Quickly calculate the data from a VSM session


Value stream analysis is one of the easiest methods to analyze a process and identify areas that can be improved. Even someone inexperienced
can find the low hanging fruit. This Value Stream Mapping Calculator is an easy-to-use Excel Template that will save you time.

This template was developed as a tool to support Lean Six Sigma Black Belt teams conducting Values Stream Mappings. It calculates
quickly the data that you need from a VSM session : Cycle time, Value Added Time, Business Value Added Time, Non Value Added
Time, Process Cycle Efficiency (PCE), TAKT time, Average Work in Progress (WIP), Process Value, FTEs and Labor Costs.

Aside from the working template is a completed template to use as a sample illustration. It includes the associated graphs generated
from the template data.

INSTRUCTIONS:

1) fill in all areas highlighted in White - the VSM 1 data and their corresponding graphs will update
2) eventually edit the graphs and arrange them
3) the spreadsheet is protected but you can format all the cells (i.e. change the currency unit of the monetary cells) and edit the graphs

Template assumptions:

1) when filled, a cell of the process step operator column in the VSM 1 table must correspond to one of the defined
process operator functions in the process operator table. Else the calculations would be incorrect.

Template Limitations:

1) the template is limited to 10 operator functions


2) the template is limited to 100 process steps

Cells Color Legend:

Input your data in these cell


Cell with a calculated output
1
Value Stream Mapping

Franck P. Strub
www.equable-us.com
email: contact@equable-us.com
Equable - Business Operations Excellence - Lean Six Sigma Copyright © Equable 2008-2010. All rights reserved

Copyright © Equable 2008-2012. All rights reserved

Copyright © Equable 2008. All rights reserved. Page 1 de 5 www.equable-us.com


email contact@equable-us.com
VALUE STREAM MAPPING CALCULATIONS

Process Name: Author: VSM

Date: Version:

Number of Annual Customer Operator Function Annual Operator Social Annual Operator
demands processed (10 maximum) Gross Salary Contributions on labour cost
(Parts/Transactions/Files) Gross Salary
%

"Include your VSM map here:"


Effective working time assumptions

# of effective working hours per


day per shift
# shifts per day

# of working days per year

Total # of effective working hours


per year

Please, input your VSM elementary information below in rows 21 to 120 (output and graphs will be displayed in rows 123 to 164):
Process Step # Process Step description % of total flow # of annual Step Operator Step Cycle Time in Step Effective Step Value Added Step Business Value Weighted Step Weighted Step Weighted Step Weigthed Step Weighted step
going through this occurences Function calendar time working time (W/T) (VA) time (seconds) Added (BVA) time Cycle Time in Effective working Value Added (VA) Business Value operator labour
step (including processed in the (seconds) (includes (seconds) (seconds) calendar time time(W/T) time (seconds) Added (BVA) time cost
eventual loops) step Waiting Time) (seconds) (includes (seconds) (seconds)
Waiting Time)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
TOTALS 0 0 0 0 $0.00

VSM SUMMARY and GRAPHS

PROCESS VSM SUMMARY WORK LOAD LABOUR COSTS

Number of Annual Customer Operator One process All annual process Operator One process All annual process
FTEs
demands processed Function(s) occurrence occurrences Function(s) occurrence occurrences
(Parts/Transactions/Files) (seconds) (hours) (Full Time
Employees)
Average labour cost of one process $0.00 -
occurrence

Total labour cost of all annual FTEs -


process occurrences

Times for One Process Occurrence seconds minutes hours days -

Total Cycle time (Calendar time) - - - - -

Effective Working Time (W/T) - - - - -

Value Added Time (VA/T) - - - - -

Business VALUE Added Time - - - - -


(BVA/T)

Non Value Added Time (NVA/T) -

TAKT Time (transaction frequency) -

PCE (Process Cycle Efficiency) -

Average Standard Work in parts/files/transactions TOTAL TOTAL


Progress (WIP)

PROCESS VALUE ANNUAL WORKLOAD # FTEs LABOR COSTS


VA BVA NVA

-
- 2 4 6 Hours 8 10 12 - 0.2 0.4 FTEs
0.6 0.8 1.0 $0 $2 $4 $6 $8 $10 $12

Copyright © Equable 2008. All rights reserved. Page 2 de 5 www.equable-us.com


email contact@equable-us.com
VALUE STREAM MAPPING CALCULATIONS

Process Name: PC Order to Delivery Author: Franck STRUB VSM

Date: 25 Aug 2008 Version: 1

Number of Annual Customer 2,400 Operator Function Annual Operator Social Annual Operator
demands processed (10 maximum) Gross Salary Contributions on labour cost
(Parts/Transactions/Files) Gross Salary
%

Assistant $30,000 25% $37,500

Effective working time assumptions Technician $48,000 25% $60,000

# of effective working hours per 7 Logistician $48,000 25% $60,000


day per shift
# shifts per day 1 Senior Technician $72,000 25% $90,000

# of working days per year 210

Total # of effective working hours 1,470


per year

Please, input your VSM elementary information below in rows 21 to 120 (output and graphs will be displayed in rows 123 to 164):
Process Step # Process Step description % of total flow # of annual Step Operator Step Cycle Time in Step Effective Step Value Added Step Business Value Weighted Step Weighted Step Weighted Step Weigthed Step Weighted step
going through this occurences Function calendar time working time (W/T) (VA) time (seconds) Added (BVA) time Cycle Time in Effective working Value Added (VA) Business Value operator labour
step (including processed in the (seconds) (includes (seconds) (seconds) calendar time time(W/T) time (seconds) Added (BVA) time cost
eventual loops) step Waiting Time) (seconds) (includes (seconds) (seconds)
Waiting Time)

1 Check Order 105% 2,520 Assistant 43200 3600 0 0 45360 3780 0 0 $26.79
2 Refuse and fix order 5% 120 Assistant 259200 1800 0 0 12960 90 0 0 $0.64
3 Fill an unstock form 100% 2,400 Technician 14400 900 0 900 14400 900 0 900 $10.20
4 Configure PC 100% 2,400 Technician 86400 7200 7200 0 86400 7200 7200 0 $81.63
5 Test PC 102% 2,448 Technician 86400 3600 0 3600 88128 3672 0 3672 $41.63
6 Fix PC 2% 48 Senior Technician 86400 10800 0 0 1728 216 0 0 $3.67
7 Pack 100% 2,400 Logistician 28800 900 0 0 28800 900 0 0 $10.20
8 Fill Delivery Note 100% 2,400 Technician 28800 900 0 0 28800 900 0 0 $10.20
9 Invoice 100% 2,400 Assistant 28800 1800 900 0 28800 1800 900 0 $12.76
10 Ship 100% 2,400 Logistician 28800 14400 6300 0 28800 14400 6300 0 $163.27
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
TOTALS 364,176 33,858 14,400 4,572 $360.99

VSM SUMMARY and GRAPHS

PROCESS VSM SUMMARY WORK LOAD LABOUR COSTS

Number of Annual Customer 2,400 Operator One process All annual process Operator One process All annual process
FTEs
demands processed Function(s) occurrence occurrences Function(s) occurrence occurrences
(Parts/Transactions/Files) (seconds) (hours) (Full Time
Employees)
Average labour cost of one process $360.99 Assistant 5,670 3,780 2.6 Assistant $40.18 $96,429
occurrence

Total labour cost of all annual $866,388 15.4 FTEs Technician 12,672 8,448 5.7 Technician $143.67 $344,816
process occurrences

Times for One Process Occurrence seconds minutes hours days Logistician 15,300 10,200 6.9 Logistician $173.47 $416,327

Total Cycle time (Calendar time) 364,176 6,069.6 101.16 4.22 Senior Technician 216 144 0.1 Senior Technician $3.67 $8,816

Effective Working Time (W/T) 33,858 564.3 9.41 0.39

Value Added Time (VA/T) 14,400 240.0 4.00 0.17

Business VALUE Added Time 4,572 76.2 1.27 0.05


(BVA/T)

Non Value Added Time (NVA/T) 345,204 5,753.4 95.89 4.00

TAKT Time (transaction frequency) 2,205 36.8 0.6 0.03

PCE (Process Cycle Efficiency) 3.95%

Average Standard Work in 165 parts/files/transactions TOTAL 33,858 22,572 15.4 TOTAL $360.99 $866,388
Progress (WIP)

PROCESS VALUE ANNUAL WORKLOAD # FTEs LABOR COSTS


VA BVA NVA

VA
4% BVA
1%

NVA Senior Technician 144 Senior Technician Senior Techni cian $8,816
95% 0.1

Logistician 10,200 Logistician


6.9 Logisti cian $416,327

Technician 8,448 Technician


5.7 Techni cian $344,816

Assistant 3,780 Assistant


2.6 Assistant $96,429

- Hours
5,000 10,000 15,000 - 2.0 FTEs 4.0 6.0 8.0
$0 $100,000 $200,000 $300,000 $400,000 $500,000

Copyright © Equable 2008. All rights reserved. Page 3 de 5 www.equable-us.com


email contact@equable-us.com
franckx08 CONTROL:
REVISION

VERSION 5:
- Add reference to "Instructions" Tab copyrights cell in all other Tabs where there is a copyright (at bottom of pag
- Change color of TITLE background (dark Blue)

VERSION 6:
- Replace "Efficient" by "Effective" and change Wording in Process Step table, Summary and Graphs
- Solve issue when the Operator functions are not used (all is blank)
- Solve issue when there is no BVA task at all or no VA task
- Add number of shift per day in the "Effective working time assumptions" table entry
- Labor cost graph axis has an automatic scale now
- Add days in Process VSM SUMMARY times
- Change cell colors for better printouts visibility
- Change pie chart colors (VA green, BVA orange, NVA red)
- Add WORKLOAD GRAPH
Franck P. Strub
www.equable-us.com
email: contact@equable-us.com
Equable - Business Operations Excellence - Lean Six Sigma

Copyright © Equable 2008-2012. All rights reserved


ere is a copyright (at bottom of pages)

Summary and Graphs

e entry

You might also like