Professional Documents
Culture Documents
Plan (FDP)
For HWU
Professional Experience:
Aug. 2018 – Onwards Program / Sustainability Manager, Integrated Operations (IO), Schlumberger Eastern Hemisfere
Jan 2017 – Aug. 2018 Enhanced Oil Recovery Team Lead, Integrated Operations, Schlumberger Eastern Hemisfere
Jan. 2016 – Jan. 2017 Reservoir Engineering Manager, Schlumberger – South East Asia
Schlumberger-Private
Sept. 2015 – Jan 2016 Senior Reservoir Engineer, Project, Schlumberger – Malaysia, Brunei & Philippines
2 Projects (INTERSECT Deployment and History Matching Project for PETRONAS)
2014 – Sept. 2015 Senior Reservoir Engineer, Field Development Project, Genting Oil and Gas,
Kasuri, Indonesia and Cheng Dao Xi, China
3 Projects (Gas and Oil Field Development)
2008 – 2012 Senior Reservoir Engineer / Lead Instructor, Schlumberger – South East Asia Geomarket
4 Projects (Well Optimizations, Geothermal, Petrel RE Workflows, MoRes)
Lead Instructor for ECLIPSE/ECLIPSE Advanced, Petrel RE, PVTi, SCAL
Schlumberger-Private
Plan of Development (POD) is the plan for development one or more oil and gas field in an integrated
manner to develop and optimize production of the hydrocarbon with consideration of technicals, economics and HSE
elements.
National Operating
Field Development
Worldwide E&P CAPEX spend more than
USD $600 Billion…
A better perspective…
Schlumberger-Private
= 400 KLCC Twin Tower
159 of 160 projects, achieved peak production was less than estimated
Good Project
Value
Poor Project
Detailed Design
• Well plans
• Right sizing of facilities
• Production forecast
• Optimization of the plan
• Impact of uncertainty
Field Development
Appraisal Concept Design Execution
Production Engineering
Well , production network and surface facilities
Schlumberger-Private
Reservoir Engineering
Fluid movement with in the reservoir and recovery prediction
Geosciences
Defines shape, size and reservoir properties
Reservoir Modeling
Why do we do Modeling?
Schlumberger-Private
What is Reservoir Modeling
Schlumberger-Private
Why Reservoir Modeling?
• Recovery predictions
– How much is recoverable?
• Financial analysis
Schlumberger-Private
– What is the Net Present Value?
• Production strategy definition and optimization
– How to recover? What is the appropriate facilities?
• Risk management
– How to avoid early water breakthrough
• Reservoir management
Typical Reservoir Modeling Process
Geological
Interpretation
Schlumberger-Private
Prediction and Geologic Modeling
Uncertainty Depth conversion
analysis
Reservoir
Simulation
Geologic Modeling –
Facies & Petrophysical
Simulation
Pre-processing
Reservoir Modeling – in a nutshell
Schlumberger-Private
Scale of observations
well
A lot of Uncertainties
Cores: 1D or 2D at subsurface level.
Logs: 1D
Schlumberger-Private
Repeat formation testing: 2D
Well testing: 2D
Schlumberger-Private
Formation Tester Example
Radius of investigation=
420 ft from classical equation
Schlumberger-Private
Reservoir Testing – Standard Set Up
Schlumberger-Private
Reservoir Testing – Standard Set Up
Schlumberger-Private
What are the Input?
Calculate pore volumes,
Reservoir grid model
transmissibilities, depths,
geometry, properties non-neighbour connections
Porosity, Permeability,
NTG, Sw
Schlumberger-Private
Fluid & Rock description Initialize saturations,
pressures, temperature,
composition, flow behaviour, fluids-in-place
initial conditions
Operators has to explain the geological findings with the latest geological data with
the supports of seismic, logs, core, cutting analysis to come up with the geological
descriptions
Schlumberger-Private
Depositional Environment
Schlumberger-Private
Geological Finding & Review - Example
Schlumberger-Private
Depositional Model Stratigraphic Column
Schlumberger-Private
Top Map Bottom Map
Types of Simulation Model Grids
Schlumberger-Private
What are the Input?
Calculate pore volumes,
Reservoir grid model
transmissibilities, depths,
geometry, properties non-neighbour connections
Porosity, Permeability,
NTG, Sw
Schlumberger-Private
Fluid & Rock description Initialize saturations,
pressures, temperature,
composition, flow behaviour, fluids-in-place
initial conditions
Reservoir modeling
Schlumberger-Private
Completion design
Production planning
Why study PVT?
Knowledge of fluid behavior in reservoir, well and at the surface
Over a wide range of pressures, temperatures and compositions
Transport
Refining
Schlumberger-Private
Surface Seperation Sampling
Gas Injection
(Re-cycling)
Sampling
Multi-Phase
Flow
Miscible/Immisicible
Displacement
Schlumberger-Private
Fluid & Rock description Initialize saturations,
pressures, temperature,
composition, flow behaviour, fluids-in-place
initial conditions
Schlumberger-Private
Case Studies
Hurricane – Highly Fractured Basement Reservoir
Description/Challenge
– Massive presence of faults and fractures
– Large permeability contrast
Schlumberger-Private
Business case
– Robust field development decision
– Multiple realizations for sensitivity analysis
Solution/Result
– Increased confidence in results
– High-resolution to capture
• Geological features
• Impact on dynamic behavior
TOTAL – Very Large and Heterogeneous SAGD Model Simulated in Hours
Description/Challenge
– Canadian Oil Sands, 1 M cP visocity
– 1.7M cells, 9 SAGD well pairs
Schlumberger-Private
– 3y production/injection history
– History match (HM) a very heterogeneous model
Business case
– Increase the RF, and expand SAGD project
Solution/Result
– 3.5h simulation time with 16 way parallel
– Reliable and fast HM
– Optimized profitability
PEMEX – Achieves Faster, More Detailed Simulations
Description/Challenge
– Improve simulation speed
– More detailed subsurface characterization
Schlumberger-Private
Business case
– Prepare drilling plan and new well locations
– Increase oil production over next 2y
Solution/Result
– High resolution DPDP model with unstructured grid
– Accurate modelling of fluid contacts movement and near wellbore effects
– Extended life of field with optimal operating conditions
– Maximizing the value of the asset
Chevron – Sharpened Performance Outlook for Major Gas
Project
Description/Challenge
– Giant natural gas field with very large grid
– Optimize forecasts for a better business case
Schlumberger-Private
Business case
– Maximize reliability of field performance forecasts for a JV decision
Solution/Result
– Fast screening and well placement optimization for increased RF
– 50 fold speed-up in simulation time
• Massive productivity gain for more comprehensive studies