You are on page 1of 1

NOTES

1. DO NOT SCALE FROM THIS DRAWING

2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH


B
ARCHITECTS AND OTHER CONSULTANTS INFORMATION
101

Zone A (Refer To 1731-GA-B03A) Zone B (Refer To 1731-GA-B03B) 3. LEVELS BASED ON OAK SURVEYS DRAWING OS.P.0318TOPO.
DATUM OF +10.00 CROWN OF ROAD

4. FOR SETTING OUT OF MASONRY CLADDING AND PORTIONS


REFER TO ARCHITECTS DRAWINGS

5. FOR SETTING OUT OF THRESHILD UPSTANDSSTEP REFER TO


ARCHITECTS DRAWINGS

6. FOR SETTING OUT OF HOLES LESS THAN 200mm DIAMETER


REFER TO M&E DRAWINGS

APPROX SITE BOUNDARY LINE


ASSUMED LOCATION OF
EXISTING PILES SHOWN THUS

SITE SURVEY REQUIRED TO


DETERMINE POSITION, DIAMETER AND
DEPTH. IF POSSIBLE PILES TO BE
REMOVED IF CLASHING WITH
PROPOSED PILES

PILING NOTES

1. ALL PILES ARE TO BE DESIGNED BY


THE PILING CONTRACTOR FOR THE
MOST ONEROUS COMBINATION OF
VERTICAL & LATERAL LOADS
INDICATED ON THIS DRAWING. IT HAS
BEEN ASSUMED THAT A CONTINUOUS
FLIGHT AUGERED SYSTEM WILL BE
USED.

2. HORIZONTAL LOADS ON EACH PILE


MAY BE APPLIED IN ANY DIRECTION.
A HORIZONTAL LOADS ARE ASSUMED
100 TO ACT 75mm ABOVE PILE CUT OFF
LEVEL.

3. ALL PILES ARE TO HAVE A MINIMUM OF


6 No MILD STEEL REINFORCING BARS
FOR THE UPPER 10m OF PILE.

4. THE PILE DESIGN SHOULD ALLOW FOR


THE FOLLOWING POINTS REGARDING
LEVELS:

- THE LEVELS OF PILING PLATFORM;


WHETHER A REDUCED OR ELEVATED
LEVEL.
- THE AMOUNT OF "CUT OFF" TO FORM
PILE CAPS AND GROUND BEAMS.

5. SETTING-OUT DIMENSIONS SHOWN


GENERALLY ARE BASED ON A
MINIMUM PILE SPACING OF 3 x DIA. A
PILE DIAMETER OF 1200 or 600 HAS
BEEN ASSUMED. THE CONTRACTOR
MAY PROPOSE ALTERNATIVE PILE
DIAMETERS BUT SHOULD TAKE THE
SETTING-OUT SHOWN INTO ACCOUNT.

6. THE CONTRACTOR IS TO PROVIDE A


METHOD STATEMENT FOR THE
INSTALLATION OF PILES WHICH
INCLUDES THE PROPOSED SEQUENCE
OF CONSTRUCTION AND DETAILS OF
HOW MANY PILES ARE TO BE CUT
DOWN AND "HEADS" REMOVED FROM
SITE.

7. A FACTOR OF SAFETY OF 3 MUST BE


ADOPTED IN THE DESIGN OF THE
BEARING PILES FOR COMPRESSIVE
AND TENSION LOADS.
THE CONTRACTOR MAY CHOOSE TO
INSTALL A PRELIMINARY TEST PILE
FOR USE IN HIS DESIGN IF A MORE
ECONOMIC F.O.S CAN BE ACHIEVED.

8. THE CONTRACTORS ATTENTION IS


DRAWN TO CLAUSE 760 OF THE
ENGINEERS SPECIFICATION
REFERRING TO INTEGRITY TESTING
OF PILES.

9. PILING CONTRACTOR TO ADVISE ON


PILING MAT THICKNESS REQUIRED IN
HIS TENDER TO REFLECT HIS PLANT
REQUIREMENTS CONSIDERING THE
GROUND CONDITIONS ON SITE.

REINFORCEMENT TO

NDARY L I NE PROJECT ABOVE CUT OFF

X SITE BOU
LEVEL BY APPROPRIATE

APPRO ANCHORAGE LENGTH

.
Typical Pile Section
Zone D (Refer To 1731-GA-B03D) Zone C (Refer To 1731-GA-B03C)
Client: Drawing title: Scale at A0: Drawn by: Date: Chk'd by:
T4 06.09.18 ISSUED FOR TENDER DJP BS
Victoria Holidays Company Limited As indicated DJP MARCH 2018 BS
T3 05.09.18 ISSUED FOR TENDER DJP BS Piling Layout
T2 20.08.18 ISSUED FOR TENDER DJP BS Project:
P3
P2
10.08.18
05.07.18
SCHEME DESIGN
SCHEME DESIGN
DJP
DJP
BS
BS
La Definition TENDER
P1 25.05.18 SCHEME DESIGN DJP BS
Akin Ogunlewe Road, Project Number: Drawing Type: Drawing No: Revision:
1:200 0 4000 8000 12000 16000 20000
Victoria Island, Lagos.
T1
Rev
04.05.18
Date
ISSUED FOR TENDER
Amendments
DJP
By
BS
Chk'd
1731 GA B03 T4