EQUIPMENT (VENTILATION)
Fresh Air Fan
Exhaust Fan
PUMPS
Fuel Oil Pumps
Dampers
Diffusers
Dampers
Diffusers
Piping works
Refrigerants
Condensate drain
LPG Piping
General Requirements
UNIT RATE
AMOUNT
MATLS LABOR OTHERS TOTAL
Project: # Storey Residential Building
Location: Quezon City
Subject: Plumbing / Sanitary Works System( 2-storey)
Date: 5-Nov-18
Water Line
PVC Pipes, Blue Sch. 40
25 mmø 22.6 lm
20 mmø 6 lm
15 mmø 76.8 lm
Tee Reducer
25 x 15 mmø 8 pcs
Tee
15 x 15 mmø 6 pcs
Coupling
25 mmø 4 pcs
15 mmø 12 pcs
Coupling Reducer
25 x 20 mmø 2 pcs
20 x 15 mmø 2 pcs
Elbow, 90°
25 mmø 15 pcs
15 mmø 70 pcs
End Cap
15 mmø 20 pcs
Tee Threaded female adaptor
15 mmø 17 pcs
MaleThreaded coupling adaptor
15 mmø 61 pcs
Valves, Check Valves, Water Meter and accessories
15 mmø, gate valve 22 pcs
15 mmø, check valve 4 pcs
15 mmø, water meter 2 pcs
15 mmø, Angle valve for Lavatory and WC 10 pcs
Hose Adaptor, 15 mmø 10 pcs
Pump and accessories
Hydropnuematic pump, 15GPM vs. 15M TDH, A 2 unit
125 Gals. capacity Hydropnuematic Tank 2 unit
Pressure gage 4 sets
Pump Controller 2 assy
Hangers and Support 1 lot
Miscellaneous and Consumables 1 lot
TOTAL
UNIT RATE
AMOUNT
MATLS LABOR OTHERS TOTAL total
547021.44
VENT SEWER WASTE DS CWL
3
44.6 31.5
9
79.1 9.1
16
2
12
2
8
2
1
10
2
48
2
2
20
5
2
8
14
5
5
3
4
12
6
2
5
2
2
5
3
2
2
2
2
6
2
22.6
6
76.8
4
12
2
2
15
70
20
17
61
22
4
2
10
10
2
2
4
2