Professional Documents
Culture Documents
INTERPRETATION on
CONFIGURATION
of MORT&H
V. VENKATA NARAYANA
EXECUTIVE ENGINEER (R&B),
vvnhighways.blogspot.in
vvnhighways.blogspot.in 1
MORT&H & IRC
MORT&H
An apex Organisation under the control of Central Government
It is entrusted with the task of formulating and administering
policies for Road Transport, National Highways and Transport
Research with a view to increasing the mobility and efficiency of the
Road Transport system in the country.
vvnhighways.blogspot.in 2
MORT&H - BOOK
MINISTRY OF ROAD
TRANSPORT & HIGHWAYS
(Fifth Revision)
Published by
Indian Roads Congress
NEW DELHI 2013
vvnhighways.blogspot.in 3
MORT&H - SECTIONS
vvnhighways.blogspot.in 6
MORT&H- CLAUSES
The 32 Sections can be tentatively classified as
I. GENERAL ::
II. MATERIALS ::
i. Natural and/or Factory supplied. …
ii. Factory finished. …
III. WORKS ::
I. …
IV. QUALITY CONTROL ::
i. 900 Quality Control For Road Works.
vvnhighways.blogspot.in 7
MORT&H- CLAUSES
I. GENERAL ::
i. 100 General
II. MATERIALS ::
i. Natural and/or Factory supplied
1) 700 Geosynthetics. 5) 1500 Formwork.
2) 1000 Materials For Structures. 6) 1600 Steel Reinforcement.
3) 1300 Brick Masonry. 7) 1700 Structural Concrete.
4) 1400 Stone And Concrete 8) 1900 Structural Steel.
Block Masonry.
ii. Factory finished..
1) 2000 Bearings. 2) 2600 Expansion Joints
vvnhighways.blogspot.in 8
MORT&H- CLAUSES
III. WORKS ::
A. CONSTRUCTION.
i. ROADS. …
ii. BRIDGES. …
iii. CULVERTS.
1) 2900 Pipe Culverts.
iv. PROTECTION.
1) 2500 River Training Work And Protection Work.
2) 3200 Soil Nailing
v. SAFETY. … 800 Traffic Signs, Markings And Other Road Appurtenances.
B. MAINTENANCE.
1) 2800 Repair Of Structures. 2) 3000 Maintenance Of Road.
vvnhighways.blogspot.in 9
MORT&H- CLAUSES
III. WORKS ::
A. CONSTRUCTION.
i. ROADS. …..
a) FLEXIBLE PAVEMENTS. b) RIGID PAVEMENTS.
1) 200 Site Clearance. 1) 200 Site Clearance.
2) 300 Earth Works. 2) 300 Earth Works.
3) 400 Sub-bases & Bases. 3) 400 Sub-bases & Bases.
4) 500 Bases and Surface Courses. 4) 600 Concrete Pavement.
vvnhighways.blogspot.in 10
MORT&H- CLAUSES
III. WORKS ::
A. CONSTRUCTION.
ii. BRIDGES..
1) 2400 Surface And Sub-Surface 7) 2300 Concrete Super
Geotechnical Investigation. Structure.
2) 300 Earth Works. 8) 2700 Wearing Coat And
3) 1100 Pile Foundations. Appurtenances.
4) 1200 Well Foundations. 9) 3100 Reinforced Earth.
5) 2100 Open Foundations. 10) 1800 Prestressing..
6) 2200 Substructure.
vvnhighways.blogspot.in 11
z
GENERAL Q.C.
100 General NATURAL AND/OR CONSTRUCTION MAINTENANCE
900 Quality Control For
Road Works
FACTORY 2800 Repair Of Structures
SUPPLIED
700 Geosynthetics 3000 Maintenance Of Road
vvnhighways.blogspot.in 13
Typical structure of a CLAUSE
406 WET MIX MACADAM SUB-BASE/BASE.
406.3 Construction Operations.
406.3.5 Compaction. ….
406.3.6 Setting and Drying. ….
406.4 Opening to Traffic. ….
406. 5 Surface finish and Quality Control Work.
406.5.1 Surface Evenness. ….
406.5.2 Quality Control. ….
406.6 Rectification of Surface Irregularity. …
406.7 Arrangement for Traffic. ….
406.8 Measurement for Payment. ….
406.9 Payment. ….
vvnhighways.blogspot.in 14
WET MIX MACADAM
vvnhighways.blogspot.in 15
WET MIX MACADAM
vvnhighways.blogspot.in 16
WET MIX MACADAM
vvnhighways.blogspot.in 17
WET MIX MACADAM
vvnhighways.blogspot.in 18
WET MIX MACADAM
vvnhighways.blogspot.in 19
WET MIX MACADAM - BOQ SPECIFICATION
SPECIFICATION ::
Providing, Laying, Spreading and compacting graded HBG crushed stone
aggregate to Wet Mix macadam specification including cost, (excluding
seigniorage) of all materials and including premixing the material with water
at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with Mechanical paver in base courses on well
prepared surface and compacting with Vibratory roller to achieve the desired
density etc., as directed by the Engineer-in-Charge and as per MoRT&H
specification.406 (5th revision) for finished item of work. (Payment will be
made based on levels for finished item of work)
MEASUREMENT ::
The Quantity of Wet Mix Macadam shall be computed in cubic meters.
vvnhighways.blogspot.in 20
Typical structure of a CLAUSE
vvnhighways.blogspot.in 21
Typical structure of a CLAUSE
DENCE BITUMINOUS MACADAM
505 DENCE BITUMINOUS MACADAM
505.3 MIX DESIGN
505.3.1 Requirements For The Mix.
505.3.2 Binder Content.
505.3.3 Job Mix Formulae.
505.3.4 Plant Trials-Permissible Variation In Job Mix
Formulae.
505.3.5 Laying Trials.
vvnhighways.blogspot.in 22
Typical structure of a CLAUSE
DENCE BITUMINOUS MACADAM
505 DENCE BITUMINOUS MACADAM
505.4 CONSTRUCTION OPERATIONS
505.4.1 Weather And Seasional Operations.
505.4.2 Preparation Of Base.
505.4.3 Geosynthetics.
505.4.4 Stress Absorbing Layer.
505.4.5 Prime Coat.
505.4.6 Tack Coat.
505.4.7 Mixing And Transportation Of Mix.
505.4.8 Spreading.
505.4.9 Rolling.
vvnhighways.blogspot.in 23
Typical structure of a CLAUSE
DENCE BITUMINOUS MACADAM
505 DENCE BITUMINOUS MACADAM
505.5 OPENING TO TRAFFIC.
505.6 SURFACE FINISH AND QUALITY CONTROL OF WORK.
505.7 ARRANGEMENTS FOR TRAFFIC.
505.8 MEASUREMENT FOR PAYMENT.
505.9 RATE.
vvnhighways.blogspot.in 24
SPECIFICATION – B.O.Q. SPECIFICATION
DENSE GRADED BITUMINOUS MACADAM ::
Providing and laying of Dense Graded Bituminous Macadam with with 100-
120 TPH Batch Mix type/ 40-60 TPH hot mix plant using HBG crushed
aggregates of Grading-2 as per table 500-10 of MoRT&H Specification 505
(5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of
weight of total mixture, transported to site, laid over a previously prepared
surface with Hydro Static sensor Paver finisher 100 TPH to the required grade,
level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the
desired compaction for finished item of work as directed by the Engineer-in-
Charge including hire and operational charges all T&P and all other contingent
charges necessary including cost of (excluding seigniorage) charges of all
materials etc., complete and as per MoRT&H specification No. 505 (5th
Revision) (Excluding VAT Charges)
vvnhighways.blogspot.in 25
SPECIFICATION
1. Item of Work :: Providing and laying of Dense Graded Bituminous Macadam
2. Machinery 1 :: with with 100-120 TPH Batch Mix type/ 40-60 TPH hot mix plant
3. Material :: using HBG crushed aggregates of Grading-2 as per table 500-10 of
MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG
30 grade @ 4.50% of weight of total mixture,
4. Machinery 2 :: transported to site, laid over a previously prepared surface with
Hydro Static sensor Paver finisher 100 TPH to the required grade, level and
alignment and rolled as per
5. Codal Reference :: Clauses 501.6 and 501.7 to achieve the desired compaction for
finished item of work as
6. Employer :: directed by the Engineer-in-Charge
7. Labour & Others :: including hire and operational charges all T&P and all other
contingent charges necessary including cost of (excluding seigniorage) charges of
all materials etc.,
8. Codal Reference 2 :: complete and as per MoRT&H specification No. 505 (5th
Revision) (Excluding VAT Charges)
vvnhighways.blogspot.in 26
THANK YOU
V. VENKATA NARAYANA,
EXECUTIVE ENGINEER (R&B),
9492578280, 07799139399,
vvn.randb@gmail.com
vvnhighways.blogspot.in
Date 18-11-2018
vvnhighways.blogspot.in 27