Carnide historical district, Lisbon, 1999 – 2003
RESIDENTIAL

Location Carnide historical district, Lisbon


Programme 24 units of 2-, 3- and 4-bdr apartments
in addition to the renovation of two adjoining old houses
Client Cooperativa de Habitacao Vila Rosa, CRL
Gross Built Area 3,200 sq.m (plus parking)
Total Building Cost EUR 4.260.000.00
Plot Size 1,020 sq.m
Construction Cost EUR 630.00 per sq.m
Project Status 1999 (concept design) – 2003 (built)

View towards West

Presentation model

www.promontorio.net
BLOCO CARNIDE
Carnide historical district, Lisbon, 1999 – 2003

NOTA: TODAS AS COTAS DEVEM SER VERIFICADAS EM OBRA. TODAS AS


ALTERAÇÕES DEVEM SER COMUNICADAS AOS PROJECTISTAS DAS
ESPECIALIDADES. AS INFORMAÇÕES CONSTANTES NESTES DESENHOS
CARECEM DA CONSULTA DE OUTROS ELEMENTOS DO PROJECTO.

A CB D E F G H I J K L
M N O
EDIFÍCIO CONFINANTE ARQ.02.001 ARQ.20.064-06 ARQ.20.064 ARQ.20.064-05
Módulo de fachada 3,05
Ver desenho ARQ.20.071-02 ARQ.02.002 ARQ.02.003 ARQ.02.004 Módulo de fachada 3,05
Ver desenho ARQ.20.070-01
ARQ.20.073-01
ARQ.20.073-04 13,17 2,08 0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55
VE2 VE2 VE2 VE2 VE5 VE5 VE5 VE5 VE5

0,55 0.01
1

0,55
0,20 ARM1

0 .63

0,51
4,12 0,15 0,15 2,38 0,13 1,70 0,27 2 ,42 0,15 1,40 0,11 1,70 0,27 0,85 1,22 0,84 0,15 0,84 1,22 0,77 0,29 0,77 1,22 0,84 0,15 0,84 1,22 0,77 0,29 0,73 1,15 0,80 0,15 0,80 1,15 1,75 1,15 0,80 0.13 0.82 1,15 1,75 1,15 0.70

0.92

1.05

0,77
1,30

0,66

0,66
1 .25

1,00
1.49

1,50
I.S.1 MLR

0,95
0,80
MSR
PC60 VE8

1.80
2,07
.76

0,10
0,75
V3

DESPENSEIRO

2,90
APA11

,67

2,69
.05
1,27

1,27

1,27

1,27
VE1 VE1

,12

0,44
2
ARM2

0,10

2
3,35
2 .44
3
4,07 0 ,61 2,30 0,15 1,70 0,27

,75
1,15 0,12 1,15 0,15 1,40 0,11 1,70 0,27 2 ,91 0,15 2 ,83 0 ,29 2,83 0,15 2,83 0,29 2,68 0,15 5,65 0,15 0.60 4.95

0,80

0.11
1,50

4,20

4,20

,20
0,95
PC60

1,27

1,50

,50
1

4,82
1,30

0,66

0,66
0,60
,80
4,82
ARM5

0,86

0,86
0.99
4,85 0,75 1,38 CL

0,15

0,15
,61
0,44

0,20
CW1 COZ3 V3
2 CW5

0,15

0,15

0,13
0,55

0,55
DESPENSEIRO
V3 V3

0,11
4
0,15

0,15

0,15

,15

0,15
I.S.6 I.S.7

0,25
3

0,24 0,75 0,10

0,75 0,10
V3

MLL

0,15 0,76
4
V3 V3 V3

1,45
0,66

0,66
4,75
0,87

0,87
0,95

1,33

1,33
CW2

0,15
PS4

DESPENSEIRO
1,20

2,50
0,17 0,17 0,18 0,15

4
3,95 0,58 0,15 1,10 0,29 2,76 0,27 2 ,42 0,15 PS2 0,11 0.11 1.64 0,22 0,32 0,85 0,15 1,35 0,38 0,85 0,17 0,09 1,72 0,29 0,10 0,75 0,09 1,72 0,15 0,10 0,75 0,09 1,72 0,29 2,61 0,29 0,60 1,64 0,15 0,95 0,42 0,93 0,89 0,29 0,17 0,75 0,60 3,56

1,70
110.34
Z.T.A

2,33
0,27

1,30
2,16

DESPENSEIRO

0,09
0,85
NÚCLEO A V3 V3

0,09

0,15

0,15
0,13
0,60

0,60
ARM3 ARM3

0,25
,15 APA2 I.S.3
1,27

1,27

1,27

1,27
VE1 I.S.2 Q.E.4 VE1

5
Módulo de fachada 3,15

0,15
,00

0,13
V3

0,27
APA6 Q.E.3 CK3b

0,39
Ver desenho ARQ.20.071.01

0,15
Módulo de fachada 3,15

1,10
FRIGORIFICO

0
Ver desenho ARQ.20.071-01

1,10
V3 V3 V3 V3

0,13

0,13

0,18
3
CW4

0,15

0,15

0,15
0,10 0,75 2 ,64

1,82
ARM4

0.26
1,84

0,75 0,18
0,90

1,72
1,67

0,17 0,75
0,90
PS6 PS6

0,13
1,48
Q.E.6 APA3

0,09 0,75
110.35 110.35

1,40
V3
0,66

0,66
V3

0,79
1,17
V3 V3
0,86

1,10

1,10

1,10
0,27 CW6

0,15
0,20
4,55 0,13 1,10 0,15 3 ,19 2 ,30 0,25 1,42 0,25 2 ,98 0,15 7 ,68 0 ,15 2,21 0,64 0,60 2,15 0,13 3,65 0,13 0,63 0,09 1,25 0,15 1,10 0,13 ARM2a 4,18
ARM2

0,20

0,09 0,75
0,60
V3 V3 V4 V3 V3 V3

0.69
3 CALDEIRA
0,55

0,15

0,15

0,29

0,29

0,55
0,15

0,18
2,42
+

,15
DEPÓSITO
I.S.4 I.S.5
0,15

0,15

0,15

,15

,15

0,15

0,15

0,15

0,15
CK3a
3

110.35

0,10
CALDEIRA CALDEIRA

0,60

0,60
DESPENSEIRO + + DESPENSEIRO

2,38
DEPÓSITO
CK2 DEPÓSITO

0,80
1,25

0.75
2,11
V3
0,66

0,66
0,15

0,15
0,87

V4

,90
0,15 2 ,90 0,15 0,75 0,75 0,80 0,60 0,29 1,45 0,75 0,70 0,10 0,90 4,81 0,29 0,85 0,75 1,23 0,15 2 ,85 0,27 2 ,54 0,36 3,63 0,15 0,70 1,25 0,15 0,13 4,18

1,20

1,20

1,82
DESPENSEIRO DESPENSEIRO
V4 I.S.8

1,70

1,70
V3

0.76
0,60

,59
CW3

0,15
,15
1,27

1 ,27

1,27

1,27
VE1 FRIGORÍFICO FRIGORÍFICO VE1
ARM11
CK1 ARM2

,40
PS6

0,09
0,21
0

,29
Z.T.B

0,19

0,17
DESPENSEIRO DESPENSEIRO
0,11

0
5,78 0,15 0,24 0,75 1,31 0,60 0,15 2,90 0,29 2,90 0,15 5,81 0,29 6 ,10 2,54 0,27 2,41 0,15 0,17 0,90 0,33 0.11 1.56 0,22 1.10 0,15 0,60 3,56

1,20
PS4

4,80

0,10 0,75
0,95
0,66

0,66
ARQ.02.008 V3 ARQ.02.008

0,86
MLL

MLL

1,66
4,20

1
DESPENSEIRO DESPENSEIRO

0
COZ7 COZ8 V3
4
110.34
0,55

1 ,88

0,55
0,20
6,05

6,05
NÚCLEO B

0,25

0,15

0,15

0,15
5,45
3

5,65
5,05
0,66

0,67
0,99
4,80

0,95

1,50
0,80
4,20
PC60

1,50
0,60 4,81

4,06

,06

,47
1,30

2,14
0,09
APA12
0,44
DESPENSEIRO DESPENSEIRO

2,90
,12
1,27

1,27

1,27
VE1 VE1

0,10
VE7 VE7

0,10

0,10
PC60

0,80
MLR MLR

1,42

0,95

1,82
MSR MSR
3

ARQ.20.073-03

1,50
PS2 1,30 ARM2a

0,61
1,15

1,15
0,66

0,76

0,76
0,74 1,22 1 ,83 1 ,22 0,77 0,29 0,77 1,22 0,77 0,29 0,76 1,25 0,76 0,29 0,77 1,22 0,77 0,29 0,77 1,22 1 ,83 1 ,22 0,77 0,29 0,77 1,22 1 ,83 1 ,22 3 ,60 0,27 1,15 0,12 1,14 0,15 0,12 0,90 0,38 0,11 1,68 0,20 5,43

0,27

0,27
5

0,77
0,27 0,02

0,61
0,55

0,45

0,02

0,56
PS6

0,27
6 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2
0,27

0,27

0,27
0,27
0,61

0,61
0,43
0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,60 1,27 0,63 0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,64 1,22 0,64 0,55 0,64 1,24 0,62

0,47
DESPENSEIRODESPENSEIRODESPENSEIRO F RIGORÍFICO

1,68
APA7
1,47
LEGENDA

1,65
ARQ.20.073-02 4,53 0,15 2,47 0,13 0,18 0,75 0,33 4,36 0,10 VE9 1,16
Módulo de fachada 3,05
ARQ.02.007 ARQ.02.007

1,86
2,57
1,18
1,15

,30

1,15
ARQ.20.073-01 VE5 V5 VE5
Ver desenho ARQ.20.071.02 110.35 COZ9

Q.E.8
2,68

0,09
2,46
6,88 1,50 V3 0,15 3,00 0,71 1,91

0,15
- Alvenaria tijolo

0,90
0,61

0,61
0,81
0,90
CALDEIRA MLR

0,60
+
MSR

0,15

0,15
DEPÓSITO

V3 CK4
7 - Alvenaria bloco de betão

0,55

1,77

0,55
0,10
0,15

,15

0,15

0,15
0,75 0,10

0,11 0,75
V3 V3

0,61
0,18

0,61
0,81
4,53 0,65 1,95 0,15 0,18 0,75 0,15 0,74 4,88
- Betão armado

1,20
1

0,35
I.S.15
CW7
ARQ.02.006 ARQ.02.006

0,09
- Betão celular
2,92

1,15

1,15

1,15

1,15
VE5 VE5

0,15

0,75 0,15

2 ,77
Módulo de fachada 2,92
Ver desenho ARQ.20.070-02

1,72
I.S.16
- Betão pré-fabricado

0,61

0,61
,58

0,81
0,75
V3

2,15
0,29 2,31 0,27 ARM3 5 ,50

0,55

1,77

0,55
- Isolamento térmico

,84

0,15

0,15

0,15
0,65
CW8

0,61

0,61
0,81
- Pedra

0.26

1,72
0,27 5 ,50

6
2,92

1,15

1,15

2,77

1,15

1,15
VE5 VE5
ARM3a - Reboco/enchimento
I.S.17

1.94

0,09
0,61

0,61
0.70 1.75 0,15 1,10 0,15 0,19 0,75 4,68

0,81

0,81
0,96
0,15

0,15
9

0,55

0,55
0,10
V3 V3

5
0,15

0,15

0,15

0,15
rev. data assunto aprovou

0,75 0,10

0,75 0,10

0,11 0,75
V3 V3 V3

0,61

0,61
0,81

0,81
4,53 0,15 2,45 0,15 2,34 0,15 0,60 3,78

0,09
,72
2,92

1,15

1,15

1,15

1,15
VE5 VE5

2,70
,72
Módulo de fachada 2,92 0,13 4 ,40 Módulo de fachada 2,92
sem portadas Ver desenho ARQ.20.070-02

1,85

1 ,87

2
2

1,72
0,61

0,61
ARM10

0,74

0,81
ARM3

0,24
CW9 V3
10

0,55

0,55
Z.T.C 1,75

0,15

0,15
0,23
1,18 1,75 0,80 1,75 1,10 0,12 0,22 0,10 0,75 4 ,63

0,76 0,27

0,25
ARQUITECTURA E COORDENAÇÃO

0,25

0,87
0,61

0,61
PS4
promontório arquitectos

1,14

0,99
ARQ.02.005 ventilador estático
ARQ.02.005 joão perloiro

1,70
Ver proj. AVAC
joão luis ferreira

0,09
paulo perloiro

APA10

0,20
2,92

1,15

1,15

1,15
VE5 VE5
paulo martins barata

0,12

2,70

2,70
2,67
0,20
1,13 4,60 0,85 0,12 1,72 0,03 0,62 4,88 pedro appleton
www.promontorio.net
NÚCLEO C

1,72
1,50
1,41

0,80

0,95
PC60 1,30
r. fábrica de material de guerra, 10
104.36
1900-690 lisboa portugal

0,61

0,61
0,76

0,17
ARM3 t: +351 21 8620970

0,27

0,27
f: +351 21 8620971
11

0,27
0,55

0,29

0,29

0,29

0,55
PS6

0,60
ESTABILIDADE, ÁGUAS E ESGOTOS

0,74 0,27

0,27
4,53 0,15 0,77 0,90 0,80 CALDEIRA MLR

Q.E.9
cenor

0,66
+ DESPENSEIRO ARMÁRIO

0,74
MSR

0,61

0,61
CK5 DEPÓSITO

MLL cenor@mail.telepac.pt
av.gago coutinho, 133

1,55
1,25 5,62

1,59
110.35
1700 lisboa portugal

0,95
t: +351 21 8437300

APA5
COZ5
2,92

1,15

1,15

,30

1,15

1,15
VE5 V5 VE5 f: +351 21 8437301

,70

,70
VE10

2
0,15
V3
ELECTRICIDADE, COMUNICAÇÕES, SEGURANÇA E GÁS

0,15 1,00 0,11

1,15
eppe
2,20 0,55 0,75 0,20 0,15 4 ,20 0,10 1,32

0,61

0,61
0,15 1,00
eppe@mail.telepac.pt

0,81
azinhaga da torre do fato, 7 a
DESPENSEIRO DESPENSEIRO FRIGORÍFICO
D ESPENSEIRO

0,15
V3 1600 lisboa portugal
12

0,55

1,77

0,55
t: +351 21 7112480

0,10
0,15

0,15

0,15
0,18 f: +351 21 7112489

0,75 0,10
2,11 0,15 0,18 0,75 0,15 5,62

0,11 0,75
V3 V3

0,61

0,61
0,81
AVAC

1,20
pgi

0,35
I.S.12

1
pgi cid@netcabo.pt

0,09
r. s. domingos de benfica, 33 2º dto
2,92

1,15

1,15

1,15

1,15
VE5 VE5
1500 lisboa portugal

2 ,77
0.19
CW10

0.60
t: +351 21 7221380
0,13 f: +351 21 7221389

1,72
0,61 2,31 0,15 1,10 0,62 5,02

0,61
V3

0,81
0.75
ESPAÇOS EXTERIORES

,57

2.05
ARM3
I.S.13 global
13 global@mail.telepac.pt
0,55

1,77

0,55
r. da esperança, 9 2º e

0,15

0,15

0,15
0.70
1200 lisboa portugal

6,80
t:+351 21 3929270
0,61

0,61
0,81
f:+351 21 3929279

0,15

1,72
DONO DE OBRA
coociclo
2,92

1,15

1,15

1,15

1,15
VE5 ARM3a VE5
I.S.14 0,27

2 ,77
0,09
4,53 0,29 2,31 0,15 1,10 0,62 4,88
cooperativa de habitação e construção, c.r.l.

1.99
r. fernando lopes graça, 9 a

0,11
1600-067 lisboa portugal

0,10 0,75
t:+351 21 7578673
0,61

0,61
V3
0,81

0,81
0,76 0,75 0,10 0,15 1,10 0,15 5 ,62 f:+351 21 7578676
CW11

0,10 0,15
14

0,75 0,10 0.26


0,55

0,55
V3
PROJECTO
0,15

0,15

0,15

0,15
0,75 0,10

0,11 0,75
V3 V3 V3 edifício de habitação
0,61

0,61
0,81

0,81
0,60 5,02
5,62 0,15 1,36

LOCAL

0,09
0,22
travessa do pregoeiro ,10 - carnide, lisboa
2,89

1,15

1,15

1,15

1,15
VE5 VE5
2,67

2,67
1,82
ARM9 ARQ.20.073-01

1,62
1,60
TÉCNICO RESPONSÁVEL NIP
ARM8 ARM7 joão luís ferreira 99.05.258
0,61

0.61
0,71

0,71
0,70 1,15 1,75 1,15 0,87 0,39 0,49 1,15 0,75 0,11 0,89 1,15 1,75 1,15 0,70

15
0,55

0.55
COLABORADORES DATA
VE5 VE5 VE5 VE5 VE5 miguel pires março 2001
ARQ.20.073-01 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55 0,60 1,15 0,60 0,55 sofia reis; joana cancela
3,02 3 ,05 3 ,05 3 ,05 3 ,05 3 ,05 3 ,05 3 ,05 3 .05 2.90 2,90 2,90 2,90 2,87
Módulo de fachada 2,90
ARQ.02.001 ARQ.02.002 ARQ.02.003 ARQ.02.004 Ver desenho ARQ.20.070-01 DESIGNAÇÃO FASE DO PROJECTO

planta piso 2 execução


ESCALA DESENHO Nº

1:50 [1:150] arq.01.005

NOTA: TODAS AS COTAS DEVEM SER VERIFICADAS EM OBRA. TODAS AS


ALTERAÇÕES DEVEM SER COMUNICADAS AOS PROJECTISTAS DAS
ESPECIALIDADES. AS INFORMAÇÕES CONSTANTES NESTES DESENHOS
CARECEM DA CONSULTA DE OUTROS ELEMENTOS DO PROJECTO.

A B C DD EE FF GG H JI LJ K L
N M N O

3.02 3.05 3.05 3.05 3.05 3.05 3.05 3.05 3.08 2.87 2.90 2.90 2.90 2.87

124,48 124,48

CHK1 CHK2 CHK3a


Guarda da cobertura Módulo de fachada 2,90m Ventilador estático Modulo de fachada de 2,90m
Ver desenho ARQ.20.042 sem portada Ver proj. A.V.A.C. com quatro paineis fixos
123,31 123,31 CHW3 123,31 123,31
0.59

123,11 123,11 123,16 123,11

122,66
0.18

122,52 122,52
122,34 122,34
+122,21
0.55
0.15

VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE5 VE5 V E5

0.61 0.57

Módulo de fachada 2,90 m


2.42

2.21

2.21

+119,22
0.55

VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE5 VE5 V E5

0.03 0.61 1.22 0.61 0.03 0.55 0.57 1.14 0.57 0.03

Módulo de fachada 3,05m


Ver desenho ARQ.20.071-02
2.42

2.21

2.21

+116,23
0.55

115,51

VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE5 VE5 V E5

CHK5
Guarda da cobertura
2.42

Ver desenho ARQ.20.042


CHW11 114,34 114,34
0.59

114,14 114,19 CHW12


0.15

0.15

113,55 113,55
113,37 113,37
0.03

+113,24
0.03
0.55

0.55
0.55

0.15

VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE5 VE5 VE5 VE5 Módulo de fachada 2,90 m
2.42

2.42

+110,25
0.55

0.55

rev. data assunto aprovou

VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE2 VE5 VE5 VE5 VE5 VE5
2.42

2.42
0.30 0.05

107,73

+107,26
0.55

0.55

ARQUITECTURA E COORDENAÇÃO
promontório arquitectos
VE2 VE2 VE2 VE2 VE3 VE2 VE2 VE2 VE2 VE5 VE5 VE5 VE5 V E5
joão perloiro
joão luis ferreira
paulo perloiro
paulo martins barata
3.39

105,53
2.42

2.42

Torre de ventilação pedro appleton


Ver desenho ARQ.20.051
www.promontorio.net
r. fábrica de material de guerra, 10
1900-690 lisboa portugal
0.95

t: +351 21 8620970
+104,27
f: +351 21 8620971
0.40
0.05

103,98
ESTABILIDADE, ÁGUAS E ESGOTOS
cenor
cenor@mail.telepac.pt
av.gago coutinho, 133
1700 lisboa portugal
t: +351 21 8437300
102,70 f: +351 21 8437301

Torre de ventilação das caves ELECTRICIDADE, COMUNICAÇÕES, SEGURANÇA E GÁS


Módulo de entrada núcleo A Ver desenho ARQ.20.051 eppe
eppe@mail.telepac.pt
azinhaga da torre do fato, 7 a
1600 lisboa portugal
t: +351 21 7112480
f: +351 21 7112489

AVAC
pgi
pgi cid@netcabo.pt
r. s. domingos de benfica, 33 2º dto
1500 lisboa portugal
t: +351 21 7221380
f: +351 21 7221389

ESPAÇOS EXTERIORES
global
global@mail.telepac.pt
r. da esperança, 9 2º e
1200 lisboa portugal
t:+351 21 3929270
f:+351 21 3929279

DONO DE OBRA
coociclo
cooperativa de habitação e construção, c.r.l.
r. fernando lopes graça, 9 a
1600-067 lisboa portugal
t:+351 21 7578673
f:+351 21 7578676

PROJECTO
edifício de habitação

LOCAL
travessa do pregoeiro ,10 - carnide, lisboa

TÉCNICO RESPONSÁVEL NIP


joão luís ferreira 99.05.258

COLABORADORES DATA
miguel pires março 2001
sofia reis; joana cancela

DESIGNAÇÃO FASE DO PROJECTO

alçado sul execução


ESCALA DESENHO Nº

1:50 [1:150] arq.03.002

Detail design / 2nd floor plan and south elevation

www.promontorio.net
BLOCO CARNIDE
Carnide historical district, Lisbon, 1999 – 2003

South facade Facade detail

The housing development was promoted The new building, given its location and Thus, far from a literal representation of
by a cooperative on a site located in volume, intends to form a protective structure, our aim is the tactile and visual
Lisbon, in the historical district of shield for the historical nucleus against representation of a mise en scène capable
Carnide. Along with the vacant site, the the surrounding dense and shabby legacy of generating a solid and stable urban
row of historical houses that remains from of the 1970s. The devised L-shaped type-form. This configuration evidently
what was formerly Vila Rosa, is also to configuration guarantees a tolerant urban suggests a remission to heavyweight
be renovated for the purpose of housing. arrangement, both in its relation with tectonics in the sense that the fragile
Situated in the small historical center, historical surrounding and the resulting tympanums of the modules –conceived
the plot confines with the backyards and courtyard, where public space is not as aluminum porte-fenêtre, steel
annexes of the old nucleus of Carnide, only granted an agreeable scale but also handrails and wood paneling shutters–
classified by the national heritage institute a mediating role in its relation with the are visually supported by a powerful
(IPPAR). interstitial spaces of the old and the new. skeleton of pre-cast concrete elements.
The full ensemble comprises the new Meanwhile, a phenomenon of randomness
block with 24 apartments, the renovation The concept of the new block is based on springs from the different positions in
of the old houses of the Pregoeiro the idea of monolithism and repetition. which prospective users will leave the
Passageway, and a small shop to be rented The severe monumentality that emanates shutters, one that is also indicative of the
for local commerce. from the compositional system of the unrestrained and physical presence of
façades suggests the representational dwelling.
The urban surroundings depict an transposition of the load and bearing
amalgamate of epochs and urban politics. running across the building with its
mineral skeleton resting on a heavy
stereotomic plinth.

www.promontorio.net