SCOPE OF CONSULTANCY SERVICES

PROJECT NAME: BANGLADESH AUTO INDUSTRIES LTD.


A) Project Outline
The Masterplan: The masterplan will be developed covering all requirements of the present plant and
future expansion.
B) Infrastructure
1. Factory buildings.
2. Administrative building
3. Roads and drains
4. Utility (Electricity, Water, Gas generator etc)
5. ETP, STP, WTP, WWTP
6. Logistic yard
7. Other relevant infrastructure.
8. Social infrastructure
9. Protection of environment.
C) Project Outline Formation of Design team
1. Architect (Team Leader)
2. Associate architect
3. Planner
4. Civil Engineer
5. Central drainage and plumbing engineer
6. Electrical engineer
7. Mechanical Engineer/HVAC Engineer
8. Fire and health safety engineer
9. Environment, air quality and energy consultant
10. Landscape designer.
This design team will work as per the requirement of the project requirement and based on technical
data provided.
D) Formation of Project owner’s team: Industrial consultant (Foreign)
E) Masterplan Formulation:
Scope of Work:
1. Masterplan of LS 100 acres of Land area
2. Layout plan
3. Environment design
4. Masterplan Approval drawings from the Respective Authority
5. Community & Corporate Facilities and others
6. Entry and Exit, Office Block, Residential building blocks, Recreation Center, Officers Club,
Canteen, Mosque, Medical Centre etc.
7. Road networks
8. Detail Landscape and pavements along with Material Specifications, Detail BOQ and Bid
Documents
9. Architectural & Structural Design and details for Masterplan Items i.e. Roads, Drain,
Culverts, Retaining walls, Central Water tank, Entry & Exist Gate etc.
10. Electrical Master planning
11. Plumbing and Sanitary Master planning/ Central drainage system
12. Fire Safety master planning.
13. LEED Campus Certification compatibility.
14. 3D view preparation (Undetailed Building Blocks with Road Network, Landscaping and plantation.
F) Individual Building: Scope of Services
1) Architectural Design
1.1.1. Floor Plans
1.1.2. Elevations
1.1.3. Sections
1.1.4. All required construction drawings of each building.
1.1.5. Preparation of perspective views.
1.1.6. Material Specifications
1.1.7. Detail BOQ
1.1.8. Bid Documents
1.1.9. Preparation of Approval drawings from the Respective Authority.
2) Structural Design (Steel & RCC Both)
2.1.1. Foundation design and layout
2.1.2. Column design and layout
2.1.3. Grade beam design and layout
2.1.4. Design of beam and slab.
2.1.5. Design of stairs.
2.1.6. Design of underground water reservoir and overhead reservoir.
2.1.7. Design of septic tank.
2.1.8. External and Internal drains.
2.1.9. Lift core and machine room.
2.1.10. Material Specifications
2.1.11. Detail BOQ
2.1.12. Bid Documents
2.1.13. Preparation of Approval drawings from the Respective Authority.
3) Electrical Design
3.1.1. Electrical Design for Individual Buildings
3.1.2. Electrical System design
3.1.3. Calculation of load based on provided machine loads.
3.1.4. Single line diagram.
3.1.5. Design of substation
3.1.6. Design of DB and SDB
3.1.7. BBT & Cable Both layout
3.1.8. Masterplan lighting.
3.1.9. Power source layout
3.1.10. Alternative Energy System.
3.1.11. Earthling system
3.1.12. Lightning arrestor.
3.1.13. Material Specifications
3.1.14. Detail BOQ
3.1.15. Bid Documents
3.1.16. Preparation of Approval drawings from the Respective Authority.
4) Plumbing /Sanitary & drainage Design
4.1) Calculation of water requirement on the basis of provided data
4.2) Design and calculation of water reservoir
4.3) Supply water line design
4.4) Waste water line design.
4.5) Rain and storm sewerage
4.6) Soil pipe.
4.7) Septic tanks and soak pits.
4.8) Soak well.
4.9) Detail system design drainage.
4.10) Material Specifications
4.11) Detail BOQ
4.12) Bid Documents
4.13) Preparation of Approval drawings from the Respective Authority.
5) Mechanical Design/ ventilation/ HVAC Design:
5.1.1 Load calculation
5.1.2 Mechanical Ventilation System
5.1.3 Humidity Control System
5.1.4 Heating System if required
5.1.5 Air-conditioning System
5.1.6 LEED Certification Compatibility as per LEED Consultant.
5.1.7 Exhaust fans
5.1.8 Material Specifications
5.1.9 Detail BOQ
5.1.10 Bid Documents
5.1.11 Preparation of Approval drawings from the Respective Authority.
6) Fire, health & safety (FHS) Design
6.1) Load calculation
6.2) Fire Hydrant with
6.3) Fire Detection and alarm system
6.4) Authority Approval Drawing
6.5) LEED Certification Compatibility as per LEED Consultant.
6.6) Fire detection design
6.7) Fire protection design.
6.8) Material Specifications
6.9) Detail BOQ
6.10) Bid Documents
6.11) Preparation of Approval drawings from the Respective Authority.