Pre-Construction
Site Survey
Architecture
Septic Design
Structural Engineering
Permits
Power
Land
Other
Site Work
Excavation
Tree Removal
Landscaping
Other
Concrete/Stone/Brick Work
Footings
Slabs/Flat Work
Category Estimate 1 Estimate 2 Estimate 3
Patio(s)
Fire Place
Other
Subcontractors
Suppliers
Wood Flooring
Windows and Doors
Tile
Building Materials
HVAC Materials
Roofing
ElectricalMaterials
Flooring
Plumbing
Other
Subcontractors
Masonry (Materials and/or Labor)
Insulation
Wood Flooring
Drywall
Tile
Painting
HVAC/Solar
Roofing
Electrical
Framing
Plumbing
Siding
Masonry
Interior Finish/Stairs
Insulation
Countertops
Drywall
Other
Painting
Miscellaneous
Roofing
Security/Sound
Framing/Dry-in
Decks/Out Buildings
Siding
Fuel to Heat
Interior Finish/Stairs
the Project
Speciality Hardware/Labor
Other
Miscellaneous
Custom Built-ins
Appliances
Security/Sound
Rentals
Decks/Out Buildings
Additional
Fuel Fees
to Heat the Project
Other to Build the Project
Electric
Speciality Hardware/Labor
Custom Built-ins
Category Estimate 1 Estimate 2 Estimate 3
Waste Management
Professional Cleaning
Garage Doors
Appliances
Rentals
Additional Fees
Other
Total
Contingency Amount (usually 3-10% of total)