1 21.1

HOSP.-23
Second Floor
Tiolets-01 1 7.85
Tiolets-01 skirting 1 29.92
Tiolets-02 1 7.38
Tiolets-02 skirting 1 29.2
Tiolets-03 1 7.85
Tiolets-03 skirting 1 29.68
Tiolets-04 1 7.38
Tiolets-04 skirting 1 28.8
TOTAL

11.26 Kota stone slab flooring------------


11.26.1 25mm thick
Ground Floor
Court yard
CSSD 1 14.23
CSSD skirting 1 42.46
Ramps 2 8
Ramps skirting 2 20
Gas Manifold Room 1 7
Gas Manifold Room skirting 1 28
AC Plant Room
Laundry 1 7
Laundry skirting 1 28
AHU Room 6 7.11
AHU Room skirting 6 22.22
AHU Room---2 2 7
AHU Room ---2skirting 2 20.88
AHU Room---3 1 7
AHU Room ---3skirting 2 20.64
Electrical Rooms 2 7
Electrical Rooms skirting 2 18.9
AHU Room---01 6 7.11
AHU Room --01 skirting 6 21.1
AHU Room---03 6 7
AHU Room --03skirting 2 22

First Floor
Electrical Rooms 2 7
Electrical Rooms skirting 2 18.9
Ramps

Second Floor
Electrical Rooms 2 7
Electrical Rooms skirting 2 18.9
AHU Room---02 1 7
AHU Room --02skirting 1 28
AHU Room---01 1 7.11
AHU Room --01skirting 1 21.22
Pantry 1 7.11

HOSP.-24
Pantry skirting 1 21.04
TOTAL

VITRIFIED FLOOR TILES


11.41 P/L vitrified floor tiles --------
11.41.2 Size of tile 600x600mm
Ground Floor
Registration 1 6.78
Registration(Skirting) 1 20.96
Back Office 1 7
Back Office skirting 1 19.82
Maintenance office 1 7.11
Maintenance office skirting 1 28.22
Dietician Room 1 7
Dietician Room skirting 1 21.4
Lift lobby --1 2 4
Lift lobby --1 skirting 1 12.94
Lift lobby 1 5.02
Lift lobby skirting 1 18.04
Radiology waiting 1 7.23
Radiology waiting skirting 1 26.68
Sample collection 1 7.11
Sample collection skirting 1 21.22
Record /Billing section 1 7.11
Record /Billing section skirting 1 28
X-Ray---2 1 7.2
X-Ray---2 skirting 1 23.16
Radiology store 1 7
Radiology store skirting 1 20
USG Room 1 3.38
USG Room skirting 1 13.42
USG Room ---1 1 3.38
USG Room ---1 skirting 1 13.44
ECG Room 1 3.44
ECG Room 1 13.44
Radiologist room 1 7
Radiologist room skirting 1 20.88
Dr.Duty room 1 7
Dr.Duty room skirting 1 20.88
Blood store 1 7
Blood store skirting 1 20.66
Emergency store 1 7
Emergency store skirting 1 20.66
CU 1 2.4
CU skirting 1 9
DU 1 2.4
DU 1 9
Emergency Treatment Bed 2 8.57
Emergency Treatment Bed skirting 1 31.14
Emergency waiting 1 6.96

HOSP.-25
Emergency waiting skirting 1 21.68
Police post 1 3.4
Police post skirting 1 12.8
Emergency Entrance lobby 2 7.6
Emergency Entrance lobby skirting 1 29.2
Emergency X-Ray 1 4.3
Emergency X-Ray skirting 1 15.36
Sterile store 1 2.88
Sterile store skirting 1 10.56
Doc Change 1 2.88
Doc Change skirting 1 10.3
Registration----1 1 3.44
Registration----1 skirting 1 13.54

FIRST FLOOR
Nurse duty room 1 7.11
Nurse duty room skirting 1 20.88
Doctor uty room-02 1 7.11
Doctor uty room-02 skirting 1 21.44
store room--01 1 3.5
store room--01 skirting 1 12.2
Lift lobby--01 1 5.03
Lift lobby--01 skirting 1 18.06
Lift lobby--02 1 3.77
Lift lobby--02 skirting 1 12.48
OT store room---1 1 3.5
OT store room---1 skirting 1 11.2
Ansthesia room 1 3.25
Ansthesia room skirting 1 11.2
DR. Change & Locker room 1 3.77
DR. Change & Locker room skirting 1 12.14
Nurse Change & Locker room 1 3.77
Nurse Change & Locker room skirting 1 12.1
Staff Change & Locker room 1 3.77
Staff Change & Locker room skirting 1 12.1
OT sterilazation room 1 7
OT sterilazation room skirting 1 20.22
Waste Holding 1 6.78
Waste Holding skirting 1 18.08
Soiled linen Store 1 6.78
Soiled linen Store skirting 1 18.08
Nurse Store 1 3.44
Nurse Store skirting 1 13.54
Semi Private ward 1 7
Semi Private ward skirting 1 20.88
Ward Pantry 1 3.8
Ward Pantry skirting 1 15
Store 1 3.8
Store skiring 1 15.2
Doctor Duty Room 1 7.11

HOSP.-26
Doctor Duty Room skirting 1 20
Lift lobby --01 1 4
Lift lobby --01 skirting 1 12.94
Doctor Duty Room 1 7.11
Doctor Duty Room skirting 1 20
Ward pantry ----01 1 4
Ward pantry ----01 skirting 1 15.76
Store 1 3.88
Store skiring 1 13.76
O.P. store---01 1 3.25
O.P. store---01 skirting 1 11.1
Trolley /wheel chair bay 1 3.71
Trolley /wheel chair bay skirting 1 11.44
Laboratory 1 24.12
Laboratory skirting 1 62.24
SECOND FLOOR 1 11.34
Nursery 1 36.9
Nursery skirting 1 11.34
Exam room 1 3.45
Exam room skirting 1 12.22
CU 1 2.66
CU skirting 1 8.88
DU 1 2.66
DU 1 8.64
NICU 1 14.12
NICU skirting 1 42.46
PICU 1 14.56
PICU skirting 1 43.12
Doctor duty room 1 4.39
Doctor duty room skirting 1 14.38
Attendent waiting area 1 7.23
Attendent waiting area skirting 1 28.46
Pre-delivery room 1 7.11
Pre-delivery room skirting 1 28.3
Post delivery room 1 7.12
Post delivery room skirting 1 28.46
Aseptic table 1 7
Aseptic table skirting 1 20.88
P.A Room 1 7.11
P.A Room skirting 1 20.46
P.A Room----01 1 7.11
P.A Room 01 skirting 1 20.22
Director office 1 7.11
Director office skirting 1 22.26
Store 1 7
Store skirting 1 20.64
Waiting area ---01 1 7.23
Waiting area ---01 skirting 1 24.74
Incharge room 1 3.5
Incharge room skirting 1 13

HOSP.-27
Record room 1 3.5
Record room skirting 1 14.76
Server room 1 7
Server room skirting 1 28
Semi private ward 1 7
Semi private ward skirting 1 20.88
Doctor duty room 1 7.11
Doctor duty room skirting 1 20
ward pantry--01 1 3.88
ward pantry--01 skirting 1 15.5
Store 1 3.87
Store skirting 1 13.74
Issolation room 1 7.11
Issolation room skirting 1 21.02
Issolation room-01 1 7.11
Issolation room--01 skirting 1 21.12
Waiting area--02 1 7
Waiting area--02 skirting 1 28
Ward pantry--02 1 4
Ward pantry--02 skirting 1 15.76
Treatment room 1 7
Treatment room skirting 1 20.88
TOTAL

11.48 Grouting of joints of tile flooring------------


11.48.2 Size of tile 600x600mm
Same as quantity of vitrified tiles

ROOFING
12.21 Providing gola 75x75mm------ RM
Peremeter of Terrace

12.22 Making Khura 45x45cm Nos.

12.52 P/F false ceiling ----------

12.52.1 G.I.Metal ceilling------ Sqm


Ground floor Area (Carpet Area)
First floor Area (Carpet Area)
Second floor
TOTAL

12.55 Providing and laying heat resistance tiles at terrace-----Sqm


Terrace 1 109.34
2 47.91
1 33.45
TOTAL

HOSP.-28
13.0 FINISHING

13.4.2 12MM & 15mm cement plaster of mix 1:6 ----------------sqm


Qty.of brick work /
0.23x2=sqm=3250/0.23=14130x2=28260sqm
Qty.of half brick work x2=sqm=3872.40 x2=7744.80
sqm
Less for doors of GF,FF and Second floor
D-1 13 1.8
D-2 12 1.5
D-3 17 1.5
D-4 38 1.1
D-5 27 1
D-6 59 0.9
D-7 160 0.75
TOTAL

13.4.2 12MM cement plaster of mix 1:6 ---------------- sqm


13.5.2 15MM cement plaster of mix 1:6 ----------------
Qty.same as per item no. 13.4.2 sqm

13.16.1. 6mm cement Plaster Sqm


Ground Floor
Main entrance lobby 1 16.43

Waiting Area-1 1 6.78


Waiting Area-2 1 7.11
Waiting Area-3 1 7.11
Waiting Area-4 1 7.11
Waiting Area-5 1 3.5
Minor OT 1 7.00
Minor OT 1 22.00
Emergency ward 1 12.13
CMO Room 1 7.00
X-Ray 1 7.00
X-Ray supporting Area 1 7.00
First Floor
OT-01 1 7.23
OT-02 &03 2 7.11
OT-02 &03(skirting) 2 13.89
Waiting Area 1 7.22
Waiting Area-02 1 6.78
Waiting Area-03 1 7.22
Waiting Area-04 1 7.23
Waiting Area-05 1 7

HOSP.-29
Waiting Area-06 1 7.11
Doctors Lounge 1 7.11
Wards 6 7
Nursing Station 1 7.23
Nursing Station 1 7.23
Nicu/Picu/Nursery SICU/MICU

SICU 1 14.56
MICU 1 11.15
MICU(skirting) 1 36.3
SECOND FLOOR
Nursing Station-01 1 7.23
Nursing Station-01 1 7.23
DMS ROOM 1 7.11
DMS ROOM,skirting 1 22.16
MS ROOM 1 7.11
Laboratories and offices 1 24.12
Conference roos room for Doctors 1 7.11
Doctor room /Doctor duty room/HOD Rooms 1 4.39
HOD-01 2 3.5
HOD-02 4 3.5
Lift lobby-01 1 3.77
Lift lobby-02 1 7.23
Eclampsia Room 1 7.11
Septic table 1 7

Ground Floor
OPD consulting Cubicles 16 3.55
Staircase Landing 16 4.33

Corridoor(Length of corridoor at GF) 1 263.1


Security office 1 4
Dispensary/Pharmacy(Medical store) 1 7.11
Kitchen 2 12.66
Medical store 1 7.38
Medical store (skirting) 1 28.98
Medical store 2 14.34
Medical store(skirting) 2 42.68
First Floor
Intensive Care Unit

MICU 1 11.15
SICU 1 14.56
Pre operation room 1 14.01
Post Operation Room 1 14.01
Staircase Landing 16 11.66

Corridoor(Length of corridoor at GF) 1 263.1


O.P.D Consulting Cubicles 16 3.44
WARDS 6 7

HOSP.-30
Examination/ Treatment / Injection Room

Injection Room 1 7
Treatment Room 1 7

Second Floor
General Wards/ Gynae Wards

Gynae ward-01 2 7
Gynae ward-02 2 7.17
General Wards 6 7
O.P.D Consulting Cubicles 16 3.44
Admin Area 1 7.11
Accounts room 1 10.83
Medical Record Department 1 7.11
Medical Record Department skirting 1 28.42
Non Medical Stores 1 9.56
store-01 1 4.39
Store 1 7
Examination / Treatment/ Injection Room 1 4.39

Corridoor(Length of corridoor at GF) 1 263.1


Corridoor(Length of corridoor at SF), skirting 2 263.1
Services 1 7.22

Ground Floor
Toilets 5 7.85
First Floor
Toilets 5 7
Second Floor
Toilets 5 7.85

Ground Floor
Phsiyotherapy room 1 8.33
Plaster /Dressing Room 1 7
Doctor;s Duty room 1 7.11
First Floor
Tiolets 5 7.85
Tiolets skirting 5 29.7
Nurse Duty Room 1 7.11
Second Floor
Tiolets-01 1 7.85
Tiolets-02 1 7.38
Tiolets-03 1 7.85
Tiolets-04 1 7.38

Ground Floor
Court yard

HOSP.-31
CSSD 1 14.23
Ramps 2 8
Gas Manifold Room 1 7
AC Plant Room
Laundry 1 7
AHU Room 2 7.11
AHU Room---2 2 7
AHU Room---3 1 7
Electrical Rooms 2 7
AHU Room---01 2 7.11
AHU Room---03 2 7

First Floor
Electrical Rooms 2 7
Ramps

Second Floor
Electrical Rooms 2 7
AHU Room---02 1 7
AHU Room---01 1 7.11

Pantry 1 7.11
Ground Floor
Registration 1 6.78

Back Office 1 7

Maintenance office 1 7.11

Dietician Room 1 7

Lift lobby --1 2 4


Lift lobby 1 5.02

Radiology waiting 1 7.23

Sample collection 1 7.11

Record /Billing section 1 7.11

X-Ray---2 1 7.2

Radiology store 1 7

USG Room 1 3.38

USG Room ---1 1 3.38

ECG Room 1 3.44


ECG Room 1 13.44

HOSP.-32
Radiologist room 1 7

Dr.Duty room 1 7

Blood store 1 7

Emergency store 1 7

CU 1 2.4

DU 1 2.4
DU 1 9
Emergency Treatment Bed 1 8.57

Emergency waiting 1 6.96

Police post 1 3.4

Emergency Entrance lobby 1 7.6

Emergency X-Ray 1 4.3

Sterile store 1 2.88

Doc Change 1 2.88

Registration----1 1 3.44

FIRST FLOOR
Nurse duty room 1 7.11

Doctor uty room-02 1 7.11

store room--01 1 3.5

Lift lobby--01 1 5.03

Lift lobby--02 1 3.77

OT store room---1 1 3.5

Ansthesia room 1 3.25

DR. Change & Locker room 1 3.77

Nurse Change & Locker room 1 3.77

Staff Change & Locker room 1 3.77

HOSP.-33
OT sterilazation room 1 7

Waste Holding 1 6.78

Soiled linen Store 1 6.78

Nurse Store 1 3.44

Semi Private ward 1 7

Ward Pantry 1 3.8

Store 1 3.8

Doctor Duty Room 1 7.11

Lift lobby --01 1 4

Doctor Duty Room 1 7.11

Ward pantry ----01 1 4

Store 1 3.88

O.P. store---01 1 3.25

Trolley /wheel chair bay 1 3.71

Laboratory 1 24.12

SECOND FLOOR 1 11.34


Nursery 1 36.9

Exam room 1 3.45

CU 1 2.66

DU 1 2.66
DU 1 8.64
NICU 1 14.12

PICU 1 14.56

Doctor duty room 1 4.39

Attendent waiting area 1 7.23

Pre-delivery room 1 7.11

Post delivery room 1 7.12

HOSP.-34
Aseptic table 1 7

P.A Room 1 7.11

P.A Room----01 1 7.11

Director office 1 7.11

Store 1 7

Waiting area ---01 1 7.23

Incharge room 1 3.5

Record room 1 3.5

Server room 1 7

Semi private ward 1 7

Doctor duty room 1 7.11

ward pantry--01 1 3.88

Store 1 3.87

Issolation room 1 7.11

Issolation room-01 1 7.11

Waiting area--02 1 7

Ward pantry--02 1 4

Treatment room 1 7

TOTAL

13.22 Length of 230mm th.outer wall 2 579.02

13.41 Distempering with Oil bound washable distemper---------------

Ground Floor:
Length of 230mm th.outer wall 2 579.02
Length of 230mm th. Internal walls 2 622
First floor
Length of 230mm th.outer wall 2 579.02
Length of 230mm th. Internal walls 2 504
Second floor

HOSP.-35
Length of 230mm th.outer wall 2 579.02
Length of 230mm th. Internal walls 2 504
ceiling area at Gf,F.F & SF
Ground Floor
Toilets ceiling 10 7.85
Toilets walls 10 29.7
First Floor
Toilets ceiling 10 7
Toilets walls 10 29.7
Second Floor
Toilets ceiling 10 7.85
Toilets walls 10 29.7
Less for doors of GF,FF and Second floor
D-1 55 1.8
D-2 44 1.5
D-3 25 1.5
D-4 1 1.1
D-5 23 1
D-6 11 0.9
D-7 2 0.75
Less for corridoor 3 263.01
Less for acrylic emilsion paint
TOTAL

13.45 Finishing walls with textured exterior paint----------

Peremeter of Building Sqm 1 579.02


Inside of parapet wall 1 579.02
Outer window GF,FF and Second floor 241 1.8
TOTAL

Wall painting with Premium acrylic emilsion paint of


13.83 interior grade ---------------

Ground Floor
Main entrance lobby 1 16.43
Main entrance lobby wall 2 55.32
Minor OT 1 7.00
Minor OT 1 22.00
Emergency ward 1 12.13
Emergency ward wall 2 38.26
CMO Room 1 7.00
CMO Roomwall 1 21.00
First Floor
DMS ROOM 1 7.11
DMS ROOM wall 1 22.16
DMS ROOMwall 1 22.16

HOSP.-36
MS ROOM 1 7.11
MS ROOM wall 1 22.16
Conference roos room for Doctors 1 7.11
Conference roos room for Doctors,wall 2 28.08
Doctor room /Doctor duty room/HOD Rooms 1 4.39
Doctor room /Doctor duty room/HOD Rooms(wall 1 14.38
HOD-01 2 3.5
HOD-01wall 2 14.04
HOD-02 4 3.5
HOD-02wall 6 13.6
Lift lobby-01 1 3.77
Lift lobby-01wall 1 12.48
Lift lobby-02 1 7.23
Lift lobby-02wall 1 28.46

Ground Floor
OPD consulting Cubicles 16 3.55
OPD consulting Cubicleswall 16 13.98
Corridoor(Length of corridoor at GF) 1 263.1
Corridoor(Length of corridoor at GF), wall 2 263.1
Medical store 1 7.38
Medical storewall 1 28.98
Medical store 4 14.34
Medical storewall 2 42.68
First Floor
Intensive Care Unit
MICU 1 11.15
MICU wall 1 32.52
SICU 1 14.56
SICU wall 1 43.12
Pre operation room 1 14.01
Pre operation room wall 1 42.24
Post Operation Room 1 14.01
Post Operation Roomwall 1 42.24
Corridoor(Length of corridoor at GF) 2 263.1
Corridoor(Length of corridoor at GF), wall 2 263.1
O.P.D Consulting Cubicles 16 3.44
O.P.D Consulting Cubicleswall 16 13.54

Second Floor
O.P.D Consulting Cubicles 16 3.44
O.P.D Consulting Cubicles (skirting) 16 13.54
Admin Area 1 7.11
Admin Area skirting 1 27.64
Accounts room 1 10.83
Accounts room skirting 1 35.66
Corridoor(Length of corridoor at GF) 1 263.1
Corridoor(Length of corridoor at SF), wall 2 263.1
Services 1 7.22
Ground floor

HOSP.-37
Doctor;s Duty room 1 7.11
Doctor;s Duty room wall 1 21.1

Ground Floor
Lift lobby --1 2 4
Lift lobby --1 wall 1 12.94
Lift lobby 1 5.02
Lift lobby wall 1 18.04
Dr.Duty room 1 7
Dr.Duty room wall 1 20.88
Blood store 1 7
Blood store wall 1 20.66
Emergency store 1 7
Emergency store wall 1 20.66
Doc Change 1 2.88
Doc Change wall 1 10.3

FIRST FLOOR
Lift lobby--01 1 5.03
Lift lobby--01 wall 1 18.06
Lift lobby--02 1 3.77
Lift lobby--02 wall 1 12.48
OT sterilazation room 1 7
OT sterilazation room wall 1 20.22
Semi Private ward 1 7
Semi Private ward wall 1 20.88
Ward Pantry 1 3.8
O.P. store---01 1 3.25
O.P. store---01 wall 1 11.1
SECOND FLOOR 1 11.34
Nursery 1 36.9
Nursery wall 1 11.34
Director office 1 7.11
Director office wall 1 22.26
Waiting area ---01 wall 1 24.74
Incharge room 1 3.5
Incharge room wall 1 13
TOTAL

13.78 P/Applying 12mm thick gypsum plaster------------

Quantity same as item no.13.4.2 & 13.5.2 Sqm

ALUMINIUM WORK

21.1.1 Fixed portion


21.1.1.2 Power coated ------------------ KG

HOSP.-38
21.1.2 For shutters of doors and windows---------
21.1.2.2 Power coated ------------------

Doors and windows of GF,FF and Second floor KG


D-1 55 1.8
D-2 44 1.5
D-3 25 1.5
D-4 1 1.1
D-5 23 1
D-6 11 0.9
D-7 2 0.75
Windows in outer wall at GF,FF &SF 241 1.8
TOTAL 402

Weight of Aluminium=1612.32 sqm @ 22 kg/sqm=35471.04 kg


KG

Filling the gap in between aluminium frame & adjacent


21.8 RCC/Brick/Stone work-----------
Doors and windows of GF,FF and Second floor RM
D-1 55 8.4
D-2 44 7.8
D-3 25 7.8
D-4 1 7
D-5 23 6.8
D-6 11 6.6
D-7 2 6.3
Windows in outer wall at GF,FF &SF 241 8.4
TOTAL

P/F double glazed Hermeticaly sealed glazing in


aluminium doors and windowsWindows in outer wall
21.10 at GF,FF &SF
Doors and windows of GF,FF and Second floor SQM
D-1 55 1.8
D-2 44 1.5
D-3 25 1.5
D-4 1 1.1
D-5 23 1
D-6 11 0.9
D-7 2 0.75
Windows in outer wall at GF,FF &SF 241 1.8
TOTAL

21.13 P/F 100mm brass locks in aluminium doors


Doors and windows of GF,FF and Second floor NO.
D-1 55 1
D-2 44 1

HOSP.-39
D-3 25 1
D-4 1 1
D-5 23 1
D-6 11 1
D-7 2 1
TOTAL

21.15 P/F aluminium casement windows -------------------

21.15.2 Power coated -------------


Windows in outer wall at GF,FF &SF Each 241 2

21.16 P/F aluminium round shape handles casement windows -------------------


Doors and windows of GF,FF and Second floor Each
D-1 55 2
D-2 44 2
D-3 25 2
D-4 1 2
D-5 23 2
D-6 11 2
D-7 2 2
TOTAL

22 WATER PROOFING

P/F WATER PROOFING TREATMENT TO Sunken


22.3 portions SQM

Ground Floor
Toilets floor 10 7.85
Toilets walls 10 29.7
First Floor
Toilets floor 10 7
Toilets walls 10 29.7
Second Floor
Toilets floor 10 7.85
Toilets walls 10 29.7
TOTAL

22.7 P/L Brick coba integran water proofing------------------

At Terrace (Area of terrace


Terrace 1 109.34
2 47.91
1 33.45
TOTAL

HOSP.-40
25 STRUCTURAL GLAZING

Design,fabricating,installing,protection installing and


25.7 fixing in position -------------
Lump sum quantity SQm

HOSP.-41
Hospital at Raipur

Breadth H/D Qty.

400
200
500

3.75 2 182.25
4.05 2 1410.62
4.05 2 246.65
4.35 2 37.85
5.8 2 148.71
3.75 2 61.88
4.05 2 773.96
4.35 2 1642.13
4.05 2 117.13
4.35 2 173.13
6.95 2 193.21
5.86 2 302.02
0.38 0.55 303.05

5592.56

1.415 1.105 2640.88

HOSP.-42
8233.44

-2.43

-388.47
-219.57
7622.97

3.75 0.5 45.56


4.05 0.5 352.65
4.05 0.5 61.66
4.35 0.5 9.46
5.8 0.5 37.18
3.75 0.5 15.47
4.05 0.5 193.49
4.35 0.5 410.53
4.05 0.5 29.28
4.35 0.5 43.28
6.95 0.5 48.30
5.86 0.5 75.51
1322.38

0.1 425
425

0.1 264.16
3.35 0.1 7.34
3.65 0.1 57.29
3.65 0.1 10.09
3.95 0.1 1.56
5.4 0.1 6.49
3.35 0.1 2.63
3.65 0.1 32.98
3.95 0.1 70.61
3.65 0.1 4.99
3.95 0.1 7.54
6.55 0.1 8.58

HOSP.-43
5.46 0.1 13.42
0.38 0.1 55.10
1.3 0.1 219.57

762.34

465
465

0.23 106.95
0.23 143.06
0.115 45.31
295.32

0.23 106.95
0.23 143.06
0.115 45.31
295.32

0.5 39.60
0.5 296.70
0.5 50.40
0.5 7.50
0.5 17.30
0.5 9.85
0.5 131.95
0.5 266.25
0.5 20.10
0.5 26.10
1.5 91.80
1.5 95.40
1.5 18.00
1.5 21.60
1.5 108.00
1.5 216.00
1.5 189.00
0.5 3.60

HOSP.-44
1.5 16.20
0.45 1305.00
2930.35

1.5 18139.50
1.5 155.88
2 720.00
4 192.00
4 192.00
19399.38

0.23 28.15
0.2 57.12
0.23 19.32
0.2 40.32
0.23 14.49
0.2 30.24
0.23 9.87
0.2 21.84
0.23 11.50
0.2 26.00
0.23 14.49
0.2 33.60
0.23 27.95
0.2 68.04
0.45 1520.55
0.23 1358.61
0.48 1890.24
5172.32

10.05 120.60
10.05 144.72
10.05 723.60
10.05 1447.20
10.05 1266.30
10.05 72.36
10.05 108.54
3883.32

1.5 155.88
0.15 135.00
2 720.00

HOSP.-45
0.17 0.00
1010.88

1395.00
1395.00

144073

449865

3.75 0.5 45.56


4.05 0.5 352.65
4.05 0.5 61.66
4.35 0.5 9.46
5.8 0.5 37.18
3.75 0.5 15.47
4.05 0.5 193.49
4.35 0.5 410.53
4.05 0.5 29.28
4.35 0.5 43.28
6.95 1.5 144.91
5.86 1.5 226.52
0.45 1.5 1.62
0.45 1.5 2.43
0.6 1.5 16.20
0.6 1.5 32.40
0.6 1.5 28.35
0.23 0.5 0.21
0.6 1.5 2.43
0.23 0.45 150.08
1803.71

0.45 10.05 10.85


0.45 10.05 16.28
0.6 10.05 108.54
0.6 10.05 217.08
0.6 10.05 189.95

HOSP.-46
0.6 10.05 10.85
0.6 10.05 16.28
1.5 0.17 1292.09
451.30
0.3 0.125
2 0.17 35.33
4.3 0.15 580.50
1.5 0.17 30.60
5 0.125 37.30
2996.95

81

0.23 0.9 388.47

0.23 3.78 503.40

HOSP.-47
0.23 3.78 540.77
0.00
0.23 3.78 503.40
0.23 3.78 438.18
0.00
0.23 3.78 503.40
0.23 3.78 438.18
0.23 1 133.17
0.00
0.23 2.1 47.82
0.23 2.1 31.88
0.23 2.1 18.11
0.23 2.1 0.53
0.23 2.1 11.11
0.23 2.1 4.78
0.23 2.1 0.72
0.23 1.8 74.83
3250.28

0.60 18.42
0.60 14.74
0.60 18.42
51.58

42.70
34.16
42.70

789.30
908.86

30.00
24.00
30.00
24.00
30.00
84.00

HOSP.-48
0.50 7.50
0.50 6.00
0.50 7.50
21.00

11.23 369.02
0.1 11.06
6.78 45.97
0.1 2.71
7 49.77
0.1 2.82
7.11 50.55
0.1 2.84
3.67 26.09
0.1 2.16
3.6 12.60
0.1 0.35
4.00 28.00
0.10 2.20
7.00 84.91
7.00 267.82
3.5 24.50
0.1 2.10
3.88 27.16
0.1 2.18
3.00 21.00
0.10 2.00
0.00
7.11 51.41
0.1 2.87
6.78 96.41
0.1 2.78
7.11 102.67
0.1 5.73
6.78 91.94
0.1 2.71
7.11 51.33
0.1 2.87
7.11 102.81
7.11 102.81
7 98.00
0.1 2.80
3.67 26.09
0.1 2.16
7.23 51.41
0.1 2.87

HOSP.-49
7 294.00
0.1 16.80
7 50.61
0.1 2.85
7 101.22
0.1 2.85
0.00
0.00
7 101.92
0.1 4.31
7 78.05
0.1 3.63
0.00
7.00 50.61
0.10 2.85
7.00 50.61
0.10 2.85
3.97 28.23
0.1 2.22
0.1 2.22
3.97 28.23
0.1 2.22
7 168.84
0.1 6.22
6.93 49.27
0.1 2.81
2.8 12.29
0.1 1.44
3.52 24.64
0.1 2.81
3.3 46.20
0.1 5.44
2.47 9.31
0.1 1.25
7 50.61
0.1 2.85
3.95 28.08
0.1 2.21
3.44 24.08
0.1 2.09
3102.07

2.1 153.90
2.1 32.40
2.1 72.00
Total 258.30

HOSP.-50
2.1 85.05
2.1 15.12
2.1 45.36
Total 145.53

0.3 2.43

2.00 90.00

25.00 25000.00
8137.5
33137.50

3.44 195.39
0.1 22.37
1.5 103.92
0.3 55.97
0.3 228.62
0.15 119.51
0.45 10.19
0.00
2.4 1262.88
1.5 789.30
3.23 12.92
0.1 1.49
4.88 34.70
0.1 2.40
7 177.24
0.1 7.86
7.11 52.47
0.1 2.90
7 200.76

HOSP.-51
7.11 79.28
0.1 3.25
7 203.84
0.1 4.31
7.11 99.61
0.1 4.22
7.11 99.61
0.1 4.22
0.3 55.97
0.00
0.3 228.62
0.00
0.15 119.51
0.45 10.19
2.4 631.44
1.5 789.30
3.33 183.28
0.1 21.66
7 294.00
0.1 16.80

3.32 23.24
0.1 2.06
3.44 24.08
0.1 2.09

6.95 97.30
0.1 5.58
7 100.38
0.1 5.67
7 392.00
0.1 16.80
3.33 206.19
0.1 24.37
6.71 47.71
0.1 2.76
7 75.81
0.1 3.57
7.1 50.48
0.1 2.84
7 66.92
0.1 3.31
1.57 6.89
0.1 1.19

HOSP.-52
3.32 23.24
0.1 2.06
2.5 10.98
0.1 1.38
0.00
0.3 55.97
0.00
0.3 228.62
0.00
0.15 119.51
0.00
2.4 631.44
1.5 789.30
7.11 51.33
9205.10

2.10 623.70
0.00
2.10 623.70
0.00
2.10 623.70
1871.10

7.00 549.50
0.00
6.90 483.00
0.00
7.00 549.50
1582.00

7.11 59.23
0.10 3.09
3.38 23.66
0.10 2.08
3.44 24.46
0.10 2.11
0.00
7.00 549.50
0.10 29.70
3.44 24.46
0.10 2.11

HOSP.-53
0.00
7.11 55.81
0.10 2.99
7.22 53.28
0.10 2.92
6.99 54.87
0.10 2.97
7.11 52.47
0.10 2.88
948.59

7.00 99.61
0.10 4.25
2.00 32.00
0.30 12.00
7.00 49.00
0.10 2.80
0.00
7.00 49.00
0.10 2.80
4.00 170.64
0.10 13.33
3.44 48.16
0.10 4.18
3.32 23.24
0.10 4.13
2.47 34.58
0.10 3.78
3.44 146.75
0.10 12.66
4.00 168.00
0.10 4.40

2.45 34.30
0.10 3.78

2.47 34.58
0.10 3.78
4.00 28.00
0.10 2.80
3.50 24.89
0.10 2.12
3.41 24.25

HOSP.-54
0.10 2.10
1045.90

3.70 25.09
0.10 2.10
2.91 20.37
0.10 1.98
7.00 49.77
0.10 2.82
3.35 23.45
0.10 2.14
2.47 19.76
0.10 1.29
4.00 20.08
0.10 1.80
6.11 44.18
0.10 2.67
3.50 24.89
0.10 2.12
6.89 48.99
0.10 2.80
4.38 31.54
0.10 2.32
3.00 21.00
0.10 2.00
3.33 11.26
0.10 1.34
3.34 11.29
0.10 1.34
3.38 11.63
0.10 1.34
3.44 24.08
0.10 2.09
3.44 24.08
0.10 2.09
3.33 23.31
0.10 2.07
3.33 23.31
0.10 2.07
2.10 5.04
0.10 0.90
2.10 5.04
0.10 0.90
7.00 119.98
0.10 3.11
3.88 27.00

HOSP.-55
0.10 2.17
3.00 10.20
0.10 1.28
7.00 106.40
0.10 2.92
3.38 14.53
0.10 1.54
2.40 6.91
0.10 1.06
2.27 6.54
0.10 1.03
3.33 11.46
0.10 1.35

3.33 23.68
0.10 2.09
3.61 25.67
0.10 2.14
2.60 9.10
0.10 1.22
4.00 20.12
0.10 1.81
2.47 9.31
0.10 1.25
2.01 7.04
0.10 1.12
2.30 7.48
0.10 1.12
2.30 8.67
0.10 1.21
2.28 8.60
0.10 1.21
2.28 8.60
0.10 1.21
3.11 21.77
0.10 2.02
2.26 15.32
0.10 1.81
2.26 15.32
0.10 1.81
3.33 11.46
0.10 1.35
3.44 24.08
0.10 2.09
3.70 14.06
0.10 1.50
3.00 11.40
0.10 1.52
2.89 20.55

HOSP.-56
0.10 2.00
2.47 9.88
0.10 1.29
2.89 20.55
0.10 2.00
3.88 15.52
0.10 1.58
3.00 11.64
0.10 1.38
2.30 7.48
0.10 1.11
2.01 7.46
0.10 1.14
7.00 168.84
0.10 6.22
7.11 80.63
0.10 3.69
7.11 80.63
2.66 9.18
0.10 1.22
1.78 4.73
0.10 0.89
1.66 4.42
0.10 0.86
7.11 100.39
0.10 4.25
7.00 101.92
0.10 4.31
2.80 12.29
0.10 1.44
7.00 50.61
0.10 2.85
7.04 50.05
0.10 2.83
7.11 50.62
0.10 2.85
3.44 24.08
0.10 2.09
3.12 22.18
0.10 2.05
3.00 21.33
0.10 2.02
4.02 28.58
0.10 2.23
3.32 23.24
0.10 2.06
5.14 37.16
0.10 2.47
3.00 10.50
0.10 1.30

HOSP.-57
3.88 13.58
0.10 1.48
4.00 28.00
0.10 2.80
3.44 24.08
0.10 2.09
2.89 20.55
0.10 2.00
3.87 15.02
0.10 1.55
3.00 11.61
0.10 1.37
3.40 24.17
0.10 2.10
3.45 24.53
0.10 2.11
7.00 49.00
0.10 2.80
3.88 15.52
0.10 1.58
3.44 24.08
0.10 2.09
2394.62

2394.62

511.46

429

4250.00
2468.82
2514.94
9233.76

16.72 1828.16
16.72 1602.11
16.72 559.28
3989.56

HOSP.-58
28260.00

7744.80

2.1 -49.14
2.1 -37.80
2.1 -53.55
2.1 -87.78
2.1 -56.70
2.1 -111.51
2.1 -252.00
35356.32

42452.64
17678.00

11.23 184.51
0.00
6.78 45.97
7 49.77
7.11 50.55
3.67 26.09
3.6 12.60
4.00 28.00
0.10 2.20
7.00 84.91
3.5 24.50
3.88 27.16
3.00 21.00

7.11 51.41
6.78 96.41
0.1 2.78
7.11 51.33
6.78 45.97
7.11 51.33
7.11 51.41
7 49.00

HOSP.-59
3.67 26.09
7.23 51.41
7 294.00
7 50.61
7 50.61

7 101.92
7 78.05
0.1 3.63
0.00
7.00 50.61
7.00 50.61
3.97 28.23
0.1 2.22
3.97 28.23
7 168.84
6.93 49.27
2.8 12.29
3.52 24.64
3.3 46.20
2.47 9.31
7 50.61
3.95 28.08
3.44 24.08

3.44 195.39
1.5 103.92
0.00
2.4 631.44
3.23 12.92
4.88 34.70
7 177.24
7.11 52.47
0.1 2.90
7 200.76
0.1 8.54

7.11 79.28
7 101.92
7.11 99.61
7.11 99.61
0.3 55.97

2.4 631.44
3.33 183.28
7 294.00

HOSP.-60
3.32 23.24
3.44 24.08

6.95 97.30
7 100.38
7 294.00
3.33 183.28
6.71 47.71
7 75.81
7.1 50.48
0.1 2.84
7 66.92
1.57 6.89
3.32 23.24
2.5 10.98

2.4 631.44
1.5 789.30
7.11 51.33

7.00 274.75
0.00
6.90 241.50
0.00
7.00 274.75
0.00
0.00
7.11 59.23
3.38 23.66
3.44 24.46
0.00
7.00 274.75
0.10 14.85
3.44 24.46
0.00
7.11 55.81
7.22 53.28
6.99 54.87
7.11 52.47
0.00
0.00
0.00
0.00

HOSP.-61
7.00 99.61
2.00 32.00
7.00 49.00
0.00
7.00 49.00
4.00 56.88
3.44 48.16
3.32 23.24
2.47 34.58
3.44 48.92
4.00 56.00
0.00
0.00
2.45 34.30
0.00
0.00
0.00
2.47 34.58
4.00 28.00
3.50 24.89
0.00
3.41 24.25
0.00
3.70 25.09
0.00
2.91 20.37
0.00
7.00 49.77
0.00
3.35 23.45
0.00
2.47 19.76
4.00 20.08
0.00
6.11 44.18
0.00
3.50 24.89
0.00
6.89 48.99
0.00
4.38 31.54
0.00
3.00 21.00
0.00
3.33 11.26
0.00
3.34 11.29
0.00
3.38 11.63
0.10 1.34

HOSP.-62
3.44 24.08
0.00
3.44 24.08
0.00
3.33 23.31
0.00
3.33 23.31
0.00
2.10 5.04
0.00
2.10 5.04
0.10 0.90
7.00 59.99
0.00
3.88 27.00
0.00
3.00 10.20
0.00
7.00 53.20
0.00
3.38 14.53
0.00
2.40 6.91
0.00
2.27 6.54
0.00
3.33 11.46
0.00
0.00
0.00
3.33 23.68
0.00
3.61 25.67
0.00
2.60 9.10
0.00
4.00 20.12
0.00
2.47 9.31
0.00
2.01 7.04
0.00
2.30 7.48
0.00
2.30 8.67
0.00
2.28 8.60
0.00
2.28 8.60
0.00

HOSP.-63
3.11 21.77
0.00
2.26 15.32
0.00
2.26 15.32
0.00
3.33 11.46
0.00
3.44 24.08
0.00
3.70 14.06
0.00
3.00 11.40
0.00
2.89 20.55
0.00
2.47 9.88
0.00
2.89 20.55
0.00
3.88 15.52
0.00
3.00 11.64
0.00
2.30 7.48
0.00
2.01 7.46
0.00
7.00 168.84
0.00
7.11 80.63
0.10 3.69
0.00
2.66 9.18
0.00
1.78 4.73
0.00
1.66 4.42
0.10 0.86
7.11 100.39
0.00
7.00 101.92
0.00
2.80 12.29
0.00
7.00 50.61
0.00
7.04 50.05
0.00
7.11 50.62

HOSP.-64
0.00
3.44 24.08
0.00
3.12 22.18
0.00
3.00 21.33
0.00
4.02 28.58
0.00
3.32 23.24
0.00
5.14 37.16
0.00
3.00 10.50
0.00
3.88 13.58
0.00
4.00 28.00
0.00
3.44 24.08
0.00
2.89 20.55
0.00
3.87 15.02
0.00
3.00 11.61
0.00
3.40 24.17
0.00
3.45 24.53
0.00
7.00 49.00
0.00
3.88 15.52
0.00
3.44 24.08

11753.68

3.6 4168.94

3.78 4377.39
3.78 4702.32
3.78 0.00
0.00
3.78 3810.24
3.78 0.00

HOSP.-65
3.78 4377.39
3.78 3810.24
11753.68

7.00 549.50
1.68 498.96

6.90 483.00
1.68 498.96

7.00 549.50
1.68 2.1 498.96

2.1 -207.90
2.1 -138.60
2.1 -78.75
2.1 -2.31
2.1 -48.30
2.1 -20.79
2.1 -1.50
2.28 -789.03

34622.96

13.3 7700.97
1 579.02
2.4 1041.12
9321.11

11.23 184.51
3.78 418.22
4.00 28.00
3.78 83.16
7.00 84.91
7.00 535.64
3.5 24.50
3.78 79.38

3.97 28.23
3.78 83.76
3.78 83.76

HOSP.-66
3.97 28.23
3.78 83.76
6.93 49.27
3.78 212.28
2.8 12.29
3.78 54.36
3.52 24.64
3.78 106.14
3.3 46.20
3.78 308.45
2.47 9.31
3.78 47.17
7 50.61
3.78 107.58

3.44 195.39
3.78 845.51
2.4 631.44
1.5 789.30
7.11 52.47
3.78 109.54
7 401.52
3.78 322.66

7.11 79.28
3.78 122.93
7 101.92
3.78 162.99
7.11 99.61
3.78 159.67
7.11 99.61
3.78 159.67
2.4 1262.88
1.5 789.30
3.33 183.28
3.78 818.90

3.33 183.28
3.78 818.90
6.71 47.71
3.78 104.48
7 75.81
3.78 134.79
2.4 631.44
1.5 789.30
7.11 51.33

HOSP.-67
3.44 24.46
3.78 79.76

2.47 19.76
3.78 48.91
4.00 20.08
3.78 68.19
3.44 24.08
3.78 78.93
3.33 23.31
3.78 78.09
3.33 23.31
3.78 78.09
2.27 6.54
3.78 38.93

4.00 20.12
3.78 68.27
2.47 9.31
3.78 47.17
3.11 21.77
3.78 76.43
3.44 24.08
3.78 78.93
3.70 14.06
2.30 7.48
3.78 41.96
7.11 80.63
0.10 3.69
7.11 80.63
4.02 28.58
3.78 84.14
3.78 93.52
3.00 10.50
3.78 49.14
14452.15

43813.00

3900.00

HOSP.-68
2.4 237.60
2.4 158.40
2.4 90.00
2.4 2.64
2.4 55.20
2.4 23.76
2.4 3.60
2.4 1041.12
1612.32

35116.00

462.00
343.20
195.00
7.00
156.40
72.60
12.60
2024.40
3273.20

2.4 237.60
2.4 158.40
2.4 90.00
2.4 2.64
2.4 55.20
2.4 23.76
2.4 3.60
2.4 1041.12
1612.32

55.00
44.00

HOSP.-69
25.00
1.00
23.00
11.00
2.00
161.00

482.00

110.00
88.00
50.00
2.00
46.00
22.00
4.00
322.00

7.00 549.50
0.45 133.65

6.90 483.00
0.45 133.65

7.00 549.50
0.45 133.65
1982.95

16.72 1828.16
16.72 1602.11
16.72 559.28
3989.56

HOSP.-70
500

HOSP.-71
NAME OF WORK: CONSTRUCTION OF PROPOSED 3 BHK with servant Quarter for ESIC
BOQ As per DSR 2014
Sl. No. Item No. Description of the work

1.0 SUB-HEAD I - Carriage of Materials

1.1 1.1.2 Carriage of Earth by Mechanical transport Including loading


unloding and stacking

0 to 2 KM
5KM to 10KM
10KM to 20 KM

2.0 SUBHEAD II : Earth Work


2.1 2.6 Earth work in excavation by mechanical means (Hydraulic
excavator) /manual means in foundation over areas
(exceeding 30cm in depth , 1.5 m in width or 10 sqm on
plan), including disposal of excavated earth, for all leads and
lifts, disposed earth to be levelled and neatly dressed.All kind
of soil.

2.9 Earth work in foundation trenches or drains------

2.9.3 Hard rock (Blasting Prohibited)


2.2 2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides of foundations etc. in layers not exceeding 20cm
in depth, consolidating each deposited layer by ramming and
watering, lead up to 50 m and lift upto 1.5 m.

2.3 2.27 Supplying and filling in plinth with jamuna sand under floors,
including watering,ramming consolidating and dressing
complete
2.31 Clearing jungle uprooting of rank vegitation

2.34 Supplying Chemical emulsion --------------


2.34.1 Chlorphriphos Lindane----------------

2.35 Diluting and injecting Chemical emulsion----------


2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration
2.35.3 Treatment of soils under existing floors--------------

33
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1% concentration

3.0 SUB HEAD-III --CONCRETE WORK


3.1 4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate
40 mm nominal size)
4.11 Providing and laying 50mm thick DPC----------

4.13 Applying a coat of residual petrolium-----------------

3.2 4.17 Making plinth protection 50 mm thick of cement concrete


1:3:6 (1 cement:
3 coarse sand : 6 graded stone aggregate 20 mm nominal
size) over
75mm thick bed of dry brick ballast 40 mm nominal size, well
rammed and
consolidated and grouted with fine sand, including finishing
the top
smooth

4.0 SUB HEAD-IV RCC WORK


4.1 5.9.1 Centering and shuttering including strutting, propping etc.
and removal of form for : Foundations, footings, bases of
columns, etc. for mass concrete
4.3 5.9.6 Centering and shuttering including strutting, propping etc.
and removal of form for :Columns, Pillars, Piers, Abutments,
Posts and Struts

4.4 5.9.5 Centering and shuttering including strutting, propping etc.


and removal of form for : Lintels, beams, plinth beams,
girders, bressumers and cantilevers

4.5 5.9.7 Centering and shuttering including strutting, propping etc.


and removal of form for : Stairs, (excluding landings) except
spiral-staircases

4.6 5.9.19 Weather shade,chajjas,corbles etc. including edges

Suspended floors,roofs,landings,balconies and access


4.7 5.9.20 platform with water proof ply 12mm thick

4.8 5.22.6 Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
upto plinth level

34
5.22A Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
above plinth level . Thermo-Mechanically Treated bars

4.8 5.33.1 Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works upto plinth level

4.9 5.33.2 Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works above plinth
level upto floor V level

4.10 5.34.1 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-30 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-30 is @ 340 kg/ kg/cum)

4.11 5.34.2 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-35 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-35 is @ 350 kg/ kg/cum)

4.12 5.34.3 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-40 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-40 is @ 360kg/ kg/cum)

35
5.0 SUBHEAD V-BRICK WORK
5.1 6.1 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:
(a) 6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.4.2 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in super structure above
plinth level upto floor V level

6.2.4 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.12 Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundation and
plinth in:
6.12.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.13 Half b masonry work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in super structure
above plinth level upto floor V level

6.13.2 Cement mortar 1:6 (1 cement : 6 coarse sand)


6.15 Extra for providing and placing in position 2 nos.6mm dia.MS
bars at every third course of half brick masonry

7.0
SUBHEAD VII-MARBLE & GRINITE WORK

7.1 8.2 Providing and fixing 18 mm thick gang saw cut, mirror
polished, premoulded
and prepolished, machine cut for kitchen platforms, vanity
counters, window
sills , facias and similar locations of required size, approved
shade, colour
and texture laid over 20 mm thick base cement mortar 1:4 (1
cement : 4
coarse sand), joints treated with white cement, mixed with
matching pigment,
epoxy touch ups, including rubbing, curing, moulding and
polishing to edges
to give high gloss finish etc. complete at all levels

8.2.2 Granite of any colour and shade


8.2.2.2 Area of slab over 0.50 sqm

36
8.3 Providing edge moulding to 18mm thick marble stone
counters,vanities etc. including machine polishing to edge to
give high gloss finish etc.complete as per design approved by
Engineer-In-Charge.

8.3.2 Granite work

7.2 8.5 Extra for providing opening of required size & shape for wash
basin/ kitchen
sink in kitchen platform, vanity counter and similar location in
marble/
Granite/stone work, including necessary holes for pillar taps
etc. including
moulding, rubbing and polishing of cut edges etc. complete

7.3 8.6 Mirror polishing on marble work/Granite work/Stone work


where ever required to give high gloss finish complete.

7.4 8.12 Providing and laying flamed finish Granite stone flooring in
required design and patterns, in linear as well as curvilinear
portions of the building all complete as per the architectural
drawings with 18 mm thick stone slab
over 20 mm (average) thick base of cement mortar 1:4 (1
cement : 4 coarse sand) laid and jointed with cement slurry
and pointing with white cement slurry admixed with pigment
of matching shade including rubbing, curing
and polishing etc. all complete as specified and as directed
by the Engineerin-In-Charge :

a Flamed finish granite stone slab Jet Black, Cherry Red, Elite
Brown, Cat Eye or equivalent

8.0 SUBHEAD VIII-Wood Work

9.53 P/F 40x5mm flat iron hold fast-----------------


9.18 P/F cup board shelves -----------------------------------------------
9.18.2 25mm thick

8.4 9.84 Providing and fixing aluminium extruded section body tubular
type universal hydraulic door closer (having brand logo with
ISI, IS : 3564, embossed on the body, door weight upto 36 kg
to 80 kg and door width from 701 mm to 1000 mm), with
double speed adjustment with necessary accessories and
screws etc. complete.

37
9.96 Providing and fixing aluminium sliding door bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
IS:1868), transparent or dyed to required color or shade, with
nuts and screws etc. complete
9.96.1 300x16 mm

16.11 9.97 Providing and fixing aluminium Tower bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
IS:1868), transparent or dyed to required color or shade, with
necessary screws etc. complete
9.97.1 300x10 mm

16.12 9.100 Providing and fixing aluminium handles, ISI msrked anodised
(anodic coating not less than grade AC 10 as per IS:1868),
transparent or dyed to required color or shade, with
necessary screws etc. complete
9.100.1 125 mm

16.13 9.101 Providing and fixing aluminium hanging floor door stopper, ISI
msrked anodised (anodic coating not less than grade AC 10
as per IS:1868), transparent or dyed to required color or
shade, with necessary screws etc. complete
9.101.2 Twin rubber stopper
8.5 9.103 Providing and fixing bright finished brass 100 mm mortice
latch and lock, ISI marked, with six levers and a pair of
anodised (anodic coating not less than grade AC 10 as per IS
: 1868) aluminium lever handles of approvedquality with
necessary screws etc. complete.

8.7 9.21 Providing and fixing ISI marked flush door shutters
conforming to IS: 2202 (part1) non-decorative type. Core of
block board construction with frame of 1st class hard wood
and well matched commercial 3 ply veneering with vertical
grains or cross bands and face veneers on both faces of
shutters:

(a) 9.21.1 35mm thick including ISI marked Stainless Steel butt hinges
with necessary screws.

9.21.3 25mm thick (For cup board ) Including ISI marked nicel plated
Bright finished MS piano hinges with necessary screws.

9.0 SUBHEAD IX-STEEL WORK

38
P/F Pressed steel door frame confirming to IS:4351,manufactured
from commercial mild steel sheet of 1.60mm thickness including
hinges,jamb ,lock jamb ,bead and if required angles thresshold of
mild steel angle of section 50x20mm,or base ties of 1.60mm
pressed mild steel welded or rigidly fixed together by mechanical
10.14 means including M S pressed butt hinges 2.5mm thick with mortar
guard,lock strikeplate and shock absorvers as specified and
applying a coat of approved steel primer after pre-treatment of the
surface

Profile B
10.14.1
9.2 10.30 Providing & fixing glass panes with putty and glazing clips in
steel doors,
windows, clerestory windows, all complete with :

10.30.2 5.5 mm thick glass panes


P/F stainless steel (Grade 304) railing made of hollow
tubes,channels,plates etc.including welding
,grinding,buffing,polishing and making curvature(wherever
required)and fitting the same with necessary stainless steel nuts
and bolts complete i/c fixing the railing with necessary accessories
and stainless steel dash fastners,stainless steel bolts etc. of
10.28 required size ,on the top of the floor or side of waste slab with
suitable arrangement as per approval of Engineer-In-Charge(For
payment purpose only weight of stainless steel members shall be
considered excluding fixing accessories such as nuts,bolts fastners
etc.)

10.0 SUBHEAD X-Flooring


10.5 11.36 Providing and fixing Ist quality ceramic glazed wall tiles
conforming to IS : 15622 (thickness to be specified by the
manufacturer ) of approved make in all colours, shades
except burgundy, bottle green, black of any size as approved
by Engineer-in-Charge, in skirting, risers of steps and dados
over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @ 3.3kg
per sqm including pointing in white cement mixed with
pigment of matching shade complete.

11.37 Providing and fixing ceramic glazed floor tiles of size


300x300mm(Thickness to be specified by the manufacturers)
of 1st quality conforming to IS : 15622 of approved make in
colours, such as white,Ivory,Grey Fumes,Red Brown laid on
20 mm thick bed of cement Mortar 1:4 (1 cement : 4 coarse
sand) including pointing the joints with white cement with
pigment of matching shade complete.

39
10.6 11.41 Providing and laying vitrified floor tiles in different sizes
(thickness to be specified by the manufacturer) with water
absorption less than 0.08% and conforming to IS : 15622, of
approved make, in all colours and shades, laid on 20mm
thick cement mortar 1:4 (1 cement : 4 coarse sand),
ncluding grouting the joints with white cement and matching
pigments etc., complete.

11.41.2 Size of Tile 600x600 mm

10.7 11.48 Grouting the joints of flooring tiles having joints of 3mm
width ,using epoxy grout mix of 0.70 kg of organic coated
filler of desired shade (0.10 kg of hardener and 0.20 kg of
resin per kg)including filling /grouting and finishing complete
as per the direction of Engineer-In-Charge.

11.48.2 Size if Tile 600x600 mm

TOTAL
11.0 SUBHEAD XI- ROOFING
11.1 12.21 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement
: 2 coarse sand : 4 stone aggregate 10 mm and down
gauge), including finishing with cement mortar 1:3 (1 cement :
3 fine sand) as per standard design

12.21.1 In 75x75 mm deep chase


11.2 12.22 Making khurras 45x45 cm with average minimum thickness of
5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate of 20 mm nominal size) over P.V.C.
sheet 1 m x1 m x 400 micron, finished with 12 mm cement
plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat
cement, rounding the edges and making and finishing the
outlet complete

11.4 12.55 Providing and fixing Heat Resistant Terrace Tiles (300 mm x
300 mm x 20 mm) with SRI (solar refractive index) > 78, solar
reflection > 0.70 and initial emittance > 0.75 on waterproof
and sloped surface of terrace, laid on 20 mm thick cement
sand mortar in the ratio of 1:4 (1 cement : 4
coarse sand) and grouting the joints with mix of white cement
& marble powder in ratio of 1:1, including rubbing and
polishing of the surface upto 3 cuts complete, including
providing skirting upto 150 mm height along the parapet walls
in the same manner.

12.0 SUBHEAD XII- Finishing


12.1 13.4 12 mm cement plaster of mix :
(a) 13.4.2 1:6 (1 cement: 6 coarse sand)

40
15 mm cement plaster on rough side of single or half brick
12.2 13.5 wall of mix :

1:6 (1 cement: 6 coarse sand)


(a) 13.5.2
12.3 13.16.1 6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)

12.5 13.26 Providing and applying plaster of paris putty of 2 mm


thickness over
plastered surface to prepare the surface even and smooth
complete

12.7 13.41 Distempering with oil bound washable distemper of approved


brand and
manufacture to give an even shade

13.41.1 New work (two or more coats) over and including water
tinnable priming coat with cement primer

12.8 13.45 Finishing walls with textured exterior paint of required shade

13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm)
over and including priming coat of exterior primer applied @
2.20kg/ 10 sqm

13.78 Providing and applying 12mm thick gypsum light weight


plaster------------
13.83 Wall painting with remium acrylic imulsion paint of interior
grade------------
13.83.2
Two coats
12.9 13.84 Painting with synthetic enamel paint ,having VOC(Volatile
Organic Compound) contents less than 150 gms/litre,of
approved brand and manufacture,including applying
additional coats wherever required to achieve even shade
and colour
13.84.2 Two coats
12.10 13.85
Applying priming coats with primer of approved brand and
manufacture,having low VOC(Volatile Organic Compound)
contents.
12.11 13.85.1 With ready mixed pink or grey primer on wood work(Hard and
Soft wood)having VOC(Volatile Organic Compound) contents
less than 50 gms/litre.

41
13 SUB HEAD XIII Aluminium Work
13.1 21.1 Providing and fixing aluminium work for doors, windows,
ventilators and partitions with extruded built up standard
tubular sections/ appropriate Z sections and other sections of
approved make conforming to IS: 733 and IS: 1285, fixing
with dash fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top, bottom
and sides with required EPDM rubber/ neoprene gasket etc.
Aluminium sections shall be smooth, rust free, straight, mitred
and jointed mechanically wherever required including cleat
angle, Aluminium snap beading for glazing / paneling, C.P.
brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-
charge. (Glazing, paneling and dash fasteners to be paid for
separately) :

21.1.1 For fixed portion


21.1.1.2 Powder coated aluminium (minimum thickness of powder
coating 50 micron

21.1.2 For shutters of doors,windows & ventilators including


providing and fixing hinges/pivots and making provision for
fixing of fittings wherever required including the cost of EPDM
rubber/neoprene gasket required(Fittings shall be paid for
seperately)

21.1.2.2 Powder coated aluminium (minimum thickness of powder


coating 50 micron

13.2 21.10 P/F double glazed hermetically sealed glazing in


aluminium----------

13.3 21.8 Filling the gap in between aluminium frame & adjacent
RCC/Brick/Stone work by providing weather silicon sealent
over backer rod of approved quality as per architectural
drawings and direction of Engineer-In-Charge

21.8.1 Upto 5mm depth and 5mm width


21.15 P/F aluminium casement window---------

21.15.2 Powder coated------------

14.0 Sub Head XIV: Water Proofing


14.1 22.3 Providing and laying water proofing treatment to vertical and
horizontal surfaces of depressed portions of W.C., kitchen
and the like consisting of:

42
(i) Ist course of applying cement slurry @ 4.4 kg/sqm mixed with
water proofing compound conforming to IS 2645 in
recommended proportions including rounding off junction of
vertical and horizontal surface.
(ii) IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse
sand) mixed with water proofing compound in recommended
proportion including rounding off junction of vertical and
horizontal surface.
(iii) IIIrd course of applying blown or residual bitumen applied hot
at 1.7 kg. per sqm of area.
(iv) IVth course of 400 micron thick PVC sheet. (Overlaps at
joints of PVC sheet should be 100 mm wide and pasted to
each other with bitumen @ 1.7 kg/sqm).
14.2 22.7 Providing and laying integral cement based water proofing
treatment including preparation of surface as required for
treatment of roofs,balconies, terraces etc consisting of
following operations: a) Applying a slurry coat of neat cement
using 2.75 kg/sqm of cement admixed with water proofing
compound conforming to IS. 2645 and approved by
Engineer-in-charge over the RCC slab including adjoining
walls upto 300mm height including cleaning the surface
before treatment. b) Laying brick bats with mortar using
broken bricks/brick bats 25 mm to 115 mm size with 50% of
cement mortar 1:5 (1 cement : 5 coarse sand) admixed with
water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge over 20 mm thick layer of
cement mortar of mix 1:5(1 cement :5 coarse sand ) admixed
with water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge to required
slope and treating similarly the adjoining walls upto 300 mm
height including rounding of junctions of walls and slabs c)
After two days of proper curing applying a second coat of
cement slurry using 2.75 kg/ sqm of cement admixed jointless
cement mortar of mix 1:4 (1 cement :4 coarse
sand) admixed with water proofing compound conforming to
IS : 2645 and approved by Engineer-in-charge including
laying glass fibre cloth of approved quality in top layer of
plaster and finally finishing the surface with trowel with neat
cement slurry and making pattern of 300x300 mm square
3 mm deep. e) The whole terrace so finished shall be flooded
with
With water for thickness
a minimumofperiod of two
and weeks for thickness
curing andat
average 120 mm minimum
a 22.7.1
khurra as 65 mm.

16.0 Sub Head XVII: Non Scheduled

43
NS-20 Providing and fixing Glass Reinforced Concrete
jali(GRC) screen in approved
size,pattern,design,thickness and color.The jali shall be
made from 53 grade white portland cement/43 grade
OPC or PPC grey cement manufactured by J.K. cement
or equivalent,quartz,fine silica sand ,Alkali resistance
glass fiber manufactured by Sant Gobin or
equivalent,super plasticiser and polymer manufactured
by BASF,sika as per the manufacturar;s specifications
and as per the directions of Engineer-In-Charge

35mm thick GRC jali

TOTAL NON-SCHEDULED ITEMS

44
th servant Quarter for ESIC Hospital at Raipur

Unit Qty. Rate Amount

Cum 40 113.29 4531.60


Cum 25 57.70 1442.50
Cum 100 48.00 4800.00
Total 10774.10

Cum 150 155.6 23340.00

Cum 306 618.1 189138.60

Cum 235 112.1 26398.89

Cum 15.79 910.25 14372.57

100 Sqm 1900.00 642.00 12198.00

Liters 149 185.95 27706.55

Mtrs. 66.00 22.72 1499.52

45
Sqm 17.80 118.90 2116.42

Total 296771

Cum 133.63 4301.15 574783.97


Sqm 30.76 314.85 9685.57

SQM 30.76 132.00 4060.65

Sqm 103.50 419.30 43397.55


Total 618181.52

SQM 301.95 196.45 59318.08

SQM 487.20 453.35 220872.12

SQM 481.08 332.15 159790.19

SQM 32.87 396.65 13039.08

SQM 23.72 492.35 11679.13

SQM 306.95 493.55 151495.17

KG 10238 68.10 697,186

46
KG 56674 68.10 3,859,499

CUM 100.03 6296.15 629778.70

CUM 350.44 7014.55 2458189.42

CUM 15.00 76.50 1147.50

CUM 20.00 152.95 3059.00

CUM 7.00 229.45 1606.15


Total 8266659.95

47
cum 127.20 4677.25 594946.20

cum 141.92 5426.15 770104.82

Sqm 127.20 584.75 74380.20

Sqm 396.00 665.80 263656.80

Sqm 396.00 69.50 27522.00


Total 1730610.02

Sqm 13.20 3907.40 51577.68

48
Metre 29.20 230.55 6732.06

Each 6.00 386.60 2319.60

Sqm 198.81 212.85 42315.90

Sqm 198.81 3244.35 644996.89


TOTAL 747942.13

each 186.00 117.35 21827.10

Sqm 15.48 1290.55 19977.71

each 32.00 1043.6 33395.20

49
Each 31.00 229.65 7119.15

Each 31.00 112.1 3475.10

Each 62.00 69.8 4327.60

Each 31.00 83.95 2602.45

each 32.00 815.45 26094.40

sqm 57.96 1909.55 110677.52

sqm 34.56 1482.15 51223.10


Total 280719.34

50
RM 157.80 377.70 59601.06

Sqm 34.58 988.00 34165.04

Kg 914.57 619.40 566484.66


Total 660250.76

sqm 108.99 836.65 91186.48

sqm 26.43 785.40 20760.48

51
Sqm 26.43 1405.95 37163.48

Sqm 26.43 187.95 4968.08


154078.52

Rm 66.00 143.10 9444.60

Each 21.00 186.65 3919.65

Sqm 164.15 1133.85 186118.08


Total 199482.33

sqm 1059.00 149.45 158267.55

52
sqm 1059.00 172.80 182995.20

Sqm 157.90 134.70 21268.73

Sqm 2000.00 110.95 221900.00

Sqm 2407.62 89.70 215963.35

Sqm 541.20 146.45 79258.74

Sqm 1216.90 244.35 297348.78

Sqm 2118.00 75.35 159591.30

Sqm 601.10 71.60 43038.76

Sqm 584.56 36.10 21102.62

Total 1400735.03

53
kg 136.00 377.75 51374.00

kg 1223.00 435.75 532922.25

Sqm 61.78 1338.40 82681.00

metre 185.76 88.75 16486.20

Each 70.00 55.15 3860.50


Total 683463.45

54
sqm 52.87 522.90 27643.63

Sqm 157.90 1019.05 160904.94


Total 188548.57

55
Sqm 275 4819 1,325,225

1325225.00

56
NAME OF WORK: CONSTRUCTION OF PROPOSED 3 BHK with servant Quarte

MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant


DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

EARTH WORK
SUB-HEAD I - Carriage of Materials
1.1.2 Carriage of Earth by Mechanical transport Including loading unloding
and stacking
0 to 2 KM Cum
5KM to 10KM Cum
10KM to 20 KM Cum

SUBHEAD II : Earth Work


2.6 EARTH WORK
Column footings
FT-1
Plinth beam
TOTAL

2.9 Earth work in foundation trenches or drains------


2.9.3 Hard rock (Blasting Prohibited) Cum
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
TOTAL
2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides of foundations etc. in layers not exceeding 20cm in depth,
Total excavation
consolidating each deposited layer by ramming and watering, lead up to
50 mQty.of
Less and lift
RCCuptoand
1.5Columns
m. in foundation
Less Qty.of Brick work in foundation
Less Qty.of PCC in foundation
TOTAL

Extra for every additional lift of i.5m or part thereof in excavation/banking


2.26 excavated or stacked material Cum

Column footings
FT-1
TOTAL

2.31 Clearing jungle uprooting of rank vegitation=1900sqm


100 Sqm
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

2.34 Supplying Chemical emulsion --------------


2.34.1 Chlorphriphos Lindane----------------
Peremeter of external wall=1x66= 66m@2.25 litres/linear meter
=148.50 litres say=149 Liters
2.35 Diluting and injecting Chemical emulsion----------
2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration Mtrs.
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1% concentration=252nos. of
holesx area of one hole=252x0.785x0.30x0.30=17.80 sqm Sqm

2.27 Supplying and filling in plinth with jamuna sand under floors, including
watering,ramming consolidating and dressing complete
Cum
Verandah GF
Verandah GF
Verandah GF
Drawing room
Toilets
Bed rooms
Dinning room
Master bed
Toilets
Dress
Kitchen
Lobby
Passage
Servant room
Wash &Toilet
Staircase portion
Total
SUB HEAD-III --CONCRETE WORK
4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm
nominal size) Cum
Verandah GF
Verandah GF
Verandah GF
Drawing room
Toilets
Bed rooms
Dinning room
Master bed
Toilets
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

Dress
Kitchen
Lobby
Passage
Servant room
Wash &Toilet
Staircase portion
FT-1
Plinth beam
Length of walls
Total

4.17 Making plinth protection 50 mm thick of cement concrete 1:3:6 (1


cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
over 75mm thick bed of dry brick ballast 40 mm nominal size, well
rammed and consolidated and grouted with fine sand, including finishing
the top
smooth
Sqm
Length FOR Plinth protection

TOTAL

4.11 P/L 50mm th. DPC----------

Ground Floor:

Length of 230mm th.outer wall

Length of 230mm th. Internal walls

Length of 115 mm th. wall


TOTAL

4.13 Applying a coat of residual petrolium-----------------

Length of 230mm th.outer wall

Length of 230mm th. Internal walls

Length of 115 mm th. wall


TOTAL

5.9.1 Foundation,footings,basis of columns------------------------


FT-1
Columns
Plinth beams
TOTAL
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

5.9.20 Suspended floors,roofs,landings,balconies etc.-----


GF & FF
Verandah GF
Verandah GF
Verandah GF
Drawing room
Toilets
Bed rooms
Dinning room
Master bed
Toilets
Dress
Kitchen
Lobby
Passage
Servant room
Wash &Toilet
Staircase portion
Total

5.9.4 Shelves-------------

5.9.5 Lintels,beams,plinth beams--------------(GF,FF,S.F & TF)


D-1(Bottom)
D-1(Sides)
D-2(Bottom)
D-2(Sides)
D-3(Bottom)
D-3(Sides)
D4(Bottom)
D-4(Sides)
D-5(Bottom)
D-5(Sides)
D-6(Bottom)
D-6(Sides)
Plinth Beams(sides)
Floor Beams(Bottom) GF & FF
Floor Beams(Sides) GF &FF
W-1(Bottom)
W-1(Sides)
W-2(Bottom)
W-2(Sides)
W-3(Bottom)
W-3(Sides)
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

W-4(Bottom)
W-4(Sides)
W-5(Bottom)
W-5(Sides)
W-6(Bottom)
W-6(Sides)
W-7(Bottom)
W-7(Sides)
W-8(Bottom)
W-8(Sides)
W-9(Bottom)
W-9(Sides)
W-10(Bottom)
W-10(Sides)
W-11(Bottom)
W-11(Sides)
TOTAL

5.9.6 Columns,pillars,piers etc-------(GF,FF,&S.F)

5.9.7 Stairs (Excluding landing)-----------------


Langing GF & FF
Steps GF & FF
TOTAL

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide RM


Peremeter of slab at FF & Terrace
TOTAL

5.9.19 Weather shade,chajjas -------------------


GF & FF
Balcony
Balcony
Balcony
Total

5.22. Steel reinforcement for RCC work in foundation and plinth Kg


RCC Raft =81.40 cumx80 kg/cum=6511.68 kg RCC in Columns=281.97 cum@
200kg/cum=56394 kg

5.22A Steel reinforcement for RCC work above plinth level

5 RCC Work
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

5.33.1 RCC upto plinth level


Column footings
FT-1
Plinth beam
Column
TOTAL

5.33.2 RCCabove plinth level upto floor V level


Columns
FloorSlabs beams GF,FF & SF
Landing GF
Add for FF , SF,tf & ff
Steps GF 0.5
Add for FF & SF
Slab for GF,FF, & SF TF FF ( Area of slab for one slab=242.51 Sqm)
Mumty
TOTAL

5.34.1 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-30 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-30 is @ 340 kg/ kg/cum)
CUM
5.34.2 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-35 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-35 is @ 350 kg/ kg/cum)

CUM
5.34.3 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-40 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-40 is @ 360kg/ kg/cum)
CUM

6.1 Brick work with common burnt clay -------------


6.1.2 Plinth beam

6.4 Brick work with common burnt clay -------------


6.4.2 Cement 1:6 Cum
Ground Floor:
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
First floor
Length of 230mm th.outer wall
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

Length of 230mm th. Internal walls


Perapet wall
Less for doors of GF,FF,SF and third floor
D-1

D-2

D-3

D4

D-5

D-6

W-1

W-2

W-3

W-4

W-5

W-6

W-7

W-8

W-9

W-10

W-11
Total

6.12 Half brick work in foundation & plinth-------------------- Sqm


Internal walls

Ground Floor: & FF


6.13.2 Half brick work
Length of 115 mm th. wall

TOTAL
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

6.15 Extra for providing and placing--------------- Sqm


Quantity same as per item no 6.13.2
MARBLE WORK
8.2 P/F 18mm thick granite top---------
8.2.2 Granite of any colour and shade Sqm
8.2.2.1 Area of slab over 0.50 sqm
Ground Floor & FF
Kitchen
Wash Basin
TOTAL

8.3 Providing edge moulding----------


8.3.2 Granite work
Ground Floor & FF
Kitchen
Wash Basin
TOTAL
8.4 Extra for facia work------------
QUANTITY AS PER ITEM NO.8.3.2 AS ABOVE Metre
TOTAL

8.5 Extra for providing opening of required size


QUANTITY AS PER Plumbing ITEM
Ground Floor & FF
Kitchen
Wash Basin
TOTAL
8.12 P/and laying flamed finished Granite stone flooring----
a) Flamed finished granite----------- Sqm
GF & FF
Verandah
Verandah (Skirting)
Verandah
Verandah(Skirting)
Verandah
Verandah(Skirting)
Drawing room
Drawing room(Skirting)
Bed rooms
Bed rooms(Skirting)
Dinning room
Dinning room(Skirting)
Master bed
Master bed(Skirting)
Dress
Dress(Skirting)
Lobby
Lobby(Skirting)
Passage
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

Passage(Skirting)
TOTAL

WOOD WORK

9.21 P/F ISI marked Flush door shutters-----------------------

9.21.1 35mm thick including ISI marked ss but hinges--------------


Doors for GF, & FF SQM

D-1

D-2

D-3

D4

D-5

D-6
TOTAL

9.21.3 25mm thick (For cup board shutters)---------------------------------------

Ground Floor & First floor SQM


Bed rooms, Master bed rooms
TOTAL

9.18 P/F cup board shelves -----------------------------------------------


9.18.2 25mm thick SQM
Ground Floor & First floor
Bed rooms, Master bed rooms
TOTAL
9.53 P/F 40x5mm flat iron hold fast-----------------
Ground Floor & First floor Each
Toatal No.of doors

TOTAL
P/F ISI marked Brass with chrome finished sliding door bolt ----------------
NS
Sliding door bolt for First , Second and third floor SQM
300x16mm
Ground Floor & First floor Each
Toatal No.of doors

TOTAL
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

NS P/F ISI marked Brass with chrome finished tower bolt--------------


Tower bolt GF & SQM
250x10mm
Ground Floor & First floor Each
Toatal No.of doors

TOTAL

NS P/F ISI marked Brass with chrome finished handles --------------


Handles for GF & FF SQM
125mm
Ground Floor & First floor Each
Toatal No.of doors

TOTAL

NS P/F ISI marked Brass with chrome finished Hanging type door stopper --------------
Door stopper
Ground Floor & First floor Each
Toatal No.of doors

TOTAL

P/F ISI marked Brass with chrome finished mortice latch and lock with 6 levers
NS --------------
Mortice latch and lock for GF & FF SQM
Ground Floor & First floor Each
Toatal No.of doors

TOTAL
10.0 STEEL WORK
10.14 P/F Pressed steel door frames ------------------------
10.14.1 Profile B
10.14.1.1 Fixing with adjustable lugs------
Doors for GF,First , Second and third floor RM
D-1

D-2

D-3

D4

D-5
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

D-6
TOTAL

10.28 P/F stainless steel (Grade 304) railing made of hollow sections--------------
For stair cases(2 nos.)=4.74 x1.00x2 =9.48 sqm @ 25 kg/sqm=237 kg

KG
IN corridoors=3x3.81=11.43 sqm @ 20 kg/sqm=228.60 kg
Length of Railing for Balcony =33.88mx1.00=33.88 sqm@ 20kg/sqm=677.60
kg KG
TOTAL

FLOORING
11.23 Marble stone flooring-----------------
11.23.5 Udaipur Green Marble Sqm
Ground Floor

11.36 P/L Ceramic Glazed wall tiles


Toilets
Toilets
TOTAL

11.37 P/L ceramic glazed floor tiles -------------------------------------------


Toilets
Toilets

TOTAL

VITRIFIED FLOOR TILES


11.41 P/L vitrified floor tiles --------
11.41.2 Size of tile 600x600mm
Toilets
Toilets

TOTAL

11.48 Grouting of joints of tile flooring------------


11.48.2 Size of tile 600x600mm
Same as quantity of vitrified tiles
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

ROOFING
12.21 Providing gola 75x75mm------ RM
Peremeter of Terrace

12.22 Making Khura 45x45cm Nos.

12.55 Providing and laying heat resistance tiles at terrace------ Sqm


Verandah GF

Verandah GF
Verandah GF
Verandah GF
Drawing room
Toilets
Bed rooms
Dinning room
Master bed
Toilets
Dress
Kitchen
Lobby
Passage
Servant room
Wash &Toilet
Staircase portion
Total

13.0 FINISHING

13.4.2 12MM & 15mm cement plaster of mix 1:6 ---------------- sqm
Qty.of brick work /0.23x2=sqm=142 /0.23= 617.39 x2=1236 sqm
Qty.of half brick work x2=sqm=396 x2=792 sqm
Parapet wall (Peremeter of Wall)
Verandah GF
Verandah GF

Verandah GF
Total

13.4.2 12MM cement plaster of mix 1:6 ----------------


sqm
13.5.2 15MM cement plaster of mix 1:6 ----------------
Qty.same as per item no. 13.4.2 sqm

13.22 Extra for plastering more than 10 m height--------


MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

Total
13.16.1. 6mm cement Plaster Sqm

Verandah GF
Verandah GF
Verandah GF
Drawing room
Toilets
Bed rooms
Dinning room
Master bed
Toilets
Dress
Kitchen
Lobby
Passage
Servant room
Wash &Toilet
Staircase portion
Total

13.41 Distempering with Oil bound washable distemper---------------

Area of plaster for internal walls


Area of plaster of ceiling
Parapet wall
Total

13.45 Finishing walls with textured exterior paint----------

Peremeter of Building Sqm

TOTAL

13.83
Wall painting with Premium acrylic emilsion paint of interior grade ---------------

Ground Floor
13.78 P/Applying 12mm thick gypsum plaster------------

Quantity same as item no.13.4.2 & 13.5.2 Sqm


AS per area of ceiling plaster
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

TOTAL

ALUMINIUM WORK

21.1.1 Fixed portion


21.1.1.2 Power coated ------------------ KG

21.1.2 For shutters of doors and windows---------


21.1.2.2 Power coated ------------------

windows of GF,FF,SF &TF floor KG

W-1

W-2

W-3

W-4

W-5

W-6

W-7

W-8

W-9

W-10

W-11
TOTAL

Weight of Aluminium=61.78 sqm @ 22 kg/sqm=1359.16 kg


KG

Filling the gap in between aluminium frame & adjacent RCC/Brick/Stone


21.8 work-----------
windows of GF,FF,SF &TF floor RM

W-1

W-2
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

W-3

W-4

W-5

W-6

W-7

W-8

W-9

W-10

W-11
TOTAL

21.1 P/F glazing in aluminium doors and windows in outer wall at GF,FF &SF
windows of GF,FF Sqm
Equal to area of windows

21.13 P/F 100mm brass locks in aluminium doors


Doors and windows of GF,FF,SF & TFfloor NO.

21.15 P/F aluminium casement windows -------------------

21.15.2 Power coated -------------


Windows in outer wall at GF,FF ,SF and TF Each

21.16 P/F aluminium round shape handles casement windows -------------------


Doors and windows of GF,FF and Second floor Each

22.3 P/F WATER PROOFING TREATMENT TO Sunken portions SQM

Ground Floor
Toilets Horizontal
Toilets Vertical
Toilets Horizontal
Toilets
TOTAL

22.7 P/L Brick coba integran water proofing------------------


Verandah GF
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK with servant
DSR,2016 Unit
Quarter (G + 1) for ESIC Hospital at Raipur

Verandah GF
Verandah GF
Drawing room
Toilets
Bed rooms
Dinning room
26 Master bed
Toilets
26.2 Dress
Kitchen
Lobby
Passage
NS Servant room
Wash &Toilet
Staircase portion
11.21 Total
ervant Quarter for ESIC Hospital at Raipur

Nos. Length Breadth H/D Qty.

40
25
100

27 2.25 2.85 2 346.28


1 193.31 0.23 0.45 20.01
366.28

1 66 1.2 1 79.20
1 40 1.2 1 48.00
127.20

493.48
-100.03
-127.20
-30.76
235.49

27 2.25 2.85 0.5 86.57


86.57

1.00 1,900.00 1900.00


Nos. Length Breadth H/D Qty.

149

66.00

17.80

1 5.2 1.23 0.1 0.64


1 1.8 1.1 0.1 0.20
1 2.62 1.33 0.1 0.35
1 4.99 4.02 0.1 2.01
1 2.55 1.65 0.1 0.42
1 3.9 3.3 0.1 1.29
1 4.99 3.67 0.1 1.83
1 4.87 3.34 0.1 1.63
2 2.68 1.65 0.1 0.88
1 2.07 1.77 0.1 0.37
1 3.44 3.3 0.1 1.14
1 1.94 1.65 0.1 0.32
1 2.99 1.13 0.1 0.34
1 4.35 3.3 0.1 1.44
1 1.55 1.26 0.1 0.20
1 6.66 4.14 0.1 2.76
15.79

1 5.2 1.23 0.1 0.64


1 1.8 1.1 0.1 0.20
1 2.62 1.33 0.1 0.35
1 4.99 4.02 0.1 2.01
1 2.55 1.65 0.1 0.42
1 3.9 3.3 0.1 1.29
1 4.99 3.67 0.1 1.83
1 4.87 3.34 0.1 1.63
2 2.68 1.65 0.1 0.88
Nos. Length Breadth H/D Qty.

1 2.07 1.77 0.1 0.37


1 3.44 3.3 0.1 1.14
1 1.94 1.65 0.1 0.32
1 2.99 1.13 0.1 0.34
1 4.35 3.3 0.1 1.44
1 1.55 1.26 0.1 0.20
1 6.66 4.14 0.1 2.76
27 2.85 2.55 0.5 98.11
1 138 0.23 0.1 3.17
1 138 1.2 0.1 16.56
133.63

1 138 0.75 103.50


103.50

1 66 0.23 15.18

1 40 0.23 9.20

1 55.5 0.115 6.38


30.76

1 66 0.23 15.18

1 40 0.23 9.20

1 55.5 0.115 6.38


30.76

27 10.8 0.5 145.80


27 1.5 1.5 60.75
2 106 0.45 95.40
301.95
Nos. Length Breadth H/D Qty.

2 5.2 1.23 12.79


2 1.8 1.1 3.96
2 2.62 1.33 6.97
2 4.99 4.02 40.12
2 2.55 1.65 8.42
2 3.9 3.3 25.74
2 4.99 3.67 36.63
2 4.87 3.34 32.53
2 2.68 1.65 8.84
2 2.07 1.77 7.33
2 3.44 3.3 22.70
2 1.94 1.65 6.40
2 2.99 1.13 6.76
2 4.35 3.3 28.71
2 1.55 1.26 3.91
2 6.66 4.14 55.14
306.95

8 0.9 0.23 1.66


16 1.2 0.15 2.88
5 1 0.23 1.15
10 1.3 0.15 1.95
4 1 0.23 0.92
8 1.3 0.15 1.56
6 0.8 0.23 1.10
12 1.1 0.15 1.98
4 0.75 0.23 0.69
8 1.05 0.15 1.26
4 0.9 0.23 0.83
8 1.2 0.15 1.44
2 106 0.6 127.20
2 106 0.23 48.76
4 106 0.6 254.40
8 1.8 0.23 3.31
16 2.1 0.2 6.72
2 1.5 0.23 0.69
4 1.8 0.15 1.08
2 1.5 0.23 0.69
4 1.8 0.15 1.08
Nos. Length Breadth H/D Qty.

2 1.5 0.23 0.69


4 1.8 0.15 1.08
6 1.5 0.23 2.07
12 1.8 0.15 3.24
1 0.9 0.23 0.21
2 1.2 0.15 0.36
4 0.83 0.23 0.76
8 1.13 0.15 1.36
4 0.75 0.23 0.69
8 1.05 0.15 1.26
2 1.8 0.23 0.83
4 2.1 0.2 1.68
2 3.53 0.23 1.62
4 3.83 0.2 3.06
2 0.6 0.23 0.28
4 0.9 0.15 0.54
481.08

28 2 8.7 487.2

2 3.55 1.33 9.44


44 3.55 0.15 23.43
32.87

2 66 132.00
132.00

2 5.2 1.23 12.79


2 1.8 1.1 3.96
2 2.62 1.33 6.97
23.72

10237.68

56674
Nos. Length Breadth H/D Qty.

28 2.85 2.55 0.4 81.40


1 138 0.23 0.45 14.28
28 0.23 0.45 1.5 4.35
100.03

48 0.3 0.45 7.2 103.68


5 106 0.23 0.45 54.86
1 1.5 1.3 0.17 0.33
1.65
22 1.5 0.3 0.15 0.74
3.7
5 242.51 0.15 181.88
1 6 4 0.15 3.60
350.44

15.00

20.00

7.00

1 106 1.2 1 127.20

1 66 0.23 3.9 59.20


1 20 0.23 3.9 17.94

1 66 0.23 3.9 59.20


Nos. Length Breadth H/D Qty.

1 20 0.23 3.9 17.94


1 66 0.23 1 15.18

8 0.9 0.23 2.1 -3.48

5 1 0.23 2.1 -2.42

4 1 0.23 2.1 -1.93

6 0.8 0.23 2.1 -2.32

4 0.75 0.23 2.1 -1.45

4 0.9 0.23 2.1 -1.74

8 1.8 0.23 1.2 -3.97

2 1.5 0.23 1.2 -0.83

2 1.5 0.23 1.2 -0.83

2 1.5 0.23 1.2 -0.83

6 1.5 0.23 1.2 -2.48

1 0.9 0.23 1.2 -0.25

4 0.83 0.23 1.2 -0.92

4 0.75 0.23 1.2 -0.83

2 1.8 0.23 1.2 -0.99

2 3.53 0.23 1.2 -1.95

2 0.6 0.23 1.2 -0.33


141.92

1 106 1.2 1 127.20

2 66 3 396

396
Nos. Length Breadth H/D Qty.

396

2 7.4 0.60 8.88


6 1.2 0.60 4.32
13.20

2 7.4 14.80
6 2.4 14.40
29.20

29.20
29.20

2 2
6 4
6.00

2 5.2 1.23 12.79


2 12.92 0.1 2.58
2 1.8 1.1 3.96
2 5.8 0.1 1.16
2 2.62 1.33 6.97
2 7.9 0.1 1.58
2 4.99 4.02 40.12
2 18.01 0.1
2 3.9 3.3 25.74
2 14.4 0.1 2.88
2 4.99 3.67 36.63
2 17.34 0.1 3.47
2 4.87 3.34 32.53
2 16.42 0.1 3.28
2 2.07 1.77 7.33
2 7.68 0.1 1.54
2 1.94 1.65 6.40
2 7.18 0.1 1.44
2 2.99 1.13 6.76
Nos. Length Breadth H/D Qty.

2 8.26 0.1 1.65


198.81

8 0.9 2.1 15.12

5 1 2.1 10.50

4 1 2.1 8.40

6 0.8 2.1 10.08

4 0.75 2.1 6.30

4 0.9 2.1 7.56


57.96

6 1.92 3 34.56
34.56

18 1.92 0.6 15.48


15.48

31 6 186.00

186.00

31 1 31.00

31.00
Nos. Length Breadth H/D Qty.

31 1 31.00

31.00

31 2 62.00

62.00

31 1 31.00

31.00

31 1 31.00

31.00

8 5.1 40.80

5 5.2 26.00

4 5.2 20.80

6 5 30.00

4 4.95 19.80
Nos. Length Breadth H/D Qty.

4 5.1 20.40
157.80

237 237.00

677.57 677.57
914.57

2 8.65 2.1 36.33


4 8.65 2.1 72.66
108.99

2 2.65 1.65 8.75


4 2.68 1.65 17.69
26.43

2 2.65 1.65 8.75


4 2.68 1.65 17.69
26.43

26.43
Nos. Length Breadth H/D Qty.

1 66 66

21

2 2.5 1.25 6.25

1 5.2 1.23 6.40


1 1.8 1.1 1.98
1 2.62 1.33 3.48
1 4.99 4.02 20.06
1 2.55 1.65 4.21
1 3.9 3.3 12.87
1 4.99 3.67 18.31
1 4.87 3.34 16.27
2 2.68 1.65 8.84
1 2.07 1.77 3.66
1 3.44 3.3 11.35
1 1.94 1.65 3.20
1 2.99 1.13 3.38
1 4.35 3.3 14.36
1 1.55 1.26 1.95
1 6.66 4.14 27.57
164.15

1236
792.00
1 66 1.00 66.00
2 5.2 1.23 12.79
2 1.8 1.1 3.96

2 2.62 1.33 6.97


2117.72

1059.00

1059.00
Nos. Length Breadth H/D Qty.

1 5.2 1.23 6.40


1 1.8 1.1 1.98
1 2.62 1.33 3.48
1 4.99 4.02 20.06
1 2.55 1.65 4.21
1 3.9 3.3 12.87
1 4.99 3.67 18.31
1 4.87 3.34 16.27
2 2.68 1.65 8.84
1 2.07 1.77 3.66
1 3.44 3.3 11.35
1 1.94 1.65 3.20
1 2.99 1.13 3.38
1 4.35 3.3 14.36
1 1.55 1.26 1.95
1 6.66 4.14 27.57
157.90

2117.72
157.90
2 66 1 132
2407.62

1 66 8.2 541.20

541.20

2118

1059.00
157.90
Nos. Length Breadth H/D Qty.

1216.90

136.00

8 1.8 1.2 17.28

2 1.5 1.2 3.60

2 1.5 1.2 3.60

2 1.5 1.2 3.60

6 1.5 1.2 10.80

1 0.9 1.2 1.08

4 0.83 1.2 3.98

4 0.75 1.2 3.60

2 1.8 1.2 4.32

2 3.53 1.2 8.47

2 0.6 1.2 1.44


61.78

1223.00

8 6 48.00

2 5.4 10.80
Nos. Length Breadth H/D Qty.

2 5.4 10.80

2 5.4 10.80

6 5.4 32.40

1 3 3.00

4 4.06 16.24

4 3.9 15.60

2 6 12.00

2 9.46 18.92

2 3.6 7.20
185.76

61.78

35 2 70.00

2 2.65 1.65 8.75

4 2.68 1.65 17.69


26.43
52.87

1 5.2 1.23 6.40


Nos. Length Breadth H/D Qty.

1 1.8 1.1 1.98


1 2.62 1.33 3.48
1 4.99 4.02 20.06
1 2.55 1.65 4.21
1 3.9 3.3 12.87
1 4.99 3.67 18.31
1 4.87 3.34 16.27
2 2.68 1.65 8.84
1 2.07 1.77 3.66
1 3.44 3.3 11.35
1 1.94 1.65 3.20
1 2.99 1.13 3.38
1 4.35 3.3 14.36
1 1.55 1.26 1.95
1 6.66 4.14 27.57
157.90
NAME OF WORK: CONSTRUCTION OF PROPOSED 3 BHK Quarter for ESIC Hospital a

BOQ As per DSR 2014


Sl. No. Item No. Description of the work

1.0 SUB-HEAD I - Carriage of Materials

1.1 1.1.2 Carriage of Earth by Mechanical transport Including loading


unloding and stacking

0 to 2 KM
5KM to 10KM

10KM to 20 KM

2.0 SUBHEAD II : Earth Work


2.1 2.6 Earth work in excavation by mechanical means (Hydraulic
excavator) /manual means in foundation over areas
(exceeding 30cm in depth , 1.5 m in width or 10 sqm on
plan), including disposal of excavated earth, for all leads and
lifts, disposed earth to be levelled and neatly dressed.All kind
of soil.

2.9 Earth work in foundation trenches or drains------


2.9.3 Hard rock (Blasting Prohibited)
2.2 2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides of foundations etc. in layers not exceeding 20cm
in depth, consolidating each deposited layer by ramming and
watering, lead up to 50 m and lift upto 1.5 m.

2.3 2.27 Supplying and filling in plinth with jamuna sand under floors,
including watering,ramming consolidating and dressing
complete

2.31 Clearing jungla uprooting of rank vegitation

2.34 Supplying Chemical emulsion --------------


2.34.1 Chlorphriphos Lindane----------------

52
Peremeter of external wall=1x75.56= 75.56m@2.25
litres/linear meter =170.01 litres

2.35 Diluting and injecting Chemical emulsion----------


2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1%
concentration=252 nos. of holesx area of one
hole=252x0.785x0.30x0.30=17.80 sqm

3.0 SUB HEAD-III --CONCRETE WORK

3.1 4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate


40 mm nominal size)

4.11 Providing and laying 50mm thick DPC----------

4.13 Applying a coat of residual petrolium-----------------

3.2 4.17 Making plinth protection 50 mm thick of cement concrete


1:3:6 (1 cement:
3 coarse sand : 6 graded stone aggregate 20 mm nominal
size) over
75mm thick bed of dry brick ballast 40 mm nominal size, well
rammed and
consolidated and grouted with fine sand, including finishing
the top
smooth

4.0 SUB HEAD-IV RCC WORK


4.1 5.9.1 Centering and shuttering including strutting, propping etc.
and removal of form for : Foundations, footings, bases of
columns, etc. for mass concrete

4.3 5.9.6 Centering and shuttering including strutting, propping etc.


and removal of form for :Columns, Pillars, Piers, Abutments,
Posts and Struts

4.4 5.9.5 Centering and shuttering including strutting, propping etc.


and removal of form for : Lintels, beams, plinth beams,
girders, bressumers and cantilevers

53
4.5 5.9.7 Centering and shuttering including strutting, propping etc.
and removal of form for : Stairs, (excluding landings) except
spiral-staircases

4.6 5.9.19 Weather shade,chajjas,corbles etc. including edges

Suspended floors,roofs,landings,balconies and access


4.7 5.9.20 platform with water proof ply 12mm thick

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide

5.9.19 Weather shade,chajjas -------------------

4.8 5.22.6 Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
upto plinth level . Thermo-Mechanically Treated bars

5.22A Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
above plinth level . Thermo-Mechanically Treated bars

4.8 5.33.1 Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works upto plinth level

54
4.9 5.33.2 Providing and laying in position machine batched and
machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works above plinth
level upto floor V level

4.10 5.34.1 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-30 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-30 is @ 340 kg/ kg/cum)

4.11 5.34.2 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-35 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-35 is @ 350 kg/ kg/cum)

4.12 5.34.3 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-40 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-40 is @ 360kg/ kg/cum)

5.0 SUBHEAD V-BRICK WORK


5.1 6.1 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:

(a) 6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.4.2 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in super structure above
plinth level upto floor V level

6.2.4 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.12 Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundation and
plinth in:

55
6.12.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.13 Half b masonry work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in super structure
above plinth level upto floor V level

6.13.2 Cement mortar 1:6 (1 cement : 6 coarse sand)


6.15 Extra for providing and placing in position 2 nos.6mm dia.MS
bars at every third course of half brick masonry

7.0
SUBHEAD VII-MARBLE & GRINITE WORK

7.1 8.2 Providing and fixing 18 mm thick gang saw cut, mirror
polished, premoulded
and prepolished, machine cut for kitchen platforms, vanity
counters, window
sills , facias and similar locations of required size, approved
shade, colour
and texture laid over 20 mm thick base cement mortar 1:4 (1
cement : 4
coarse sand), joints treated with white cement, mixed with
matching pigment,
epoxy touch ups, including rubbing, curing, moulding and
polishing to edges
to give high gloss finish etc. complete at all levels

8.2.2 Granite of any colour and shade


8.2.2.2 Area of slab over 0.50 sqm

8.3 Providing edge moulding to 18mm thick marble stone


counters,vanities etc. including machine polishing to edge to
give high gloss finish etc.complete as per design approved by
Engineer-In-Charge.

8.3.2 Granite work

7.2 8.5 Extra for providing opening of required size & shape for wash
basin/ kitchen
sink in kitchen platform, vanity counter and similar location in
marble/
Granite/stone work, including necessary holes for pillar taps
etc. including
moulding, rubbing and polishing of cut edges etc. complete

56
7.3 8.6 Mirror polishing on marble work/Granite work/Stone work
where ever required to give high gloss finish complete.

7.4 8.12 Providing and laying flamed finish Granite stone flooring in
required design and patterns, in linear as well as curvilinear
portions of the building all complete as per the architectural
drawings with 18 mm thick stone slab
over 20 mm (average) thick base of cement mortar 1:4 (1
cement : 4 coarse sand) laid and jointed with cement slurry
and pointing with white cement slurry admixed with pigment
of matching shade including rubbing, curing
and polishing etc. all complete as specified and as directed
by the Engineerin-In-Charge :

a Flamed finish granite stone slab Jet Black, Cherry Red, Elite
Brown, Cat Eye or equivalent

8.0 SUBHEAD VIII-Wood Work


8.2 9.18 Providing and fixing Pre-laminated flat pressed 3 layer
(medium density) particle board or graded wood particle
board IS : 3087 marked, with one side decorative and other
side balancing lamination Grade I, Type II exterior grade IS :
12823 marked, in shelves with screws and fittings wherever
required, edges to be painted with polyurethane primer
(fittings to be paid separately).

9.18.2 25 mm thick

9.53 P/F 40x5mm flat iron hold fast-----------------

8.4 9.84 Providing and fixing aluminium extruded section body tubular
type universal hydraulic door closer (having brand logo with
ISI, IS : 3564, embossed on the body, door weight upto 36 kg
to 80 kg and door width from 701 mm to 1000 mm), with
double speed adjustment with necessary accessories and
screws etc. complete.

9.96 Providing and fixing aluminium sliding door bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
IS:1868), transparent or dyed to required color or shade, with
nuts and screws etc. complete

9.96.1 300x16 mm

57
16.11 9.97 Providing and fixing aluminium Tower bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
IS:1868), transparent or dyed to required color or shade, with
necessary screws etc. complete
9.97.1 300x10 mm

16.12 9.100 Providing and fixing aluminium handles, ISI msrked anodised
(anodic coating not less than grade AC 10 as per IS:1868),
transparent or dyed to required color or shade, with
necessary screws etc. complete
9.100.1 125 mm

16.13 9.101 Providing and fixing aluminium hanging floor door stopper, ISI
msrked anodised (anodic coating not less than grade AC 10
as per IS:1868), transparent or dyed to required color or
shade, with necessary screws etc. complete

9.101.2 Twin rubber stopper


8.5 9.103 Providing and fixing bright finished brass 100 mm mortice
latch and lock, ISI marked, with six levers and a pair of
anodised (anodic coating not less than grade AC 10 as per IS
: 1868) aluminium lever handles of approvedquality with
necessary screws etc. complete.

8.6 9.129 Providing and fixing cup board shutters 25 mm thick, with
Pre-laminated flat pressed three layer particle board or
graded wood particle board IS: 12823 marked, exterior grade
(Grade l Type ll), having one side decorative lamination and
other side balancing lamination, including IInd class teak
wood lipping of 25 mm wide x12 mm thick with necessary
screws and bright finished stainless steel piano hinges,
complete as per direction of the Engineer-in-Charge

8.7 9.21 Providing and fixing ISI marked flush door shutters
conforming to IS: 2202 (part1) non-decorative type. Core of
block board construction with frame of 1st class hard wood
and well matched commercial 3 ply veneering with vertical
grains or cross bands and face veneers on both faces of
shutters:

(a) 9.21.1 35mm thick including ISI marked Stainless Steel butt hinges
with necessary screws.

9.21.3 25mm thick (For cup board ) Including ISI marked nicel plated
Bright finished MS piano hinges with necessary screws.

9.0 SUBHEAD IX-STEEL WORK

58
P/F Pressed steel door frame confirming to IS:4351,manufactured
from commercial mild steel sheet of 1.60mm thickness including
hinges,jamb ,lock jamb ,bead and if required angles thresshold of
mild steel angle of section 50x20mm,or base ties of 1.60mm
pressed mild steel welded or rigidly fixed together by mechanical
means including M S pressed butt hinges 2.5mm thick with mortar
guard,lock strikeplate and shock absorvers as specified and
applying a coat of approved steel primer after pre-treatment of the
surface

10.14
Profile B
10.14.1
9.2 10.30 Providing & fixing glass panes with putty and glazing clips in
steel doors,
windows, clerestory windows, all complete with :

10.30.2 5.5 mm thick glass panes


P/F stainless steel (Grade 304) railing made of hollow
tubes,channels,plates etc.including welding
,grinding,buffing,polishing and making curvature(wherever
required)and fitting the same with necessary stainless steel nuts
and bolts complete i/c fixing the railing with necessary accessories
and stainless steel dash fastners,stainless steel bolts etc. of
10.28 required size ,on the top of the floor or side of waste slab with
suitable arrangement as per approval of Engineer-In-Charge(For
payment purpose only weight of stainless steel members shall be
considered excluding fixing accessories such as nuts,bolts fastners
etc.)

10.0 SUBHEAD X-Flooring


10.1 11.19 Chequered terrazo tiles 22 mm thick with graded marble
chips of size up
to 6 mm in floors, jointed with neat cement slurry mixed with
pigment to
match the shade of the tiles, including rubbing and polishing
complete, on
20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse
sand) :

10.2 11.26 kota stone slab flooring over 20mm (average thick base laid
over and jointed with grey cement slutty mixed with pigment
to match the shade of the slab including rubbing and
polishing complete with base of cement mortar 1: 4 (1 cement
: 4 coarse sand):

11.26.1 25mm thick

59
10.5 11.36 Providing and fixing Ist quality ceramic glazed wall tiles
conforming to IS : 15622 (thickness to be specified by the
manufacturer ) of approved make in all colours, shades
except burgundy, bottle green, black of any size as approved
by Engineer-in-Charge, in skirting, risers of steps and dados
over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @ 3.3kg
per sqm including pointing in white cement mixed with
pigment of matching shade complete.

11.37 Providing and fixing ceramic glazed floor tiles of size


300x300mm(Thickness to be specified by the manufacturers)
of 1st quality conforming to IS : 15622 of approved make in
colours, such as white,Ivory,Grey Fumes,Red Brown laid on
20 mm thick bed of cement Mortar 1:4 (1 cement : 4 coarse
sand) including pointing the joints with white cement with
pigment of matching shade complete.

10.6 11.41 Providing and laying vitrified floor tiles in different sizes
(thickness to be
specified by the manufacturer) with water absorption less
than 0.08%
and conforming to IS : 15622, of approved make, in all
colours and shades,
laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
sand), including
grouting the joints with white cement and matching pigments
etc.,
complete.

11.41.2 Size of Tile 600x600 mm

10.7 11.48 Grouting the joints of flooring tiles having joints of 3mm
width ,using epoxy grout mix of 0.70 kg of organic coated
filler of desired shade (0.10 kg of hardener and 0.20 kg of
resin per kg)including filling /grouting and finishing complete
as per the direction of Engineer-In-Charge.

11.48.2 Size if Tile 600x600 mm

11.0 SUBHEAD XI- ROOFING


11.1 12.21 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement
: 2 coarse sand : 4 stone aggregate 10 mm and down
gauge), including finishing with cement mortar 1:3 (1 cement :
3 fine sand) as per standard design

12.21.1 In 75x75 mm deep chase

60
11.2 12.22 Making khurras 45x45 cm with average minimum thickness of
5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate of 20 mm nominal size) over P.V.C.
sheet 1 m x1 m x 400 micron, finished with 12 mm cement
plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat
cement, rounding the edges and making and finishing the
outlet complete

11.4 12.55 Providing and fixing Heat Resistant Terrace Tiles (300 mm x
300 mm x 20 mm) with SRI (solar refractive index) > 78, solar
reflection > 0.70 and initial emittance > 0.75 on waterproof
and sloped surface of terrace, laid on 20 mm thick cement
sand mortar in the ratio of 1:4 (1 cement : 4
coarse sand) and grouting the joints with mix of white cement
& marble powder in ratio of 1:1, including rubbing and
polishing of the surface upto 3 cuts complete, including
providing skirting upto 150 mm height along the parapet walls
in the same manner.

12.0 SUBHEAD XII- Finishing


12.1 13.4 12 mm cement plaster of mix :
(a) 13.4.2 1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick
12.2 13.5 wall of mix :

1:6 (1 cement: 6 coarse sand)


(a) 13.5.2
12.3 13.16.1 6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
12.4 13.22 Extra for plastering exterior walls of height more than 10m
from ground level for every additional height of 3m or part
thereof.

12.7 13.41 Distempering with oil bound washable distemper of approved


brand and
manufacture to give an even shade

13.41.1 New work (two or more coats) over and including water
tinnable priming coat with cement primer

12.8 13.45 Finishing walls with textured exterior paint of required shade

13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm)
over and including priming coat of exterior primer applied @
2.20kg/ 10 sqm

61
13.78 Providing and applying 12mm thick gypsum light weight
plaster------------
13.83 Wall painting with remium acrylic imulsion paint of interior
grade------------
13.83.2
Two coats
12.9 13.84 Painting with synthetic enamel paint ,having VOC(Volatile
Organic Compound) contents less than 150 gms/litre,of
approved brand and manufacture,including applying
additional coats wherever required to achieve even shade
and colour

13.84.2 Two coats


12.10 13.85
Applying priming coats with primer of approved brand and
manufacture,having low VOC(Volatile Organic Compound)
contents.
12.11 13.85.1 With ready mixed pink or grey primer on wood work(Hard and
Soft wood)having VOC(Volatile Organic Compound) contents
less than 50 gms/litre.

13 SUB HEAD XIII Aluminium Work


13.1 21.1 Providing and fixing aluminium work for doors, windows,
ventilators and partitions with extruded built up standard
tubular sections/ appropriate Z sections and other sections of
approved make conforming to IS: 733 and IS: 1285, fixing
with dash fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top, bottom
and sides with required EPDM rubber/ neoprene gasket etc.
Aluminium sections shall be smooth, rust free, straight, mitred
and jointed mechanically wherever required including cleat
angle, Aluminium snap beading for glazing / paneling, C.P.
brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-
charge. (Glazing, paneling and dash fasteners to be paid for
separately) :

21.1.1 For fixed portion


21.1.1.2 Powder coated aluminium (minimum thickness of powder
coating 50 micron

62
21.1.2 For shutters of doors,windows & ventilators including
providing and fixing hinges/pivots and making provision for
fixing of fittings wherever required including the cost of EPDM
rubber/neoprene gasket required(Fittings shall be paid for
seperately)

21.1.2.2 Powder coated aluminium (minimum thickness of powder


coating 50 micron

13.2 21.10 P/F double glazed hermetically sealed glazing in


aluminium----------

13.3 21.8 Filling the gap in between aluminium frame & adjacent
RCC/Brick/Stone work by providing weather silicon sealent
over backer rod of approved quality as per architectural
drawings and direction of Engineer-In-Charge

21.8.1 Upto 5mm depth and 5mm width


21.15 P/F aluminium casement window---------

21.15.2 Powder coated------------

21.16 P/F aluminium round shape handles--------

21.16.2 Powder coated------------

14.0 Sub Head XIV: Water Proofing


14.1 22.3 Providing and laying water proofing treatment to vertical and
horizontal surfaces of depressed portions of W.C., kitchen
and the like consisting of:
(i) Ist course of applying cement slurry @ 4.4 kg/sqm mixed with
water proofing compound conforming to IS 2645 in
recommended proportions including rounding off junction of
vertical and horizontal surface.
(ii) IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse
sand) mixed with water proofing compound in recommended
proportion including rounding off junction of vertical and
horizontal surface.
(iii) IIIrd course of applying blown or residual bitumen applied hot
at 1.7 kg. per sqm of area.
(iv) IVth course of 400 micron thick PVC sheet. (Overlaps at
joints of PVC sheet should be 100 mm wide and pasted to
each other with bitumen @ 1.7 kg/sqm).

63
14.2 22.7 Providing and laying integral cement based water proofing
treatment including preparation of surface as required for
treatment of roofs,balconies, terraces etc consisting of
following operations: a) Applying a slurry coat of neat cement
using 2.75 kg/sqm of cement admixed with water proofing
compound conforming to IS. 2645 and approved by
Engineer-in-charge over the RCC slab including adjoining
walls upto 300mm height including cleaning the surface
before treatment. b) Laying brick bats with mortar using
broken bricks/brick bats 25 mm to 115 mm size with 50% of
cement mortar 1:5 (1 cement : 5 coarse sand) admixed with
water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge over 20 mm thick layer of
cement mortar of mix 1:5(1 cement :5 coarse sand ) admixed
with water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge to required
slope and treating similarly the adjoining walls upto 300 mm
height including rounding of junctions of walls and slabs c)
After two days of proper curing applying a second coat of
cement slurry using 2.75 kg/ sqm of cement admixed jointless
cement mortar of mix 1:4 (1 cement :4 coarse
sand) admixed with water proofing compound conforming to
IS : 2645 and approved by Engineer-in-charge including
laying glass fibre cloth of approved quality in top layer of
plaster and finally finishing the surface with trowel with neat
cement slurry and making pattern of 300x300 mm square
3 mm deep. e) The whole terrace so finished shall be flooded
with water for a minimum period of two weeks for curing and
a 22.7.1 With average thickness of 120 mm and minimum thickness at
khurra as 65 mm.

16.0 Sub Head XVII: Non Scheduled

64
NS-20 Providing and fixing Glass Reinforced Concrete
jali(GRC) screen in approved
size,pattern,design,thickness and color.The jali shall be
made from 53 grade white portland cement/43 grade
OPC or PPC grey cement manufactured by J.K. cement
or equivalent,quartz,fine silica sand ,Alkali resistance
glass fiber manufactured by Sant Gobin or
equivalent,super plasticiser and polymer manufactured
by BASF,sika as per the manufacturar;s specifications
and as per the directions of Engineer-In-Charge

35mm thick GRC jali

TOTAL NON-SCHEDULED ITEMS

65
Quarter for ESIC Hospital at Raipur (G + 3)

Unit Qty. Rate Amount

Cum 105 113.29 11895.45


Cum 75 57.70 4327.50

Cum 100 48.00 4800.00


Total 21022.95

Cum 90 155.6 14004.00

Cum 326 618.1 201500.60

Cum 131 112.1 14685.10

Cum 15.08 910.25 13730.21

100 Sqm 5880.00 642.00 37749.60

66
Liters 170.01 185.95 31613.36

Mtrs. 709.98 22.72 16130.75

Sqm 17.80 118.90 2116.42

Total 331530

Cum 60.99 4301.15 262334.88


Sqm 25.43 314.85 8006.26

SQM 25.43 132.00 3356.60

Sqm 56.67 419.30 23761.73


Total 286096.61

SQM 287.91 196.45 56560.31

SQM 685.44 453.35 310744.22

SQM 735.18 332.15 244191.10

67
SQM 41.76 396.65 16564.10

SQM 25.20 492.35 12407.22

SQM 709.32 493.55 350084.89

SQM 226.68 116.40 26385.55

SQM 25.20 492.35 12407.22

KG 21235 68.10 1,446,104

KG 50485 68.10 3,438,029

CUM 126.20 6296.15 794583.45

68
CUM 315.58 7014.55 2213664.88

CUM 2.00 76.50 153.00

CUM 1.00 152.95 152.95

CUM 1.00 229.45 229.45


Total 8922260.34

cum 90.67 4677.25 424095.61

cum 311.21 5426.15 1688663.46

69
Sqm 232.40 584.75 135895.90

Sqm 468.72 665.80 312073.78

Sqm 468.72 69.50 32576.04


Total 2593304.79

Sqm 33.93 3907.40 132578.08

Metre 62.00 230.55 14294.10

Each 24.00 386.60 9278.40

70
Sqm 586.00 212.85 124730.10

Sqm 586.00 3244.35 1901189.10


TOTAL 2182069.78

sqm 23.92 1290.55 30864.79

each 336.00 117.35 39429.60

each 56.00 1043.6 58441.60

Each 56.00 229.65 12860.40

71
Each 56.00 112.1 6277.60

Each 112.00 69.8 7817.60

Each 56.00 83.95 4701.20

each 56.00 815.45 45665.20

sqm 9.30 1629.75 15156.68

sqm 137.76 1909.22 263014.15

sqm 119.52 1482.15 177146.57


Total 661375.38

72
RM 284.00 377.70 107266.80

Sqm 19.20 988.00 18969.60

Kg 2355.00 619.40 1458687.00


Total 1584923.40

sqm 218.00 1141.40 248821.32

73
sqm 251.00 836.65 209997.48

sqm 67.68 785.40 53154.93

Sqm 75.00 1405.95 105446.25

Sqm 75.00 187.95 14096.25

Total 631516.23

Rm 0.00 143.10 0.00

74
Each 75.56 186.65 14103.27

Sqm 9.18 1133.85 10408.74


Total 24512.02

sqm 2954.39 149.45 441533.26

sqm 1477.00 172.80 255225.60

Sqm 12.60 134.70 1697.22

Sqm 241.79 37.95 9176.01

Sqm 632.76 89.70 56758.16

Sqm 1117.00 146.45 163584.65

75
Sqm 1477.00 244.35 360904.95

Sqm 800.00 74.40 59520.00

Sqm 130.00 74.40 9672.00

Sqm 130.00 36.10 4693.00

Total 1362764.84

kg 0.00 377.75 0.00

76
kg 0.00 435.75 0.00

Sqm 19.20 1338.40 25697.28

metre 70.40 88.75 6248.00

Each 0.00 55.15 0.00

Each 55.15 0.00


Total 31945.28

sqm 13.63 522.90 7125.04

77
Sqm 0.00 1019.05 0.00
Total 7125.04

78
Sqm 90 4819 433,710

433710.00

79
NAME OF WORK: CONSTRUCTION OF PROPOSED 3 BHK Quarter for ESIC Hospital a

MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for


DSR,2016 Unit
ESIC Hospital at Raipur

EARTH WORK
SUB-HEAD I - Carriage of Materials
1.1.2 Carriage of Earth by Mechanical transport Including loading unloding
and stacking
0 to 2 KM Cum
5KM to 10KM Cum
10KM to 20 KM Cum

SUBHEAD II : Earth Work


2.6 EARTH WORK
Column footings
FT-1
FT-2
FT-3
CFT-1
CFT-2
Plinth beam
TOTAL

2.9 Earth work in foundation trenches or drains------


2.9.3 Hard rock (Blasting Prohibited) Cum
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
TOTAL
2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides of foundations etc. in layers not exceeding 20cm in depth,
Total excavation
consolidating each deposited layer by ramming and watering, lead up to
50 mQty.of
Less and lift
RCCuptoand
1.5Columns
m. in foundation
Less Qty.of Brick work in foundation
Less Qty.of PCC in foundation
TOTAL
Extra for every additional lift of i.5m or part thereof in excavation/banking
2.26 excavated or stacked material Cum

Column footings
FT-1
FT-2
FT-3
3 BHK (G + 3)-30
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

CFT-1
CFT-2
TOTAL

2.27 Supplying and filling in plinth with jamuna sand under floors, including
watering,ramming consolidating and dressing complete
Cum
Verandah GF
Living room
Study room
Dinning room
Kitchen
Verandah GF near kitchen
Toilets
Bed rooms
TOTAL

2.31 Same as per item no.2.31 of 3BHK+Servant Qtr.


2.34 Supplying Chemical emulsion --------------

2.34.1 Chlorphriphos Lindane----------------

Peremeter of external wall=1x66= 66m@2.25 litres/linear meter


=148.50 litres say=149
Liters
2.35 Diluting and injecting Chemical emulsion----------
2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration Mtrs.
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1% concentration=252nos. of
holesx area of one hole=252x0.785x0.30x0.30=17.80 sqm
Sqm

SUB HEAD-III --CONCRETE WORK


4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm Cum
nominal size)
Verandah GF
Living room
Study room
Dinning room
Kitchen
Verandah GF near kitchen
Toilets
Bed rooms

3 BHK (G + 3)-31
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

FT-1
FT-2
FT-3
CFT-1
CFT-2
Ground Floor:
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Peremeter of plinth beam
TOTAL

4.17 Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 Sqm


cement:FOR
Length 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Plinth protection
over 75mm thick bed of dry brick ballast 40 mm nominal size, wellTOTAL
rammed and consolidated and grouted with fine sand, including finishing
4.11
the top
P/L 50mm th. DPC----------
smooth
Ground Floor:
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Length of 115 mm th. wall
TOTAL
4.13 Applying a coat of residual petrolium-----------------
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Length of 115 mm th. wall
TOTAL

5.9.1 Foundation,footings,basis of columns------------------------

5.9.1 Foundation,footings,basis of columns------------------------

FT-1
FT-2
FT-3
CFT-1
CFT-2
Columns
Peremeter of plinth beam
TOTAL

5.9.20 Suspended floors,roofs,landings,balconies etc.-----

Verandah GF
Living room

3 BHK (G + 3)-32
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

Study room

Dinning room

Kitchen

Verandah GF near kitchen

Toilets

Bed rooms

Waste slab

In front of stair case FF

Add for second floor

Balconies FF

Add for SF

Add for First floor ,Second floor and 3rd floor

TOTAL

5.9.4 Shelves-------------

5.9.5 Lintels,beams,plinth beams--------------(GF,FF,S.F & TF)


D (Bottom)
D (Sides)
D-1(Bottom)
D-1(Sides)
D-2(Bottom)
D-2(Sides)
W(Bottom)
W(Sides)
W-1(Bottom)
W-1(Sides)
W-2(Bottom)
W-2(Sides)
W-2(Bottom)
W-2(Sides)
Plinth beams, (sides)
,floor beams (Bottoms)
floor beams (sides)
TOTAL

3 BHK (G + 3)-33
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

5.9.6 Columns,pillars,piers etc-------(GF,FF,&S.F)

5.9.7 Stairs (Excluding landing)-----------------


Langing GF
Add for FF,SF &TF
Steps GF
Add for FF,SF & TF
TOTAL

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide RM


Peremeter of slab at FF
Add for second and 3rd floor
TOTAL

5.9.19 Weather shade,chajjas -------------------


Chajja Around study room and living room FF
Add for SF and 3rd floor
TOTAL

5.22. Steel reinforcement for RCC work in foundation and plinth Kg


RCC Raft =100.64 cumx80 kg/cum=8050.8 kg RCC in Columns=25.57 cum@
180kg/cum=5113.30 kg

5.22A Steel reinforcement for RCC work above plinth level

5 RCC Work
5.33.1 RCC upto plinth level
Column footings
Column footings
FT-1
FT-2
FT-3
CFT-1
CFT-2
Plinth beam
Columns
TOTAL

5.33.2 RCCabove plinth level upto floor V level


Columns
FloorSlabs beams GF,FF & SF
3 BHK (G + 3)-34
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

Landing GF
Add for FF & SF
Steps GF 0.5
Add for FF & SF
Slab for GF,FF & SF ( Area of slab for one slab=148.07 Sqm)
Mumty
TOTAL
5.34.1 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-30 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-30 is @ 340 kg/ kg/cum)
CUM
5.34.2 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-35 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-35 is @ 350 kg/ kg/cum)
CUM
5.34.3 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-40 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-40 is @ 360kg/ kg/cum)
CUM

6.1 Brick work with common burnt clay -------------


6.1.2 Length of 230mm th.outer wall
Length of 230mm th. Internal walls
TOTAL

6.4 Brick work with common burnt clay -------------


6.4.2 Cement 1:6 Cum
Ground Floor:
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
First floor
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Second floor
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Third Floor floor
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Perapet wall
Boxes
Less for doors of GF,FF,SF and third floor
D-1
Less windows
W
3 BHK (G + 3)-35
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

W-1
W-2
W-3
TOTAL

6.12 Half brick work in foundation & plinth-------------------- Sqm

Ground Floor:
6.13.2 Half brick work
Length of 115 mm th. wall
First floor
Length of 115 mm th. wall
Second floor
Length of 115 mm th. wall
Third floor
Length of 115 mm th. wall

Less for doors of GF,FF,SF and third floor


D-1
D-2
TOTAL

6.15 Extra for providing and placing--------------- Sqm


Quantity same as per item no 6.13.2
MARBLE WORK
8.2 P/F 18mm thick granite top---------
8.2.2 Granite of any colour and shade Sqm
8.2.2.1 Area of slab over 0.50 sqm
Ground Floor
Kitchen
Wash Basin
First floor
Kitchen
Wash Basin
Second Floor
Kitchen
Wash Basin
Third Floor
Kitchen
Wash Basin
TOTAL

8.3 Providing edge moulding----------


8.3.2 Granite work
Ground Floor
Kitchen
3 BHK (G + 3)-36
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

Wash Basin
First floor
Kitchen
Wash Basin
Second Floor
Kitchen
Wash Basin
TOTAL
8.4 Extra for facia work------------
QUANTITY AS PER ITEM NO.8.3.2 AS ABOVE Metre
TOTAL

8.5 Extra for providing opening of required size


QUANTITY AS PER Plumbing ITEM
Ground Floor
Kitchen
Wash Basin
First floor
Kitchen
Wash Basin
Second Floor
Kitchen
Wash Basin
TOTAL
8.12 P/and laying flamed finished Granite stone flooring----

a) Flamed finished granite----------- Sqm


Verandah GF
Verandah GF (Skirting)
Living room
Living room (Skirting)
Study room
Study room (Skirting)
Dinning room
Dinning room (Skirting)
Verandah GF near kitchen
Verandah GF near kitchen (Skirting)
Bed rooms
Bed rooms (Skirting)
Add for First floor and Second floor
TOTAL

WOOD WORK

9.21 P/F ISI marked Flush door shutters-----------------------

9.21.1 35mm thick including ISI marked ss but hinges--------------

3 BHK (G + 3)-37
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

Doors for GF,FF , SF and TF SQM


D

D-1

D-2
TOTAL

9.21.3 25mm thick (For cup board shutters)---------------------------------------

Ground Floor
Bed rooms
Bed rooms
Study room
Add for First , Second and third floor
TOTAL

9.18 P/F cup board shelves -----------------------------------------------


9.18.2 25mm thick
Ground Floor
Bed rooms
Bed rooms
Study room
Add for First , Second and third floor
TOTAL

9.53 P/F 40x5mm flat iron hold fast-----------------


Hold fat First , Second and third floor Each
D

D-1

D-2
TOTAL
NS P/F ISI marked Brass with chrome finished sliding door bolt ----------------
Sliding door bolt for First , Second and third floor SQM
300x16mm
D

D-1

D-2
TOTAL

3 BHK (G + 3)-38
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

NS P/F ISI marked Brass with chrome finished tower bolt--------------


Tower bolt for GFFirst , Second and third floor SQM
250x10mm
D

D-1
TOTAL

200x10mm

D-2

TOTAL

NS P/F ISI marked Brass with chrome finished handles --------------


Handles for GFFirst , Second and third floor SQM
125mm
D

D-1
TOTAL

100mm

D-2
TOTAL

NS P/F ISI marked Brass with chrome finished Hanging type door stopper --------------
Door stopper for GF,First , Second and third floor SQM

D-1

D-2
TOTAL

P/F ISI marked Brass with chrome finished mortice latch and lock with 6 levers
NS --------------
Mortice latch and lock for GF,First , Second and third floor SQM

3 BHK (G + 3)-39
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

D-1

D-2
TOTAL

10.0 STEEL WORK


10.14 P/F Pressed steel door frames ------------------------
10.14.1 Profile B
10.14.1.1 Fixing with adjustable lugs------
Doors for GF,First , Second and third floor SQM
D

D-1

D-2
TOTAL

10.28 P/F stainless steel (Grade 304) railing made of hollow sections--------------
For stair cases(5 nos.)=6.71x1.00x5 nos.x4 floors=134.20 sqm @ 25
kg/sqm=3355.00 kg KG
IN corridoors=3x3.81=11.43 sqm @ 20 kg/sqm=228.60 kg
Railing in
balconies(Verandah)=(2.5+1.25+1.25+2.3+1+1+2.9+1.55+1.55)x2x3=91.80mx
1.00=91.80 sqm@ 20kg/sqm=1836.00kg KG
TOTAL

FLOORING
11.23 Marble stone flooring-----------------
11.23.5 Udaipur Green Marble Sqm
Ground Floor

11.36 P/L Ceramic Glazed wall tiles


GF Toilets
Toilets (Skirting)
Add for FF , SF &TF
TOTAL

11.26 Kota stone slab flooring------------

3 BHK (G + 3)-40
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

11.26.1 25mm thick


Ground Floor
Kitchen
Kitchen (Skirting)
Balconies-1
Balconies -1 (Skirting)
Balconies-2
Balconies -2 (Skirting)
Balconies-3
Balconies -3 (Skirting)
Stair case GF
Stair case GF skirting
Add for FF , SF and third floor
TOTAL

11.37 P/L ceramic glazed floor tiles -------------------------------------------


GF Toilets
Toilets
Toilets (Skirting)
Add for FF,SF and third floor
TOTAL

VITRIFIED FLOOR TILES


11.41 P/L vitrified floor tiles --------

11.41.2 Size of tile 600x600mm

11.48 Grouting of joints of tile flooring------------


11.48.2 Size of tile 600x600mm
Same as quantity of vitrified tiles

ROOFING

12.21 Providing gola 75x75mm------ RM

Peremeter of Terrace

3 BHK (G + 3)-41
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

12.22 Making Khura 45x45cm Nos.

12.55 Providing and laying heat resistance tiles at terrace------ Sqm


Verandah GF

Living room

Study room

Dinning room

Verandah GF near kitchen

Bed rooms

Toilets

Ground Floor
Kitchen

Balconies-1

Balconies-2

Balconies-3

Stair case GF

13.0 FINISHING

13.4.2 12MM & 15mm cement plaster of mix 1:6 ---------------- sqm
Qty.of brick work /0.23x2=sqm=223.26/0.23=970.70x2=1941.40sqm
Qty.of half brick work x2=sqm=356.58 x2=713.15 sqm
Parapet wall (Peremeter of Wall)
Balconies-1 !st floor,2nd and 3rd floor
Balconies-2
Balconies-3
Chajja Around study room and living room FF for bottom portion
Chajja Around study room and living room FF for top portion
Add for SF and third floor
Stair case GF
Langing GF

3 BHK (G + 3)-42
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

Waste slab
Side of waste slab
Add for FF,SF & TF
TOTAL
Doors for GF,FF & SF SQM
D

D-1

D-2
Total

13.4.2 12MM cement plaster of mix 1:6 ---------------- sqm


13.5.2 15MM cement plaster of mix 1:6 ----------------
Qty.same as per item no. 13.4.2 sqm

13.22 Extra for plastering more than 10 m height--------


Peremeter of building Sqm

Total
13.16.1. 6mm cement Plaster Sqm
Ground Floor

Verandah GF

Living room

Study room

Dinning room

Verandah GF near kitchen

Bed rooms

Toilets
Add for FF, SF and third floor
Kitchen GF
Add for FF, SF and third floor
Total

13.41 Distempering with Oil bound washable distemper---------------

Area of plaster for internal walls


3 BHK (G + 3)-43
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

Area of plaster of ceiling


Parapet wall
Total

13.45 Finishing walls with textured exterior paint----------

Peremeter of Building Sqm

TOTAL

13.83
Wall painting with Premium acrylic emilsion paint of interior grade ---------------

Ground Floor
13.78 P/Applying 12mm thick gypsum plaster------------

Quantity same as item no.13.4.2 & 13.5.2 Sqm


AS per area of ceiling plaster
TOTAL

ALUMINIUM WORK

21.1.1 Fixed portion


21.1.1.2 Power coated ------------------ KG

21.1.2 For shutters of doors and windows---------


21.1.2.2 Power coated ------------------

windows of GF,FF,SF &TF floor KG


W
W-1
W-2
W-3
TOTAL

Weight of Aluminium=67.20 sqm @ 22 kg/sqm=1478.40 kg


KG

3 BHK (G + 3)-44
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

Filling the gap in between aluminium frame & adjacent RCC/Brick/Stone


21.8 work-----------
windows of GF,FF,SF &TF floor RM
W
W-1
W-2
W-3
TOTAL

21.10 P/F glazing in aluminium doors and windows in outer wall at GF,FF &SF
windows of GF,FF,SF &TF floor
W
W-1
W-2
W-3
TOTAL

21.13 P/F 100mm brass locks in aluminium doors


Doors and windows of GF,FF,SF & TFfloor NO.

21.15 P/F aluminium casement windows -------------------

21.15.2 Power coated -------------


Windows in outer wall at GF,FF ,SF and TF Each

21.16 P/F aluminium round shape handles casement windows -------------------


Doors and windows of GF,FF and Second floor Each

22.3 P/F WATER PROOFING TREATMENT TO Sunken portions SQM

Ground Floor
Toilets Horizontal portion
Toilets Vertical portion
Add for FF , SF and third floor
TOTAL

22.7 P/L Brick coba integran water proofing------------------

At Terrace (Area of terrace


Terrace

3 BHK (G + 3)-45
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G + 3) for
DSR,2016 Unit
ESIC Hospital at Raipur

TOTAL

3 BHK (G + 3)-46
or ESIC Hospital at Raipur (G + 3)

Nos. Length Breadth H/D Qty.

400
200
500

10 2.85 2.55 2 145.35


8 2.85 2.85 2 129.96
2 3.15 2.85 2 35.91
1 4.45 2.25 2 20.03
3 4.85 2.45 2 71.30
1 125.28 0.23 0.45 12.97
415.51

2 37.78 1.2 1 90.67


2 7 1.2 1 16.80
107.47

522.98
0.00
107.47
-42.17
588.28

10 2.85 2.55 0.5 36.34


8 2.85 2.85 0.5 32.49
2 3.15 2.85 0.5 8.98
3 BHK (G + 3)-47
Nos. Length Breadth H/D Qty.

1 4.45 2.25 0.5 5.01


3 4.85 2.45 0.5 17.82
100.64

2 2.5 1.25 0.1 0.63


2 3.9 3 0.1 2.34
2 3.15 3.115 0.1 1.96
2 4.085 3.78 0.1 3.09
2 3 2.1 0.1 1.26
2 2.885 1.55 0.1 0.89
2 1.9 1.833 0.1 0.70
4 3.3 3.195 0.1 4.22
15.08

1900.00

149

66.00

17.80

2 2.5 1.25 0.1 0.63


2 3.9 3 0.1 2.34
2 3.15 3.115 0.1 1.96
2 4.085 3.78 0.1 3.09
2 3 2.1 0.1 1.26
2 2.885 1.55 0.1 0.89
2 1.9 1.833 0.1 0.70
4 3.3 3.195 0.1 4.22

3 BHK (G + 3)-48
Nos. Length Breadth H/D Qty.

10 2.85 2.55 0.1 7.27


8 2.85 2.85 0.1 6.50
2 3.15 2.85 0.1 1.80
1 4.45 2.25 0.1 1.00
3 4.85 2.45 0.1 3.56

2 37.78 1.2 0.1 9.07


2 7 1.2 0.1 1.68
1 125.28 1.2 0.1 15.03
60.99

2 37.78 0.75 56.67


56.67

2 37.78 0.23 17.38


2 7 0.23 3.22
2 21 0.115 4.83
25.43

2 37.78 0.23 17.38


2 7 0.23 3.22
2 21 0.115 4.83
25.43

10 10.8 2.55 0.4 43.20


8 11.4 2.85 0.4 36.48
2 12 2.85 0.4 9.60
1 13.4 2.25 0.4 5.36
3 14.6 2.45 0.4 17.52
28 1.5 1.5 63
2 125.28 0.45 112.752
287.91

2 2.5 1.25 6.25


2 3.9 3 23.40

3 BHK (G + 3)-49
Nos. Length Breadth H/D Qty.

2 3.15 3.115 19.62

2 4.085 3.78 30.88

2 3 2.1 12.60

2 2.885 1.55 8.94

2 1.9 1.833 6.97

4 3.3 3.195 42.17

1 4.05 0.8 3.24

1 3 1 3.00

3.00

2 2.3 1.25 5.75

11.50

531.99

709.32

8 1.3 0.23 2.39


16 1.3 0.15 3.12
32 1.2 0.23 8.83
64 1.2 0.15 11.52
16 1.05 0.23 3.86
32 1.05 0.15 0.00
16 1.5 0.23 5.52
32 1.5 0.15 0.00
8 1 0.23 1.84
16 1 0.15 0.00
16 1 0.23 3.68
32 1 0.15 0.00
8 1 0.23 1.84
16 1 0.15 0.00
2 268.44 0.23 0.6 123.48
4 268.44 0.23 246.96
2 268.44 0.6 322.13
735.18

3 BHK (G + 3)-50
Nos. Length Breadth H/D Qty.

28 1.6 15.3 685.44

1 1.5 1.3 1.95


5.85
22 0.8 0.15 2.64
31.32
41.76

2 37.78 75.56
151.12
226.68

2 7 0.6 8.40
16.8
25.20

21238

50485

10 2.85 2.55 0.5 36.34


8 2.85 2.85 0.5 32.49
2 3.15 2.85 0.5 8.98
1 4.45 2.25 0.5 5.01
3 4.85 2.45 0.5 17.82
1 125.28 0.23 0.45 12.97
28 0.3 0.45 1.5 12.60
126.20

28 0.3 0.45 18.3 153.72


6 125.28 0.23 0.45 77.80
3 BHK (G + 3)-51
Nos. Length Breadth H/D Qty.

1 1.5 1.3 0.17 0.33

80 1.5 0.3 0.15 2.70

3 148.07 0.15 66.63


4 6 4 0.15 14.40
315.58

2.00

1.00

1.00

2 37.78 1.2 1 90.67


2 7 1.2 1 16.80
107.47

2 37.78 0.23 3 52.14


2 7 0.23 3 9.66

2 37.78 0.23 3 52.14


2 7 0.23 3 9.66

2 37.78 0.23 3 52.14


4 7 0.23 3 19.32

2 37.78 0.23 3 52.14


4 7 0.23 3 19.32
2 37.78 0.23 1 17.38
6 1.5 0.23 13.2 27.32

32 1 0.23 2.1 15.46

16 1.5 0.23 1.2 -6.62


3 BHK (G + 3)-52
Nos. Length Breadth H/D Qty.

8 1 0.23 1.2 -2.21


16 1 0.23 1.2 -4.42
8 1 0.23 1.2 -2.21
311.21

2 21 3.3 138.6

2 21 3.3 138.6

2 21 3.3 138.6

2 21 3.3 138.6

32 0.9 2.1 -60.48


16 0.75 2.1 -25.2
468.72

468.72

2 4.1 0.60 4.92


4 0.6 0.60 1.44

2 4.1 0.60 4.92


4 0.6 0.60 1.44

2 4.1 0.60 4.92


4 0.6 0.60 1.44

2 4.1 0.60 4.92


4 0.6 0.60 1.44
33.93

2 4.1 8.20
3 BHK (G + 3)-53
Nos. Length Breadth H/D Qty.

4 1.8 7.20

2 4.1 8.20
4 1.8 7.20

2 4.1 8.20
4 1.8 7.20
62.00

62.00
62.00

1 3 3
1 4 4

1 3 3
1 4 4

1 3 3
1 4 4
24.00

2 2.5 1.25 6.25


2 7.5 0.1 1.50
2 3.9 3 23.40
2 13.8 0.1 2.76
2 3.15 3.115 19.62
2 12.53 0.1 2.51
2 4.085 3.78 30.88
2 7.87 0.1 1.57
2 2.885 1.55 8.94
2 8.87 0.1 1.77
4 3.3 3.195 42.17
4 12.99 0.1 5.20
293.17
439.75

3 BHK (G + 3)-54
Nos. Length Breadth H/D Qty.

8 1.3 2.1 21.84

32 1.2 2.1 80.64

16 1.05 2.1 35.28


56 137.76

2 1.88 3 11.28
2 1.55 3 9.30
2 1.55 3 9.30
89.64
119.52

2 1.88 0.6 2.26


2 1.55 0.6 1.86
2 1.55 0.6 1.86
17.94
23.92

8 6 48.00

32 6 192.00

16 6 96.00
336.00

8 1 8.00

32 1 32.00

16 1 16.00
56.00

3 BHK (G + 3)-55
Nos. Length Breadth H/D Qty.

8 1 8.00

32 1 32.00
40.00

16 1 16.00

16.00

8 2 16.00

32 2 64.00
80.00

16 2 32.00
32.00

8 1 8.00

32 1 32.00

16 1 16.00
56.00

3 BHK (G + 3)-56
Nos. Length Breadth H/D Qty.

8 1 8.00

32 1 32.00

16 1 16.00
56.00

8 5.2 41.60

32 5.1 163.20

16 4.95 79.20
284.00

519 519.00

1836 1836.00
2355.00

4 7.47 2.1 62.75


188.25
251.00

3 BHK (G + 3)-57
Nos. Length Breadth H/D Qty.

2 3 2.1 12.60
2 10.2 0.1 2.04
2 2.89 2.07 11.96
2 9.92 0.1 1.98
2 2.47 1 4.94
2 6.94 0.1 1.39
2 3 1.25 7.50
2 8.5 0.1 1.70
1 4.25 2.16 9.18
1 4 0.3 1.20
163.50
218.00

4 1.9 1.833 13.93


4 7.47 0.1 2.99
50.76
67.68

2 37.78 75.56

3 BHK (G + 3)-58
Nos. Length Breadth H/D Qty.

18

2 2.5 1.25 6.25

2 3.9 3 23.40

2 3.15 3.115 19.62

2 4.085 3.78 30.88

2 2.885 1.55 8.94

4 3.3 3.195 42.17

4 1.9 1.833 13.93

2 3 2.1 12.60

2 2.89 2.07 11.96

2 2.47 1 4.94

2 3 1.25 7.50

1 4.25 2.16 9.18

191.39

1941.4
713.15
2 75.76 1 151.52
16 2.89 2.07 95.72
8 2.47 1 19.76
8 3 1.25 30.00
8 7 0.6 33.60
8 7 0.6 33.60
25.2
1 4.25 1.5 6.38
1 1.5 1.3 1.95

3 BHK (G + 3)-59
Nos. Length Breadth H/D Qty.

1 4.05 0.8 3.24


1 4.05 0.12 0.49
36.15
3092.15

8 1.3 2.1 -21.84

32 1.2 2.1 -80.64

16 1.05 2.1 -35.28


2954.39

1477.00

1477.00

1 75.56 3.2 241.79


1 75.56 1 75.56
317.35

2 2.5 1.25 6.25

2 3.9 3 23.40

2 3.15 3.115 19.62

2 4.085 3.78 30.88

2 2.885 1.55 8.94

4 3.3 3.195 42.17

4 1.9 1.883 14.31


436.77
2 3 2.1 12.60
37.80
632.76

1477.00
3 BHK (G + 3)-60
Nos. Length Breadth H/D Qty.

632.76
2 37.78 1 75.56
2185.32

2 37.78 14.2 1072.95

1072.95

1477.00
632.76
2109.76

148.00

16 1.5 1.2 28.80


8 1 1.2 9.60
16 1 1.2 19.20
8 1 1.2 9.60
67.20

1330.00

3 BHK (G + 3)-61
Nos. Length Breadth H/D Qty.

16 5.4 86.40
8 4.4 35.20
16 4.4 70.40
8 4.4 35.20
227.20

16 1.5 1.2 28.80


8 1 1.2 9.60
16 1 1.2 19.20
8 1 1.2 9.60
67.20

48 2 96.00

4 1.9 1.883 14.31


4 7.57 0.45 13.63
83.62
111.56

191.39

3 BHK (G + 3)-62
Nos. Length Breadth H/D Qty.

191.39

3 BHK (G + 3)-63
NAME OF WORK: CONSTRUCTION OF PROPOSED 3 BHK Quarter for ESIC Hospital at
BOQ As per DSR 2014
Sl. No. Item No. Description of the work

1.0 SUB-HEAD I - Carriage of Materials

1.1 1.1.2 Carriage of Earth by Mechanical transport Including loading


unloding and stacking

0 to 2 KM
5KM to 10KM

10KM to 20 KM

2.0 SUBHEAD II : Earth Work


2.1 2.6 Earth work in excavation by mechanical means (Hydraulic
excavator) /manual means in foundation over areas
(exceeding 30cm in depth , 1.5 m in width or 10 sqm on
plan), including disposal of excavated earth, for all leads and
lifts, disposed earth to be levelled and neatly dressed.All kind
of soil.

2.9 Earth work in foundation trenches or drains------


2.9.3 Hard rock (Blasting Prohibited)
2.2 2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides of foundations etc. in layers not exceeding 20cm
in depth, consolidating each deposited layer by ramming and
watering, lead up to 50 m and lift upto 1.5 m.

Extra for every additional lift of i.5m or part thereof in


excavation/banking excavated or stacked material
2.26

Ordinary or hard rock


2.26.2
2.3 2.27 Supplying and filling in plinth with jamuna sand under floors,
including watering,ramming consolidating and dressing
complete

2.5 16.3 Supplying and stacking at site.

16.3.9 Good earth

72
2.31 Clearing jungla uprooting of rank vegitation-
=199.99x155=30998.00sqm

2.34 Supplying Chemical emulsion --------------


2.34.1 Chlorphriphos Lindane----------------
Peremeter of external wall=1x87.56= 87.56 m@2.25
litres/linear meter =197.01 litres

2.35 Diluting and injecting Chemical emulsion----------


2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1%
concentration=292 nos. of holesx area of one
hole=292x0.785x0.30x0.30=20.62 sqm

3.0 SUB HEAD-III --CONCRETE WORK

3.1 4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate


40 mm nominal size)

4.11 Providing and laying 50mm thick DPC----------

4.13 Applying a coat of residual petrolium-----------------

3.2 4.17 Making plinth protection 50 mm thick of cement concrete


1:3:6 (1 cement:
3 coarse sand : 6 graded stone aggregate 20 mm nominal
size) over
75mm thick bed of dry brick ballast 40 mm nominal size, well
rammed and
consolidated and grouted with fine sand, including finishing
the top
smooth

4.0 SUB HEAD-IV RCC WORK


4.1 5.9.1 Centering and shuttering including strutting, propping etc.
and removal of form for : Foundations, footings, bases of
columns, etc. for mass concrete

73
4.3 5.9.6 Centering and shuttering including strutting, propping etc.
and removal of form for :Columns, Pillars, Piers, Abutments,
Posts and Struts

4.4 5.9.5 Centering and shuttering including strutting, propping etc.


and removal of form for : Lintels, beams, plinth beams,
girders, bressumers and cantilevers

4.5 5.9.7 Centering and shuttering including strutting, propping etc.


and removal of form for : Stairs, (excluding landings) except
spiral-staircases

4.6 5.9.19 Weather shade,chajjas,corbles etc. including edges

Suspended floors,roofs,landings,balconies and access


4.7 5.9.20 platform with water proof ply 12mm thick

5.9.4 Shelves-------------

5.9.5 Lintels,beams,plinth beams--------------(GF,FF,&S.F)

5.9.6 Columns,pillars,piers etc-------(GF,FF,&S.F)

5.9.7 Stairs (Excluding landing)-----------------

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide

5.9.19 Weather shade,chajjas -------------------


Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
5.22.6.A
above plinth level . Thermo-Mechanically Treated bars

4.8 5.22.6 Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
upto plinth level . Thermo-Mechanically Treated bars

74
4.8 5.33.1 Providing and laying in position machine batched and
machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works upto plinth level

4.9 5.33.2 Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works above plinth
level upto floor V level

4.10 5.34.1 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-30 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-30 is @ 340 kg/ kg/cum)

4.11 5.34.2 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-35 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-35 is @ 350 kg/ kg/cum)

4.12 5.34.3 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-40 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-40 is @ 360kg/ kg/cum)

5.0 SUBHEAD V-BRICK WORK

75
5.1 6.1 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:

(a) 6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.4.2 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in super structure above
plinth level upto floor V level

6.2.4 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.12 Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundation and
plinth in:
6.12.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.13 Half b masonry work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in super structure
above plinth level upto floor V level

6.13.2 Cement mortar 1:6 (1 cement : 6 coarse sand)


6.15 Extra for providing and placing in position 2 nos.6mm dia.MS
bars at every third course of half brick masonry

5.2 6.38 Providing and laying autoclaved aerated cement blocks


masonry with 100mm thick AAC blocks in super structure
above plinth level up to floor V level in cement mortar 1:4 (1
cement : 4 coarse sand ). The rate includes providing and
placing in position 2 Nos 6 mm dia M.S. bars at every third
course of masonry work.

6.5 Extra for brick work/ACC block masonry/Tile brick masonry in


super structure above floor V level,for each four floors or part
thereof by mechanical means.

7.0
SUBHEAD VII-MARBLE & GRINITE WORK

76
7.1 8.2 Providing and fixing 18 mm thick gang saw cut, mirror
polished, premoulded
and prepolished, machine cut for kitchen platforms, vanity
counters, window
sills , facias and similar locations of required size, approved
shade, colour
and texture laid over 20 mm thick base cement mortar 1:4 (1
cement : 4
coarse sand), joints treated with white cement, mixed with
matching pigment,
epoxy touch ups, including rubbing, curing, moulding and
polishing to edges
to give high gloss finish etc. complete at all levels

8.2.2 Granite of any colour and shade


8.2.2.2 Area of slab over 0.50 sqm

8.3 Providing edge moulding to 18mm thick marble stone


counters,vanities etc. including machine polishing to edge to
give high gloss finish etc.complete as per design approved by
Engineer-In-Charge.

8.3.2 Granite work

7.2 8.5 Extra for providing opening of required size & shape for wash
basin/ kitchen
sink in kitchen platform, vanity counter and similar location in
marble/
Granite/stone work, including necessary holes for pillar taps
etc. including
moulding, rubbing and polishing of cut edges etc. complete

7.3 8.6 Mirror polishing on marble work/Granite work/Stone work


where ever required to give high gloss finish complete.

7.4 8.12 Providing and laying flamed finish Granite stone flooring in
required design and patterns, in linear as well as curvilinear
portions of the building all complete as per the architectural
drawings with 18 mm thick stone slab
over 20 mm (average) thick base of cement mortar 1:4 (1
cement : 4 coarse sand) laid and jointed with cement slurry
and pointing with white cement slurry admixed with pigment
of matching shade including rubbing, curing
and polishing etc. all complete as specified and as directed
by the Engineerin-In-Charge :

77
a Flamed finish granite stone slab Jet Black, Cherry Red, Elite
Brown, Cat Eye or equivalent

8.0 SUBHEAD VIII-Wood Work


8.2 9.18 Providing and fixing Pre-laminated flat pressed 3 layer
(medium density) particle board or graded wood particle
board IS : 3087 marked, with one side decorative and other
side balancing lamination Grade I, Type II exterior grade IS :
12823 marked, in shelves with screws and fittings wherever
required, edges to be painted with polyurethane primer
(fittings to be paid separately).

9.18.2 25 mm thick
8.3 9.40 Providing and fixing wooden moulded beading to door and
window frames with iron screws ,plugs and priming coat
unexposed surface etc.complete.
9.53 P/F 40x5mm flat iron hold fast-----------------

8.4 9.84 Providing and fixing aluminium extruded section body tubular
type universal hydraulic door closer (having brand logo with
ISI, IS : 3564, embossed on the body, door weight upto 36 kg
to 80 kg and door width from 701 mm to 1000 mm), with
double speed adjustment with necessary accessories and
screws etc. complete.

9.96 Providing and fixing aluminium sliding door bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
IS:1868), transparent or dyed to required color or shade, with
nuts and screws etc. complete

9.96.1 300x16 mm
Providing and fixing aluminium Tower bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
9.97 IS:1868), transparent or dyed to required color or shade, with
necessary screws etc. complete
9.97.1 300x10 mm

9.100 Providing and fixing aluminium handles, ISI msrked anodised


(anodic coating not less than grade AC 10 as per IS:1868),
transparent or dyed to required color or shade, with
necessary screws etc. complete
9.100.1 125 mm
9.101 Providing and fixing aluminium hanging floor door stopper, ISI
msrked anodised (anodic coating not less than grade AC 10
as per IS:1868), transparent or dyed to required color or
shade, with necessary screws etc. complete
9.101.2 Twin rubber stopper

78
8.5 9.103 Providing and fixing bright finished brass 100 mm mortice
latch and lock, ISI marked, with six levers and a pair of
anodised (anodic coating not less than grade AC 10 as per IS
: 1868) aluminium lever handles of approvedquality with
necessary screws etc. complete.

8.6 9.129 Providing and fixing cup board shutters 25 mm thick, with
Pre-laminated flat pressed three layer particle board or
graded wood particle board IS: 12823 marked, exterior grade
(Grade l Type ll), having one side decorative lamination and
other side balancing lamination, including IInd class teak
wood lipping of 25 mm wide x12 mm thick with necessary
screws and bright finished stainless steel piano hinges,
complete as per direction of the Engineer-in-Charge

8.7 9.21 Providing and fixing ISI marked flush door shutters
conforming to IS: 2202 (part1) non-decorative type. Core of
block board construction with frame of 1st class hard wood
and well matched commercial 3 ply veneering with vertical
grains or cross bands and face veneers on both faces of
shutters:

(a) 9.21.1 35mm thick including ISI marked Stainless Steel butt hinges
with necessary screws.

9.0 SUBHEAD IX-STEEL WORK


P/F Pressed steel door frames ------------------------
10.14
Profile B
10.14.1
9.2 10.30 Providing & fixing glass panes with putty and glazing clips in
steel doors,
windows, clerestory windows, all complete with :

10.30.2 5.5 mm thick glass panes


9.3 10.26 Providing and fixing hand rail of approved size by welding
etc. to steel
ladder railing, balcony railing, staircase railing and similar
works, including
applying priming coat of approved steel primer

10.26.1 M.S. tube

10.28 P/F stainless steel (Grade 304) railing made of hollow


sections--------------

10.0 SUBHEAD X-Flooring

79
10.2 11.26 kota stone slab flooring over 20mm (average thick base laid
over and jointed with grey cement slutty mixed with pigment
to match the shade of the slab including rubbing and
polishing complete with base of cement mortar 1: 4 (1 cement
: 4 coarse sand):

11.26.1 25mm thick


10.5 11.36 Providing and fixing Ist quality ceramic glazed wall tiles
conforming to IS : 15622 (thickness to be specified by the
manufacturer ) of approved make in all colours, shades
except burgundy, bottle green, black of any size as approved
by Engineer-in-Charge, in skirting, risers of steps and dados
over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @ 3.3kg
per sqm including pointing in white cement mixed with
pigment of matching shade complete.

11.37 P/L Ceramic Glazed floor tiles


10.6 11.41 Providing and laying vitrified floor tiles in different sizes
(thickness to be
specified by the manufacturer) with water absorption less
than 0.08%
and conforming to IS : 15622, of approved make, in all
colours and shades,
laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
sand), including
grouting the joints with white cement and matching pigments
etc.,
complete.

11.41.2 Size of Tile 600x600 mm

10.7 11.48 Grouting the joints of flooring tiles having joints of 3mm
width ,using epoxy grout mix of 0.70 kg of organic coated
filler of desired shade (0.10 kg of hardener and 0.20 kg of
resin per kg)including filling /grouting and finishing complete
as per the direction of Engineer-In-Charge.

11.48.2 Size if Tile 600x600 mm

11.0 SUBHEAD XI- ROOFING


11.1 12.21 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement
: 2 coarse sand : 4 stone aggregate 10 mm and down
gauge), including finishing with cement mortar 1:3 (1 cement :
3 fine sand) as per standard design

12.21.1 In 75x75 mm deep chase

80
11.2 12.22 Making khurras 45x45 cm with average minimum thickness of
5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate of 20 mm nominal size) over P.V.C.
sheet 1 m x1 m x 400 micron, finished with 12 mm cement
plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat
cement, rounding the edges and making and finishing the
outlet complete

11.3 12.52 Providing and fixing tiled false ceiling of approved materials
of size 595x595 mm in true horizontal level, suspended on
inter locking metal grid of hot dipped galvanized steel
sections ( galvanized @ 120 grams/ sqm, both side inclusive)
consisting of main “T” runner with suitably spaced joints to
get required length and of size 24x38 mm made from 0.30
mm thick(minimum) sheet, spaced at 1200 mm center to
center and cross “T” of size 24x25 mm made of 0.30 mm
thick (minimum) sheet, 1200 mm long spaced between main
“T” at 600 mm center to center to form a grid of 1200x600
mm and secondary cross “T” of length 600 mm and size
24x25 mm made of 0.30 mm thick (minimum) sheet to be
interlocked at middle of the 1200x600 mm panel to form grids
of 600x600 mm and wall angle of size 24x24x0.3 mm and
laying false ceiling tiles of approved texture in the grid
including, required cutting/making, opening for services like
diffusers,grills, light fittings, fixtures, smoke detectors etc.
Main “T” runners to be suspended from ceiling using GI
slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling
with 12.5 mm dia and 50 mm long dash fasteners, 4 mm GI
adjustable rods with galvanised butterfly level clips of size 85
x 30x 0.8 mm spaced at 1200 mm center to center along
12.52.1 main T, bottom
GI Metal Ceilingexposed widthTegular
Lay in plain of 24 mm ofGlobal
edge all T-sections shall
white color
tiles of size 595x595 mm, and 0.5 mm thick with 8 mm
drop;made of G I sheet having galvanizing of 100 gms/sqm
(both sides inclusive) and electro statically polyester powder
coated of thickness 60 microns (minimum), including factory
painted after bending.

11.4 12.55 Providing and fixing Heat Resistant Terrace Tiles (300 mm x
300 mm x 20 mm) with SRI (solar refractive index) > 78, solar
reflection > 0.70 and initial emittance > 0.75 on waterproof
and sloped surface of terrace, laid on 20 mm thick cement
sand mortar in the ratio of 1:4 (1 cement : 4
coarse sand) and grouting the joints with mix of white cement
& marble powder in ratio of 1:1, including rubbing and
polishing of the surface upto 3 cuts complete, including
providing skirting upto 150 mm height along the parapet walls
in the same manner.

12.0 SUBHEAD XII- Finishing


12.1 13.4 12 mm cement plaster of mix :

81
(a) 13.4.2 1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick
12.2 13.5 wall of mix :

1:6 (1 cement: 6 coarse sand)


(a) 13.5.2
12.3 13.16.1 6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
12.4 13.22 Extra for plastering exterior walls of height more than 10m
from ground level for every additional height of 3m or part
thereof.

12.7 13.41 Distempering with oil bound washable distemper of approved


brand and
manufacture to give an even shade

13.41.1 New work (two or more coats) over and including water
tinnable priming coat with cement primer

12.8 13.45 Finishing walls with textured exterior paint of required shade

13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm)
over and including priming coat of exterior primer applied @
2.20kg/ 10 sqm

13.78 Providing and applying 12mm thick gypsum light weight


plaster------------
13.83 Wall painting with remium acrylic imulsion paint of interior
grade------------
13.83.2
Two coats
12.9 13.84 Painting with synthetic enamel paint ,having VOC(Volatile
Organic Compound) contents less than 150 gms/litre,of
approved brand and manufacture,including applying
additional coats wherever required to achieve even shade
and colour

13.84.2 Two coats


12.10 13.85
Applying priming coats with primer of approved brand and
manufacture,having low VOC(Volatile Organic Compound)
contents.
12.11 13.85.1 With ready mixed pink or grey primer on wood work(Hard and
Soft wood)having VOC(Volatile Organic Compound) contents
less than 50 gms/litre.

82
13 SUB HEAD XIII Aluminium Work
13.1 21.1 Providing and fixing aluminium work for doors, windows,
ventilators and partitions with extruded built up standard
tubular sections/ appropriate Z sections and other sections of
approved make conforming to IS: 733 and IS: 1285, fixing
with dash fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top, bottom
and sides with required EPDM rubber/ neoprene gasket etc.
Aluminium sections shall be smooth, rust free, straight, mitred
and jointed mechanically wherever required including cleat
angle, Aluminium snap beading for glazing / paneling, C.P.
brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-
charge. (Glazing, paneling and dash fasteners to be paid for
separately) :

21.1.1 For fixed portion


21.1.1.2 Powder coated aluminium (minimum thickness of powder
coating 50 micron

21.1.2 For shutters of doors,windows & ventilators including


providing and fixing hinges/pivots and making provision for
fixing of fittings wherever required including the cost of EPDM
rubber/neoprene gasket required(Fittings shall be paid for
seperately)

21.1.2.2 Powder coated aluminium (minimum thickness of powder


coating 50 micron

13.2 21.3 Providing and fixing glazing in aluminium door, window,


ventilator shutters
and partitions etc. with EPDM rubber / neoprene gasket etc.
complete as
per the architectural drawings and the directions of engineer-
in-charge (Cost of aluminium snap beading shall be paid in
basic item):

21.3.3 With float glass panes of 8 mm thickness

13.3 21.8 Filling the gap in between aluminium frame & adjacent
RCC/Brick/Stone work by providing weather silicon sealent
over backer rod of approved quality as per architectural
drawings and direction of Engineer-In-Charge

21.8.1 Upto 5mm depth and 5mm width

83
21.10 P/F double glazed hermetically sealed glazing in
aluminium----------

21.13 P/F 100mm Brass lock---------------------

21.15 P/F aluminium casement window---------

21.15.2 Powder coated------------

21.16 P/F aluminium round shape handles--------

21.16.2 Powder coated------------

14.0 Sub Head XIV: Water Proofing


14.1 22.3 Providing and laying water proofing treatment to vertical and
horizontal surfaces of depressed portions of W.C., kitchen
and the like consisting of:
(i) Ist course of applying cement slurry @ 4.4 kg/sqm mixed with
water proofing compound conforming to IS 2645 in
recommended proportions including rounding off junction of
vertical and horizontal surface.
(ii) IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse
sand) mixed with water proofing compound in recommended
proportion including rounding off junction of vertical and
horizontal surface.
(iii) IIIrd course of applying blown or residual bitumen applied hot
at 1.7 kg. per sqm of area.
(iv) IVth course of 400 micron thick PVC sheet. (Overlaps at
joints of PVC sheet should be 100 mm wide and pasted to
each other with bitumen @ 1.7 kg/sqm).

84
14.2 22.7 Providing and laying integral cement based water proofing
treatment including preparation of surface as required for
treatment of roofs,balconies, terraces etc consisting of
following operations: a) Applying a slurry coat of neat cement
using 2.75 kg/sqm of cement admixed with water proofing
compound conforming to IS. 2645 and approved by
Engineer-in-charge over the RCC slab including adjoining
walls upto 300mm height including cleaning the surface
before treatment. b) Laying brick bats with mortar using
broken bricks/brick bats 25 mm to 115 mm size with 50% of
cement mortar 1:5 (1 cement : 5 coarse sand) admixed with
water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge over 20 mm thick layer of
cement mortar of mix 1:5(1 cement :5 coarse sand ) admixed
with water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge to required
slope and treating similarly the adjoining walls upto 300 mm
height including rounding of junctions of walls and slabs c)
After two days of proper curing applying a second coat of
cement slurry using 2.75 kg/ sqm of cement admixed jointless
cement mortar of mix 1:4 (1 cement :4 coarse
sand) admixed with water proofing compound conforming to
IS : 2645 and approved by Engineer-in-charge including
laying glass fibre cloth of approved quality in top layer of
plaster and finally finishing the surface with trowel with neat
cement slurry and making pattern of 300x300 mm square
3 mm deep. e) The whole terrace so finished shall be flooded
with
With water for thickness
average a minimumofperiod
120 mmof two
and weeks
minimum for thickness
curing andat
a 22.7.1
khurra as 65 mm.

15.0 Sub Head XV: Road Work


15.1 16.81 Providing and erecting 2.00 metre high temporary barricading
at site as per drawing/ direction of Engineer-in-Charge which
includes writing and painting,arrangement for traffic diversion
such as traffic signals during construction at site for day and
night, glow lamps, reflective signs, marking, flags, caution
tape as directed by the Engineer-in- Charge. The barricading
provided shall be retained in position at site continuously i/c
shifting of barricading from one location to another location
as many times as required during the execution of the entire
work till its completion. Rate include its maintenance for
damages, painting, all incidentals, labour materials,
equipments and works required to execute the job. The
barricading shall not be removed without prior approval of
Engineer-in-Charge.

(Note :- One time payment shall be made for providing


barricading from start of work till completion of work i/c
shifting. The barricading provided shall remain to be the
property of the contractor on completion of the work).

85
16
Sub Head XVI:STRUCTURAL GLAZING AND ALUMINIUM
COMPOSITE PANEL

16.1 26.7 Design,fabricating,testing and fixing in position curtain Wall


with aluminium composite panel cladding with open grooves
for linear as well as curvilinear portion of the building for all
heights and all levels etc.

a) Structural analysis & design and preparation of shop


drawings for pressure equalisation or rain screen principle as
required ,proper drainage of water to make it watertight
including checking of all the structural and functional design.

b) Providing,fabricating and supplying and fixing panels of


aluminium composite panel clading in pan shape in metalic
colour of approved shades made out of 4mm thick aluminium
composite panel material consisting of 3mm thick FR grade
mineral core sandwiched between two alumonium sheets
(each 0.5mm thick).The aluminium composite panel cladding
sheet shall be coil coated ,with Kynar 500 based
PVDF/Lumiflon based fluoropolymer(Service) coating on face
# 2 as specified using stainless steel
screws,nuts,bolts,washers,cleats ,weather silicone
sealant,backer rods etc.

86
c) The fastening brackets of aluminium alloys 6005 T5/MS with
Hot dip galvanised with serrations and serrated washers to
arrest the wind load movement ,fasteners,SS 316 pins and
anchors bolts of approved make in SS 316 ,Nylon seperators
to prevent bi-metallic contacts all complete required to
perform as per specificationd and drawings .The items
includes cost of all materials and labour components,the cost
of all mock ups at site, cost of all samples of the indivisual
components for testing in an approved laboratory ,field tests
on the assembled workin curtain wall with aluminium
composite panel cladding ,cleaning and protection of the
curtain wall with aluminium composite panel cladding till
handing over of the building for occupation .Base frame work
for ACP cladding is payable under the relevant aluminium
items.The contractor shall provide curtain wall with aluminium
composite panel cladding ,having all the performance
characteristics all completeas per the Architectural
drawings,as per item description ,as specified ,as per the
approved shop drawingsand as directed by the Engineer-In-
Charge.However,for the purpose of payment,only the actual
area on the external face of the curtain wall with aluminium
composite panel cladding (including width of groove)shall be
measured in sqm.,upto two decimal places

16.0 Sub Head XVII: Non Scheduled


35 mm thick
16.2 NS 2 Providing and laying Antiskid floor tiles of size 450x300 mm
(thickness to be specified by the manufacturer), of 1st quality
conforming of approved make, in all colours, shades, laid on
20 mm thick bed of cement mortar1:4 (1 Cement : 4 Coarse
sand), including pointing the joints with white cement and
matching pigments etc., complete(Basic price of the tile
shall not be less than Rs.55/Sqft.)

NS-10 Providing and fixing brass sliding door bolts crome finished,
ISI marked with nuts and screws etc. complete :

300x16 mm

16.11 NS-11 Providing and fixing brass Tower bolt crome finished, ISI
marked with nuts and screws etc. complete :
300x10 mm

87
16.12 NS-12 Providing and fixing Brass handles chrome finished, ISI
marked, with necessary screws etc. complete :

125 mm

16.13 NS-13 Providing and fixing Brass chrome finished hanging floor door
stopper, ISI marked, with necessary screws etc. complete.

Twin rubber stopper

16.15 NS-15 Providing and laying Double charged vitrified floor tiles in
different sizes (thickness to be specified by the manufacturer)
with water absorption’s less than 0.08% and conforming to IS
: 15622 of approved make in all colours and shades, laid on
20mm thick cement mortar 1:4(1 cement: 4 coarse sand)
including grouting the joints with white cement and matching
pigments etc., complete.(Basic price of the tile shall not be
less than Rs.80/Sqft.)

Size 600x600mm
16.16 NS-16 Providing and fixing bolts of grade 10.9 conforming to IS
1367(Part 1/2/3) including nuts and washers complete.

NS-20 Providing and fixing Glass Reinforced Concrete


jali(GRC) screen in approved
size,pattern,design,thickness and color.The jali shall be
made from 53 grade white portland cement/43 grade
OPC or PPC grey cement manufactured by J.K. cement
or equivalent,quartz,fine silica sand ,Alkali resistance
glass fiber manufactured by Sant Gobin or
equivalent,super plasticiser and polymer manufactured
by BASF,sika as per the manufacturar;s specifications
and as per the directions of Engineer-In-Charge

35mm thick GRC jali

TOTAL NON-SCHEDULED ITEMS

88
Quarter for ESIC Hospital at Raipur (G + 2)

Unit Qty. Rate Amount

Cum 50 113.29 5664.50


Cum 75 57.70 4327.50

Cum 100 48.00 4800.00


Total 14792.00

Cum 100 155.6 15560.00

Cum 315 618.1 194701.50

Cum 446 112.1 49964.06

Cum 101 82.95 8347.67

Cum 15.08 910.25 13730.21

Cum 308.00 0.00

89
100 Sqm 5880.00 642.00 37749.60

Liters 197.01 185.95 36634.01

Mtrs. 709.98 22.72 16130.75

Sqm 20.62 118.90 2451.72

Total 375270

Cum 60.99 4301.15 262334.88


Sqm 25.43 314.85 8006.26

SQM 25.43 132.00 3356.60

Sqm 56.67 419.30 23761.73


Total 286096.61

SQM 287.91 196.45 56560.31

90
SQM 441.00 453.35 199927.35

SQM 47.44 332.15 15755.87

SQM 25.47 396.65 10102.68

SQM 16.80 492.35 8271.48

SQM 531.99 493.55 262563.66

SQM 0.00 401.65 0.00

SQM 112.75 332.15 37450.58

SQM 441.00 453.35 199927.35

SQM 25.47 453.35 11546.82

SQM 151.12 116.40 17590.37

SQM 16.80 492.35 8271.48

KG 27652 68.10 1,883,101

KG 5376 68.10 366,106

91
CUM 67.20 6296.15 423101.28

CUM 254.00 7014.55 1781695.70

CUM 30.00 76.50 2295.00

CUM 20.00 152.95 3059.00

CUM 10.00 229.45 2294.50


Total 5289620.23

92
cum 95.00 4677.25 444338.75

cum 223.26 5426.15 1211447.68

Sqm 105.00 584.75 61398.75

Sqm 356.58 665.80 237410.96

Sqm 356.58 69.50 24782.31

Cum 0.00 6386.95 0.00

Cum 90.00 289.05 26014.50


Total 2005392.95

93
Sqm 19.08 3907.40 74553.19

Metre 46.20 230.55 10651.41

Each 18.00 386.60 6958.80

Sqm 439.75 212.85 93601.77

94
Sqm 439.75 3244.35 1426717.84
TOTAL 1612483.01

sqm 11.96 1290.55 15429.82

each 252.00 117.35 29572.20

each 42.00 1043.6 43831.20

Each 42.00 229.65 9645.30

Each 42.00 112.1 4708.20

Each 84.00 69.8 5863.20

Each 42.00 83.95 3525.90

95
each 42.00 815.45 34248.90

sqm 89.64 1629.75 146090.79

sqm 103.32 1909.22 197260.61


Total 490176.12

RM 213.00 377.70 80450.10

Sqm 988.00 0.00

Kg 104.70 0.00

Kg 1452.06 619.40 899405.96


Total 979856.06

96
sqm 109.00 1141.40 124408.72

sqm 188.25 836.65 157497.69

sqm 50.76 785.40 39865.96

Sqm 30.00 1405.95 42178.50

Sqm 30.00 187.95 5638.50

Total 369589.37

Rm 75.56 143.10 10812.64

97
Each 18.00 186.65 3359.70

Sqm 1551.55 0.00

Sqm 245.89 1133.85 278802.38


Total 292974.71

98
sqm 1410.00 149.45 210724.50

sqm 1410.00 172.80 243648.00

Sqm 474.57 134.70 63923.96

Sqm 37.95 0.00

Sqm 1960.13 89.70 175823.25

Sqm 868.94 146.45 127256.26

Sqm 1884.57 244.35 460493.56

Sqm 75.00 74.40 5580.00

Sqm 75.00 74.40 5580.00

Sqm 500.00 36.10 18050.00

99
Total 1311079.53

kg 110.00 377.75 41552.50

kg 998.00 435.75 434878.50

Sqm 50.40 1338.40 67455.36

metre 170.40 88.75 15123.00

100
Sqm 50.40 3487.10 175749.84

Each 42.00 418.65 17583.30

Each 72.00 55.15 3970.80

Each 144.00 55.15 7941.60


Total 559009.36

sqm 83.02 522.90 43409.48

101
Sqm 245.89 1019.05 250574.20
Total 293983.69

metre 0.00 5868.00 0.00

102
Total 0.00

103
sqm 0.00 3775.30 0.00
Total 0.00

sqm 4152.00 0.00

Sqm 50.76 1252.00 63550.02

Each 42.00 1021 42882.00

Each 42.00 367 15414.00

104
Each 84.00 138 11592.00

Each 42.00 164.00 6888.00

Sqm 1565.00 0.00

kg 150 -

Sqm 75 4819 361,425

501751.02

105
NAME OF WORK: CONSTRUCTION OF PROPOSED 3 BHK Quarter for ESIC Hospi

MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC


DSR,2016 Unit Nos.
Hospital at Raipur

EARTH WORK
SUB-HEAD I - Carriage of Materials
1.1.2 Carriage of Earth by Mechanical transport Including loading unloding
and stacking
0 to 2 KM Cum
5KM to 10KM Cum
10KM to 20 KM Cum

SUBHEAD II : Earth Work


2.6 EARTH WORK
Column footings
FT-1 10
FT-2 8
FT-3 2
CFT-1 1
CFT-2 3
Plinth beam 1
TOTAL

2.9 Earth work in foundation trenches or drains------


2.9.3 Hard rock (Blasting Prohibited) Cum
Length of 230mm th.outer wall 2
Length of 230mm th. Internal walls 2
TOTAL
2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides
Total of foundations etc. in layers not exceeding 20cm in depth,
excavation
consolidating
Less Qty.of RCC each
anddeposited layer
Columns in by ramming and watering, lead up to
foundation
50 m and lift upto 1.5 m.
Less Qty.of Brick work in foundation
Less Qty.of PCC in foundation
TOTAL
Extra for every additional lift of i.5m or part thereof in excavation/banking
2.26 excavated or stacked material Cum

Column footings
FT-1 10
FT-2 8
FT-3 2
CFT-1 1
CFT-2 3
TOTAL

2.27 Supplying and filling in plinth with jamuna sand under floors, including
watering,ramming consolidating and dressing complete
Cum
Verandah GF 2
Living room 2
Study room 2
Dinning room 2
Kitchen 2
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

Verandah GF near kitchen 2


Toilets 2
Bed rooms 4
TOTAL
2.31 Same as per item no.2.31 of 3BHK+Servant Qtr.

2.34 Supplying Chemical emulsion --------------


2.34.1 Chlorphriphos Lindane----------------
Peremeter of external wall=1x66= 66m@2.25 litres/linear meter Liters 149
2.35 =148.50 litresinjecting
Diluting and say=149Chemical emulsion----------
2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration Mtrs. 66.00
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1% concentration=252nos. of Sqm 17.80
holesx area of one hole=252x0.785x0.30x0.30=17.80 sqm
SUB HEAD-III --CONCRETE WORK
4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm
nominal size) Cum
Verandah GF 2
Living room 2
Study room 2
Dinning room 2
Kitchen 2
Verandah GF near kitchen 2
Toilets 2
Bed rooms 4
FT-1 10
FT-2 8
FT-3 2
CFT-1 1
CFT-2 3
Ground Floor:
Length of 230mm th.outer wall 2
Length of 230mm th. Internal walls 2
Peremeter of plinth beam 1
TOTAL
4.17 Making plinth protection 50 mm thick of cement concrete 1:3:6 (1
cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
over 75mm thick bed of dry brick ballast 40 mm nominal size, well
rammed and consolidated and grouted with fine sand, including finishing Sqm
the top
smooth

Length FOR Plinth protection 2


TOTAL

4.11 P/L 50mm th. DPC----------


Ground Floor:
Length of 230mm th.outer wall 2
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

Length of 230mm th. Internal walls 2


Length of 115 mm th. wall 2
TOTAL
4.13 Applying a coat of residual petrolium-----------------
Length of 230mm th.outer wall 2
Length of 230mm th. Internal walls 2
Length of 115 mm th. wall 2
TOTAL

5.9.1 Foundation,footings,basis of columns------------------------

FT-1 10
FT-2 8
FT-3 2
CFT-1 1
CFT-2 3
Columns 28
Peremeter of plinth beam 2
TOTAL

5.9.20 Suspended floors,roofs,landings,balconies etc.-----

Verandah GF 2
Living room 2

Study room 2

Dinning room 2

Kitchen 2

Verandah GF near kitchen 2

Toilets 2

Bed rooms 4

Waste slab 1

In front of stair case FF 1

Add for second floor

Balconies FF 2

Add for SF
Add for First floor and Second floor

TOTAL
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

5.9.4 Shelves-------------

5.9.5 Lintels,beams,plinth beams--------------(GF,FF,&S.F)


D (Bottom) 6
D (Sides) 12
D-1(Bottom) 24
D-1(Sides) 48
D-2(Bottom) 12
D-2(Sides) 24
W(Bottom) 12
W(Sides) 24
W-1(Bottom) 6
W-1(Sides) 12
W-2(Bottom) 12
W-2(Sides) 24
W-2(Bottom) 6
W-2(Sides) 6
Total

5.9.6 Columns,pillars,piers etc-------(GF,FF,&S.F) 28

5.9.7 Stairs (Excluding landing)-----------------


Langing GF 1
Add for FF & SF
Steps GF 22
Add for FF & SF
TOTAL

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide RM


Peremeter of slab at FF 2
Add for second floor
TOTAL

5.9.19 Weather shade,chajjas -------------------


Chajja Around study room and living room FF 2
Add for SF
TOTAL

5.22. Steel reinforcement for RCC work in foundation and plinth Kg


RCC Raft =100.64 cumx80 kg/cum=8050.8 kg RCC in Columns=25.57 cum@
180kg/cum=5113.30 kg
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

5.22A Steel reinforcement for RCC work above plinth level

5 RCC Work
5.33.1 RCC upto plinth level
Column footings
Column footings
FT-1 10
FT-2 8
FT-3 2
CFT-1 1
CFT-2 3
Plinth beam 1
Columns 28
TOTAL

5.33.2 RCCabove plinth level upto floor V level


Columns 28
FloorSlabs beams GF,FF & SF 3
Landing GF 1
Add for FF & SF
Steps GF 0.5 22
Add for FF & SF
Slab for GF,FF & SF ( Area of slab for one slab=148.07 Sqm) 3
Mumty 1
TOTAL

5.34.1 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-30 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-30 is @ 340 kg/ kg/cum)
CUM
5.34.2 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-35 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-35 is @ 350 kg/ kg/cum)

CUM
5.34.3 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-40 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-40 is @ 360kg/ kg/cum)
CUM

6.1 Brick work with common burnt clay -------------


6.1.2 In foundation and plinth
Length of 230mm th.outer wall 2
Length of 230mm th. Internal walls 2
TOTAL
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

6.4 Brick work with common burnt clay -------------


6.4.2 Cement 1:6 Cum
Ground Floor:
Length of 230mm th.outer wall 2
Length of 230mm th. Internal walls 2
First floor
Length of 230mm th.outer wall 2
Length of 230mm th. Internal walls 2
Second floor
Length of 230mm th.outer wall 2
Length of 230mm th. Internal walls 2
Perapet wall 2
Boxes 6
Less for doors of GF,FF and Second floor
D-1 24
Less windows
W 12
W-1 6
W-2 12
W-3 6
TOTAL

6.12 Half brick work in foundation & plinth-------------------- Sqm


Length of 115 mm th. wall 2

Ground Floor:
6.13.2 Half brick work
Length of 115 mm th. wall 2
First floor
Length of 115 mm th. wall 2
Second floor
Length of 115 mm th. wall 2
Less for doors of GF,FF and Second floor
D-1 8
D-2 4
TOTAL

6.15 Extra for providing and placing--------------- Sqm


Quantity same as per item no 6.13.2
MARBLE WORK
8.2 P/F 18mm thick granite top---------
8.2.2 Granite of any colour and shade Sqm
8.2.2.1 Area of slab over 0.50 sqm
Ground Floor
Kitchen 2
Wash Basin 4
First floor
Kitchen 2
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

Wash Basin 4
Second Floor
Kitchen 2
Wash Basin 4
TOTAL

8.3 Providing edge moulding----------


8.3.2 Granite work
Ground Floor
Kitchen 2
Wash Basin 4
First floor
Kitchen 2
Wash Basin 4
Second Floor
Kitchen 2
Wash Basin 4
TOTAL
8.4 Extra for facia work------------
QUANTITY AS PER ITEM NO.8.3.2 AS ABOVE Metre
TOTAL

8.5 Extra for providing opening of required size


QUANTITY AS PER Plumbing ITEM
Ground Floor
Kitchen 2
Wash Basin 4
First floor
Kitchen 2
Wash Basin 4
Second Floor
Kitchen 2
Wash Basin 4
TOTAL
8.12 P/and laying flamed finished Granite stone flooring----
a) Flamed finished granite----------- Sqm
Verandah GF 2
Verandah GF (Skirting) 2
Living room 2
Living room (Skirting) 2
Study room 2
Study room (Skirting) 2
Dinning room 2
Dinning room (Skirting) 2
Verandah GF near kitchen 2
Verandah GF near kitchen (Skirting) 2
Bed rooms 4
Bed rooms (Skirting) 4
Add for First floor and Second floor
TOTAL
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

WOOD WORK

9.21 P/F ISI marked Flush door shutters-----------------------

9.21.1 35mm thick including ISI marked ss but hinges--------------


Doors for GF,FF & SF SQM
D 6

D-1 24

D-2 12
TOTAL 42

9.21.3 25mm thick (For cup board shutters)---------------------------------------

Ground Floor
Bed rooms 2
Bed rooms 2
Study room 2
Add for First & Second floor
TOTAL

9.18 P/F cup board shelves -----------------------------------------------


9.18.2 25mm thick
Ground Floor
Bed rooms 2
Bed rooms 2
Study room 2
Add for First & Second floor
TOTAL

9.53 P/F 40x5mm flat iron hold fast-----------------


Hold fat Doors for GF,FF & SF SQM
D 6

D-1 24

D-2 12
TOTAL
P/F ISI marked Brass with chrome finished sliding door bolt ----------------
NS
Sliding door bolt for GF,FF & SF SQM
300x16mm
D 6

D-1 24
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

D-2 12
TOTAL

NS P/F ISI marked Brass with chrome finished tower bolt--------------


Tower bolt for GF,FF & SF SQM
250x10mm
D 6

D-1 24
TOTAL

200x10mm

D-2 12
TOTAL

NS P/F ISI marked Brass with chrome finished handles --------------


Handles for GF,FF & SF SQM
125mm
D 6

D-1 24
TOTAL

100mm

D-2 12
TOTAL

NS P/F ISI marked Brass with chrome finished Hanging type door stopper --------------
Door stopper for GF,FF & SF SQM

D 6

D-1 24

D-2 12
TOTAL

P/F ISI marked Brass with chrome finished mortice latch and lock with 6 levers
NS --------------
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

Mortice latch and lock for GF,FF & SF SQM

D 6

D-1 24

D-2 12
TOTAL

10.0 STEEL WORK


10.14 P/F Pressed steel door frames ------------------------
10.14.1 Profile B
10.14.1.1 Fixing with adjustable lugs------
Doors for GF,FF & SF SQM
D 6

D-1 24

D-2 12
TOTAL

10.28 P/F stainless steel (Grade 304) railing made of hollow sections--------------
For stair cases(5 nos.)=6.71x1.00x5 nos.x3 floors=100.50 sqm @ 25 kg/sqm

KG 228.06
IN corridoors=3x3.81=11.43 sqm @ 20 kg/sqm=228.60 kg
Railing in
balconies(Verandah)=(2.5+1.25+1.25+2.3+1+1+2.9+1.55+1.55)x2x2=61.20mx
1.00=61.20 sqm@ 20kg/sqm=1224.00kg KG 1224
TOTAL

FLOORING
11.23 Marble stone flooring-----------------
11.23.5 Udaipur Green Marble Sqm
Ground Floor

11.36 P/L Ceramic Glazed wall tiles


GF Toilets
Toilets (Skirting) 4
Add for FF & SF
TOTAL

11.26 Kota stone slab flooring------------


11.26.1 25mm thick
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

Ground Floor
Kitchen 2
Kitchen (Skirting) 2
Balconies-1 2
Balconies -1 (Skirting) 2
Balconies-2 2
Balconies -2 (Skirting) 2
Balconies-3 2
Balconies -3 (Skirting) 2
Stair case GF 1
Stair case GF skirting 1
Add for FF & SF
TOTAL

11.37 P/L ceramic glazed floor tiles -------------------------------------------


GF Toilets
Toilets 4
Toilets (Skirting) 4
Add for FF & SF
TOTAL

VITRIFIED FLOOR TILES


11.41 P/L vitrified floor tiles --------
11.41.2 Size of tile 600x600mm

11.48 Grouting of joints of tile flooring------------


11.48.2 Size of tile 600x600mm
Same as quantity of vitrified tiles

ROOFING
12.21 Providing gola 75x75mm------ RM
Peremeter of Terrace 2

12.22 Making Khura 45x45cm Nos.

12.55 Providing and laying heat resistance tiles at terrace------ Sqm


Verandah GF 2

Living room 2

Study room 2

Dinning room 2

Verandah GF near kitchen 2


MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

Bed rooms 4

Toilets 4

Ground Floor
Kitchen 2

Balconies-1 2

Balconies-2 2

Balconies-3 2

Stair case GF 1

Add for FF & SF

13.0 FINISHING

13.4.2 12MM & 15mm cement plaster of mix 1:6 ---------------- sqm
Qty.of brick work /0.23x2=sqm=223.26/0.23=970.70x2=1941.40sqm
Qty.of half brick work x2=sqm=356.58 x2=713.15 sqm
Parapet wall (Peremeter of Wall) 2
Balconies-1 !st floor & 2nd floor 4
Balconies-2 4

Balconies-3 4
Chajja Around study room and living room FF for bottom portion 2
Chajja Around study room and living room FF for top portion 2
Add for SF
Stair case GF 1
Langing GF
1

Waste slab 1

Side of waste slab


1

Add for FF & SF

TOTAL

Doors for GF,FF & SF SQM

D
6
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

D-1 24

D-2 12
Total

13.4.2 12MM cement plaster of mix 1:6 ----------------


sqm
13.5.2 15MM cement plaster of mix 1:6 ----------------
Qty.same as per item no. 13.4.2 sqm

13.16.1. 6mm cement Plaster Sqm


Ground Floor

Verandah GF 2

Living room 2

Study room 2

Dinning room 2

Verandah GF near kitchen 2

Bed rooms 4

Toilets 4
Add for FF & SF
Kitchen GF 2
Add for FF & SF
Total

13.41 Distempering with Oil bound washable distemper---------------

Area of plaster for internal walls


Area of plaster of ceiling
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

Parapet wall 2
Total

13.45 Finishing walls with textured exterior paint----------

Peremeter of Building Sqm 2

TOTAL

13.83
Wall painting with Premium acrylic emilsion paint of interior grade ---------------

Ground Floor
13.78 P/Applying 12mm thick gypsum plaster------------

Quantity same as item no.13.4.2 & 13.5.2 Sqm


AS per area of ceiling plaster
TOTAL

ALUMINIUM WORK

21.1.1 Fixed portion


21.1.1.2 Power coated ------------------ KG

21.1.2 For shutters of doors and windows---------


21.1.2.2 Power coated ------------------

windows of GF,FF and Second floor KG


W 12
W-1 6
W-2 12
W-3 6
TOTAL

Weight of Aluminium=50.40 sqm @ 22 kg/sqm=1108.80 kg


KG

Filling the gap in between aluminium frame & adjacent RCC/Brick/Stone


21.8 work-----------
windows of GF,FF and Second floor RM
MEASUREMENTS CONSTRUCTION OF PROPOSED 3 BHK (G+2) for ESIC
DSR,2016 Unit Nos.
Hospital at Raipur

W 12
W-1 6
W-2 12
W-3 6
TOTAL

21.10 P/F glazing in aluminium doors and windows in outer wall at GF,FF &SF
windows of GF,FF and Second floor
W 12
W-1 6
W-2 12
W-3 6
TOTAL

21.13 P/F 100mm brass locks in aluminium doors


Doors and windows of GF,FF and Second floor NO.

21.15 P/F aluminium casement windows -------------------

21.15.2 Power coated -------------


Windows in outer wall at GF,FF &SF Each 36

21.16 P/F aluminium round shape handles casement windows -------------------


Doors and windows of GF,FF and Second floor Each

22.3 P/F WATER PROOFING TREATMENT TO Sunken portions SQM

Ground Floor
Toilets Horizontal portion 4
Toilets Vertical portion 4
Add for FF & SF
TOTAL

22.7 P/L Brick coba integran water proofing------------------

At Terrace (Area of terrace


Terrace
TOTAL
SIC Hospital at Raipur (G + 2)

Length Breadth H/D Qty.

400
200
500

2.85 2.55 2 145.35


2.85 2.85 2 129.96
3.15 2.85 2 35.91
4.45 2.25 2 20.03
4.85 2.45 2 71.30
125.28 0.23 0.45 12.97
415.51

37.78 1.2 1 90.67


7 1.2 1 16.80
107.47

522.98
0.00
-56.67
-20.60
445.71

2.85 2.55 0.5 36.34


2.85 2.85 0.5 32.49
3.15 2.85 0.5 8.98
4.45 2.25 0.5 5.01
4.85 2.45 0.5 17.82
100.64

2.5 1.25 0.1 0.63


3.9 3 0.1 2.34
3.15 3.115 0.1 1.96
4.085 3.78 0.1 3.09
3 2.1 0.1 1.26
Length Breadth H/D Qty.

2.885 1.55 0.1 0.89


1.9 1.833 0.1 0.70
3.3 3.195 0.1 4.22
15.08
1900.00

2.5 1.25 0.1 0.63


3.9 3 0.1 2.34
3.15 3.115 0.1 1.96
4.085 3.78 0.1 3.09
3 2.1 0.1 1.26
2.885 1.55 0.1 0.89
1.9 1.833 0.1 0.70
3.3 3.195 0.1 4.22
2.85 2.55 0.1 7.27
2.85 2.85 0.1 6.50
3.15 2.85 0.1 1.80
4.45 2.25 0.1 1.00
4.85 2.45 0.1 3.56

37.78 1.2 0.1 9.07


7 1.2 0.1 1.68
125.28 1.2 0.1 15.03
60.99

37.78 0.75 56.67


56.67

37.78 0.23 17.38


Length Breadth H/D Qty.

7 0.23 3.22
21 0.115 4.83
25.43

37.78 0.23 17.38


7 0.23 3.22
21 0.115 4.83
25.43

10.8 2.55 0.4 43.20


11.4 2.85 0.4 36.48
12 2.85 0.4 9.60
13.4 2.25 0.4 5.36
14.6 2.45 0.4 17.52
1.5 1.5 63
125.28 0.45 112.752
287.91

2.5 1.25 6.25


3.9 3 23.40

3.15 3.115 19.62

4.085 3.78 30.88

3 2.1 12.60

2.885 1.55 8.94

1.9 1.833 6.97

3.3 3.195 42.17

4.05 0.8 3.24

3 1 3.00

3.00

2.3 1.25 5.75

11.50
354.66

531.99
Length Breadth H/D Qty.

1.3 0.23 1.79


1.3 0.15 2.34
1.2 0.23 6.62
1.2 0.15 8.64
1.05 0.23 2.90
1.05 0.15 3.78
1.5 0.23 4.14
1.5 0.15 5.40
1 0.23 1.38
1 0.15 1.80
1 0.23 2.76
1 0.15 3.60
1 0.23 1.38
1 0.15 0.90
47.44

1.5 10.5 441.00

1.5 1.3 1.95


3.9
0.8 0.15 2.64
16.98
25.47

37.78 75.56
75.56
151.12

7 0.6 8.40
8.4
16.80

13164.1
Length Breadth H/D Qty.

31292.06

2.85 2.55 0.5 36.34


2.85 2.85 0.5 32.49
3.15 2.85 0.5 8.98
4.45 2.25 0.5 5.01
4.85 2.45 0.5 17.82
125.28 0.23 0.45 12.97
0.3 0.45 1.5 12.60
126.20

0.3 0.45 10.5 88.20


125.28 0.23 0.45 38.90
1.5 1.3 0.17 0.33
0.99
1.5 0.3 0.15 0.74
1.48
148.07 0.15 66.63
6 4 0.15 3.60
200.87

30.00

20.00

10.00

37.78 0.23 1 17.38


7 0.23 1 3.22
20.60
Length Breadth H/D Qty.

37.78 0.23 3 52.14


7 0.23 3 9.66

37.78 0.23 3 52.14


7 0.23 3 9.66

37.78 0.23 3 52.14


7 0.23 3 9.66
37.78 0.23 1 17.38
1.5 0.23 9.9 20.49

1 0.23 2.1 11.59

1.5 0.23 1.2 -4.97


1 0.23 1.2 -1.66
1 0.23 1.2 -3.31
1 0.23 1.2 -1.66
223.26

21 3 126

21 3 126

21 3 126

21 3 126

0.9 2.1 -15.12


0.75 2.1 -6.3
356.58

356.58

4.1 0.60 4.92


0.6 0.60 1.44

4.1 0.60 4.92


Length Breadth H/D Qty.

0.6 0.60 1.44

4.1 0.60 4.92


0.6 0.60 1.44
19.08

4.1 8.20
1.8 7.20

4.1 8.20
1.8 7.20

4.1 8.20
1.8 7.20
46.20

46.20
46.20

2
4

2
4

2
4
18.00

2.5 1.25 6.25


7.5 0.1 1.50
3.9 3 23.40
13.8 0.1 2.76
3.15 3.115 19.62
12.53 0.1 2.51
4.085 3.78 30.88
7.87 0.1 1.57
2.885 1.55 8.94
8.87 0.1 1.77
3.3 3.195 42.17
12.99 0.1 5.20
293.17
439.75
Length Breadth H/D Qty.

1.3 2.1 16.38

1.2 2.1 60.48

1.05 2.1 26.46


103.32

1.88 3 11.28
1.55 3 9.30
1.55 3 9.30
59.76
89.64

1.88 0.6 2.26


1.55 0.6 1.86
1.55 0.6 1.86
5.98
11.96

6 36.00

6 144.00

6 72.00
252.00

1 6.00

1 24.00
Length Breadth H/D Qty.

1 12.00
42.00

1 6.00

1 24.00
30.00

1 12.00
12.00

2 12.00

2 48.00
60.00

2 24.00
24.00

1 6.00

1 24.00

1 12.00
42.00
Length Breadth H/D Qty.

1 6.00

1 24.00

1 12.00
42.00

5.2 31.20

5.1 122.40

4.95 59.40
213.00

228.06

1224.00
1452.06

7.47 2.1 62.75


125.50
188.25
Length Breadth H/D Qty.

3 2.1 12.60
10.2 0.1 2.04
2.89 2.07 11.96
9.92 0.1 1.98
2.47 1 4.94
6.94 0.1 1.39
3 1.25 7.50
8.5 0.1 1.70
4.25 2.16 9.18
4 0.3 1.20
54.50
109.00

1.9 1.833 13.93


7.47 0.1 2.99
33.84
50.76

37.78 75.56

18

2.5 1.25 6.25

3.9 3 23.40

3.15 3.115 19.62

4.085 3.78 30.88

2.885 1.55 8.94


Length Breadth H/D Qty.

3.3 3.195 42.17

1.9 1.833 13.93

3 2.1 12.60

2.89 2.07 11.96

2.47 1 4.94

3 1.25 7.50

4.25 2.16 9.18

54.50
245.89

1941.4
713.15
75.76 1 151.52
2.89 2.07 23.93
2.47 1 9.88

3 1.25 15.00

7 0.6 8.40
7 0.6 8.40
16.8
4.25 1.5 6.38

1.5 1.3 1.95

4.05 0.8 3.24

4.05 0.12 0.49

24.10

2924.63

1.3 2.1 -16.38


Length Breadth H/D Qty.

1.2 2.1 -60.48

1.05 2.1 -26.46


2821.31

1410.00

1410.00

2.5 1.25 6.25

3.9 3 23.40

3.15 3.115 19.62

4.085 3.78 30.88

2.885 1.55 8.94

3.3 3.195 42.17

1.9 1.883 14.31


291.18
3 2.1 12.60
25.20
474.57

1410.00
474.57
Length Breadth H/D Qty.

37.78 1 75.56
1960.13

37.78 11.5 868.94

868.94

1410.00
474.57
1884.57

110.00

1.5 1.2 21.60


1 1.2 7.20
1 1.2 14.40
1 1.2 7.20
50.40

998.00
Length Breadth H/D Qty.

5.4 64.80
4.4 26.40
4.4 52.80
4.4 26.40
170.40

1.5 1.2 21.60


1 1.2 7.20
1 1.2 14.40
1 1.2 7.20
50.40

2 72.00

1.9 1.883 14.31


7.57 0.45 13.63
55.08
83.02

245.89
245.89
NAME OF WORK: CONSTRUCTION OF PROPOSED 2 BHK Quarter for ESIC Hospi
BOQ As per DSR 2014
Sl. No. Item No. Description of the work

1.0 SUB-HEAD I - Carriage of Materials

1.1 1.1.2 Carriage of Earth by Mechanical transport Including loading


unloding and stacking

0 to 2 KM
5KM to 10KM

10KM to 20 KM

2.0 SUBHEAD II : Earth Work


2.1 2.6 Earth work in excavation by mechanical means (Hydraulic
excavator) /manual means in foundation over areas
(exceeding 30cm in depth , 1.5 m in width or 10 sqm on
plan), including disposal of excavated earth, for all leads and
lifts, disposed earth to be levelled and neatly dressed.All kind
of soil.

2.9 Earth work in foundation trenches or drains------


2.9.3 Hard rock (Blasting Prohibited)

2.2 2.25 Filling available excavated earth (excluding rock) in trenches,


plinth,sides of foundations etc. in layers not exceeding 20cm
in depth, consolidating each deposited layer by ramming and
watering, lead up to 50 m and lift upto 1.5 m.

Extra for every additional lift of i.5m or part thereof in


2.26 excavation/banking excavated or stacked material

2.3 2.27 Supplying and filling in plinth with jamuna sand under floors,
including watering,ramming consolidating and dressing
complete

2.5 16.3 Supplying and stacking at site.

93
2.31 Clearing jungla uprooting of rank vegitation-
=199.99x155=30998.00sqm

2.34 Supplying Chemical emulsion --------------


2.34.1 Chlorphriphos Lindane----------------
Peremeter of external wall=1x138= 138m@2.25 litres/linear
meter =310.50 litres

2.35 Diluting and injecting Chemical emulsion----------


2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1%
concentration=460 nos. of holesx area of one
hole=460x0.785x0.30x0.30=31.26 sqm

3.0 SUB HEAD-III --CONCRETE WORK

3.1 4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate


40 mm nominal size)

4.11 Providing and laying 50mm thick DPC----------

4.13 Applying a coat of residual petrolium-----------------

3.2 4.17 Making plinth protection 50 mm thick of cement concrete


1:3:6 (1 cement:
3 coarse sand : 6 graded stone aggregate 20 mm nominal
size) over
75mm thick bed of dry brick ballast 40 mm nominal size, well
rammed and
consolidated and grouted with fine sand, including finishing
the top
smooth

4.0 SUB HEAD-IV RCC WORK


4.1 5.9.1 Centering and shuttering including strutting, propping etc.
and removal of form for : Foundations, footings, bases of
columns, etc. for mass concrete

94
4.3 5.9.6 Centering and shuttering including strutting, propping etc.
and removal of form for :Columns, Pillars, Piers, Abutments,
Posts and Struts

4.4 5.9.5 Centering and shuttering including strutting, propping etc.


and removal of form for : Lintels, beams, plinth beams,
girders, bressumers and cantilevers

4.5 5.9.7 Centering and shuttering including strutting, propping etc.


and removal of form for : Stairs, (excluding landings) except
spiral-staircases

4.6 5.9.19 Weather shade,chajjas,corbles etc. including edges

Suspended floors,roofs,landings,balconies and access


4.7 5.9.20 platform with water proof ply 12mm thick

5.9.4 Shelves-------------

5.9.5 Lintels,beams,plinth beams--------------(GF,FF,&S.F)

5.9.6 Columns,pillars,piers etc-------(GF,FF,&S.F)

5.9.7 Stairs (Excluding landing)-----------------

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide

5.9.19 Weather shade,chajjas -------------------

4.8 5.22.6 Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
upto plinth level . Thermo-Mechanically Treated bars

5.22A Steel reinforcement for R.C.C. work including straightening,


cutting, bending, placing in position and binding all complete
above plinth level . Thermo-Mechanically Treated bars

95
4.8 5.33.1 Providing and laying in position machine batched and
machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works upto plinth level

4.9 5.33.2 Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as
per approved design mix, including pumping of concrete to
site of laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-
in-charge. (Note :- Cement content considered in this item is
@ 330 kg/cum. Excess/ less cement used as per design mix
is payable/recoverable separately). All works above plinth
level upto floor V level

4.10 5.34.1 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-30 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-30 is @ 340 kg/ kg/cum)

4.11 5.34.2 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-35 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-35 is @ 350 kg/ kg/cum)

4.12 5.34.3 Extra for providing richer mixes at all floor levels.Note:-
Excess/less cement over the specified cement content used
is payable /recoverable separately. Providing M-40 grade
concrete instead of M-25 grade BMC / RMC. (Note:- Cement
content considered in M-40 is @ 360kg/ kg/cum)

5.0 SUBHEAD V-BRICK WORK

96
5.1 6.1 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in foundation and plinth in:

(a) 6.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.4.2 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in super structure above
plinth level upto floor V level

6.2.4 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.12 Half brick masonry with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in foundation and
plinth in:
6.12.2 Cement mortar 1:6 (1 cement : 6 coarse sand)

6.13 Half b masonry work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in super structure
above plinth level upto floor V level

6.13.2 Cement mortar 1:6 (1 cement : 6 coarse sand)


6.15 Extra for providing and placing in position 2 nos.6mm dia.MS
bars at every third course of half brick masonry

STONE WORK

Stone work (machine cut edges)for wall lining etc.(Veneer work)


upto 10 meter height,backing filled with a grout of average 12mm
thick cement mortar 1:3(1 Cement:3 coarse sand) including
pointing in white cement mortar 1:2( 1 White Cement:2 Stone
7.23 dust) with an admixture of pigment matching the stone shade(To
be secured to the backing and the sides by means of cramps and
pins which shall be paid for seperately.

White sand stone- Exposed face machine cut and table rubbed
7.23.4 with rough backing:
7.23.4.5 30 mm trhick
Total

7.0
SUBHEAD VII-MARBLE & GRINITE WORK

97
7.1 8.2 Providing and fixing 18 mm thick gang saw cut, mirror
polished, premoulded
and prepolished, machine cut for kitchen platforms, vanity
counters, window
sills , facias and similar locations of required size, approved
shade, colour
and texture laid over 20 mm thick base cement mortar 1:4 (1
cement : 4
coarse sand), joints treated with white cement, mixed with
matching pigment,
epoxy touch ups, including rubbing, curing, moulding and
polishing to edges
to give high gloss finish etc. complete at all levels

8.2.2 Granite of any colour and shade


8.2.2.2 Area of slab over 0.50 sqm

8.3 Providing edge moulding to 18mm thick marble stone


counters,vanities etc. including machine polishing to edge to
give high gloss finish etc.complete as per design approved by
Engineer-In-Charge.

8.3.2 Granite work

7.2 8.5 Extra for providing opening of required size & shape for wash
basin/ kitchen
sink in kitchen platform, vanity counter and similar location in
marble/
Granite/stone work, including necessary holes for pillar taps
etc. including
moulding, rubbing and polishing of cut edges etc. complete

7.3 8.6 Mirror polishing on marble work/Granite work/Stone work


where ever required to give high gloss finish complete.

7.4 8.12 Providing and laying flamed finish Granite stone flooring in
required design and patterns, in linear as well as curvilinear
portions of the building all complete as per the architectural
drawings with 18 mm thick stone slab
over 20 mm (average) thick base of cement mortar 1:4 (1
cement : 4 coarse sand) laid and jointed with cement slurry
and pointing with white cement slurry admixed with pigment
of matching shade including rubbing, curing
and polishing etc. all complete as specified and as directed
by the Engineerin-In-Charge :

98
a Flamed finish granite stone slab Jet Black, Cherry Red, Elite
Brown, Cat Eye or equivalent

8.0 SUBHEAD VIII-Wood Work


8.2 9.18 Providing and fixing Pre-laminated flat pressed 3 layer
(medium density) particle board or graded wood particle
board IS : 3087 marked, with one side decorative and other
side balancing lamination Grade I, Type II exterior grade IS :
12823 marked, in shelves with screws and fittings wherever
required, edges to be painted with polyurethane primer
(fittings to be paid separately).

9.18.2 25 mm thick
8.3 9.40 Providing and fixing wooden moulded beading to door and
window frames with iron screws ,plugs and priming coat
unexposed surface etc.complete.
9.53 P/F 40x5mm flat iron hold fast-----------------

8.4 9.84 Providing and fixing aluminium extruded section body tubular
type universal hydraulic door closer (having brand logo with
ISI, IS : 3564, embossed on the body, door weight upto 36 kg
to 80 kg and door width from 701 mm to 1000 mm), with
double speed adjustment with necessary accessories and
screws etc. complete.

9.96 Providing and fixing aluminium sliding door bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
IS:1868), transparent or dyed to required color or shade, with
nuts and screws etc. complete
9.96.1 300x16 mm
Providing and fixing aluminium Tower bolt, ISI msrked
anodised (anodic coating not less than grade AC 10 as per
9.97 IS:1868), transparent or dyed to required color or shade, with
necessary screws etc. complete
9.97.1 300x10 mm
9.100 Providing and fixing aluminium handles, ISI msrked anodised
(anodic coating not less than grade AC 10 as per IS:1868),
transparent or dyed to required color or shade, with
necessary screws etc. complete
9.100.1 125 mm
8.5 9.101 Providing and fixing aluminium hanging floor door stopper, ISI
msrked anodised (anodic coating not less than grade AC 10
as per IS:1868), transparent or dyed to required color or
shade, with necessary screws etc. complete
8.6 9.101.2 Twin rubber stopper

99
8.7 9.103 Providing and fixing bright finished brass 100 mm mortice
latch and lock, ISI marked, with six levers and a pair of
anodised (anodic coating not less than grade AC 10 as per IS
: 1868) aluminium lever handles of approvedquality with
necessary screws etc. complete.

(a) 9.21.1 35mm thick including ISI marked Stainless Steel butt hinges
with necessary screws.

9.21.3 25mm thick (For cup board ) Including ISI marked nicel plated
Bright finished MS piano hinges with necessary screws.

9.0 SUBHEAD IX-STEEL WORK


P/F Pressed steel door frame confirming to IS:4351,manufactured
from commercial mild steel sheet of 1.60mm thickness including
hinges,jamb ,lock jamb ,bead and if required angles thresshold of
mild steel angle of section 50x20mm,or base ties of 1.60mm
pressed mild steel welded or rigidly fixed together by mechanical
means including M S pressed butt hinges 2.5mm thick with mortar
guard,lock strikeplate and shock absorvers as specified and
applying a coat of approved steel primer after pre-treatment of the
surface

10.14
Profile B
10.14.1
Steel work in built up tubular ( round, square or rectangular hollow tubes
of grade YST 310 etc.) trusses, sky light, facade frame work, portal frame
work, column, runner, purlin , paragola or similar location etc., including
cutting, hoisting, fixing in position at all heights and applying a priming
coat of approved steel primer, including welding and bolted with special
DSR 10.16.3 shaped washers etc. complete.(Holding down bolts and chemical HILTI
anchor shall be paid separately)

9.2 10.30 Providing & fixing glass panes with putty and glazing clips in
steel doors,
windows, clerestory windows, all complete with :

10.30.2 5.5 mm thick glass panes

100
P/F stainless steel (Grade 304) railing made of hollow
tubes,channels,plates etc.including welding
,grinding,buffing,polishing and making curvature(wherever
required)and fitting the same with necessary stainless steel nuts
and bolts complete i/c fixing the railing with necessary accessories
and stainless steel dash fastners,stainless steel bolts etc. of
10.28 required size ,on the top of the floor or side of waste slab with
suitable arrangement as per approval of Engineer-In-Charge(For
payment purpose only weight of stainless steel members shall be
considered excluding fixing accessories such as nuts,bolts fastners
etc.)

10.0 SUBHEAD X-Flooring


10.2 11.26 kota stone slab flooring over 20mm (average thick base laid
over and jointed with grey cement slutty mixed with pigment
to match the shade of the slab including rubbing and
polishing complete with base of cement mortar 1: 4 (1 cement
: 4 coarse sand):

11.26.1 25mm thick


10.5 11.36 Providing and fixing Ist quality ceramic glazed wall tiles
conforming to IS : 15622 (thickness to be specified by the
manufacturer ) of approved make in all colours, shades
except burgundy, bottle green, black of any size as approved
by Engineer-in-Charge, in skirting, risers of steps and dados
over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @ 3.3kg
per sqm including pointing in white cement mixed with
pigment of matching shade complete.

11.37 Providing and fixing ceramic glazed floor tiles of size


300x300mm(Thickness to be specified by the manufacturers)
of 1st quality conforming to IS : 15622 of approved make in
colours, such as white,Ivory,Grey Fumes,Red Brown laid on
20 mm thick bed of cement Mortar 1:4 (1 cement : 4 coarse
sand) including pointing the joints with white cement with
pigment of matching shade complete.

101
10.6 11.41 Providing and laying vitrified floor tiles in different sizes
(thickness to be
specified by the manufacturer) with water absorption less
than 0.08%
and conforming to IS : 15622, of approved make, in all
colours and shades,
laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
sand), including
grouting the joints with white cement and matching pigments
etc.,
complete.

11.41.2 Size of Tile 600x600 mm

10.7 11.48 Grouting the joints of flooring tiles having joints of 3mm
width ,using epoxy grout mix of 0.70 kg of organic coated
filler of desired shade (0.10 kg of hardener and 0.20 kg of
resin per kg)including filling /grouting and finishing complete
as per the direction of Engineer-In-Charge.

11.48.2 Size if Tile 600x600 mm

11.0 SUBHEAD XI- ROOFING


11.1 12.21 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement
: 2 coarse sand : 4 stone aggregate 10 mm and down
gauge), including finishing with cement mortar 1:3 (1 cement :
3 fine sand) as per standard design

12.21.1 In 75x75 mm deep chase


11.2 12.22 Making khurras 45x45 cm with average minimum thickness of
5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate of 20 mm nominal size) over P.V.C.
sheet 1 m x1 m x 400 micron, finished with 12 mm cement
plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat
cement, rounding the edges and making and finishing the
outlet complete

11.4 12.55 Providing and fixing Heat Resistant Terrace Tiles (300 mm x
300 mm x 20 mm) with SRI (solar refractive index) > 78, solar
reflection > 0.70 and initial emittance > 0.75 on waterproof
and sloped surface of terrace, laid on 20 mm thick cement
sand mortar in the ratio of 1:4 (1 cement : 4
coarse sand) and grouting the joints with mix of white cement
& marble powder in ratio of 1:1, including rubbing and
polishing of the surface upto 3 cuts complete, including
providing skirting upto 150 mm height along the parapet walls
in the same manner.

102
12.0 SUBHEAD XII- Finishing
12.1 13.4 12 mm cement plaster of mix :
(a) 13.4.2 1:6 (1 cement: 6 coarse sand)
15 mm cement plaster on rough side of single or half brick
12.2 13.5 wall of mix :

1:6 (1 cement: 6 coarse sand)


(a) 13.5.2
12.3 13.16.1 6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
12.4 13.22 Extra for plastering exterior walls of height more than 10m
from ground level for every additional height of 3m or part
thereof.

12.7 13.41 Distempering with oil bound washable distemper of approved


brand and
manufacture to give an even shade

13.41.1 New work (two or more coats) over and including water
tinnable priming coat with cement primer

12.8 13.45 Finishing walls with textured exterior paint of required shade

13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm)
over and including priming coat of exterior primer applied @
2.20kg/ 10 sqm

13.78 Providing and applying 12mm thick gypsum light weight


plaster------------
13.83 Wall painting with remium acrylic imulsion paint of interior
grade------------
13.83.2
Two coats
12.9 13.84 Painting with synthetic enamel paint ,having VOC(Volatile
Organic Compound) contents less than 150 gms/litre,of
approved brand and manufacture,including applying
additional coats wherever required to achieve even shade
and colour

13.84.2 Two coats


12.10 13.85
Applying priming coats with primer of approved brand and
manufacture,having low VOC(Volatile Organic Compound)
contents.

103
12.11 13.85.1 With ready mixed pink or grey primer on wood work(Hard and
Soft wood)having VOC(Volatile Organic Compound) contents
less than 50 gms/litre.

13 SUB HEAD XIII Aluminium Work


13.1 21.1 Providing and fixing aluminium work for doors, windows,
ventilators and partitions with extruded built up standard
tubular sections/ appropriate Z sections and other sections of
approved make conforming to IS: 733 and IS: 1285, fixing
with dash fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top, bottom
and sides with required EPDM rubber/ neoprene gasket etc.
Aluminium sections shall be smooth, rust free, straight, mitred
and jointed mechanically wherever required including cleat
angle, Aluminium snap beading for glazing / paneling, C.P.
brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-
charge. (Glazing, paneling and dash fasteners to be paid for
separately) :

21.1.1 For fixed portion


21.1.1.2 Powder coated aluminium (minimum thickness of powder
coating 50 micron

21.1.2 For shutters of doors,windows & ventilators including


providing and fixing hinges/pivots and making provision for
fixing of fittings wherever required including the cost of EPDM
rubber/neoprene gasket required(Fittings shall be paid for
seperately)

21.1.2.2 Powder coated aluminium (minimum thickness of powder


coating 50 micron

13.2 21.3 Providing and fixing glazing in aluminium door, window,


ventilator shutters
and partitions etc. with EPDM rubber / neoprene gasket etc.
complete as
per the architectural drawings and the directions of engineer-
in-charge (Cost of aluminium snap beading shall be paid in
basic item):

21.3.3 With float glass panes of 8 mm thickness

104
13.3 21.8 Filling the gap in between aluminium frame & adjacent
RCC/Brick/Stone work by providing weather silicon sealent
over backer rod of approved quality as per architectural
drawings and direction of Engineer-In-Charge

21.8.1 Upto 5mm depth and 5mm width


21.15 P/F aluminium casement window---------

21.15.2 Powder coated------------

14.0 Sub Head XIV: Water Proofing


14.1 22.3 Providing and laying water proofing treatment to vertical and
horizontal surfaces of depressed portions of W.C., kitchen
and the like consisting of:
(i) Ist course of applying cement slurry @ 4.4 kg/sqm mixed with
water proofing compound conforming to IS 2645 in
recommended proportions including rounding off junction of
vertical and horizontal surface.
(ii) IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse
sand) mixed with water proofing compound in recommended
proportion including rounding off junction of vertical and
horizontal surface.
(iii) IIIrd course of applying blown or residual bitumen applied hot
at 1.7 kg. per sqm of area.
(iv) IVth course of 400 micron thick PVC sheet. (Overlaps at
joints of PVC sheet should be 100 mm wide and pasted to
each other with bitumen @ 1.7 kg/sqm).

105
14.2 22.7 Providing and laying integral cement based water proofing
treatment including preparation of surface as required for
treatment of roofs,balconies, terraces etc consisting of
following operations: a) Applying a slurry coat of neat cement
using 2.75 kg/sqm of cement admixed with water proofing
compound conforming to IS. 2645 and approved by
Engineer-in-charge over the RCC slab including adjoining
walls upto 300mm height including cleaning the surface
before treatment. b) Laying brick bats with mortar using
broken bricks/brick bats 25 mm to 115 mm size with 50% of
cement mortar 1:5 (1 cement : 5 coarse sand) admixed with
water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge over 20 mm thick layer of
cement mortar of mix 1:5(1 cement :5 coarse sand ) admixed
with water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge to required
slope and treating similarly the adjoining walls upto 300 mm
height including rounding of junctions of walls and slabs c)
After two days of proper curing applying a second coat of
cement slurry using 2.75 kg/ sqm of cement admixed jointless
cement mortar of mix 1:4 (1 cement :4 coarse
sand) admixed with water proofing compound conforming to
IS : 2645 and approved by Engineer-in-charge including
laying glass fibre cloth of approved quality in top layer of
plaster and finally finishing the surface with trowel with neat
cement slurry and making pattern of 300x300 mm square
3 mm deep. e) The whole terrace so finished shall be flooded
with
With water for thickness
average a minimumofperiod
120 mmof two
and weeks
minimum for thickness
curing andat
a 22.7.1
khurra as 65 mm.

NS-10 Providing and fixing brass sliding door bolts crome finished,
ISI marked with nuts and screws etc. complete :

300x16 mm

16.11 NS-11 Providing and fixing brass Tower bolt crome finished, ISI
marked with nuts and screws etc. complete :
300x10 mm

16.12 NS-12 Providing and fixing Brass handles chrome finished, ISI
marked, with necessary screws etc. complete :

125 mm

16.13 NS-13 Providing and fixing Brass chrome finished hanging floor door
stopper, ISI marked, with necessary screws etc. complete.

Twin rubber stopper

106
16.14 NS-14 Providing and fixing acoustical stretched wall panelling and
for ceiling system using approved acoustical fire tated
fabric(Manufactured by walltracts or approved equivalent.) As
ope approved sample and shade on 6mm thick PU foam and
12mm thick commercial ply backing and wooden battens
fixed with steel screws eye hooks/UPVC gripper/power
coated Alluminium Sections on GI frame work comprising
40x40x18G Galvanised tubular frame 600x600mm c/c(Max.)
fixed to wall surface by MS Angles supports/cleats of suitable
size fixed with expansion fastners etc. The frame work to
have welded connections Minimum 20mm weld on each side
The fabric pannel to be backed with 25mm thick raising
bonded glass wool(48 KG/CUM) cut to size and inserted in GI
frame work.Providing and fixing approved 25x25mm stainless
steel strips (Paid Seperately) as directed over all panelling
with approved self tapping self drilling screws.Fabric to be
stretched flat and fixed on rare of commercial ply pannels
with screws/wood adhesive.The wooden pannels/members
shall be treated with one coat approved wood preservative.

16.15 NS-15 Providing and laying Double charged vitrified floor tiles in
different sizes (thickness to be specified by the manufacturer)
with water absorption’s less than 0.08% and conforming to IS
: 15622 of approved make in all colours and shades, laid on
20mm thick cement mortar 1:4(1 cement: 4 coarse sand)
including grouting the joints with white cement and matching
pigments etc., complete.(Basic price of the tile shall not be
less than Rs.80/Sqft.)

Size 600x600mm
16.16 NS-16 Providing and fixing bolts of grade 10.9 conforming to IS
1367(Part 1/2/3) including nuts and washers complete.

107
NS-17 Providing and fixing Lloyd Superdeck /LYSAGHT Ezydek or
approved equivalent profile 1.2mm thick TCT colour coated
galvanized steel having minimum 240-245MPa yield strength
as per IS 513 with a crest height of 44 to 51 at a pitch
distance of 130 to 316mm c/c having a cover width of 760 to
960mm. The galvanization shall be minimum 275 gm per
sqcm as per IS 277 with colour coating of polyester quality
paint of 20 microns over the primer coat of 5 microns on the
exposed side and 5 microns alkyde coat over 5 microns
primer coat on the inner side/ hot dipped zinc coating of 275
gm/sqcm on both sides confirming to AS 1397 and BS EN
10147:2000 complete as per direction of Engineer in charge.

NS-18 Tensile application supply,heat sealing ,installation and


testing of tensile application of FERRARI PRECONTRAINT--
702 TEnsile fabric 750 GSM/MEHLER VALMAX MAHATOP-
700 GSM and complete fabric processing welded fixing with
aluminium strips,SDS screws including handeling lifting
complete in all respects.

FIRE PROOF COATING


NS-19 Providing and appliying Fire proof coating, (MONOKOTE
Z 146 or equivalent ) supplied and applied by Ovilite
Industries, for steel structural works comprising one or
more coats as per methodology. Monokote Z146 to be
appled as spray with spray finish on unprimed steel
beams and columns. Thickness based on UL design
ratings for 2 hrs / 4 hrs for various steel members.

NS P/F 3M film doors of approved make as per the


instruction of Engineer-In-Incharge as of Rs. 70/Sqft

NS-20 Providing and fixing Glass Reinforced Concrete


jali(GRC) screen in approved
size,pattern,design,thickness and color.The jali shall be
made from 53 grade white portland cement/43 grade
OPC or PPC grey cement manufactured by J.K. cement
or equivalent,quartz,fine silica sand ,Alkali resistance
glass fiber manufactured by Sant Gobin or
equivalent,super plasticiser and polymer manufactured
by BASF,sika as per the manufacturar;s specifications
and as per the directions of Engineer-In-Charge

35mm thick GRC jali

108
TOTAL NON-SCHEDULED ITEMS

109
BHK Quarter for ESIC Hospital at Raipur (S + 4)
SR 2014
Unit Qty. Rate Amount

Cum 100 113.29 11329.00


Cum 50 57.70 2885.00

Cum 200 48.00 9600.00


Total 23814.00

Cum 100 155.6 15560.00

Cum 524 618.1 323884.40

Cum 1097 112.1 122979.26

Cum 156 82.95 12921.41

Cum 24.13 910.25 21965.06

110
100 Sqm 30998.00 642.00 199007.16

Liters 310.5 185.95 57737.48

Mtrs. 138.00 22.72 3135.36

Sqm 31.26 118.90 3716.81

Total 760907

Cum 74.65 4301.15 321087.39


Sqm 40.83 314.85 12855.20

SQM 40.83 132.00 5389.51

Sqm 103.50 419.30 43397.55


Total 364484.94

SQM 444.69 196.45 87359.35

111
SQM 1231.20 453.35 558164.52

SQM 1199.68 332.15 398473.71

SQM 121.05 396.65 48014.48

SQM 83.50 492.35 41113.19

SQM 1291.62 493.55 637477.57


SQM 20.00 401.65 8033.00

SQM 1199.68 332.15 398473.71

SQM 0.00 453.35 0.00

SQM 121.05 453.35 54878.02

SQM 690.00 116.40 80316.00

SQM 83.50 492.35 41113.19

KG 66364 68.10 4,519,361

KG 73181 68.10 4,983,626

112
CUM 406.59 6296.15 2559944.07

CUM 538.18 7014.55 3775121.56

CUM 130.00 76.50 9945.00

CUM 120.00 152.95 18354.00

CUM 125.00 229.45 28681.25


Total 18248449.90

113
cum 150.00 4677.25 701587.50

cum 372.24 5426.15 2019836.59

Sqm 300.00 584.75 175425.00

Sqm 239.04 665.80 159152.83

Sqm 239.04 69.50 16613.28


Total 3072615.20

Sqm 340.20 3059.85 1040960.97


1040960.97

114
Sqm 39.46 3907.40 154170.37

Metre 104.16 230.55 24014.09

Each 18.00 386.60 6958.80

Sqm 439.75 212.85 93601.77

115
Sqm 439.75 3244.35 1426717.84
TOTAL 1705462.87

sqm 23.92 1290.55 30864.79

each 912.00 117.35 107023.20

each 152.00 1043.6 158627.20

Each 152.00 229.65 34906.80

Each 152.00 112.1 17039.20

Each 304.00 69.8 21219.20

Each 304.00 83.95 25520.80

116
each 152 815.45 123948.40

sqm 137.76 1909.22 263014.15

sqm 119.52 1482.15 177146.57


Total 782163.74

RM 284.00 377.70 107266.80

Sqm 292.32 988.00 288812.16

117
Kg 2355.00 619.40 1458687.00
Total 1854765.96

sqm 292.57 1141.40 333937.34

sqm 383.04 836.65 320470.42

sqm 67.68 785.40 53154.93

118
Sqm 50.00 1405.95 70297.50

Sqm 50.00 187.95 9397.50

Total 787257.69

Rm 75.56 143.10 10812.64

Each 18.00 186.65 3359.70

Sqm 191.39 1133.85 217007.55

119
Total 231179.89

sqm 1477.00 149.45 220737.65

sqm 1477.00 172.80 255225.60

Sqm 632.76 134.70 85232.15

Sqm 317.35 37.95 12043.51

Sqm 2185.32 89.70 196022.79

Sqm 1072.95 146.45 157133.82

Sqm 2109.76 244.35 515518.73

Sqm 1200.00 74.40 89280.00

Sqm 275.00 74.40 20460.00

120
Sqm 275.00 36.10 9927.50

Total 1561581.75

kg 148.00 377.75 55907.00

kg 1330.00 435.75 579547.50

Sqm 67.20 1338.40 89940.48

121
metre 227.20 88.75 20164.00

Each 72.00 55.15 3970.80


Total 745558.98

sqm 111.56 522.90 58333.05

122
Sqm 191.39 1019.05 195035.98
Total 253369.03

Each 56.00 1021 57176.00

Each 56.00 367 20552.00

Each 112.00 138 15456.00

Each 56.00 164.00 9184.00

123
Sqm 0 5897.00 0.00

Sqm 0 1565.00 0.00

kg 0 150 -

124
SQM 0 1500 -

SQM 0 4876 -

SQM 900 -

SQM 980 -

Sqm 4819 -

125
102368.00

126
NAME OF WORK: CONSTRUCTION OF PROPOSED 2 BHK Quarter for ESIC Ho

MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for


DSR,2016 Unit
ESIC Hospital at Raipur

EARTH WORK

SUB-HEAD I - Carriage of Materials


1.1.2 Carriage of Earth by Mechanical transport Including loading unloding
and stacking
0 to 2 KM Cum
5KM to 10KM Cum
10KM to 20 KM Cum

SUBHEAD II : Earth Work


2.6 EARTH WORK
Column footings
FT-1
FT-2
FT-3
FT-4
CFT-1
CFT-2
CFT-3
CFT-4
Plinth beam
TOTAL

2.9 Earth work in foundation trenches or drains------


2.9.3 Hard rock (Blasting Prohibited) Cum
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
TOTAL
2.25 Filling available excavated earth (excluding rock) in trenches,
plinth,sides
Total of foundations etc. in layers not exceeding 20cm in depth,
excavation
consolidating
Less Qty.of RCC each
anddeposited layer
Columns in by ramming and watering, lead up to
foundation
50 m and lift upto 1.5 m.
Less Qty.of Brick work in foundation
Less Qty.of PCC in foundation

TOTAL

2.26 Extra for every additional lift of i.5m or part thereof in excavation/banking Cum
excavated or stacked material
Column footings
FT-1
FT-2
FT-3
FT-4
CFT-1
CFT-2
CFT-3
CFT-4

TOTAL
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
2.27 Supplying and filling in plinth with jamuna sand under floors, including Cum
watering,ramming
Stilt Portion consolidating and dressing complete
Area-1
Area-2
Area-3
Area-4
TOTAL

2.31 Same as per item no.2.31 of 3BHK+Servant Qtr.

2.34 Supplying Chemical emulsion --------------


2.34.1 Chlorphriphos Lindane----------------
Peremeter of external wall=1x66= 66m@2.25 litres/linear meter Liters
2.35 =148.50 litresinjecting
Diluting and say=149Chemical emulsion----------
2.35.2 Along the external wall below concrete/masonry-----------
2.35.2.1 With Chlorphriphos Lindane E.C.20% with 1% concentration Mtrs.
2.35.3 Treatment of soils under existing floors--------------
2.35.3.1 With Chlorphriphos Lindane E.C.20% with 1% concentration=252nos. of Sqm
holesx area of one hole=252x0.785x0.30x0.30=17.80 sqm
SUB HEAD-III --CONCRETE WORK
4.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm Cum
nominal size)
Stilt Portion
Area-1
Area-2
Area-3
Area-4
Area -5
Area--6
Area-7
FT-1
FT-2
FT-3
FT-4
CFT-1
CFT-2
CFT-3
CFT-4
Plinth beam
Length of walls
TOTAL

4.17 Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 Sqm


cement:FOR
Length 3 coarse sand : 6 graded
Plinth protection ( Lengthstone aggregate
of Outer wall) 20 mm nominal size)
over 75mm thick bed of dry brick ballast 40 mm nominal size, wellTOTAL
rammed and consolidated and grouted with fine sand, including finishing
4.11
the top
P/L 50mm th. DPC----------
smooth
Ground Floor:
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Length of 115 mm th. wall
TOTAL
4.13 Applying a coat of residual petrolium-----------------
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Length of 115 mm th. wall
TOTAL

5.9.1 Foundation,footings,basis of columns------------------------

FT-1
FT-2
FT-3
FT-4
CFT-1
CFT-2
CFT-3
CFT-4
Plinth beam
C1,C2,C3,C4
TOTAL

5.9.20 Suspended floors,roofs,landings,balconies etc.----- Sqm

Area of Ceiling of stilt portion


Balcony
Living room

Bed room

Bed room

Kitchen

Utility room

Toilets

WC

Waste slab

In front of stair case FF

Lift lobby

Corridoor

TOTAL
5.9.4 Shelves-------------

5.9.5 Lintels,beams,plinth beams--------------(GF,FF,S.F , TF & FF)


D-1(Bottom)
D-1(Sides)
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
D-2(Bottom)
D-2(Sides)
D-3(Bottom)
D-3(Sides)
D-4(Bottom)
D-4(Sides)
W(Bottom)
W(Sides)
W-1(Bottom)
W-1(Sides)
W-2(Bottom)
W-2(Sides)
W-3(Bottom)
W-3(Sides)
Plinth beams, (sides)
,floor beams (Bottoms)
floor beams (sides)
TOTAL

5.9.6 Columns,pillars,piers etc-------(GF,FF,&S.F)


C1,C2,C3,C4

5.9.7 Stairs (Excluding landing)-----------------


Langing Stilt
Add for FF,SF, TF &fourth floor
Steps Stilt
Add for FF,SF, TF &fourth floor
TOTAL

5.9.16 Edge of slabs---------------------------

5.9.16.1 Under 20cm wide RM


Peremeter of slab at FF
Add for second , 3rd & fourth floor
TOTAL

5.9.19 Weather shade,chajjas -------------------


Balcony FF
Add for SF, 3rd & 4th floor
TOTAL

5.22. Steel reinforcement for RCC work in foundation and plinth Kg


RCC Raft =124..62 cumx80 kg/cum=9969.60 kg RCC in Columns=281.97 cum@
200kg/cum=56394 kg

5.22A Steel reinforcement for RCC work above plinth level

5 RCC Work
5.33.1 RCC upto plinth level
Column footings
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
FT-1
FT-2
FT-3
FT-4
CFT-1
CFT-2
CFT-3
CFT-4
Plinth beam
C1,C2,C3,C4
TOTAL

5.33.2 RCCabove plinth level upto floor V level


Columns
FloorSlabs beams GF,FF & SF
Landing GF
Add for FF , SF,tf & ff
Steps GF 0.5
Add for FF & SF
Slab for GF,FF, & SF TF FF ( Area of slab for one slab=242.51 Sqm)
Mumty
TOTAL

5.34.1 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-30 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-30 is @ 340 kg/ kg/cum)
CUM
5.34.2 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-35 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-35 is @ 350 kg/ kg/cum)
CUM
5.34.3 Extra for providing richer mixes at all floor levels.Note:- Excess/less
cement over the specified cement content used is payable /recoverable
separately. Providing M-40 grade concrete instead of M-25 grade BMC /
RMC. (Note:- Cement content considered in M-40 is @ 360kg/ kg/cum)
CUM

BRICK WORK
6.1 Brick work with common burnt clay -------------
6.1.2 Plinth beam

6.4 Brick work with common burnt clay -------------


6.4.2 Cement 1:6 Cum
First Floor:
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Second floor
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Third floor
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Fourth Floor floor
Length of 230mm th.outer wall
Length of 230mm th. Internal walls
Perapet wall
Less for doors of GF,FF,SF and third floor
D-1
D-3
D-4
Less windows
W
W-1
W-2
TOTAL

6.12 Half brick work in foundation & plinth-------------------- Sqm

Ground Floor:
6.13.2 Half brick work
Length of 115 mm th. wall
First floor
Length of 115 mm th. wall
Second floor
Length of 115 mm th. wall
Third floor
Length of 115 mm th. wall
Fourth floor
Length of 115 mm th. wall
Less for doors of GF,FF,SF and third floor
D-2
D-4
TOTAL

6.15 Extra for providing and placing--------------- Sqm


Quantity same as per item no 6.13.2

STONE WORK
7.23.4.5 On columns at stilt floor
TOTAL

MARBLE WORK
8.2 P/F 18mm thick granite top---------
8.2.2 Granite of any colour and shade Sqm
8.2.2.1 Area of slab over 0.50 sqm
First Floor
Kitchen
Wash Basin
Second floor
Kitchen
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
Wash Basin
Third Floor
Kitchen
Wash Basin
Fourth Floor
Kitchen
Wash Basin
TOTAL

8.3 Providing edge moulding----------


8.3.2 Granite work
First Floor
Kitchen
Wash Basin
Second Floor
Kitchen
Wash Basin
Third Floor
Kitchen
Wash Basin
Fourth Floor
Kitchen
Wash Basin

TOTAL
8.4 Extra for facia work------------
QUANTITY AS PER ITEM NO.8.3.2 AS ABOVE Metre
TOTAL

8.5 Extra for providing opening of required size


QUANTITY AS PER Plumbing ITEM
First Floor
Kitchen
Wash Basin
Second Floor
Kitchen
Wash Basin
Third Floor
Kitchen
Wash Basin
Fourth Floor
Kitchen
Wash Basin
TOTAL

8.12 P/and laying flamed finished Granite stone flooring----


a) Flamed finished granite----------- Sqm
Area of Ceiling of stilt portion

Balcony
Balcony (Skirting)
Living room
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
(Skirting)
Bed room
(Skirting)
Bed room
(Skirting)
Kitchen
(Skirting)
Utility room
(Skirting)
Toilets
(Skirting)
WC
(Skirting)
Waste slab
(Skirting)
In front of stair case FF
(Skirting)
Lift lobby
(Skirting)
Corridoor
(Skirting)
TOTAL

WOOD WORK

9.21 P/F ISI marked Flush door shutters-----------------------

9.21.1 35mm thick including ISI marked ss but hinges--------------


Doors for GF,FF , SF and TF SQM
D-1
D-2
D-3
D-4
TOTAL

9.21.3 25mm thick (For cup board shutters)---------------------------------------

Ground Floor
Bed rooms
Bed rooms
Study room
Add for First , Second and third floor
TOTAL

9.18 P/F cup board shelves -----------------------------------------------


9.18.2 25mm thick
Ground Floor
Bed rooms
Bed rooms
Study room
Add for First , Second and third floor
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
TOTAL

9.53 P/F 40x5mm flat iron hold fast-----------------


Hold fat First , Second and third floor Each
D-1
D-2
D-3
D-4
TOTAL

NS P/F ISI marked Brass with chrome finished sliding door bolt ----------------
Sliding door bolt for First , Second ,TF and Fourth floor SQM
300x16mm
D-1
D-2
D-3
D-4
TOTAL

NS P/F ISI marked Brass with chrome finished tower bolt--------------


Tower bolt for GFFirst , Second and third floor SQM
250x10mm
D-1
D-2
D-3
D-4
TOTAL

NS P/F ISI marked Brass with chrome finished handles --------------


Handles for GFFirst , Second and third floor SQM
125mm
D-1
D-2
D-3
D-4
TOTAL

NS P/F ISI marked Brass with chrome finished Hanging type door stopper --------------
Door stopper for GF,First , Second and third floor SQM

D-1
D-2
D-3
D-4
TOTAL

P/F ISI marked Brass with chrome finished mortice latch and lock with 6 levers
NS --------------
Mortice latch and lock for GF,First , Second and third floor SQM

D-1
D-2
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur

D-3
D-4
TOTAL

10.0 STEEL WORK


10.14 P/F Pressed steel door frames ------------------------
10.14.1 Profile B
10.14.1.1 Fixing with adjustable lugs------
Doors for GF,First , Second and third floor SQM
D-1
D-2
D-3
D-4
TOTAL

10.28 P/F stainless steel (Grade 304) railing made of hollow sections--------------
For stair cases(5 nos.)=4.84x1.00x1 nos.x4 floors=19.36 sqm @ 25
kg/sqm=484.00 kg KG
Railing in balconies(Verandah)= 3.48x1.00x 16=55.68sqm@
20kg/sqm=1113.60kg KG
TOTAL

FLOORING
11.23 Marble stone flooring-----------------
11.23.5 Udaipur Green Marble Sqm
Ground Floor

11.36 P/L Ceramic Glazed wall tiles


FF Toilets
Toilets
Dado
WC
Dado
TOTAL

11.26 Kota stone slab flooring------------


11.26.1 25mm thick
Stilt Portion
Area-1
Area-2
Area-3
Area-4
Area -5
Area--6
Area-7
TOTAL

11.37 P/L ceramic glazed floor tiles -------------------------------------------


GF Toilets
Toilets
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
Toilets (Skirting)
Add for FF,SF and third floor
TOTAL

VITRIFIED FLOOR TILES


11.41 P/L vitrified floor tiles --------
11.41.2 Size of tile 600x600mm

11.48 Grouting of joints of tile flooring------------


11.48.2 Size of tile 600x600mm
Same as quantity of vitrified tiles

ROOFING
12.21 Providing gola 75x75mm------ RM
Peremeter of Terrace

12.22 Making Khura 45x45cm Nos.

12.55 Providing and laying heat resistance tiles at terrace------ Sqm


Area at Terrace
Area-1
Area-2
Area-3
Area-4
Area -5
Area--6
Area-7
TOTAL

13.0 FINISHING

13.4.2 12MM & 15mm cement plaster of mix 1:6 ---------------- sqm
Qty.of brick work /0.23x2=sqm=372.24/0.23=1618.43x2=3236.86 sqm
Qty.of half brick work x2=sqm=239.04 x2=478.08 sqm
Top of Parapet wall (Peremeter of Wall)

Balconies-1 !st floor,2nd ,3rd floor and fourth floor


Shafts
Stair case Stilt
Langing GF
Waste slab
Side of waste slab

Less Doors and windows for FF,SF ,TF & FF SQM


D-1
D-2
D-3
D-4
D-2
W
W-1
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
W-2
TOTAL

13.4.2 12MM cement plaster of mix 1:6 ---------------- sqm


13.5.2 15MM cement plaster of mix 1:6 ----------------
Qty.same as per item no. 13.4.2 sqm

13.22 Extra for plastering more than 10 m height--------


Peremeter of building Sqm

Total

13.16.1. 6mm cement Plaster Sqm


Area of Ceiling of stilt portion
Balcony
Living room

Bed room

Bed room

Kitchen

Utility room

Toilets

WC

Waste slab

In front of stair case FF

Lift lobby

Corridoor

TOTAL

13.41 Distempering with Oil bound washable distemper---------------

Area of plaster for internal walls


Area of plaster of ceiling
Parapet wall
Total

13.45 Finishing walls with textured exterior paint----------

Peremeter of Building Sqm


MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
TOTAL

13.83
Wall painting with Premium acrylic emilsion paint of interior grade ---------------

Ground Floor
13.78 P/Applying 12mm thick gypsum plaster------------

Quantity same as item no.13.4.2 & 13.5.2 Sqm


AS per area of ceiling plaster
TOTAL

ALUMINIUM WORK

21.1.1 Fixed portion


21.1.1.2 Power coated ------------------ KG

21.1.2 For shutters of doors and windows---------


21.1.2.2 Power coated ------------------

windows of GF,FF,SF &TF floor SQm


W
W-1
W-2
v
TOTAL

Weight of Aluminium=113.76 sqm @ 22 kg/sqm=2502.72 kg


KG

Filling the gap in between aluminium frame & adjacent RCC/Brick/Stone


21.8 work-----------
windows of GF,FF,SF &TF floor RM
W
W-1
W-2
v
TOTAL

21.3 P/F glazing in aluminium doors and windows in outer wall at GF,FF &SF
windows of GF,FF,SF &TF floor
W
W-1
W-2
v
TOTAL

21.13 P/F 100mm brass locks in aluminium doors


Doors and windows of GF,FF,SF & TFfloor NO.
MEASUREMENTS CONSTRUCTION OF PROPOSED 2 BHK (S+4) for
DSR,2016 Unit
ESIC Hospital at Raipur
21.15 P/F aluminium casement windows -------------------

21.15.2 Power coated -------------


Windows in outer wall at GF,FF ,SF and TF Each

21.16 P/F aluminium round shape handles casement windows -------------------


Doors and windows of GF,FF and Second floor Each

22.3 P/F WATER PROOFING TREATMENT TO Sunken portions SQM

First Floor to Fourth floor


Toilets
Vertical
WC
WC (Vertical)
TOTAL

22.7 P/L Brick coba integran water proofing------------------

At Terrace (Area of terrace


Terrace
TOTAL
er for ESIC Hospital at Raipur (S + 4)

Nos. Length Breadth H/D Qty.

400
200
500

6 2.25 2.55 2 68.85


12 2.85 2.55 2 174.42
4 2.85 2.85 2 64.98
4 4.06 3.26 2 105.88
4 4.8 2.25 2 86.40
1 4.2 3.84 2 32.26
2 4.64 2.45 2 45.47
1 4.06 3.26 2 26.47
1 193.31 0.23 0.45 20.01
624.74

1 193 1.2 1 231.60


2 7 1.2 1 16.80
248.40

873.14
-8.06
231.97
74.65

1171.70

6 2.85 2.55 0.5 21.80


12 2.85 2.55 0.5 43.61
4 2.85 2.85 0.5 16.25
4 4.06 3.26 0.5 26.47
4 4.8 2.25 0.5 21.60
1 4.2 3.84 0.5 8.06
2 4.64 2.45 0.5 11.37
1 4.06 3.26 0.5 6.62

155.77
Nos. Length Breadth H/D Qty.

4 6.66 3.7 0.1 9.86


4 6.22 2.96 0.1 7.36
4 5.77 2.52 0.1 5.82
4 1.73 1.58 0.1 1.09
24.13

1900.00

149

66.00

17.80

4 6.66 3.7 0.1 9.86


4 6.22 2.96 0.1 7.36
4 5.77 2.52 0.1 5.82
4 1.73 1.58 0.1 1.09
1 14.8 1.96 0.1 2.90
1 2.2 2.17 0.1 0.48
1 5.62 3.11 0.1 1.75
6 2.25 2.55 0.1 3.44
12 2.85 2.55 0.1 8.72
4 2.85 2.85 0.1 3.25
4 4.06 3.26 0.1 5.29
4 4.8 2.25 0.1 4.32
1 4.2 3.84 0.1 1.61
2 4.64 2.45 0.1 2.27
1 4.06 3.26 0.1 1.32
1 106 0.23 0.1 2.44
1 106 1.2 0.1 12.72
74.65

1 138 0.75 103.50


103.50

1 138 0.23 31.74


1 23.68 0.23 5.45
1 31.68 0.115 3.64
40.83
Nos. Length Breadth H/D Qty.

1 138 0.23 31.74


1 23.68 0.23 5.45
1 31.68 0.115 3.64
40.83

6 9.6 0.4 23.04


12 10.8 0.4 51.84
4 11.4 0.4 18.24
4 14.64 0.4 23.42
4 14.1 0.4 22.56
1 16.08 0.4 6.43
2 14.18 0.4 11.34
1 14.64 0.4 5.85
2 193.31 0.45 173.97
48 1.5 1.5 108.00
444.69

292
16 3.38 1.12 60.57
16 4.95 3.05 241.56

16 3.2 3.05 156.16

16 3.2 2.9 148.48

16 2.105 1.85 62.31

16 1.73 1.58 43.73

16 2.2 1.3 45.76

16 1.2 1 19.20

10 2.42 1.2 29.04

5 2.7 1.77 23.90

5 2.2 2.17 23.87

5 14.8 1.96 145.04

1291.62

24 1.2 0.23 6.62


48 1.5 0.15 10.80
Nos. Length Breadth H/D Qty.

48 1 0.23 11.04
96 1.3 0.15 18.72
16 0.9 0.23 3.31
32 1.2 0.15 5.76
64 0.75 0.23 11.04
128 1.05 0.15 20.16
4 1.7 0.23 1.56
8 2 0.15 2.40
16 1.5 0.23 5.52
32 1.8 0.15 8.64
48 1.2 0.23 13.25
96 1.5 0.15 21.60
16 0.9 0.23 3.31
32 1.2 0.15 5.76
2 138 0.23 0.6 63.48
5 138 0.23 158.70
10 138 0.6 828.00
1199.68

48 1.5 17.1 1231.20

5 2.7 1.5 20.25


81.00
22 1.2 0.15 3.96
15.84
121.05

1 138 138.00
552.00
690.00

4 3.48 1.2 16.70


66.8
83.50

66363.6

73181
Nos. Length Breadth H/D Qty.

6 2.85 2.55 0.4 17.44


12 2.85 2.55 0.4 34.88
4 2.85 2.85 0.4 13.00
4 4.06 3.26 0.4 21.18
4 4.8 2.25 0.4 17.28
1 4.2 3.84 0.4 6.45
2 4.64 2.45 0.4 9.09
1 4.06 3.26 0.4 5.29
2 193.31 0.45 173.97
48 1.5 1.5 108.00
406.59

48 0.3 0.45 17.1 246.24


5 193.31 0.23 0.45 100.04
1 1.5 1.3 0.17 0.33
1.65
22 1.5 0.3 0.15 0.74
3.7
5 242.51 0.15 181.88
1 6 4 0.15 3.60
538.18

130.00

120.00

125.00

1 193.31 1.2 1 231.97

1 138 0.23 3 95.22


1 23.68 0.23 3 16.34

1 138 0.23 3 95.22


1 23.68 0.23 3 16.34
Nos. Length Breadth H/D Qty.

1 138 0.23 3 95.22


1 23.68 0.23 3 16.34

2 37.78 0.23 3 52.14


2 7 0.23 3 9.66
1 138 0.23 1 31.74

24 1.2 0.23 2.1 -13.91


16 0.9 0.23 2.1 -6.96
32 0.75 0.23 2.1 -11.59

4 1.2 0.23 0.9 -0.99


16 1.5 0.23 1.2 -6.62
48 1.2 0.23 1.2 -15.90
372.24

1 31.68 3 95.04

1 31.68 3 95.04

1 31.68 3 95.04

1 31.68 3 95.04

48 0.9 2.1 -90.72


32 0.75 2.1 -50.4
239.04

239.04

63 1.8 3.00 340.2

4 3.36 0.60 8.06


4 0.75 0.60 1.80

4 3.36 0.60 8.06


Nos. Length Breadth H/D Qty.

4 0.75 0.60 1.80

4 3.36 0.60 8.06


4 0.75 0.60 1.80

4 3.36 0.60 8.06


4 0.75 0.60 1.80
39.46

4 4.56 18.24
4 1.95 7.80

4 4.56 18.24
4 1.95 7.80

4 4.56 18.24
4 1.95 7.80

4 4.56 18.24
4 1.95 7.80

104.16

104.16
104.16

4 4
4 4

4 4
4 4

4 4
4 4

4 4
4 4
32.00

292

16 3.38 1.12 60.57


16 9 0.1 14.40
16 4.95 3.05 241.56
Nos. Length Breadth H/D Qty.

16 16 0.1 25.60
16 3.2 3.05 156.16
16 12.5 0.1 20.00
16 3.2 2.9 148.48
16 12.2 0.1 19.52
16 2.105 1.85 62.31
16 8 0.1 12.80
16 1.73 1.58 43.73
16 6.62 0.1 10.59
16 2.2 1.3 45.76
16 7 0.1 11.20
16 1.2 1 19.20
16 4.4 0.1 7.04
10 2.42 1.2 29.04
16 7.24 0.4 46.34
5 2.7 1.77 23.90
16 8.94 0.1 14.30
5 2.2 2.17 23.87
16 8.74 0.1 13.98
5 14.8 1.96 145.04
10 14.8 1.2 177.60
1664.99

24 1.2 2.1 60.48


48 1 2.1 100.80
16 0.9 2.1 30.24
64 0.75 2.1 100.80
152 292.32

2 1.88 3 11.28
2 1.55 3 9.30
2 1.55 3 9.30
89.64
119.52

2 1.88 0.6 2.26


2 1.55 0.6 1.86
2 1.55 0.6 1.86
Nos. Length Breadth H/D Qty.

5.98

24 6 144.00
48 6 288.00
16 6 96.00
64 6 384.00
912.00

24 1 24.00
48 1 48.00
16 1 16.00
64 1 64.00
152.00

24 1 24.00
48 1 48.00
16 1 16.00
64 1 64.00
152.00

24 2 48.00
48 2 96.00
16 2 32.00
64 2 128.00
304.00

24 1 24.00
48 1 48.00
16 1 16.00
64 1 64.00
152.00

24 1 24.00
48 1 48.00
Nos. Length Breadth H/D Qty.

16 1 16.00
64 1 64.00
152.00

24 5.4 129.60
48 5.2 249.60
16 5.1 81.60
64 4.95 316.80
777.60

484 484.00

1113.6 1113.60
1597.60

16 7 2.1 235.20

16 4.4 2.1 147.84


383.04

4 6.66 3.7 98.57


4 6.22 2.96 73.64
4 5.77 2.52 58.16
4 1.73 1.58 10.93
1 14.8 1.96 29.01
1 2.2 2.17 4.77
1 5.62 3.11 17.48
292.57

4 1.9 1.833 13.93


Nos. Length Breadth H/D Qty.

4 7.47 0.1 2.99


50.76
67.68

1 138 138

24

292
4 6.66 3.7 98.57
4 6.22 2.96 73.64
4 5.77 2.52 58.16
4 1.73 1.58 10.93
1 14.8 1.96 29.01
1 2.2 2.17 4.77
1 5.62 3.11 17.48
292.57

3236.86
713.15

1 138 0.23 31.74

32 4.68 1 149.76
8 2.47 16.5 326.04

5 2.47 1.2 14.82


5 4.05 1.2 24.30
5 4.05 0.12 2.43
4499.10

24 1.2 2.1 -60.48


48 1 2.1 -100.80
16 0.9 2.1 -30.24
64 0.75 2.1 -100.80
16 1.05 2.1 -35.28
4 1.2 0.9 -4.32
16 1.5 1.2 -28.80
Nos. Length Breadth H/D Qty.

48 1.2 1.2 -69.12


4069.26

2035.00

2035.00

1 138 6.6 910.80


1 138 1 138.00
1048.80

292
16 3.38 1.12 60.57
16 4.95 3.05 241.56

16 3.2 3.05 156.16

16 3.2 2.9 148.48

16 2.105 1.85 62.31

16 1.73 1.58 43.73

16 2.2 1.3 45.76

16 1.2 1 19.20

10 2.42 1.2 29.04

5 2.7 1.77 23.90

5 2.2 2.17 23.87

5 14.8 1.96 145.04

1291.62

2035.00
1291.62
1 138 1 138
3464.62

1 138 16.5 2277.00


Nos. Length Breadth H/D Qty.

2277.00

2035.00
23.90
2058.90

250.00

4 1.2 0.9 4.32


16 1.5 1.2 28.80
48 1.2 1.2 69.12
32 0.6 0.6 11.52
113.76

2253.00

4 4.2 16.80
16 5.4 86.40
48 4.8 230.40
32 2.4 76.80
410.40

4 1.2 0.9 4.32


16 1.5 1.2 28.80
48 1.2 1.2 69.12
32 0.6 0.6 11.52
113.76
Nos. Length Breadth H/D Qty.

100 2 200.00

16 2.2 1.3 45.76


16 7 0.45 50.40
16 1.2 1 19.20
16 4.4 0.45 31.68
147.04

1291.62
1291.62

You might also like