Bridge Inspection Report, DATE:………………..

BRIDGE NO…………………Name of

Bridge……………………………………………………………….

K M……………………..Between Stations…………………………………………………Type of Girder…………………….

1.Description of the reach. 3 times width at u/s and 1 time width at d/s:

a)Is it flood affected or not?

b) Is it eroded or not ?

c) Bank protection needed or not ?

2. General arrangement drawing.

a) abutment position describe,Protective work condition of abutment,Sketch River trg. Works,Photo

b)Pier width how much ?

c)Navigation is done or not ?

d) Vertical clearance sufficient or not ?

e)Fender is existing or not ?

f) Vertical clearance from SHW how much ?

g)Horizontal clearance OK or not?

h)Sand carrying vessel move or not ?

i)Highest Flood level local opinion,Bank spill or not ?

J)Sofit level

3.GPS coordinate data survey

4.WL station Nearby

5.X section at U/s 3 nos, D/S 1 no, CL 1 no

6. Requirement of new work:a) RTW

b)Extension of length
.