You are on page 1of 31

MEMORIA DE CALCULO DE CONEXIONES DEL PIPE

RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

VERACRUZ CPP TERMINAL PHASE 1 - NEW TANKS, ME&I AND CIVIL

Prepared for:

Vopak Terminal Veracruz

Veracruz, Mexico

Preliminary Not For Construction

Rev Date Description Originator Discipline PM


Checker Approval
A 29/11/2018 Memoria de calculo de JECT CIVIL PC
Conexiones del Pipe Rack interno
en Tankpit 4 y 5. (Interconexión a
Tanques y Manifolds).

1
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

INDICE.

1. OBJETO............................................................................................................................................ 3
2. ALCANCE ......................................................................................................................................... 3
3. SISTEMA DE UNIDADES ................................................................................................................... 3
4. DOCUMENTOS DE REFERENCIA ...................................................................................................... 4
5. NORMAS/CODIGOS DE APLICACIÓN INTERNACIONALES Y LOCALES ............................................. 4
6. DATOS GENERALES .......................................................................................................................... 5
7. DISEÑO DE CONEXIONES ............................................................................................................... 9

2
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

1. OBJETO.

La presente Memoria de Cálculo contiene los criterios para el Diseño de las Conexiones a partir del Análisis
y Diseño de la Estructura mediante el Modelo STAAD Crossing str 3_2 pinned y que corresponde al Pipe
Rack interno en Tankpit 4- 5, el cual forma parte del Proyecto Veracruz CCPS Phase 1-New Tanks, ME&I
and Civil en el interior del Recinto Portuario de la cd. de Veracruz Ver.

2. ALCANCE

Se entregaran todos los Detalles de las distintas Conexiones Soldadas o Apernadas que se despenden del
Análisis y Diseño de la Estructura mediante el Modelo STAAD Crossing str 3_2 pinned y que corresponde
al Pipe Rack interno en Tankpit 4-5, el cual forma parte del Proyecto Veracruz CCPS Phase 1-New Tanks,
ME&I and Civil en el interior del Recinto Portuario de la cd. de Veracruz Ver.

3. SISTEMA DE UNIDADES

Sistema Métrico Decimal

3
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

4. DOCUMENTOS DE REFERENCIA

1042-BB7-ST-CAL-004_A CALCULATION NOTE – STRUCTURAL PIPERACK (INTERNAL ON TANK KPIT 4-5)


1042-BB2-ST-DW-020_0(1) PLANO DE ESTRUCTURA METALICA PIPE RACK INTERNO EN TANKPIT 4-5
(INTERCONEXION A TANQUES Y MANIFOLDS)

5. NORMAS/CODIGOS DE APLICACIÓN INTERNACIONALES Y LOCALES

Los siguientes códigos y normas fueron considerados para el desarrollo de la presente memoria de
cálculo:

 AISC – American Institute Steel Code


 IMCA – Instituto Mexicano de Construcción en Acero
 AWS – American Welding Society

5.1. RESISTENCIA DE MATERIALES:

 Acero Estructural A-50 (50,000 lb/pl2 = 3515 kg/cm2) en Perfiles Metálicos.


 Acero Estructural A-36 (36,000 lb/pl2 = 2530 kg/cm2) en Placas Metálicos
 Electrodos la Serie E-70xx, conforme las Normas AWS

4
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

6. DATOS GENERALES

CROQUIS DE LA ESTRUCTURA:

5
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

6
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

7
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

8
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

7. DISEÑO DE CONEXIONES

CONEXIÓN 1:

FUERZA AXIAL MIEMBRO 77, NODO 3= 1.36 TON

CAPACIDAD DEL IPR 10” (58.2 KG/M) [W10x39]= 74.2x2530x0.4 =75,090 KG = 75.09 TON > 1.36
TON RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”= 127
MM SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71(5)=18.55 Klb =8,435 KG > 1,360 KG (OK)
NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”
ES SUFICIENTE PARA
FIJAR TODO EL ALMA DE LA VIGA A LAS CARA DE LA COLUMNA. A LOS PATINES SE APLICA
SOLDADURA DE PENETRACION.

9
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 2:

FUERZA AXIAL MIEMBRO 78, NODO 4= 1.92 TON

CAPACIDAD DEL IPR 10” (58.2 KG/M) [W10x39]= 74.2x2530x0.4 =75,090 KG = 75.09 TON > 1.92
TON RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”= 127
MM SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71(5)=18.55 Klb =8,435 KG > 1,920 KG (OK)
NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”
ES SUFICIENTE
PARA FIJAR TODO EL ALMA DE LA VIGA A LAS CARA DE LA COLUMNA. A LOS PATINES SE APLICA
SOLDADURA DE PENETRACION.

10
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 3:

FUERZA AXIAL MIEMBRO 35, NODO 28= 5.58 TON PATINES= 3.25/0.2385=13.62 TON CAPACIDAD DEL IPR
10” (58.2 KG/M) [W10x39]= 74.2x2530x0.4 =75,090 KG = 75.09 TON > 5.58 TON RESISTENCIA DE LA
SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”= 127 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71(5)=18.55 Klb =8,435 KG > 5,580 KG (OK)

SOLDADURA PENETRACION Qa=2(1/2)(21)=21 Pw= 21(4)=84,00 Klb =38,180 KG > 13,620 KG (OK)

NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5” ES


SUFICIENTE PARA FIJAR TODO EL ALMA DE LA VIGA A LAS CARA DE LA COLUMNA. A LOS PATINES SE
APLICA SOLDADURA DE PENETRACION.

11
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 4:

FUERZA AXIAL MIEMBRO 35, NODO 28= 2.66 TON PATINES= 3.88/0.2385=16.27 TON CAPACIDAD DEL IPR
10” (58.2 KG/M) [W10x39]= 74.2x2530x0.4 =75,090 KG = 75.09 TON > 2.66 TON RESISTENCIA DE LA
SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”= 127 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71(5)=18.55 Klb =8,435 KG > 2,660 KG (OK)

SOLDADURA PENETRACION Qa=2(1/2)(21)=21 Pw= 21(4)=84,00 Klb =38,180 KG > 16,270 KG (OK)

NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5” ES


SUFICIENTE PARA FIJAR TODO EL ALMA DE LA VIGA A LAS CARA DE LA COLUMNA. A LOS PATINES SE
APLICA SOLDADURA DE PENETRACION.

10
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 5:

FUERZA AXIAL MIEMBRO 8, NODO 4= 2.95 TON

CAPACIDAD DEL IPR 6” (37.2 KG/M) [W6x25]= 37.9x2530x0.4 =38,355 KG = 38.36 TON > 2.95 TON

CAPACIDAD DEL IPR 10” (58.2 KG/M) [W10x39]= 74.2x2530x0.4 =75,090 KG = 75.09 TON > 2.95 TON
RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”= 127 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71(5)=18.55 Klb =8,435 KG > 2,950 KG (OK)
TORNILLOS A-325, 1/2" DIAM. Pt= 1.27x 3,375 KG/CM2/2=2,143 KGX4=8,572 KG > 2,950 KG (OK)

NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5” ES


SUFICIENTE PARA FIJAR LAS PLACAS DE CONEXIÓN (APERNADA) A LOS ATIEZADORES (SE RECOMIENDA
E70 DE 3/8").

11
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 6:

FUERZA AXIAL MIEMBRO 81, NODO 10= 4.34 TON

CAPACIDAD DEL IPR 6” (37.2 KG/M) [W6x25]= 37.9x2530x0.4 =38,355 KG = 38.36 TON > 4.34 TON
RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”= 127 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71 (5)=18.55 Klb =8,435 KG > 4,340 KG (OK)
TORNILLOS A-325, 1/2" DIAM. Pt= 1.27x 3,375 KG/CM2/2=2,143 KGX4=8,572 KG > 4,340 KG (OK)

NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5” ES


SUFICIENTE PARA FIJAR LAS PLACAS DE CONEXIÓN (APERNADA) AL PATIN DE LA VIGA.

12
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 7:

FUERZA AXIAL MIEMBRO 35, NODO 50= 2.66 TON PATINES= 3.88/0.2385=16.27 TON CAPACIDAD DEL IPR
10” (58.2 KG/M) [W10x39]= 74.2x2530x0.4 =75,090 KG = 75.09 TON > 2.66 TON
RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 20”= 508 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71 (20)=74.2 Klb =33,727 KG > 16,270 KG (OK)
TORNILLOS A-325, 1/2" DIAM. Pt= 1.27x 3,375 KG/CM2/2=2,143 KGX4=8,572 KG > 2,660 KG (OK)
NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 20” ES
SUFICIENTE PARA FIJAR TODA LA PLACA CON EL ALMA DE LA COLUMNA.

13
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 8:

FUERZA AXIAL MIEMBRO 33, NODO 55= 4.06 TON PATINES= 3.86/0.15=25.73 TON

CAPACIDAD DEL IPR 6” (37.2 KG/M) [W6x25]= 37.9x2530x0.4 =38,355 KG = 38.36 TON > 4.06 TON
RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 3/8" PARA UN CORDON DE 4”= 100 MM
SOLDADURA FILETE Qa=0.707(3/8)(21)=5.57 Pw= 5.57 (4x3)=66.84 Klb =30,382 KG > 25,730 KG (OK)
TORNILLOS A-325, 1/2" DIAM. Pt= 1.27x 3,375 KG/CM2/2=2,143 KGX4=8,572 KG

Ptt= Pt. N = 8,572 x 4 = 34,288 KG > 25,730 KG (OK)

NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 3/8" PARA UN CORDON DE 4” POR 3
LADOS ES SUFICIENTE PARA FIJAR LAS PLACAS DE CONEXIÓN (APERNADAS) A LOS ATIEZADORES.

14
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 9:

FUERZA AXIAL MIEMBRO 67, NODO 41= 11.35 TON PATINES= 6.79/0.188=36.11 TON CAPACIDAD DEL IPR
6” (37.2 KG/M) [W6x25]= 37.9x2530x0.4 =38,355 KG = 38.36 TON > 11.35 TON RESISTENCIA DE LA
SOLDADURA PARA ELECTRODO E70 DE 3/8" PARA UN CORDON DE 6”= 150 MM
SOLDADURA FILETE Qa=0.707(3/8)(21)=5.57 Pw= 5.57 (6x2.5)=83.55 Klb =37,977 KG > 36,110 KG
(OK)

TORNILLOS A-325, 3/4" DIAM. Pt= 2.85x 3,375 KG/CM2/2=4,810 KGX8=38,480 KG > 36,110 KG (OK)
Ptt= Pt. N = 4,810 x 4 = 19,240 KG > 11,350 KG (OK)
NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 3/8" PARA UN CORDON DE 6” POR
2 LADOS ES SUFICIENTE PARA FIJAR LAS PLACAS DE CONEXIÓN (APERNADAS) A LOS PATINES DE LA VIGA.

15
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 10:

FUERZA AXIAL MIEMBRO 44, NODO 4= 1.33 TON

CAPACIDAD DEL LI 3”x3”x5/16” (9.08 KG/M) [L30305]= 11.48x2530x0.4 =11,618 KG = 11.62 TON > 1.33
TON RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5”= 127 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71 (5)=18.55 Klb =8,435 KG > 1,330 KG (OK)
TORNILLOS A-325, 1/2" DIAM. Pt= 1.27x 3,375 KG/CM2/2=2,143 KGX2=4,286 KG > 1,330 KG (OK)

NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 5” ES


SUFICIENTE PARA FIJAR LAS PLACAS DE CONEXIÓN (APERNADA) AL PATIN DE LA VIGA.

16
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 11:

FUERZA AXIAL MIEMBRO 44, NODO 9= 1.33 TON

CAPACIDAD DEL LI 3”x3”x5/16” (9.08 KG/M) [L30305]= 11.48x2530x0.4 =11,618 KG = 11.62 TON > 1.33
TON RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 6”= 150 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71 (6)=22.26 Klb =10,118 KG > 1,330 KG (OK)
NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 6” ES
SUFICIENTE
PARA FIJAR LAS PLACAS DE CONEXIÓN AL PATIN DE LA VIGA

17
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 12:

FUERZA AXIAL MIEMBRO 8, NODO 10= 1.30 TON

CAPACIDAD DEL IPR 6” (37.2 KG/M) [W6x25]= 37.9x2530x0.4 =38,355 KG = 38.36 TON > 1.30 TON
RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 4”= 100 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71 (4)=14.84 Klb =6,745 KG > 1,330 KG (OK)
NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 4” ES
SUFICIENTE PARA
FIJAR EL ALMA AL PATIN DE LA VIGA.

.
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 13:

FUERZA AXIAL MIEMBRO 19, NODO 18= 2.15 TON PATINES= 1.98/0.175=11.31 TON CAPACIDAD DEL IPR
6” (37.2 KG/M) [W6x25]= 37.9x2530x0.4 =38,355 KG = 38.36 TON > 2.15 TON
TORNILLOS A-325, 1/2" DIAM. Pt= 1.27x 3,375 KG/CM2/2=2,143 KGX6=12,858 KG > 11,310 KG (OK)
Ptt= Pt. N = 2,143 x 4 = 8,572 KG > 2,150 KG (OK)
NOTA: LA RESISTENCIA DE LOS TORNILLOS A-325 DE 1/2" DE DIAM. SON SUFICIENTES PARA FIJAR LAS
PLACAS DE CONEXIÓN A LOS PATINES Y AL ALMA DE LA VIGA.

.
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

CONEXIÓN 14:

FUERZA AXIAL MIEMBRO 19, NODO 16= 2.15 TON

CAPACIDAD DEL LI 3”x3”x5/16” (9.08 KG/M) [L30305]= 11.48x2530x0.4 =11,618 KG = 11.62 TON > 2.15
TON RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 6”= 150 MM
SOLDADURA FILETE Qa=0.707(1/4)(21)=3.71 Pw= 3.71 (6)=22.26 Klb =10,118 KG > 2,150 KG (OK)
TORNILLOS A-325, 1/2" DIAM. Pt= 1.27x 3,375 KG/CM2/2=2,143 KGX2=4,286 KG > 2,150 KG (OK)

NOTA: LA RESISTENCIA DE LA SOLDADURA PARA ELECTRODO E70 DE 1/4" PARA UN CORDON DE 6” ES


SUFICIENTE PARA FIJAR LAS PLACAS DE CONEXIÓN AL PATIN DE LA VIGA Y LOS TORNILLOS A-325 DE 1/2"
DE DIAM. CUMPLEN PARA LAS FUERZAS SOLICITADAS.

.
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

MODELO ESTRUCTURAL

DIMENSIONAL DE LA ESTRUCTURA

NODOS DE LA ESTRUCTURA EN EJE A


MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

NODOS DE LA ESTRUCTURA EN EJE B

NODOS DE LA ESTRUCTURA
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

EN EJE 1 EN EJE 2 EN EJE 3


MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

PERFILES ESTRUCTURA DE EDIFICIO - VIGAS IPR 10” (58.2 KG/M) [W10x39]

PERFILES ESTRUCTURA DE EDIFICIO - VIGAS IPR 6” (37.2 KG/M) [W6x25]


MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

PERFILES ESTRUCTURA DE EDIFICIO – VIGAS TR 3” (18.6 KG/M) [WT3x12.5]

PERFILES ESTRUCTURA DE EDIFICIO – ANGULO LI 3”x3”x5/16” (5.52 KG/M) [L30305]


MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042
MEMORIA DE CALCULO DE CONEXIONES DEL PIPE
RACK INTERNO EN TANKPIT 4 Y 5.

CLIENT: VOPAK TERMINAL VERACRUZ. REVISION: A


PROJECT NO. 20182020 PROJECT: VERACRUZ CPPs PHASE 1 - NEW TANKS, ME&I AND CIVIL DATE: 29-11-2018
LOCATION: MEXICO
DOCUMENT NUMBER: 1042-BB2-ST-CAL-101 PROJECT NO. 1042

MODELO ESTRUCTURAL: RENDER

You might also like