1 OBRAS PROVISIONALES
1.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u
2 TRABAJOS PRELIMINARES
2.01 LIMPIEZA DE TERRENO MANUAL m2
2.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2
2.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb
3 MOVIMIENTO DE TIERRAS
3.01 CORTE SUPERFICIAL MANUAL, H=0.20M, EN LOSA m3
5 PINTURA
5.01 PINTURA EN MARCAS PARA LAS TRES DISCIPLINAS ml
6 CARPINTERIA METALICA
6.01 ARCOS, TABLERO DE BASQUET, PARANTES DE VOLEY. glb
6.02. TUBERIA DE FºGº, 2"X3mm m
6.03 MALLA METALICA m2
9 VARIOS
9.01 FLETE
9.01.01 FLETE TERRESTRE kg
10 OBRAS VARIAS
10.01 LIMPIEZA DE OBRA m2
10.02 ELIMINACION DE MATERIAL EXCEDENTE FORMA MANUAL m3
COSTO DIRECTO
GASTOS GENERALES (10%)
SUB-TOTAL
IGV (18 % )
EXPEDIENTE TECNICO
SUPERVISION
PRESUPUESTO TOTAL
64.68 64.68
1.00 64.68 64.68
9,747.72 9,747.72
1,868.98 1.38 2,579.49
1,868.98 1.79 3,345.47
1.00 3,822.76 3,822.76
1,967.04 1,967.04
144.00 13.66 1,967.04
2,549.61 2,549.61
76.45 33.35 2,549.61
728.32 728.32
492.11 1.48 728.32
20,312.97 20,312.97
1.00 3,800.00 3,800.00
379.50 37.86 14,367.87
121.95 17.59 2,145.10
59,490.02
5,979.32
250.60 23.86 5,979.32
53,510.70
483.79 30.44 14,726.57
55.68 339.24 18,888.88
3,591.20 5.54 19,895.25
3,457.30
3,457.30
34,573.02 0.10 3,457.30
2,628.99
1,868.98 0.47 0.00 747.59
231.70 8.12 0.00 1881.404
100,946.65
10,094.00
-------------------------
111,040.65
19,987.32
-------------------------
10,500.00
7,500.00
=================
149,027.97
NUEVOS SOLES