You are on page 1of 10

We have created an example 8D form with the appropriate

back-up pages to allow you to fully complete a real world


8D investigation. Please save this form as the master and
then use it to create a unique 8D report.

This way you can modify the form as required without


affecting your master template.

Various boxes through the document have text comments


(shown by a 'red' triangle) to further aid your completion
of the 8D report.

Please also note that the cells have not been protected, so
if you make a mistake that affects the template, you will
need to go back to your last saved version. Therefore,
regularly save your last copy that you are happy with -
just in case!!

Regards,

Customerservices@Leandeployment.com
4.0 8D Introduction - 5mm area of flash on part ultimately causing a gap to the body of ++4mm

8D Analysis is conducted to enable targeted problem solving for one or more areas within the project. In the Chilco case, 8D is being used to provide
additional analysis on one of the parts within the injection moulding process that was identified using lean and six sigma analysis as being a
potential source for variation that can be improved upon. 8-D analysis (8-DA) evolves the broader project portfolio (PP) and project to embrace
specific content built in the PP. 8-DA is different in that most of the applications are intentionally in need of further development and interpretation
by the team. The team should select multiple worksheets (4-5 minimum) from 8-DA to apply in the project and develop in ways appropriate to the
ongoing work. Team is also expected to include procedures for use, prototypically, based on templates from CA 1 and 2, using a consistent
numbering system throughout.

Information Description of Approach Description of Intended Outcomes


Summarize how root causes for
problems were determined,
identify a corrective action and
8D Form Identify FACRs from 8D Process
whether/how it was validated, and
discuss analysis of corrective action
chosen
To constrain the problem, to determine a
Record all known information
Problem Description solution space for potential root cause
about the problem
factors
Analyze the problem description in Determine whether environmental
Problem Solving
situational context factors play a role in the problem
Explore a sample of specific
Test Cases problems related to the problem Relate conceptual findings to use cases
domain that requires a solution
Determine solution alternatives that best
Decision Making Compare alternatives fit the problem context, environment and
situation
Note: Click on blue links above to view worksheet.
8-D Response Report
WHO IS EFFECTED BY THE PROBLEM? Date Open: 8D No.:
Customer
Company: Initial Response: Complaint
No.:
Address: Target Close Date:
Location: Revision Date(s):
Part No./Code 8D Initiator:
Product Name: 8D Initiator's Spvr:
INTERNAL or EXTERNAL Actual Close Date:
D1 TEAM MEMBER NAMES/TITLES: D2 PROBLEM STATEMENT/DESCRIPTION (quantify) (one defect per 8D)
Co-Champion:
Co-Champion:
Team Members:

% Target Actual
D3 CHOOSE AND VERIFY INTERIM CONTAINMENT ACTION(S) (ICA):
Effective: Date: Date:

HOW DID YOU VERIFY THE EFFECTIVENESS OF THE ICA?

D4 DEFINE AND VERIFY ROOT CAUSE(S): % Contribution:

HOW DID YOU VERIFY THE ROOT CAUSE(S)?

D5 CHOOSE AND VERIFY PERMANENT CORRECTIVE ACTION(S) (PCA): % Effective:

HOW DID YOU VERIFY THE EFFECTIVENESS OF THE PCA?:


Target Actual
D6 IMPLEMENT AND VALIDATE PERMANENT CORRECTIVE ACTION(S) (PCA):
Date: Date:

HOW WILL YOU VALIDATE THE PCA?

D7 SYSTEM PREVENTION ACTIONS TO PREVENT RECURRENCE: Target Actual


Mistake Proofing: How are you going to ensure it can't happen again? Date: Date:

HAS CORRECTIVE ACTION/IMPLEMENTATION BEEN REVIEWED AGAINST DOCUMENTS?:


Control Plan FMEA Flowchart Proc./Work Instr. Add to Internal Audit
Check boxes that apply:
D8 TEAM AND INDIVIDUAL RECOGNITION: Recognize the collective efforts of the team.

8-D page 1 of 9 Rev. 5 18-Nov-05


PROBLEM DESCRIPTION
0
1. Operational
Definition Problem: 5mm area of flash on Datum II preventing the lamp from seating and causing a gap to the body
of 4mm and above. Injection Moulding Inspection Standard page 5 of 9 states: 2) Dimension of Gap and
What's Step 1a) gap points 5 thru 11 Gage +/- 0.5mm. Includes Datum II.
wrong with what?
Why?
2. Description
IS IS NOT GET INFO ON
of Problem
WHAT
Object Verified through
Datum II on injection moulded part # Datum II from other injection moulded parts
quality/inspection
81550/60-0C040-00 from like or similar moulding cells.
records from other cells.

Defect
Flash elsewhere on the part or on other
5mm of flash
parts from like or similar injection moulders

WHERE
Seen on object Flash and tear
in datum II

See insert- no other visible or measurable


flash on part.
Seen Customer records
geographically evaluated showed parts
Found during final inspection in shipping
Seen in lot 4723391 or before. in/before lot 4723391
department packaging area in lot 4723397.
100% of parts allowed
for lamp seating.

WHEN
First seen No records exist of this
problem for this or like /
May 31st, 2007 Before this time
similar processes to
date.

When else seen

In lots dating back to 4723392 In lot 473391 or before

When seen in
process (life cycle)
Shifts 3, 1, and 2 beginning 5/27 Before 5/27

HOW BIG
Initial Containment Information
How many objects 45
have the defect?
40

35

21
30

Qty
25
Ro
w5
More than this in first lot
Ro
w4
20

15 8

10 21

5 11

0 1
How many defects
per object?
1 = Datum II on injection moulded part #
More than 1
81550/60-0C040-00

What is the trend?


Revised Information
1400

1200

1000
Qty

612

800 Ro
w In any lot previous to 4723391
10
Ro
600 w9

400
610 159

200
239

0 11
8

Updated By: J. Travis Felton Update Date: 6/1/2007 Update #: 1.0


8-D page 4 of 9 Rev. 1.0 1-Jun-07
0 4.4 8D PROBLEM SOLVING WORKSHEET
1. Operational Definition (Type in D2 here) (Type in D2 here)
What's wrong with what? Why?
2. Description 3. Deductions About Facts and Other Information 4. Possible Causes
IS IS NOT
of Problem 3a. Differences 3b. Changes Date List Change-How Theories
WHAT A Lubricant seemed to be very sparse in the
Object Datum II from other mould retractor area.
Datum II on injection
injection moulded parts
moulded part # Retractor was damaged sooner than normal. None observed. 5/31/2007
from like or similar
81550/60-0C040-00
moulding cells.

Defect B Cleaner is impacting the lubricant functionality in


Flash elsewhere on the the retractor area of the mould.
part or on other parts Operator sprayed cleaner while machine
5mm of flash 6/4/2007
from like or similar was still running- to get grease off of surface
injection moulders

WHERE C Lubricant viscosity may not be consistent.


Seen on object See insert- no other
Inspection standard does not specify this
Only Datum II visible or measurable None observed. 6/4/2007
defect
flash on part.

Seen D
geographically Found during final
inspection in shipping Seen in lot 4723391 or Inspection standard does not specify this
department packaging before. defect
area in lot 4723397.

WHEN E
First seen
May 31st, 2007 Before this time Not considered in PFMEA or Control Plan

When else seen F


In lots dating back to
In lot 473391 or before
4723392

When seen in G
process (life cycle) Shifts 3, 1, and 2
Before 5/27
beginning 5/27

HOW BIG
How many objects 5. Test causes for probability (+, -, ?) Page 2
1 Part More than this in first lot
have the defect? Does it explain Is/Is Not fact?

How many defects 6. Steps to verify Root Cause?


per object? 1 = Datum II on injection (make the problem come and go)
moulded part # More than 1
81550/60-0C040-00

What is the trend?


In any lot previous to
398 Parts
4723391

Updated By: A. Body Update Date: 1-Jun-07 Update #: 1


8-D page 5 of 9 Rev. 1 1-Jun-07
0 4.5 TESTING POSSIBLE PROBLEM CAUSES

be

g
ctin

ay
rac th to

ten y m
ret ctio rican mpa

the
a.

rea the
r e t e in e d
tor e
are

sis sit
uld ars eem

t.
of
u ld r a i n
s ow

fun lub r is i
mo racto nality t

on sco
mo ry sp nt s
eo e-H

e c vi
the ane

t b nt
ve brica
Th ang

Cle
r ie

no brica
.
Lu
Ch

Lu

0
"IS's" A B C D E F G

1 - + +

2 - + +
3 - + +

4 - + +

5 - + +

6 - + +

7 - + +

8 - + +

9 - + +

10 - + +

11 - + +

12 - + +

13 - + +

14 - + +
15 - + +

16 - + +

17 - + +
Comments/ Verified on 17 Introduced Verified that
Follow-Up additional cleaner into lubricant
Items recreations of lubricant mix viscosity is not
the flash- and found it to an issue unless
lubricant is an counteract cleaner is
issue desired function introduced into
of lubricant the retractor
area of the
mould.

Updated By: Update Date: Update #:


8-D page 6 of 9 Rev. 5 18-Nov-05
0 4.6 DECISION MAKING WORKSHEET
(1) END RESULT:
(4) CHOICES AVAILABLE - (INNOVATE)
(2) CRITERIA:
A B C D
GIVENS: (mandatory, measurable, realistic) (5) INFO Y/N (5) INFO Y/N (5) INFO Y/N (5) INFO Y/N
Repair retractor that was damaged. Replace y re-tool y

Modify Preventive Maintenance schedule from


Determine permanent schedule
90 days to 30 days temporarily to determine 30 days often enough y y
within 90 days
required preventive maintenance schedule.
Develop Predictive Maintenance schedule
within 90 days y
based on results of #2.
Modify Inspection Standards; Moulding,
Assembly, Final Inspection, and 200% to include 200% possible at lean rate y
this issue.
Add sensors and / or mechanical check in
assembly soon enough n moulding location appropriate y mechanical check appropriate n sensors capable of detecting y
moulding and / or assembly process.
(3) How (5) How (5) How (5) How (5) How
Important INFO Good INFO Good INFO Good INFO Good
WANTS: flexible limits, subjective, realistic (1-10) (0-10) Score (0-10) Score (0-10) Score (0-10) Score
Implement standard vibration and Tools for vibration
6 0 0 0 0
Impact testing analysis for process analysis available
0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0
6
Relative MERIT (total score) 0 0 0 0
6,000
Updated By: A. Body Update Date: Update Rev #: 3
8-D page 7 of 9 Rev. 3.0 4-Jun-07