Drawing Submissions Details for Dhaka Metro Project 1st Submission 1st Review (Engineer's Comment from NKDM)

1st Review (Engineer's Comment from NKDM) 2nd Submission 2nd Review (Engineer's Comment from NKDM) 3rd Submission 3rd Review (Engineer's Comment from NKDM)
Approval From NKDM Remarks
Sl No Drawing Description Drawing No Reference No Submissions Date Reference No Date Comment Reference No Re-Submission Date Reference No Date Comment Reference No Re-Submission Date Reference No Date Comment
Uttara RSS: Overall Equipment Layout Plan & NONOB Approved
1 Section O18161-E-IS-SY-EL-1002 Rev.A 07- PSY-DRW-0001-A 29thSept’18 07- PSY-DRW-0001-B 04th Oct’18 (With Drawing) 07- PSY-DRW-0001-C 15th Oct'18 07- PSY-DRW-0001-D 25th Oct’18 NONOB 07- PSY-DRW-0001-E 28th Oct'18 07- PSY-DRW-0001-F 28th Oct’18 NONOC with Comments Resubmission Required

Uttara RSS: GIS cum Control Building layout Plan NONOB NONOB
2 and Section O18161-E-IS-GB-EL-1003 Rev.A 07- PSY-DRW-0002-A 29thSept’18 07- PSY-DRW-0002-B 04th Oct’18 (With Drawing) 07- PSY-DRW-0002-C 15th Oct'18 07- PSY-DRW-0002-D 25th Oct’18 (With Drawing) 07- PSY-DRW-0002-E 28th Oct'18 07- PSY-DRW-0002-F 28th Oct’18 NONO Approved

132/33kV RSS AT UTTARA SUBSTATION LAYOUT


NONO
3 OF BORE HOLE , TRIAL PIT, EARTH RESISTIVITY, O18161-C-RE-SY-BH-6000 Rev.A 07- PSY-DRW-0003-A 29thSept’18 07- PSY-DRW-0003-B 04th Oct’18 (With Drawing) 07- PSY-DRW-0003-C 4th Novt’18 07- PSY-DRW-0003-D 14th Nov,18 NONO Resubmission Required
PLATE LOAD TEST LOCATIONS

07- PSY-DRW-0004-B 25th Oct'18 NOOA


4 Structural design of pile for 600mm φ O18161-C-RE-SY-DC-6009 Rev.A 07- PSY-DRW-0004-A 29thSept’18 & & & 07- PSY-DRW-0004-C 4th Novt’18
07- PSY-DRW-0004-B1 29th Oct'18 NOOA

132/33kV RSS AT UTTARA SUBSTATION


5 LAYOUT OF TEST PILE LOCATION O18161-C-RE-SY-GA-6010 Rev.A 07- PSY-DRW-0005-A 29thSept’18 07- PSY-DRW-0005-B 14th Oct'18 NONO 07- PSY-DRW-0005-C 4th Novt’18

DETAILS OF 600mm DIA. BORED CAST-IN SITU


6 INITIAL LOAD TEST PILE O18161-C-RE-SY-PE-6011 Rev.A 07- PSY-DRW-0006-A 29thSept’18 07- PSY-DRW-0006-B 25th Oct'18 NOOA 07- PSY-DRW-0006-C 4th Novt’18

132/33kV RSS AT UTTARA SUBSTATION


DETAILS OF 600mm DIA. BORED CAST-IN SITU
7 WORKING PILE O18161-C-RE-SY-PE-6012 Rev.A 07- PSY-DRW-0007-A 29thSept’18 07- PSY-DRW-0007-B 25th Oct'18 NOOA 07- PSY-DRW-0007-C 4th Novt’18

8 Uttara RSS: 132kV RSS & 33kV AMS Single Line O18161-E-IS-SY-1L-1001 Rev.A 07- PSY-DRW-0008-A 07th Oct’18 07- PSY-DRW-0008-B 10th Oct'18 NONOC
Diagram (With Drawing)
NONOB
9 33kV Auxiliary Network Single Line Diagram O18161-E-IS-TC-1L-1004 Rev.A 07- PSY-DRW-0009-A 07th Oct’18 07- PSY-DRW-0009-B 23rd Oct’18 (With Drawing)

10 132/33kV RSS AT UTTARA SUBSTATION O18161-C-RE-SY-SR-6002 Rev.A 07-PSY-DRW-0010-A 08th Oct’18 07-PSY-DRW-0010-B 29th Oct'18 NOOA 07-PSY-DRW-0010-C 4th Novt’18
GEOTECHNICAL INTERPRETATIVE REPORT
DESIGN BASIS REPORT OF CIVIL & STRUCTURAL 07-PSY-DRW-0011-B 15th Oct'18 NONOB
FOR 132/33kV UTTARA AND MOTIJHEEL O18161-C-RE-SY-DB-6001 & & & Approved
11 Rev.A 07-PSY-DRW-0011-A 08th Oct’18 07-PSY-DRW-0011-C 28th Oct’18 PSY-DRW-0011-D 30th Oct'18 NONOC with Comments Resubmission Required
SUBSTATION 07-PSY-DRW-0011-B1 16th Oct'18 NOOA

Overall Cable Route Survey & Test Pit location


12 layout for 132kV Cable between Tongi GSS to O18161-E-IS-SY-CL-1121 Rev.A 07-PSY-DRW-0012-A 22nd Oct’18 07-PSY-DRW-0012-B 28th Oct'18 NONOC 07-PSY-DRW-0012-C 4th Nov'18 07-PSY-DRW-0012-D 6th Nov'18 NONO Approved
Uttara RSS

Overall Cable Route Survey & Test Pit location


13 layout for 132kV Cable between Uttara Ph-3 GSS O18161-E-IS-SY-CL-1122 Rev.A 07-PSY-DRW-0013-A 22nd Oct’18 07-PSY-DRW-0013-B 28th Oct'18 NONOC 07-PSY-DRW-0013-C 4th Nov'18 07-PSY-DRW-0013-D 6th Nov'18 NONO Approved
to Uttara RSS