Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

www.affairscloud.com Time And Work [160 math]


Aptitude Questions – Time And Work Set 16

1. A is twice efficient as B. A and B together do the same work in as much time as C and D
can do together. If the ratio of the number of alone working days of C to D is 2:3 and if
B worked 16 days more than C then no of days which A worked alone?
A. 18 Days
B. 20 Days
C. 30 Days
D. 36 Days
E. Cannot be determined

Answer & Explanation

Answer – A. 18 Days
Explanation :
Assume working days
A = x, B = 2x, C = 2y, D = 3y
1/x+1/2x = 1/2y+1/3y
And 2x-2y = 16
Solving we get x = 18 days.

2. A can do a piece of work in 40 days B can do the same piece of work in 60 days. A and B
started the work together in the first 15 days A worked with 50% of his efficiency, in the
next 15days B worked with 50% of his efficiency. Now in how many days does the
remaining work will be completed if both of them work with their full efficiencies?
A. 1 Day
B. 1.5 Days
C. 2 Days
D. 2.5 Days
E. None

Answer & Explanation

Answer – B. 1.5 Days


Explanation :
15*(1/80+1/60) + 15*(1/120+1/40) + x*(1/40+1/60) = 1
X= 3/2 = 1.5

3. A can do a piece of work in 30 days, B can do in 45 days and C can do same work alone
in 60 days. If on the first day A worked alone and on the second day A and B worked
together and on the third day A and C worked together. If they repeat the cycle as
follows then in how many days total work can be completed?
A. 21 Days
B. 21 7/8 Days
C. 21 5/6 Days
D. 21 4/9 Days
E. None

1|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer & Explanation

Answer – C. 21 5/6 Days


Explanation :
First day = 1/30
Second day = 1/30+1/45
Third day = 1/30+1/60
3 days work = 3/30+1/45+1/60 = 25/180
3*7 = 21 days work = 175/180
Now 1/36 work is left which can be completed by A alone
1/36*30 = 5/6
21+5/6 = 21 5/6 Days

4. Ramu completes 30% of work in 7.5 days. Raju is 50% as efficient as Ramu, Venu is
50% as efficient as Raju. Now Raju and Venu joined with Ramu for the rest of the work
then in how many days will take to complete the work?
A. 9 Days
B. 10 Days
C. 12 Days
D. 15 Days
E. None of these

Answer & Explanation

Answer – B. 9 days
Explanation :
Ramu takes 25 days to complete work.
Raju = 50 days Venu = 100 days
Now 70% work is left
They can complete whole work in = 1/ 1/25+1/50+1/100
100/7 days then 70% in 10 days

5. A can do a piece of work in 21days. B is 50% more efficient than A. C is twice efficient
than B. A started the work alone and worked for some days and left the work then B
and C joined together and completed the work in 2 days. Then how many days does A
worked alone?
A. 7 Days
B. 12 Days
C. 14 Days
D. 21 Days
E. None

Answer & Explanation

Answer – B. 12 Days
Explanation :
A = 21 B = 14 C =7
x/21+2*(1/14+1/7) = 1
x = 12.

2|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

6. A can do a piece of work in 60days working 14 hours. B has the same efficiency as of A.
A and B started working together. A works 5,6,7 and 8 hours respectively on first four
days and repeats the cycle again. Then B has to work how many hours daily if they
together completed the work in 80 days?
A. 1 Hour
B. 2 Hours
C. 3 Hours
D. 4 Hours
E. None of these

Answer & Explanation

Answer – D. 4 Hours
Explanation :
20*(5+6+7+8+4x)/840 = 1
x= 4 hours

7. Sruthi, Swetha and Swati together can cut 216 Apples of the same size in 3 hours.
Number of Apples cut by Sruthi in 9 hours is same as the number of Apples cut by Swati
in 7 hours. In one hour, Swati can cut as many Apples more than Swetha as Swetha can
cut more than Sruthi.Then the number of Apples cut by Swetha in one hour?
A. 21
B. 24
C. 27
D. 29
E. None

Answer & Explanation

Answer – B. 24
Explanation :
U+v+W = 72
9U = 7W
W-V = V-U
V = 24

8. A can type 100 letters in 5 minutes. B and C typing together can type 50 letters in 2
minutes. If all of them working together then can type 90 letters in how many minutes?
A. 2 minutes
B. 4 minutes
C. 5 minutes
D. 10 minutes
E. None

Answer & Explanation

Answer – A. 2 minutes
Explanation :
(1/5+1/4)
20/9*90/100 = 2

3|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

9. If A and B work together can complete a work in 8/5 days. A started the work alone and
completed. 50% of the work and left the work then B started the work alone and
finished the rest of work. They took total 5 days to complete the work. Then in how
many days B can complete the work if A is more efficient than A?
A. 1 Day
B. 2 Days
C. 3 Days
D. 4 Days
E. None

Answer & Explanation

Answer – D. 4 Days
Explanation :
1/A+1/B = 5/8
x/A+y/B = 1
x+y = 5
y=4

10. A piece of work is to be completed in 100days, 11 Men are employed to do the work it is
found that after 50 days only 1/3 rd work is completed. Now additionally how many
more Men are to be employed to work to finish the work in time?
A. 5
B. 6
C. 7
D. 11
E. None

Answer & Explanation

Answer – D. 11
Explanation :
11*50/1/3 = (11+x)*50/2/3
X = 11

Aptitude Questions: Time And Work Set 15

1. Arun can do a piece of work in 40 days, but Bala can do the same work in 5 days less,
than Arun, when working alone. Arun and Bala both started the work together but Bala
left after some days and Arun finished the remaining work in 30 days with half of his
efficiency but he did the work with Bala with his complete efficiency. For how many
days they had worked together?
A. 25/3 days
B. 31/3 days
C. 35/3 days

4|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

D. 38/3 days
E. None of these

Answer & Explanation

Answer – C. 35/3 days


Explanation :
1 day work of Arun and Bala = 1/40 + 1/35 = 15/280
Arun finished the remaining work in 30 days = 30 * 1/40 * 2 = 3/8
Remaining work done by Arun and Bala = 5/8
Worked together = (5/8)/(15/280) = 35/3 days.

2. Kiran can do a work in 20 days, while Karan can do the same work in 25 days. They
started the work jointly. Few days later Suman also joined them and thus all of them
completed the whole work in 10 days. All of them were paid total Rs.1000. What is the
share of Suman?
A. 200
B. 400
C. 100
D. 300
E. 500

Answer & Explanation

Answer – C. 100
Explanation :
Efficiency of Kiran = 5%
Efficiency of Karan = 4%
They will complete only 90% of the work = [(5+4)*10] =90
Remaining work done by Suman = 10%.
Share of Suman = 10/100 * 1000 = 100

3. 7 Indian and 4 American finish a job in 6 days. 7 African and 3 American finish the
same job in 8 days. The efficiency of each person of a particular nationality is same but
different from others. One Indian One American and One African will complete the
work in:
A. 10 days
B. 12 days
C. 24 days
D. 36 days
E. None of these

Answer & Explanation

Answer – C. 24 days
Explanation :
Explanation:
7I + 4Am = 1/6
7Af + 4Am = 1/8
7I + 7Af + 7Am = 7/24

5|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

1I + 1Af + 1Am = 1/24


One Indian One American and One African will complete the work in – 24 days.

4. Chitra is twice efficient as Arun. Bala takes thrice as many days as Chitra. Arun takes
12 days to finish the work alone. If they work in pairs(i.e Arun-Bala, Bala-Chitra,
Chitra-Arun) starting with Arun – Bala on the first day, Bala – Chitra on the second
day and Chitra – Arun on the third day and so on, then how many days are required to
finish the work?
A. 26/9 days
B. 46/9 days
C. 16/9 days
D. 56/9 days
E. None of these

Answer & Explanation

Answer – B. 9 days
Explanation :
No of days taken by Arun = 12 days
No of days(Arun:Bala:Chitra) = 2:3:1
1 day work of (Arun+Bala) = 5/36
1 day work of (Bala+Chitra) = 8/36
1 day work of (Chitra+Arun) = 9/36
5 days total work – 35/36
1/36 is done by Arun-Chitra
Number of days taken by Arun-Chitra for the rest of the work = (1/36)/(9/36) = 1/9
Total time taken to complete the work = 5 + 1/9 = 46/9 days

5. A work is done by 30 workers not all of them have the same capacity to work. Every day
exactly 2 workers, do the work with no pair of workers working together twice. Even
after all possible pairs have worked once, all the workers together works for six more
days to finish the work. Find the number of days in which all the workers together will
finish the work?
A. 22 days
B. 20 days
C. 24 days
D. 35 days
E. 32 days

Answer & Explanation

Answer – D. 35 days
Explanation :
30 workers work in pairs, with no same pair of workers working together twice
29[1/w1 + 1/w2 ….. + 1/w30] + 6[1/w1 + 1/w2 ….. + 1/w30] = 1
[1/w1 + 1/w2 ….. + 1/w30] = 1/35
35 days.

6. Arun can do a piece of work in 10 days, Bala in 15 days. They work together for 5 days,
the rest of the work is finished by Chitra in two more days. If they get Rs. 5000 as wages

6|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

for the whole work, what are the daily wages of Arun, Bala and Chitra respectively (in
Rs)?
A. 600, 400, 500
B. 200, 300, 400
C. 500, 300, 400
D. 600, 500, 300
E. 400, 300, 200

Answer & Explanation

Answer – A. 600, 400, 500


Explanation :
A’s 5 days work = 50%
B’s 5 days work = 33.33%
C’s 2 days work = 16.66%[100- (50+33.33)] Ratio of contribution of work of Arun, Bala and Chitra =
3:2:1
Arun’s total share = Rs. 3000
Bala’s total share = Rs. 2000
Chitra’s total share = Rs. 1000
Arun’s one day’s earning = Rs.600
Bala’s one day’s earning = Rs.400
Chitra’s one day’s earning = Rs.500

7. A Contractor employed a certain number of workers to finish constructing a building in


a certain scheduled time. Some time later, when a part of work had been completed, he
realized that the work would get delayed by half of the scheduled time, so he at once
doubled the no of workers and thus he managed to finish the building on the scheduled
time. How much work he had been completed, before increasing the number of
workers?
A. 200/3 %
B. 100/3 %
C. 300/3 %
D. Can’t be determined
E. None of these

Answer & Explanation

Answer – B. 100/3 %
Explanation :
Explanation:
D * x +(100- D) * 2x= 150x
=> D= 50 days
work done in 50 days = 50x
Total work = 150x
50x/150x * 100 = 100/3

8. (x-2) person can do a work in x days and (x+7) person can do 75% of the same work in
(x-10)days. Then in how many days can (x+10) person finish the work?
A. 27 days

7|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

B. 12 days
C. 25 days
D. 18 days
E. None of these

Answer & Explanation

Answer – B. 12 days
Explanation :
3/4 * (x-2)x = (x+7)(x-10)
x – 6x – 280 = 0
x = 20; x = -14
(x-2)x = 18 * 20 = 360
360 = 30 * y
y = 12 days

9. The ratio of efficiency of Arun is to Chitra is 5:3. The ratio of number of days taken by
Bala is to Chitra is 2:3. Arun takes 6 days less than Chitra, when Arun and
Chitra complete the work individually. Bala and Chitra started the work and left after 2
days. The number of days taken by Arun to finish the remaining work is?
A. 4 days
B. 5 days
C. 6 days
D. 9 days
E. None of these

Answer & Explanation

Answer – C. 6 days
Explanation :
Ratio of number of days = 9:10:15
Work done By B and C in first two days = 2*1/6 = 1/3
Rest of the work = 2/3
Number of days = (2/3)/(1/9) = 6 days

10. Arun is twice efficient as Bala and together they do the same work in as much time as
Chitra and David together. If Chitra and David can complete the work in 20 and 30
days respectively, working alone, then in how many days A can complete the work
individually?
A. 12 days
B. 18 days
C. 24 days
D. 30 days
E. None of these

Answer & Explanation

Answer – B. 18 days
Explanation :
1/x + 1/2x = 1/20 + 1/30

8|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

3/2x = 1/12
Number of days taken by Arun = 18 days

Aptitude Questions: Time And Work Set 14

1. Kiran can do a work in 25 days, while Ravi can do the same work in 50 days. They
started the work jointly. Few days later Sumit also joined them and thus all of them
completed the whole work in 10 days. All of them were paid total Rs.600. What is the
Share of Sumit?
A. Rs.360
B. Rs.385
C. Rs.240
D. can’t be determined
E. None of these

Answer & Explanation

Answer – C. Rs.240
Explanation :
Efficiency of Kiran = 4%
Efficiency of Ravi = 2%
[(4+2)*10] = 60%
The remaining work done by Sumit = 40%.
40% of 600 = 240

2. Working together Bala and Chitra take 50% more number of days than Angel, Bala and
Chitra together take and Angel and Bala working together, take 8/3 more number of
days than Angel, Bala and Chitra take together. If Angel, Bala and Chitra all have
worked together till the completion of the work and Bala has received Rs.120 out of total
earnings of Rs. 480 then in how many days did Angel, Bala and Chitra together
complete the whole work?
A. 2 days
B. 4 days
C. 6 days
D. 8 days
E. 5 days

Answer & Explanation

Answer – E. 5 days
Explanation :
The days ratio of (Angel + Bala + Chitra) : (Bala + Chitra) = X:3X/2 = 2X:3x;
Efficiency ratio = 3X:2X
Efficiency of Angel = x.
(480/3X) = Rs.160
Amount received by Bala = Rs.120 & Chitra = 200
160:120:200 =4:3:5
1/4:1/3:1/5= 15:20:12;
(1/15+1/12+1/20)*Y = 1
Y = 5 days

9|P ag e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

3. Angel can do a piece of work in 10 days, Balu in 15 days. They work together for 5 days,
the rest of the work is finished by Chitra in two more days. If they get Rs. 6000 as wages
for the whole work, what are the daily wages of Angel, Bala and Chitra respectively?
A. 200, 250, 300
B. 300, 200, 250
C. 600, 400, 200
D. 600, 400, 500
E. None of these

Answer & Explanation

Answer – D. 600, 400, 500


Explanation :
Explanation:
Angel’s 5 days work = 50%
Balu’s 5 days work = 33.33%
Chitra’s 2 days work = 16.66% [100- (50+33.33)] Ratio of work of Angel, Balu and Chitra = 3: 2: 1
Angel’s total share = Rs. 3000
Balu’s total share = Rs. 2000
Chitra’s total share = Rs. 1000
Angel’s one day’s wage = Rs.600
Balu’s one day’s wage = Rs.400
Chitra’s one day’s wage = Rs.500

4. Ravi can do a piece of work in 16 days. Rakesh can do the same work in 64/5 days, while
Geeta can do it in 32 days. All of them started to work together but Ravi leaves after 4
days. Rakesh leaves the job 3 days before the completion of the work. How long would
the work last?
A. 6 days
B. 9 days
C. 18 days
D. 5 days
E. None of these

Answer & Explanation

Answer – B. 9 days
Explanation :
Let the work lasted for x days,
Ravi’s 4 day’s work + Rakesh (x – 3) day’s work + Geeta’s x day’s work = 1
⇒ (4/16) + (x – 3) / (64/5) + x/32 = 1
⇒ 5(x – 3)/64 + x/32 = 1 – 1/4
⇒ [5(x – 3) + 2x] / 64 = 3/4
⇒ 7x – 15 = 48
∴ x = (48 + 15)/7 = 63/7 = 9 days

5. Ramu, Hari and Sanjay are three typists, who working simultaneously, can type 228
pages in four hours. In one hour, Sanjay can type as many pages more than Hari as Hari
can type more than Ramu. During a period of five hours, Sanjay can type as many

10 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

passages as Ramu can, during seven hours. How many pages does each of them type per
hour?
A. 16, 18, 22
B. 14, 17, 20
C. 15, 17, 22
D. 15, 18, 21
E. 16, 19, 22

Answer & Explanation

Answer – E. 16, 19, 22


Explanation :
Let Rohit, Harsh and Sanjeev can type x, y and z pages respectively in 1 h.
Therefore, they together can type 4(x + y + z) pages in 4 h
∴ 4(x + y + z) = 228
⇒ x + y + z = 57 …..(i)
Also, z – y = y – x
i.e., 2y = x + z ……(ii)
5z = 7x ……(iii)
From Eqs. (i) and (ii), we get
3y = 57
⇒ y = 19
From Eq. (ii), x + z = 38
x = 16 and z = 22

6. Efficiency of A is 25% more then B and B takes 25 days to complete a piece of work. A
started a work alone and then B joined her 5 days before actual completion of the work.
For how many days A worked alone?
A. 9
B. 11
C. 10
D. 25
E. 12

Answer & Explanation

Answer – B. 11
Explanation :
Efficiency (A : B) = 5 : 4
Number of days(A : B) = 4x : 5x = 4x : 25
∴ Number of days required by A to finish the work alone = 4x
= 4 x 5 = 20.
A and B work together for last 5 days = 5 x 9 = 45%
Efficiency of A = 5% and B’s efficiency = 4%
∴ No. of days taken by A to complete 55% work = 55/5 = 11days

7. In a cucumber factory, there are equal number of women and children. Women work
for 8 h a day and children for 6 h a day. During festival time, the work load goes up by
50%. The government rule does not allow children to work for more than 8 h a day. If

11 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

they are equally efficient and the extra work is done by women, then extra hours of
work put in by women every day are?
A. 5
B. 3
C. 4
D. 9
E. None of these

Answer & Explanation

Answer – A. 5
Explanation :
Let extra hours a day are x.
According to the formula,
(M1D1T1) / W1 = (M2D2T2) / W2
⇒ [1 x 1 x (8 + 6)] / 1 = [1 x 1 x (8 + 8 + x)] / 3/2
⇒ (3/2) x 14 = 16 + x
⇒ 21= 16 + x
∴ x = 21 – 16 = 5

8. A building contractor undertook to finish a certain work in 162 days and employed 150
men. After 72 days, he found that he had already done 2/3 of the work. How many men
can be discharged now, so that the work finish in time?
A. 80
B. 75
C. 90
D. 70
E. 65

Answer & Explanation

Answer – C. 90
Explanation :
M1 = 150, M2 = 150 – n, D1 = 72, D2 = 90
W1= 2/3 and W2 = 1/3
According to the formula,
(M1D1) / W1 = (M2D2) / W2
⇒ [150 x 72] / 2 = [(150 – n) x 90] / 1
⇒ (150 x 72) / (2 x 60) = (150 – n)
⇒ (150 – n) = 60
∴ n = 150 – 60 = 90

9. Sanjay can do a piece of work in 50 days. He started the work and left after some days,
when 25% work was done. After it Ajit joined and completed it working for 25 days. In
how many days Sanjay and Ajit can do the complete work, working together?
A. 6
B. 8
C. 10

12 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

D. 12
E. 20

Answer & Explanation

Answer – E. 20
Explanation :
Efficiency of Sanjay = (100/50) = 2%
Rest work = 75%
∴ Efficiency of Ajit = 75/25 = 3%
∴ Combined efficiency of Sanjay and Ajit = 5%
∴ Number of days required by Sonu and Abhijeet, to work together = 100/5 = 20 days.

10. Kiran can do a piece of work in 9 days and Kumar can do the same work in 18 days.
They started the work. After 3 days Sanjay joined them, who can complete alone the
same whole work in 3 days. What is the total number of days in which they had
completed the work?
A. 12
B. 8
C. 4
D. 6
E. None of these

Answer & Explanation

Answer – C.4 days


Explanation :
Efficiency of Kiran and Kumar = 11.11 + 5.55 = 16.66%
Work done in 3 days = 3 x 16.66 = 50%
Rest work done by Kiran, Kumar and Sanjay = 50/50 = 1 day
Work can be completed in 4 days.

Aptitude Questions: Time And Work Set 13

1. Mohan can do a work in 15 days. After working for 3 days he is joined by Vinod. If they
complete the remaining work in 3 more days, in how many days can Vinod alone
complete the work?
A.10 days
B.8 days
C.5 days
D.12 days
E.15 days

Answer & Explanation

Answer – C.5 days


Explanation :
Total days Mohan worked = 3+3 = 6
6/15 = 2/5

13 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

So 3/5 = 3/x
x=5

2. Arun can do a certain work in the same time in which Bipasha and Rahul together can
do it. If Arun and Bipasha together could do it in 10 days and Rahul alone in 50 days,
then Bipasha alone could do it in:
A.15 days
B.20 days
C.25 days
D.30 days
E.35 days

Answer & Explanation

Answer – C.25 days


Explanation :
Arun, Bipasha and rahul’s 1 day work = 1/10 + 1/50 = 6/50 = 3/25
Arun’s 1 day work = Bipasha + Rahul ‘s 1 day work
2*( Arun’s 1 day work) = 3/25
Arun’s 1 day work = 3/50
Bipasha’s 1 day work = 1/10 – 3/50 = 2/50 = 1/25

3. Sekar, Pradeep and Sandeep can do a piece of work in 15 days. After all the three
worked for 2 days, sekar left. Pradeep and Sandeep worked for 10 more days and
Pradeep left. Sandeep worked for another 40 days and completed the work. In how
many days can sekar alone complete the work if sandeep can complete it in 75 days?
A.25 days
B.20 days
C.30 days
D.35 days
E.15 days

Answer & Explanation

Answer – C.30 days


Explanation :
Assume the total work to be 600 units. (LCM of all the numbers)
Then Sandeep’s 1 day work = 8 units.
All three’s 1 day work = 40 units.All work together in the first 2 days
Work done in the first 2 days = 40 × 2 = 80 units
Sandeep alone works during the last 40 days
Work done in the last 40 days = 40 × 8 = 320 units
Remaining work = 600 – (320 + 80) = 200 units
This work is done by pradeep and sandeep in 10 days.
Pradeep and Sandeep together’s 1 day work = 20 units
Sekar’s 1 day work = All three 1 day work – Pradeep and Sandeep together’s 1 day work = 40 units –
20 units = 20 units
Sekar can do the work of 600 units in 30 days.

14 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

4. Dinesh does 80% of a work in 20 days. He then calls in Gokul and theytogether finish
the remaining work in 3 days. How long Gokul alone would take to do the whole work?
A.39 days
B.37 days
C.37 ½ days
D.40 days
E.39 ½ days

Answer & Explanation

Answer – C.37 ½ days


Explanation :
Dinesh work done = 20*5/4 = 25 days
1/5 workdone by Dinesh and gokul in 3days.
Whole work done = 15 days
Dinesh 1 days work = 1/25
Dinesh and gokul’s 1 day work = 1/15
Gokul’s 1 day work = 1/15 – 1/25 = 2/75
Gokul alone in 75/2 days or 37 ½ days.

5. Hari and Vijay can together finish a work in 30 days. They worked together for 20 days
and then Vijay left. After another 20 days, hari finished the remaining work. In how
many days hari alone can finish the work?
A.45
B.60
C.35
D.50
E.65

Answer & Explanation

Answer – B.60
Explanation :
Hari + vijay 20 days work = 1/30 *20 = 2/3
Remaining work = 1/3
1/3 work in 20 days so whole work in 60 days.

6. Madhavan can finish a work in 5 hours. He invites Manohar and Manjima who can
work 3/4th as fast as he can to join him. He also invites Mani and Mohan who can work
only 1/5th as fast as he can to join him. If the five person team works the same job and
they start together, how long will it take for them to finish the job?
A.50/97 days
B.87 days
C.50/29 days
D.78 days
E.62 days

Answer & Explanation

15 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer – C.50/29 days


Explanation :
Let the work be 100 units.
Madhavan’s 1 hour work = 100/5 = 20 units
Manohar and Manjima’s 1 day work = 3/4 × 20 = 15 units.
Mohan and Mani’s 1 day work = 1/5 × 20 = 4 units.
In one day all five of them can do = 20 + 15 + 15 + 4 + 4 = 58 units of work. Hence they can
complete the work in 100/58 days.

7. A typing work is done by three person P, Q and R. P alone takes 10 hours to type a
single booklet but B and C working together takes 4 hours, for the completion of the
same booklet. If all of them worked together and completed 14 booklets, then how many
hours have they worked?
A.30hrs
B.40hrs
C.25hrs
D.45hrs
E.50hrs

Answer & Explanation

Answer – B.40hrs
Explanation :
1/P = 1/10
1/P + 1/Q + 1/R = 1/10 + ¼ = 7/20
In 20 hours, working together, they will complete 7 booklets.
Thus, in 40 hours they will complete 14 booklets.

8. Nakul and Ram are working on aproduction company. Nakul takes 6 hours to make 32
products, while Ram takes 5 hours to make 40 products. How much time will they take,
working together to make 110 products?
A.8 hours
B.8 hours 15 minutes
C.9 hours
D.8 hours 25 minutes
E.9 hours 15 minutes

Answer & Explanation

Answer – B.8 hours15 minutes


Explanation :
Number of products made by Nakul in 1 hour = 32/6 = 16/3
Number of products made by Ram in 1 hour = 40/5 = 8
Number of products made by both in 1 hour = 16/3 + 8 = 40/3
Time taken by both to make 110 products = 110* 3/40 = 8 ¼ hrs

9. Gopal does a work in 90 days, Vikash in 40 days and Santhosh in 12 days. They work
one after another for a day each, starting with Gopal followed by Vikash and then by
Santhosh. If the total wages received are Rs 360 and Gopal, Vikash, Santhosh share
them in the ratio of the work done, find their respective individual wages.

16 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

A.Rs 44, Rs 80 and Rs 264


B.Rs 40, Rs 87 and Rs 276
C.Rs 36, Rs 81 and Rs 243
D.Rs 42, Rs 86 and Rs 232
E.Rs 37, Rs 89 and Rs 284

Answer & Explanation

Answer – C.Rs 36, Rs 81 and Rs 243


Explanation :
Assume there are 360 units of work (LCM of 90, 40 and 12).
Hence, they can do 4,9 and 30 units per day or together 43 units every 3 days.
So In 24 days, 43×8=344 units of work is completed.
In the next 2 days, 13 unitsare completed and on 27th day,Santhosh takes 1/10 thof a day to finish the
rest.
So, gopal and vikash worked for 9 days each and have hence put in 36 and 81 units respectively, and
the rest of the 243 units is put in by santhosh.
The wages shall also be distributed in the same ratio as: Rs 36, Rs 81 and Rs 243.

10. When Ashok and Karthik are working alone, they can complete a piece of work in 25
days and 30 days respectively. On day 1, Karthik started the work and Ashok joined B
from day 3 on-wards. Find approximately after how many days will the work be
completed?
A.20 days
B.10 days
C.15 days
D.25 days
E.30 days

Answer & Explanation

Answer – C.15 days


Explanation :
Fraction of work completed by Karthik on day 1 and day 2 = 2* 1/30 = 1/15
Fraction of work left after 2 days = 14/15
Fraction of work completed by Both = 1/25 + 1/30 = 11/150
Number of days after day 2 to complete work = 14*150/15*11 = 13 days
So after 2+13 = 15 days works will be completed

Aptitude Questions: Time And Work Set 12

1. If P and Q work together, they will complete a job in 7.5 days. However, if P works
alone and completes half the job and then Q takes over and completes the remaining
half alone, they will be able to complete the job in 20 days. How long will Q alone take to
do the job if P is more efficient than Q?
a) 20 days
b) 30 days
c) 40 days
d) 10 days
e) None of these

17 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer & Explanation

Answer – b) 30 days
Explanation :
1/P + 1/Q = 2/15 from first line. Now, let P take x days and Q takes y days to complete half the work
respectively.
x/P = 1/2, x = P/2 similarly y/Q = 1/2, y = Q/2
so, x +y = 20 i.e. P/2 + Q/2 = 20, P +Q = 40
solve both equation, u will get Q = 30 days

2. A and B undertake to complete a piece of work for Rupees 1200. A can do it in 8 days, B
can do it in 12 days and with the help of C they complete the work in 4 days. Find the
share of C?
a) 100
b) 200
c) 300
d) 400
e) None of these

Answer & Explanation

Answer – b) 200
Explanation :
1/8 + 1/12 + 1/C = 1/4, we get C = 24 days
now efficiency of A, B and C are in the ratio of 1/8 :1/12 : 1/24
3:2:1, so share of C is 1/6 * 1200 = 200

3. Among four persons Anuj, Bhim, Carl and Dinesh. Anuj takes thrice as much time as
Bhim to complete a piece of work. Bhim takes thrice as much time as Carl and Carl
takes thrice as much time as Dinesh to complete the same work. If all together they take
3 days to complete the work. Find the time taken by Bhim alone to complete the work
alone.
a) 20 days
b) 30 days
c) 40 days
d) 50 days
e) None of these

Answer & Explanation

Answer – c) 40 days
Explanation :
Let Bhim takes x days alone to complete the job, so Anuj will take 3x days, Carl will take x/3 days
and Dinesh will take x/9 days to complete the work alone
1/3x + 1/x + 3/x + 9/x = 1/3
Solve for x

4. A and B can do a piece of work in 20 and 25 days respectively. They began to work
together but A leaves after some days and B completed the remaining work in 12 days.
Number of days after which A left the job-

18 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

a) 5.7/9 days
b) 6.7/9 days
c) 7.7/9 days
d) 11.7/9 days
e) None of these

Answer & Explanation

Answer – a) 5.7/9 days


Explanation :
(1/20 + 1/25)*T + 12/25 = 1
We will get T = 52/9 i.e. 5.7/9 days

5. A factory produces nuts and bolts. A machine in it produces only nuts while another
produces only bolts. The machine producing only nuts produces 500 nuts per minute
and need to be cleared for 10 minutes after production of 2000 nuts. The machine
producing only bolts produces 600 bolts per minute and needs to be cleared for 15
minutes after production of 3000 bolts. Find the minimum time required to produce
6000 pairs of bolts and nuts if both machines are operated simultaneously.
a) 32 minutes
b) 20 minutes
c) 25 minutes
d) 40 minutes
e) None of these

Answer & Explanation

Answer – a) 32 minutes
Explanation :
2000 nuts are produced in 14 minutes (10 minutes break and 500 nuts per minutes so 4 minutes to
produce 2000 nuts ), for next 2000 nuts it will take 14 minutes more, and for more two thousand it
will take 4 minutes more, so total time = 32 minutes
similarly, 6000 bolts are produced in 20 + 5 = 25 minutes
so minimum time required is 32 minutes

6. Three professors P, Q, R are evaluating answer script of a subject. P is 40 more efficient


than Q, who is 20 more efficient than R. P takes 10 days less than Q to complete the
evaluation work. P starts the evaluation work and works for 10 days and then Q takes
over. Q evaluates for next 15 days and then stops. In how many days, R can complete
the remaining evaluation work?
a) 6.2 days
b) 7.2 days
c) 8.2 days
d) 9.2 days
e) None of these

Answer & Explanation

Answer – b) 7.2 days


Explanation :

19 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Let R takes x days to complete the work, then


1/P = (140/100)*1/Q and 1/Q = (120/100)*1/R
So P will take 25x/42 and Q will take 5x/6 days respectively
5x/6 – 25x/42 = 10, we get x = 42
10/25 + 15/35 + t/42 = 1

7. A piece of work has to be completed in 50 days, a number of men are employed but it is
found that only half of the work is done in 30 days, then an additional 20 men were
joined to complete the work on time. How many men initially put to work?
a) 30
b) 35
c) 40
d) 45
e) None of these

Answer & Explanation

Answer – c) 40
Explanation :
suppose Initially X men get employed. Half work is done in 30 days it means full work will be done
by X men in 60 days. Now,
Work done = 1/2 = [20*(x + 20)]/60X
X = 40

8. P can do a piece of work in 20 days. Q is 25 percent more efficient than P. In how many
days half the work is completed when both are working simultaneously?
a) 41/9
b) 40/9
c) 39/9
d) 43/9
e) None of these

Answer & Explanation

Answer – b) 40/9
Explanation :
Q is 25 percent more efficient so he will complete the work in 16 days
(1/20 + 1/16)*t = 1/2

9. A and B together can do a piece of work in 24 days, which B and C together can do it in
32 days. After A has been working at it for 10 days and B for 14 days, C finishes it in 26
days. In how many days C alone will do the work?
a) 32
b) 36
c) 44
d) 48
e) None of these

Answer & Explanation

20 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer – d) 48
Explanation :
1/A + 1/B = 1/24 , 1/B + 1/C = 1/32
10/A + 14/B + 26/C = 1
10(1/A + 1/B) + 4(1/B + 1/C) + 22/C = 1
10/24 + 4/32 + 22/C = 1, we get C = 48 days

10. 50 men could complete a work in 200 days. They worked together for 150 days, after
that due to bad weather the work is stopped for 25 days. How many more workers
should be employed so as to complete the work in time?
a) 25
b) 35
c) 50
d) 60
e) None of these

Answer & Explanation

Answer – c) 50
Explanation :
Let additional workers be P,
(50*150)/(50*200) = 3/4 of the work is already completed and now only 1/4 of the work is to be done.
So,
1/4 = ((50 + P) * 25)/50*200, solve for p, we get P = 50

Aptitude Questions: Time And Work Set 11

1. A and B can do a piece of work in 24 and 30 days respectively. Both started the work
and worked for 6 days. Then B leaves the work and C joins and the remaining work is
completed by A and C together in 11 days. Find the days in which C alone can do the
work
a) 80
b) 100
c) 120
d) 130
e) None of these

Answer & Explanation

Answer – c) 120
Explanation :
(1/24 + 1/30)*6 + (1/24 + 1/c)*11 = 1

2. P and Q can do a piece of work in 10 days and 20 days respectively. Both of them start
the work but P leaves the work 5 days before its completion. Find the time in which
work is completed
a) 10
b) 15
c) 20

21 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

d) 25
e) None of these

Answer & Explanation

Answer – a) 10
Explanation :
(1/10 + 1/20)*(T-5) + 5/20 = 1 (T is the number of days in which the work is completed)

3. Ram and shyam can do a piece of work in 5 and 7 days respectively. They start working
alternatively starting from shyam, then in how many days the work is completed
a) 5.(3/7) days
b) 6.(5/7) days
c) 7.(5/6) days
d) 5.(6/7) days
e) None of these

Answer & Explanation

Answer – d) 5.(6/7) days


Explanation :
1/7 + 1/5 = 12/35 this much work is completed in 2 days.
So 24/35 will be completed in 4 days
In the next day, 29/35 work get completed in 5 days, so remaining work will be completed by Ram in
6/7 days

4. A group of 24 women is supposed to do a work in 40 days. After 20 days 4 more women


is employed and the work is completed in 2 days before the scheduled time. How many
days it have been delayed if 4 more women were not employed?
a) 1 day
b) 2 day
c) 3 day
d) 4 day
e) None of these

Answer & Explanation

Answer – a) 1 day
Explanation :
24*20 + 28*18 = total work = 24*T (T is the number of days when 4 more women are not employed)
we get T = 41, so work will be delayed by 1 day

5. P, Q and R can do a piece of work in 16, 24 and 30 days respectively. They started the
work simultaneously but P stops the work after 4 days and Q called off the work 2 days
before the completion. In what time the work is finished?
a) 100/9 days
b) 100/11 days
c) 100/7 days
d) 100/13 days
e) None of these

22 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer & Explanation

Answer – a) 100/9 days


Explanation :
4/16 + (T -2)/24 + T/30 = 1 where T is the time taken to complete the job

6. If P can do 1/3 of the work in 5 days and Q can do 1/4 of the work in 6 days, then how
much money will Q get if they were paid a total of 390 rupee?
a) 120
b) 150
c) 170
d) 190
e) None of these

Answer & Explanation

Answer – b) 150
Explanation :
sol = P can alone complete the whole work in 15 days and Q can complete the same work alone in 24
days. So ratio of work done by them 1/15: 1/24 i.e. 8: 5
Q get = (5/13)*390 = 150

7. A piece of work has to be completed in 50 days, a number of men are employed but it is
found that only half of the work is done in 30 days, then an additional 20 men were
joined to complete the work on time. How many men initially put to work?
a) 30
b) 35
c) 40
d) 45
e) None of these

Answer & Explanation

Answer – c) 40
Explanation :
suppose Initially X men get employed. Half work is done in 30 days it means full work will be done
by X men in 60 days. Now,
Work done = 1/2 = [20*(x + 20)]/60X
X = 40

8. A does half as much work as B in one third of the time taken by B. If together they take
20 days to finish the work then what will be the share of A if 1000 rupees is given for the
whole work?
a) 400
b) 500
c) 600
d) 700
e) None of these

Answer & Explanation

23 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer – c) 600
Explanation :
Let B take x days to complete the work, then A will take = x/3 + x/3 = 2x/3 days (as half work is
completed in one third of the time)
3/2x + 1/x = 1/20
X = 50. So A will complete the work in 100/3 days and B will complete the work in 50 days.
Ratio of work done by A and B – 3/100: 1/50 = 3:2
So A share = 3/5*1000 = 600

9. A does half as much work as B does in one sixth of the time. If together they take 20
days to complete the work, then what is the time taken by A to complete the work
independently.
a) 80/3 days
b) 100/3 days
c) 60/3 days
d) 140/3 days
e) None of these

Answer & Explanation

Answer – a) 80/3 days


Explanation :
Let B complete the work in X days so in one day work done by B is 1/x
as A do half work in one-sixth of the time so A will complete work in 2*x/6 = x/3 days
One day work of A and B i.e. 3/x + 1/x = 1/20. So we get x = 80
So time taken by A alone = 80/3 days

10. P can do a piece of work in 20 days. Q is 25 percent more efficient than P. In how many
days half the work is completed when both are working simultaneously?
a) 41/9
b) 40/9
c) 39/9
d) 43/9
e) None of these

Answer & Explanation

Answer – b) 40/9
Explanation :
Q is 25 percent more efficient so he will complete the work in 16 days
(1/20 + 1/16)*t = 1/2

Aptitude Questions: Time And Work Set 10

1. P can do 2/5 of the work in 10 days and Q can do 4/5 of the work in 16 days. If both of
them start working together then the time in which the work can be done?
a) 12.1/9 days
b) 11.1/9 days
c) 11.2/9 days

24 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

d) 12.4/9 days
e) None of these

Answer & Explanation

Answer – b) 11.1/9 days


Explanation :
P can complete the work in 25 days and Q can complete the work in 20 days. So both will complete
the work in (20*25)/45 = 100/9 days

2. A does half as much work as B does in one sixth of the time. If together they take 20
days to complete the work, then what is the time taken by B to complete the work
independently.
a) 80 days
b) 100 days
c) 120 days
d) 140 days
e) None of these

Answer & Explanation

Answer – a) 80 days
Explanation :
Let B take X days to complete the work then in one –sixth of the time i.e. x/6 days. Now A do half
work as done by B so A will take twice the time i.e. 2*x/6 = x/3 to complete the job alone
So 1/x + 3/x = 1/20, x = 80 days

3. A contractor undertakes to make a mall in 60 days and he employs 30 men. After 30


days it is found that only one- third of the work is completed. How many extra men
should he employ so that the work is completed on time?
a) 20men
b) 25men
c) 30men
d) 40men
e) None of these

Answer & Explanation

Answer – c) 30men
Explanation :
Let total work is w and it is given that one-third of the work is completed after 30 days. Means
M*D = 30*30 = w/3, so total work = 30*30*3
2700 = 30*30 + (30+p)*30, so we get P = 30 (p = additional men)

4. 50 men could complete a work in 200 days. They worked together for 150 days, after
that due to bad weather the work is stopped for 25 days. How many more workers
should be employed so as to complete the work in time?
a) 25
b) 35
c) 50

25 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

d) 60
e) None of these

Answer & Explanation

Answer – c) 50
Explanation :
Let additional workers be P,
(50*150)/(50*200) = 3/4 of the work is already completed and now only 1/4 of the work is to be done.
So,
1/4 = ((50 + P) * 25)/50*200, solve for p, we get P = 50

5. P and Q were assigned to do a work for an amount of 1200. P alone can do it in 15 days
while Q can do it in 12 days. With the help of R they finish the work in 6 days. Find the
share if C.
a) 100
b) 120
c) 140
d) 160
e) None of these

Answer & Explanation

Answer – b) 120
Explanation :
1/15 + 1/12 + 1/c = 1/6, we got C = 60 (it means C will take 60 days to complete the work alone)
so ratio of work done by P:Q:R = 4:5:1
so c share = (1/10)*1200 = 120

6. A can do a work in 32 days. P who is 60 percent more efficient than A. Find how much
time they will take together to do the same work?
a) 150/13 days
b) 160/13 days
c) 170/3 days
d) 190/3 days
e) None of these

Answer & Explanation

Answer – b) 160/13 days


Explanation :
A’s one day work = 1/32 so P one day work = (160/100)*1/32 = 1/20, so P will take 20 days to
complete the work.
So Both A and P will take = (32*20)/52 = 160/13 days

7. P does half as much work as Q in three-fourth of the time. If together they take 24 days
to complete the work, how much time shall P take to complete the work?
a) 50 days
b) 60 days
c) 70 days

26 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

d) 80 days
e) None of these

Answer & Explanation

Answer – b) 60 days
Explanation :
Let Q take x days to complete the work, so P will take 2*3/4 of X day to complete the work i.e. 3x/2
days
1/x + 2/3x = 1/24, we get x = 40 days, so P will take = 3/2 of 40 = 60 days

8. X and Y can do a piece of work in 12 and 15 days respectively. They began their work
but before 3 days of its completion Y left. In how many days the work will be completed.
a) 6 days
b) 8 days
c) 10 days
d) 12 days
e) None of these

Answer & Explanation

Answer – b) 8 days
Explanation :
(1/12 + 1/15)*(T – 3) + 3/12 = 1

9. Neha takes 5 hours to type 40 pages while sunil takes 6 hours to type 60 pages. How
much time will they take working together on different computer to type an assignment
of 180 pages.
a) 5hr
b) 7hr
c) 9hr
d) 11hr
e) none of these

Answer & Explanation

Answer – e) none of these


Explanation :
In one hour number of pages type by neha = 40/5 = 8 and similarly for sunil it is 60/6 = 10.
Now to type 180 pages they will take, (8 + 10)*T = 180, T = 10 hours

10. P and Q together can complete a job in 90days, Q and R takes 60 days to complete the
same work and P and R will take 45 days to complete the same work. How much time
will P, Q and R will take to complete the work together.
a) 40 days
b) 42 days
c) 36 days
d) 44 days
e) None of these

Answer & Explanation

27 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer – a) 40 days
Explanation :
( 1/90 + 1/60 + 1/45)*1/2 = (1/P +1/Q + 1/R) = 1/40
so 40 days

Aptitude Questions: Time And Work Set 9

1. A piece of work has to be completed in 50 days, a number of men are employed but it is
found that only half of the work is done in 30 days, then an additional 20 men were
joined to complete the work on time. How many men initially put to work?
a) 30
b) 35
c) 40
d) 45
e)None of these

Answer & Explanation

Answer – c) 40
Explanation :
suppose Initially X men get employed. Half work is done in 30 days it means full work will be done
by X men in 60 days. Now,
Work done = 1/2 = [20*(x + 20)]/60X
X = 40

2. P does half as much work as Q in three-fourth of the time. If together they take 36 days
to complete the work, then the time taken by Q alone to do the work.
a) 50
b) 55
c) 60
d) 65
e)None of these

Answer & Explanation

Answer – c) 60
Explanation :
Suppose Q take ‘X’ days to complete a job, so to do the same work P will take 2*(3x/4) = 3x/2 days.
1/x + 2/3x = 1/36
X = 60

3. If 20 women and 10 boys can reap a field in 30 days, then in how many days 15 women
and 30 boys will reap the field. It is given that work done by 4 women is equal to work
done by 3 boys.
a) 210/11 days
b) 200/9 days
c) 200/11 days
d) 210/13 days
e)None of these

28 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer & Explanation

Answer – c) 200/11 days


Explanation :
20w + 10b = 1/21 (work done by 20 women and 10 boys in one day)
It is given that 4w = 3b
Solve both equation to find the value of w and b,
Then, 15/w + 30/b = 1/d (the days in which 15 women and 30 boys complete the work)

4. If P can do a work in 6 days and Q can do the same work in 8 days. If R who can do the
same work in 12 days, joins them, then the work will be completed in how many days?
a) 7/3 days
b) 8/3 days
c) 10/3 days
d) 11/3 days
e)None of these

Answer & Explanation

Answer – b) 8/3 days


Explanation :
1/6 + 1/8 + 1/12 = 1/d.
D = 8/3 days

5. A, B and C are three friends that take 20 days to finish a work. The time taken by B is
twice the time taken by A and C together and time taken by C to do the work is thrice
the time taken by A and B together. How much time will be taken by A alone to do the
work.
a) 42 days
b) 44 days
c) 46 days
d) 48 days
e)None of these

Answer & Explanation

Answer – d) 48 days
Explanation :
1/a + 1/b + 1/c = 1/20 (given)
In first case let time taken by A and C together is p days, then the time taken by B will be 2p.
Substitute in the above equation and we get p = 60 (time taken by B to complete the work).
Similarly in the second case, u will get P = 80 (time taken by C to complete the work)
Now, 1/a = 1/20 – 1/60 – 1/80 to get the answer

6. If 4 boys or 5 women can reap a field in 20 days. Then what will be the time taken by 6
boys and 8 women to reap the field.
a) 200/33 days
b) 200/31 days
c) 200/35 days

29 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

d) 200/37 days
e)None of these

Answer & Explanation

Answer – b) 200/31 days


Explanation :
work done by one boy in one day = 1/(4*20)
Similarly for women = 1/(5*20)
Now the time taken by 6 boys and 8 women to reap the field = 6/80 + 8/100 = 1/d (d = 200/31 will be
the answer)

7. 5 men and 10 boys can do a piece of work in 30 days and 8 men and 12 boys can do the
work in 20 days then the ratio of daily work done by a man to that of boy.
a) 5:1
b) 6:1
c) 7:3
d) 4:5
e)None of these

Answer & Explanation

Answer – b) 6:1
Explanation :
5m + 10b = 1/30 and 8m + 12b = 1/20
after solving we get m = 1/200 and b = 1/1200
so required ratio = (1/200) : (1/1200) = 6:1

8. A certain number of men take 45 days to complete a work. If there are 10 men less then
they will take 60 days to complete the work. Find the original number of men.
a) 30
b) 40
c) 50
d) 60
e) None of these

Answer & Explanation

Answer – b) 40
Explanation :
Let initially there are X men. Then x*45 = (x-10)*60. So we get x = 40

9. Prakash is twice as fast as sumit and therefore Prakash is able to finish the work in 30
days less than sumit. Find the time in which they can complete the work when both are
working together?
a) 25 days
b) 20 days
c) 30 days
d) 35 days
e) None of these

30 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer & Explanation

Answer – b) 20 days
Explanation :
Let sumit take x days then Prakash will take x/2 days to complete the work.
X – X/2 = 30, X = 60
1/60 + 1/30 = 1/d so, we will get d= 20 days

10. 4 women and 5 men working together can do 3 times the work done by 2 women and
one man together. Calculate the work of a man to that of woman.
a) 1:2
b) 2:1
c) 1:1
d) 3:2
e) None of these

Answer & Explanation

Answer – c) 1:1
Explanation :
4w + 5m = 3*(2w + m)
i.e. 2w = 2m
so ratio of work done by man to woman is 1:1

Aptitude Questions: Time And Work Set 8

1. A and B alone can do a piece of wok in 8 and 18 days respectively. In how many days the
work will be completed if they both work on alternate days starting with B?
A) 6 5/9 days
B) 5 days
C) 10 7/9 days
D) 10 9/7 days
E) 6 2/9 days

Answer & Explanation

C) 10 7/9 days
Explanation:
A = 8 days, B = 18 days
Total work = LCM(8,18) = 72
So efficiency of A = 72/8 = 9, efficiency of B = 72/18 = 4
2 days work of (A+B) = 9+4 = 13
2*5(10) days work of (A+B) = 9+4 = 13*5 = 65
So remaining work = 72-65 = 7
Now A’s turn on 6th day, he will do remaining work(7) in 7/9 day
So total 10 7/9 days

2. A, B and C can all together do piece of work in 10 days, in which B takes three times as
long as A and C together do the work and C takes twice as long as A and B together take
to do the work. In how many days B can alone do the work?

31 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

A) 35 days
B) 33 days
C) 43 days
D) 40 days
E) 45 days

Answer & Explanation

D) 40 days
Explanation:
(A+C) in x days so B completes in 3x days
then (1/x) + (1/3x) = 1/10
solve, x = 40/3
so B in 3x = 3*(40/3)= 40 days
OR
Given A+B+C = 10 and that B takes 3 times as A+C, so A+C is three times stronger than B
So this means that 4 times stronger can do work in 10 days
So 1 time stronger(B) in 4*10 = 40 days

3. 20 men can complete a piece of work in 14 days. 7 men started the work and after 20
days, 7 more men joined the work. In how many days the remaining work will be
completed?
A) 18 days
B) 20 days
C) 8 days
D) 12 days
E) 10 days

Answer & Explanation

E) 10 days
Explanation:
Let (7+7) complete remaining work in x days. So
20*14 = 7*20 + 14*x
x = 10 days

4. 20 men can complete a work in 14 days and 20 women can complete the same work in 18
days. 7 men and 9 women started the work. After working for some days, they were
replaced by 10 men and 10 women who complete the remaining work in 9 days. How
much work was completed by initially employed men and women?
A) 2/5
B) 3/7
C) 4/7
D) 3/8
E) None of these

Answer & Explanation

B) 3/7
Explanation:

32 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

20 m in 14 days so 10 men in (20*14)/10 = 28 days


20 w in 18 days so 10 women in (20*18)/10 = 36 days
So (1/28 + 1/36)*9 = 4/7
So 1 – 4/7 = 3/7 work was done by 7 men and 9 women

5. A, B and C can alone complete a work in 10, 12 and 15 days respectively. A and C
started the work and after working for 4 days, A left and B joined. In how many days
the total work was completed?
A) 6 5/9 days
B) 6 2/9 days
C) 6 days
D) 5 4/9 days
E) 7 2/9 days

Answer & Explanation

B) 6 2/9 days
Explanation:
(A+C) = (1/10 + 1/15) = 1/6. They worked for 4 days so did (1/6)*4 = 2/3rd of work
Remaining work = 1 – 2/3 = 1/3
Now A left , B and C working
(B+C) = (1/12 + 1/15) = 9/60 = 3/20. They worked for x days and completed 1/3rd of work so
(3/20)*x = 1/3, so x = 20/9 days
Total = 4 + 20/9

6. A, B and C can alone complete a work in 10, 12 and 15 days respectively. All started the
work but B left the work 3 days before completion. How much work was then done by A
and B together in the total work?
A) 2/3
B) 3/4
C) 1/3
D) 3/5
E) 2/5

Answer & Explanation

A) 2/3
Explanation:
Let work completed in x days, so A and C worked for all x days, and B for (x-3) days. So
(1/10 + 1/15)*x + (1/12)*(x-3) = 1
Solve, x = 5 days
In 5 days, A did 5/10 = 1/2 of work
In (5-3) = 2 days, B did 2/12 = 1/6 of work
So total by A and B = (1/2 + 1/6) = 2/3

7. 2 men and 3 women can together complete a piece of work in 4 days and 3 men and 2
women together can complete work in 3 days. In how many days 10 women will
complete this work?
A) 9 days
B) 6 days

33 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

C) 7 days
D) 12 days
E) 10 days

Answer & Explanation

B) 6 days
Explanation:
2m + 3w = 4, 3m + 2w = 3
So 4(2m + 3w) = 3(3m + 2w)
8m + 12w = 9m + 6w
6w = 1m
Given 2m + 3w = 4, so 2*(6w) + 3w = 4, so 15 women in 4 days, so 10 women in (15*4)/10 = 6 days

8. A alone can complete a work in 5 days more than A+B together and B alone can
complete a work in 45 days more than A+B together. Then in how many days A and B
together can complete the work?
A) 16 days
B) 21 days
C) 15 days
D) 20 days
E) 25 days

Answer & Explanation

C) 15 days
Explanation:
Shortcut = √5×45 = 15
OR
Let (A+B) can do in x days, so
1/(x+5) + 1/(x+45) = 1/x
Solve, x2 = 225, x = 15

9. 20 men can complete a work in 14 days and 20 women can complete the same work in 18
days. 8 men start the work and after working for 21 days, they are replaced by x
women. If the remaining work is to be completed by x women in 9 days, then how many
women should be employed?
A) 18
B) 24
C) 20
D) 16
E) 15

Answer & Explanation

D) 16
Explanation:
20 m in 14 days so 8 men in (20*14)/8 = 35 days
In 21 days 8 men complete (1/35)*21 = 3/5 work
Remaining work = 1 – 3/5 = 2/5

34 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

20 women do 1 work in 18 days so x women will do 2/5 work in 9 days


10*(2/5)*18 = x*1*9

10. A alone can complete a work in 21 days. If B is 40% more efficient than A, then in how
many days A and B together can complete the work?
A) 8 1/4 days
B) 8 3/4 days
C) 9 days
D) 10 3/4 days
E) 11 1/3 days

Answer & Explanation

B) 8 3/4 days
Explanation:
Let efficiency of A is x, so of B = (140/100)*x = 7x/5
So ratio of efficiencies = x : 7x/5 = 5 : 7
So ratio of days = 7 : 5
A can do in 21 days, so 7y = 21, y = 3
So B can do in 5*3 = 15 days
A+B in (21*15)/(21+15) = 8 ¾ days

Aptitude Questions: Time And Work Set 7

1. A project manager hired 16 men to complete a project in 40 days. However after 30 days
he realized that only 4/9 th of the work is complete. How many more men does he need
to hire to complete the project on time ?
A.30
B.32
C.44
D.40
E.None of these

Answer & Explanation

Answer – C.44
Explanation :
16*30 / 4/9 = M * 10/5/9
16*30*9/ 4 = M *10*9/5
1080 = 18M
M = 1080/18 = 60
Men required = 60 – 16 = 44

2. 20 men can complete a piece of work in 15days and 12 women can complete the same
piece of work in 24 days. What is the ratio of amount of work done by 30 men in oneday
to the amount of work done by 16 women in 1 day ?
A.6:7

35 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

B.9:5
C.7:5
D.2:7
E.None of these

Answer & Explanation

Answer – B.9:5
Explanation :
M : W = 30/20*15 : 16/12*24
= 1/10 : 1/ 18 = 1/5:1/9
Ratio = 9:5

3. X alone can do a piece of work in 5 days. Y can do the same piece of work in 4 days. X
and Y are assigned to do the work for Rs.5000.They complete the work in 2 days with
the help of Z. How much is to be paid to Z ?
A.Rs.750
B.Rs.620
C.Rs.700
D.Rs.500
E.None of these

Answer & Explanation

Answer – D.Rs.500
Explanation :
Z’s one day work = ½ – [ 1/5+1/4] = 10-4+5/20 = 1/20
Ratio = 1/5:1/4:1/20 = 4/20 : 5/20 : 1/20 = 4:5:1
Z = 5000*1/10 = 500

4. 9 men and 12 women can complete the job in 12 days.In how many days can 3 men and
4 women finish the same job working together ?
A.36days
B.42days
C.30days
D.28days
E.None of these

Answer & Explanation

Answer – A.36days
Explanation :
9m+12w = 1/12
3m+4w = ?
3(3m+4w) = 1/12
3m+4w = 1/36

5. P takes 6 days less than Q to finish the work individually. If P and Q working together
complete the work in 4 days, then how many days are required by Q to complete the
work alone ?

36 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

A.7days
B.10days
C.5 days
D.12days
E.None of these

Answer & Explanation

Answer – D.12days
Explanation :
=1/6 + 1/12
=2+1/12 =3/12 = 1/4

6. If X, Y and Z can complete a work in 6 days. If X can work twice faster than Y and
thrice faster than Z, then the no of days Z alone can complete the work is
A.22 days
B.11 days
C.33days
D.30days
E.None of these

Answer & Explanation

Answer – C.33days
Explanation :
1/x+1/2x+1/3x = 1/6
6+3+2/6x = 6
11/6x = 6
X = 11
Z = 3x = 33

7. If 20 men can do a piece of work in 42days working 8 hours per day then how many men
are required to complete the work, working 5 hours per day in 33 days ?
A.39
B.47
C.32
D.41
E.None of these

Answer & Explanation

Answer – D.41
Explanation :
M = 20*42*8/5*33 = 40.72 = 41

8. Three men, four women and six children can complete a work in 7 days. A woman does
double the work a man does and a child does half the work a man does. How many
women alone can complete this work in 7 days ?
A.7
B.6

37 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

C.8
D.10
E.None of these

Answer & Explanation

Answer – A.7
Explanation :
2 men = 1 woman
1 man =1/2 woman
3 men =3/2 women
2 children = 1 man =1/2 woman
1 child =1/4 woman
6 children =6/4 =3/2 women
Now, three men, four women and six children
=3/2 + 4 +3/2 =3+8+3/2 = 14/2 = 7 women

9. If A can complete a work in 30 days, B can do the same work in 36 days, If after doing 5
days, leaves the work.Find in how many days B will do the remaining work ?
A.22days
B.28days
C.30days
D.36days
E.None of these

Answer & Explanation

Answer – C.30days
Explanation :
A = 1/30, B = 1/42
6 days work = 5*1/30 = 1/6
Remaining = 5/6
B = 5*36/6 = 30

10. P is 20 % more efficient than Q, how much time will they working together take to
complete a job which P alone could have done in 20 days ?
A.9 days
B.11 days
C.17days
D.22daya
E.None of these

Answer & Explanation

Answer – B.11 days


Explanation :
P : Q = 100 : 120
10/12 = 20/x
12/10 = x/20
X = 24

38 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Q = 1/24 or 20*120/100 = 24
P+Q = 1/20 + 1/24
= 24+20/480 = 44/480 = 10.91 = 11 days

Quants Questions: Time And Work Set 6

1. If P can do 1/3 of the work in 5 days and Q can do ¼ of the work in 6 days, then how
much money will Q get if they were paid a total of 390 ruppee.
a) 120
b) 150
c) 170
d) 190

Answer & Solution

Answer –b) 150


Solution:
P can alone complete the whole work in 15 days and Q can complete the same work alone in 24 days.
So ratio of work done by them 1/15 : 1/24 i.e 8 : 5
Q get = (5/13)*390 = 150

2. A total of 960 rupees is given to three people A, B and C. A and B together can complete
7/12 and C and B together can complete 5/12. So, how much amount should be given to
A.
a) 360
b) 460
c) 280
d) 660

Answer & Solution

Answer –c) 280


Solution:
(work done by) : (work done by B and C)
A:B = 7:12 & C:B = 5:12 => A:B:C = 7:12:5
So amount to be paid to A = (7/24)*960 = 280

3. Three printing press P, Q and R can print 1 lack books in 5 hrs, 15 hrs and 10 hrs
respectively. If all the press starts at 10 am and press R is stopped after 2 hrs then at
what time work will be complete.
a) 12 pm
b) 1 pm
c) 2pm
d) 3pm

39 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer & Solution

Answer – b) 1 pm
Solution:
Time taken by P = 5hrs, Q = 15hr and R = 10 hrs
(1/5+1/15+1/10)*2 + (1/5 + 1/15)*X = 1 (X = time taken to do remaining work)
after solving we get X = 1. So 2+1 = 3hrs. i.e at 1pm work will be completed.

4. Arun can do a piece of work in 30 days. Rohan who is 40% more efficient than arun can
finish the work in how many days.
a) 152/7
b) 150/7
c) 145/7
d) 142/7

Answer & Solution

Answer – b) 150/7
Solution:
In one day work done by arun is 1/30 and rohan is 40% more efficient than arun , so one day work of
rohan = (140/100)*1/30 = 7/150.
So time taken by rohan will be 150/7

5. 3 men and 4 women can complete a piece of work in 12 while the same is finished by 2
men and one woman in 15 days. A boy who is 25% less efficient than that of man can
complete the piece of work in how many days.
a) 400/11
b) 420/11
c) 430/11
d) 450/11

Answer & Solution

Answer –a) 400/11


Solution:
3m + 4w = 1/12
2m + w = 1/15. After solving we one day work of man = 33/900
One day work of the boy is= 75/100*(33/900) = 11/400. So no of days needed will be 400/11.

6. Priya take 8 hours to draw 60 pages on a computer while parul takes 6 hours to draw 45
pages on computer. If both are working together in how much time will they draw a lot
of 120 pages?
a) 8hrs
b) 7hrs
c) 9hrs
d) 11hrs

Answer & Solution

Answer –a)8hrs
Solution:

40 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

First calculate no of pages they draw in one hour. For priya it is 60/8 and for parul it is 45/6.
Now total pages they draw in one hour is 60/8 + 45/6 = 15
So to print 120 time they will take = 15*X = 120. So X = 8hrs

7. A can finish a work in 15 days and B can finish the work in 25 days. Both of them start
working together but B leaves the work 3 days prior to the completion. After how many
days B quit the work.
a) 7.5
b) 8
c) 8.5
d) 9

Answer & Solution

Answer – a) 7.5
Solution:
Let ‘X’ days they take to complete the whole work.
(1/15 + 1/25)*(X-3) + 3* (1/15), X = 10.5 days. So he quits after 7.5 days.

8. A contractor undertook a job and employed 40 men to do a piece of work in 80 days.


But after 60 days he found that only 3/5 of the work is completed. To complete the work
in time, how many more men he should employ.
a) 15
b) 20
c) 25
d) 40

Answer & Solution

Answer – d) 40
Solution:
(40*60)/3 = (x*20)/2
x=80
No of men required=80-40 =40

9. P, Q and R can complete a piece of work in 9, 18 and 27 days respectively. After 1/3
work is completed P left the work and the remaining work is completed by Q and R
together. Find the days required to complete the remaining work.
a) 36/7
b) 35/6
c) 36/5
d) 32/5

Answer & Solution

Answer – c) 36/5
Solution:
1/3 work is completed so remaining work is 2/3. As P left the job so remaining work will be
completed by Q and R. Take X no. of days Q and R take to complete the work.
(1/18 + 1/27)*X = 2/3. So, X = 36/5

41 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

10. P does half as much work as Q does in 1/5 of the time. Both working together can take
20 days to complete the work. No of days P take to complete the work alone.
a) 28
b) 32
c) 34
d) 35

Answer & Solution

Answer – a) 28
Solution:
Let Q complete the work in ‘T’ time. In one day, work done by Q is equal to 1/T. In five days, work
done by Q is 5/T.
It is given that P does half as much work in 1/5 of the time. So P does 1/2 of the work. i.e 5/2T
So (1/T + 5/2T) = 1/20. So T = 70.
So P takes 2T/5 days. (2*70)/5 = 28days.

Quants Questions : Time And Work Set 5

1. A is 25% more efficient than B. C does half the work done by A & B together. If C alone
does the work n 30 days, then A alone can do the work in
A)32days
B)27days
C)22days
D)25(1/2)days
E)None of these

Answer

B)27days
Explanation :
A’s one day’s work:B’s one days work = 125:100 = 5:4
Let A’s & B’s one day’s work be 5x and 4x days
Then C’s one day’s work = 9x/2
= > 9x/2 = 1/30
= > x = ((1/30)*(2/9)) = 1/135
A’s one day’s work = 5/135 = 1/27

2. P can finish a work in 27 days, Q in 9 days and C in 12 days. Q & R start the work but
are forced to leave after 4 days. The remaining work done by P in:
A)6 days
B)9 days
C)10 days
D)12 days
E)None of these

Answer

42 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

A)6 days
Explanation :
(Q+R)’s one day’s work = 1/9+1/12 = 7/36
Q & R in 3 days = 4*7/36 = 7/9
Remaining work = 1-(7/9) = 2/9
1/27 work is done by A in 1 day.
2/9 work is done by A in 27*2/9 = 6 days

3. 4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can
complete it in 10 days. In how many days will 20 women complete it?
A)10days
B)15days
C)20days
D)25days
E)None of these

Answer

C)20days
Explanation :
1 man’s 1 day’s work = x days
1 woman’s 1 day’s work = y
Then, 4x+6y = 1/8 and 3x+7y = 1/10.
Solving these two equations y = 1/400
1 woman’s 1 day’s work = 1/400
20 women = 20/400 = 1/20 = 20days

4. 30 men can complete a work in 16 days. Six days after they started working, so 20 more
men joined them. How many days will they now take to complete the remaining work?
A)12 days
B)5 days
C)8 days
D)6 days
E)None of these

Answer

D) 6 days
Explanation :
30*6 / (6/16) = 50*x / (1-(6/16))
x = 6 days

5. A takes twice as much time as B and thrice as much time as C to finish a piece of work.
Working together they can finish the work in 6 days. C can do the work alone in ?
A)20 days
B)16 days
C)12 days
D) 10 days
E)None of these

43 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer

C)12 days
Explanation :
1/x+2/x+3/x = 1/6
6/x = 1/6
x = 36
C = 3/x = 3/36 = 1/12 = 12 days

6. If 36 men completed the work in 35 days working 7 hours a day. How many more men
should be engaged to finish the rest of the work in 28 days working 5 hours a day?
A)45
B)63
C)32
D)27
E)None of these

Answer

D)27
Explanation :
36*35*7 = 28*5*x
X = 36*35*7/ 28*5
X = 63
63-36 = 27

7. Rakesh and Ezhil are working on an assignment. Ronald takes 6 hours to type 36 pages
on a computer, while Ezhil takes 5 hours to type 25 pages. How much time will they
take, working together on two different computers to type an assignment of 110 pages?
A)8hrs
B)10hrs
C)6hrs
D)12hrs
E)None of these

Answer

B)10hrs
Explanation :
Rakesh in one hour = 36/6 = 6
Ezhil in one hour = 25/5 = 5
Number of pages typed by both in one hour = 6+5= 11
Time taken by both to type 110 pages = 110/11 = 10 hours

8. 3 men and 6 women can do a piece of work in 16days, then 12 men and 8 women can do
the same work in how many days ?
A)7days
B)3 days
C)9 days

44 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

D)5 days
E)None of these

Answer

B)3 days
Explanation :
3m + 6w = 16days
12m+8w = ?
3*6*16 = 12*8*x
X = 3*6*16 / 12*8 = 3 days

9. 15 men or 30 women can do a piece of work in 25 days. In how many days will 34 men
and 27 women do double the work ?
A)8days
B)10 days
C)16 days
D)12 days
E)None of these

Answer

C)16 days
Explanation :
1m = 2w
34m+27w = 34w+34w+27w = 95w
D = 2*25*30/95 = 2*750/95 = 16days

10. Siva can complete the job in 12hrs. Aswin can complete the job in 8 hrs. If Siva worked
for 6hrs then quit. How many hours will Aswin alone take to complete the remaining
work ?
A)4hrs
B)3hrs
C)5hrs
D)7hrs
E)None of these

Answer

A)4hrs
Explanation :
6/12+x/8= 1
12+3x = 24
3x = 12
X =4

Quants Questions : Time And Work Set 4

1. 6 men and 5 boys can do a piece of work in 10 days while 20men and 45 boys can do the
same in 2 days, how much time taken by 13 men and 25 boys in doing the same work ?
A)2(1/3)days

45 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

B)3(1/3)days
C)4(1/3)days
D)2(1/2) days

Answer

B)3(1/3)days
Explanation :
(6m+5b)10 = (20m+45b)2
60m+50b = 40m + 90b
20m = 40b
1m = 2b
6m+5b =12b+5b = 17b in 10 days
13m+25b = 26b+25b = 51b in ? days
17:10 = 51 :?
17*10/51 = ? = 3(1/3) days

2. P and Q Working separately can do a piece of work in 6 days and 11 days, if they work
alternately beginning with P then the work will be completed in how many days ?
A)10 days
B)6 days
C)8 days
D)5 days

Answer

C)8 days
Explanation :
Total work = 6*11 = 66
2 days(P+Q) = 1/6 + 1/11 = (11+6)/66 = 17/66
6 days(P+Q) = 51/66
Remaining work = (1-(51/66)) = 15/66
In 15, 6 done by P remaining done by Q (2 days)
6+2 = 8 days

3. 3 men and 5 women do a piece of work in 9 days and 2 men 7 children do the same in 6
days. How many women can do as much work as 21 children ?
A)5
B)7
C)8
D)10

Answer

D)10
Explanation :
3m+5w = 9days…….(1)6m+10w = 18 days
2m+7c = 6 days…….(2)6m+21c = 18 days
21c = 10w

46 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

4. If 12 persons can complete 3/5 of a work in 10 days, then find the number of persons
required to complete the remaining work in 10days ?
A)7
B)8
C)9
D)10

Answer

B)8
Explanation :
12*10*(3/5) = m *10*(2/5)
M = 72/4 = 18 men

5. P can complete the work in 16 days. P and Q can complete the work in 12days. In how
many days Q alone can complete the same work ?
A)32
B)46
C)48
D)38

Answer

C)48
Explanation :1/12 – 1/16 = (16 – 12)/192 = 4/192 = 1/48

6. A can complete a piece of work in 8 days and B can complete the work in 10 days and C
in 12 days. B and C together worked for 3 days, then C left the work and A replaced
him. In how many days will the remaining work be completed ?
A)1
B)2
C)3
D)4

Answer

B)2
Explanation :
(x-3)/8 + (x/10) + (3/12) = 1
(5x-15+4x)/40 = 1-3/12 = 12-3/12 = 9/12 = ¾
9x – 15 = 3*40/4 = 30
X = 45/9 = 5 (3days completed )
5 -3 = 2 days

7. A can finish a piece of work in 24 days. B is 20% more efficient than A and C is 25%
more efficient than B. Find the time B and C will take to finish the work?
A)7days
B)6days
C)8days
D)9days

47 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer

D)9days
Explanation :
A= 1/24
B = 120/100(1/24) = 1/20
C= 125/100(1/20) = 1/16
B+C =(1/20) + (1/16) = 16+20/320 = 36/320 = 8.88 = 9 days

8. Seven men can complete a work in 10 days. They started the work and after 5 days, two
men left. In how many days will the work be completed by the remaining men ?
A)7
B)6
C)8
D)9

Answer

A)7
Explanation :
7 men 1 day’s work will be 1 / 10
7 men 5 days work will be 5 / 10 = 1/2 remaining work will be (1- 1/ 2) = 1 / 2
1 man 1 day work will be 1 / (10*7) = 1 / 70
5 mens 1 day work will be 5 / 70
(70/5)*( 1 / 2) = 7 days

9. If 40 people can make 60 toys in 8 hrs, if 8 people leave the work, how many toys can
make in 12 hrs ?
A)68
B)71
C)72
D)70

Answer

C)72
Explanation :
(40*8)/60 = (32*12)/x
X = (32*12*60)/320 = 72 toys

10. 18 Women can complete a work in 10 days. 16 men complete the work in 12 days. The
ratio of working capacity of man to that of a woman is
A)15:16
B)16:15
C)15:14
D)14:15

Answer

A)15:16
Explanation :1/(16*12) : 1/(18*10) = 1/192 : 1/180 = 1/16 : 1/15 = 15:16

48 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Quants Questions : Time And Work Set 3

1. If 10 Carpenters working 4hours a day can make 320 chairs in 200 days, then no. Of
chairs made by 16 carpenters in 32 days each working 6hours in a day
A)120
B)122
C)123
D)124
E)None of these

Answer

Answer -C) 123


Explanation :

2. 6 men or 10 women can do a piece of work in 24 days.How long will 12men and 20
women take to finish the work?
A)6
B)10
C)9
D)6
E)None of these

Answer

Answer -A) 6

Explanation :

3. A and B together can complete a piece of work in 6 days. If A alone can complete the
work in 10 days.In how many days B alone can complete that work ?
A)12
B)15
C)13
D)10
E)None of these

Answer

Answer -B)15
Explanation :

49 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

4. A can do a certain job in 14 days. B is 40% more efficient than A. How many days does
B alone take to do the same job ?
A)12
B)20
C)13
D)10
E)None of these

Answer

Answer -D) 10
Explanation :

5. X can do a piece of work in 20 days and Y can do a piece of work in 30 days.They work
together in 6 days then how much work left ?
A)1/2
B)1/4
C)1/3
D)1/6
E)None of these

Answer

Answer -A) ½
Explanation :

6. 12 men complete the work in 9 days.Ater they worked for 6days, 6 more men joined
then how many days required to complete the remaining the work ?
A)5
B)6
C)3
D)2
E)None of these

Answer

Answer -D) 2

Explanation :

7. A is twice as good a workman as B, A and B together can complete a work in 12 days.In


how many days B alone finish the work ?

50 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

A)24
B)36
C)12
D)48
E)None of these

Answer

Answer -B) 36
Explanation :

8. X and Y can do a piece of work in 18 days and 14 days..X started the work alone, after 3
days Y joined till the completion of work. How long they did the work ?(approximately)
A)6
B)3
C)4
D)7
E)None of these

Answer

Answer -D) 7
Explanation :

9. 4 men and 6 women can complete the work in 8days. While 3 men and 7 women can
complete the work in 10 days.In how many days 10 women will complete the work ?
A)40
B)42
C)30
D)36
E)None of these

Answer

Answer -A) 40
Explanation :

10. A ,B and C together earn Rs.320 per day.A and C together earn Rs.125 and B and C
together earn Rs. 150.The daily earning of C is

51 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

A)42
B)44
C)45
D)54
E)None of these

Answer

Answer -C) 45

Quants Questions : Time And Work Set 2

1. A can do a job in 4 days and B can do the same job in 6 days. If A’s efficiency increases
to 4/3 times, then by how many times B has to reduce his efficiency so that the work can
be completed by both of them in two days?
1 : times
2 : 2 times
3 : times
4 : times
5 : None of these

Answer

5 : None of these

2. A and B together can complete a piece of work in 8 days. B and C together can complete
the same work in 12 days. C and A together can complete the same work in 16 days. A
and B began the work together and left after some days. C finished the remaining work.
If it took a total of 74 days to complete the entire work, for how many days did A and B
work together?
1:3
2:4
3:2
4:6
5 : None of these

Answer

52 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

3:2

3. Work done by P in one day is double the work done by Q in one day and work done by
Q in one day is thrice the work done by R in one day. If P, Q and R together can
complete the work in 30 days then in how many days P alone can do the work?
1 : 55 days
2 : 45 days
3 : 35 days
4 : 40 days
5 : 50 days

Answer

5 : 50 days

4. A can do a certain work in 24 days whereas B can do the same work in 32 days. They
took the help of C and together completed the same work in 12 days. If they received
Rs.2112 for doing the work, what is C’ s share?
1 : Rs.264
2 : Rs.396
3 : Rs.420
4 : Rs.528
5 : None of these

53 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

Answer

1 : Rs.264

5. P and Q can complete a job in 20 days working together. P and R can complete it in 30
days working together. Q and R can complete it in 40 days working together. Find the
time taken by P, Q and R to complete it working together.
1 : 220/13 days
2 : 100/3 days
3 : 200/12 days
4 : 240/13 days
5 : None of these

Answer

54 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

4 : 240/13 days

6. A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do
it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to
be paid to C?
1 : Rs 400
2 : Rs 600
3 : Rs 300
4 : Rs 350
5 : None of these

Answer

1 : Rs 400

7. A is thrice as good as workman as B and therefore is able to finish a job in 60 days less
than B. Working together, they can do it in:
1 : 20 days
2 : 22(1/2)days
3 : 25 days
4 : 30 days
5 : None of these

Answer

3 : 22(1/2)days

8. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days
can A do the work if he is assisted by B and C on every third day?
1 : 12 days
2 : 15 days
3 : 16 days
4 : 18 days
5 : None of these

Answer

2 : 15 days

55 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

9. A and B together can complete a work in 12 days. A alone can complete it in 20 days. If
B does the work only for half a day daily, then in how many days A and B together will
complete the work?
1 : 10 days
2 : 11 days
3 : 15 days
4 : 20 days
5 : None of these

Answer

3 : 15 days

10. If A can do 1/4 of a work in 3 days and B can do 1/6 of the same work in 4 days, how
much will A get if both work together and are paid Rs. 180 in all?
1 : Rs 150
2 : Rs 100
3 : Rs 120
4 : Rs 160
5 : None of these

Answer

3 : Rs 120

Quants Questions : Time And Work Set 1

1. P and Q together can complete a work in 6 days. Q and R together can complete the
same work in 15 days. P and R together can complete the work in 20/3 days. What is the
ratio of number of days that Q alone takes to complete the work to the number of days
that R alone takes to complete the work?
1:3:5
2 : 1 : 4s
3:2:5
4:2:3
5 : None of these

Answer

1:3:5

2. A and B together can complete a piece of work in 15 days, B and C together can
complete the work in 20 days. A and C together can complete the work in 30 days. What

56 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

is the ratio of number of days A alone takes to do the work to the number of days C
alone takes to do the work?
1:1:6
2:1:3
3:2:3
4:3:2
5 : None of these

Answer

2:1:3

3. Two boys can do a piece of work in ten days. Three girls can do the same work in five
days. In how many days can a boy and a girl together do the work?
1 : 16 days
2 : 8(4/7) days
3 : 12 days
4 : 5 (1/2)days
5 : None of these

Answer

57 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

2 : 8(4/7) days

4. Four men can complete a work in 5 days which 20 women take 20 days to complete.
How many days will 6 men and 40 women together take to complete the work?
1 : 1day
2 : 4days
3 : 2 (1/2)days
4 : 3days
5 : None of these

Answer

3 : 2 (1/2)days

5. A and B can complete a work in 20 days and 30 days respectively. Both of them started
doing the work and A left after six days. In how many more days can B complete the
remaining work?
1 : 20
2 : 10
3 : 15
4 : 12
5 : None of these

Answer

58 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

3 : 15

6. A takes ten days more than B to complete a piece of work. If both of them can complete
the work in 6(2/3 )days, in how many days can A alone complete the work?
1:8
2 : 12
3 : 10
4 : 20
5 : None of these

Answer

4 : 20

7. Four men and six women together can complete a work in nine days, while six men and
three women can complete the work in nine days. In how many days can two men and
three women complete the work?
1 : 10 days
2 : 16 days
3 : 18 days
4 : 20 days
5 : None of these

Answer

59 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

3 : 18 days

8. A tank of capacity 600 litres is attached with two pipes P1 and P2 at the top and another
pipe P3 at the bottom of the tank. P1 and P2 fill the tank at the rate of four litres per
minute and six litres per minute respectively while P3 empties the full tank in five hours.
All the three pipes are opened when the tank is empty. In how much time will the tank
be filled?
1 : One hour 15 minutes
2 : One hour 20 minutes
3 : two hour 45 minutes
4 : Two hours
5 : None of these

Answer

1 : One hour 15 minutes

9. Four men can complete a work in six days where as five women can complete the same
work in eight days. In how many days will six men and five women together complete
the work?
1 : 8 days

60 | P a g e
Compiled by Ekhlasur Rahman. Bsc & Msc(Statistics). Begum Rokeya University,Rangpur.

2 : 3 days
3 : 2(2/3) days
4 : 6 days
5 : None of these

Answer

3 : 2(2/3) days

10. Work done by P in one day is double the work done by Q in one day and work done by
Q in one day is thrice the work done by R in one day. If P, Q and R together can
complete the work in 30 days then in how many days P alone can do the work?
1 : 52 days
2 : 42 days
3 : 30 days
4 : 45 days
5 : None of these

Answer

5 : None of these