Professional Documents
Culture Documents
TABLE
pile cap pile BULB
Double
Items No. length width hight cap qty Dia hight pile qty Bulb
A B C D E F G H I J
3.14* G^
ALL DIM. IN FEET C*D*E 2*H/4 I/3
P1 13 3 3 0.5 4.5 1 10.5 8.24 2.75
P2 9 0 0 0 0 0.75 8 3.53 1.18
P3 5 2 2 0.5 2 0.75 8 3.53 1.18
TOTAL 27
Execavtion Shuttering STEEL
DEPTH/HEI
SOR ITEMS NO. side LENGTH WIDTH GHT
Foundation work
Shuttering
5.7 Concrete
5.20.1 Steel
As per foundation table
FILLING PLINTH
providing and filling in plinth with / bed room 1 12.00 10.00 3
stone dust and hard moorum
under floor including water dining 1 8.39 10.75 3
ramming consolidation dressing kitchen 1 11.70 8.00 3
and cost of labour materials T&P drg hall 1 11.52 15.13 3
etc. complete required for the
work. toilet 1 4.00 7.44 3
2.27.3 ots 1 4.00 3.00 2.5
staire 1 11.52 7.92 3
poarch 1 11.88 13.00 3
open front 1 12.44 9.00 2
open back 1 3.00 1.44 2
5.7 providing and laying mechanical bed room 1 12.00 10.00 0.33
mix concrete with crushed stone
aggregate cxcluding cost of cetering dining 1 8.39 10.75 0.33
& shuttering with 40mm nominal kitchen 1 11.70 8.00 0.33
size graded aggregate. drg hall 1 11.52 15.13 0.33
toilet 1 4.00 7.44 0.33
ots 1 4.00 3.00 0.33
staire 1 11.52 7.92 0.33
poarch 1 11.88 13.00 0.33
open front 1 12.44 9.00 0.33
open back 1 3.00 1.44 0.33
FLOOR CONCRETING
BEAM SHUTTERING plinth beam
C SLAB BEAM
long wall 1 2 19.04 1
long wall 2 2 25 1
short wall 1 2 31 1
short wall 1 2 27 1
short wall 3 2 11.23 1
short wall 1 2 10.75 1
poach beam 1 2 34.27 1
projection 1 1
COLUMN
upto plinth
BEAM 27 2 0.75 3
boundary 9 2 0.75 5
main 13 4 0.75 10
CONCRETING
providing & laying mechanically PLINTH BEAM
fixed excluding the
centering,shuttering & long wall 1 19.04 0.75 0.75
reinforcement in foundation ,plinth long wall 2 25 0.75 0.75
& super structure upto a hight of 4 short wall 1 31 0.75 0.75
short wall 1 27 0.75 0.75
short wall 1 7.92 0.75 0.75
short wall 3 11.23 0.75 0.75
short wall 1 10.75 0.75 0.75
short wall 1 4 0.75 0.75
bo. Wall lef 1 9.39 0.75 0.75
bo. Wall right 1 13 0.75 0.75
bo wall back 1 7.92 0.75 0.75
bo wall front 1 25 0.75 0.75
LINTEL BEAM LINTEL BEAM
long wall 1 19.04 0.75 0.375
long wall 2 25 0.75 0.375
short wall 1 31 0.375 0.375
short wall 1 27 0.375 0.375
short wall 1 7.92 0.375 0.375
short wall 3 11.23 0.375 0.375
short wall 1 10.75 0.375 0.375
short wall 1 4 0.375 0.375
COLUMN
upto plinth
BEAM 27 0.75 0.75 3
boundary 9 0.75 0.75 5
main 13 0.75 0.75 10
BRICK WORK
Brick work with well burnt chimeny 3'-9" bo
bricks in bull patent trench kiln wall 3'-1'
crushing strength not less than upto to plinth 75"
25/sqcm & water absorption not BEAM
more than 20% in foundation &
plinth
long wall 1 19.04 0.75 2.25
long wall 2 25 0.75 2.25
short wall 1 31 0.75 2.25
short wall 1 27 0.75 2.25
short wall 1 7.92 0.75 2.25
short wall 3 11.23 0.75 2.25
short wall 1 10.75 0.75 2.25
short wall 1 4 0.75 2.25
bo. Wall lef 1 9.39 0.75 1.25
bo. Wall right 1 13 0.75 1.25
bo wall back 1 7.92 0.75 1.25
bo wall front 1 25 0.75 1.25
up to SLAB
d VIII/3 CEMENT MORTAR 1:6 BEAM 10'6-1'-4.5"
D 1 3.5 0.75 7
D1 3 3 0.75 7
D2 1 2.5 0.375 7
W1 3 4 0.75 4.5
w2 2 2.5 0.75 3.5
V 1 2 0.375 1.5
gate 1 8 0.375 6
BRICK WORK
FRAME WORK
FRAME WORK
PANNEL
B 9.6.2 Sal, bija sal, benteak, haldu
pannel providing & fixing 35 . Th paneled
glazed or panneled glazed or D 1 3.5 7
door ,window,I/C ms but hinges & D1 3 3 7
necessary screws. D2 1 2.5 7
W1 3 4 4.5
w2 2 2.5 3.5
V 1 2 1.5
Pannels
VIII Grills
providing & fixing ms satty grills of
req.pattern in wooden framed
window etc. with round head nuts
by screws etc plain grills
73 kg/sqf
W1 3 1.5 4 4.5
w2 2 1.5 2.5 3.5
V 1 1.5 2 1.5
grills Grills
MARBLE
MARBLE
marble chips
poarch 1 11.88 13
open front 1 12.44 9
open back 1 3 1.44
MARBLE chips
PLASTER
12 mm cemant plaster (inside wall)
both side ignore outer
long wall 1 2 19.04 10
long wall 2 1 25 10
short wall 1 1 31 10
short wall 1 1 27 10
short wall 1 2 7.92 10
short wall 3 2 11.23 10
short wall 1 2 10.75 10
short wall 1 2 4 10
TOTAL
DEDUCTION D 1 2 3.5 7
D1 3 2 3 7
D2 1 2 2.5 7
W1 3 2 4 4.5
w2 2 2 2.5 3.5
V 1 2 2 1.5
gate 1 2 8 6
TOTAL
Stair Table
Shuttering 1 27.36 3
Rcc 1 27.36 3 0.375
steel 1 0.87 1
trade wt riser
Brick step 18 0.92 3.00 0.58
shuttering
Foundation 98.00
floar to slab 2,254.64
staire 82.08
concrete
Foundation 277.31 M20 cement
floar to slab 755.16 1:1.5:3 390
staire 30.78
1,063.25 cuf 30.10 cum 11,740.30
steel
Foundation 690.15
floar to slab 2,036.93
staire 87.15
2,814.23 kg
1:4 ratio
plaster
12mm 2133 sqf 198.23 sqm
cuf - 4392
360.00 cuf
270.58 cuf
280.80 cuf
522.89 cuf
89.28 cuf
30.00 cuf
273.72 cuf
463.32 cuf
223.92 cuf
8.64 cuf
39.60 cuf
29.76 cuf
30.89 cuf
57.52 cuf
9.82 cuf
3.96 cuf
30.11 cuf
50.97 cuf
36.95 cuf
1.43 cuf
14.28 sqf
37.50 sqf
23.25 sqf
20.25 sqf
5.94 sqf
25.27 sqf
8.06 sqf
6.00 sqf
140.55 13.06
38.08 sqf
100.00 sqf
62.00 sqf
54.00 sqf
67.38 sqf
21.50 sqf
68.54 sqf
- sqf
411.50 sqf
121.5
0
67.5
390
579 SQFT
120.00 sqf
90.19 sqf
93.60 sqf
174.30 sqf
29.76 sqf
12.00 sqf
91.24 sqf
154.44 sqf
765.53 sqf
10.71 cuf
28.13 cuf
17.44 cuf
15.19 cuf
4.46 cuf
18.95 cuf
6.05 cuf
2.25 cuf
5.28 cuf
7.31 cuf
4.46 cuf
14.06 cuf
134.27 cuf 3.80
5.36 cuf
14.06 cuf
4.36 cuf
3.80 cuf
1.11 cuf
4.74 cuf
1.51 cuf
0.56 cuf
14.28 cuf
37.50 cuf
23.25 cuf
20.25 cuf
25.27 cuf
8.06 cuf
25.70 cuf
- cuf
45.56 cuf
25.31 cuf
73.13 cuf
144.00 4.08
45.00 cuf
33.82 cuf
35.10 cuf
65.36 cuf
11.16 cuf
4.50 cuf
34.21 cuf
57.92 cuf
380.17
80.41
436.90
489.24
650.22
2,036.93 kg 2,036.93 60 122,216.01
32.13 cuf
84.38 cuf
52.31 cuf
45.56 cuf
13.37 cuf
56.85 cuf
18.14 cuf
6.75 cuf
8.80 cuf
12.19 cuf
7.43 cuf
23.44 cuf
337.90 cuf
130.23 cuf
342.00 cuf
212.04 cuf
184.68 cuf
54.17 cuf
230.44 cuf
73.53 cuf
27.36 cuf
35.21 cuf
48.75 cuf
29.70 cuf
93.75 cuf
1,461.87 cuf
18.38 cuf
47.25 cuf
6.56 cuf
40.50 cuf
13.13 cuf
1.13 cuf
18.00 cuf
144.94
0.31 cuf
1.23
0.79 cuf
3.70
0.22 cuf
1.23
2.12 cuf
4.76
0.88 cuf
1.85
0.35 cuf
0.26
24.5 sqf
63 sqf
17.5 sqf
54 sqf
17.5 sqf
3 sqf
18 kg
7.5 kg
3 kg
120.00 sqf
90.19 sqf
93.60 sqf
174.30 sqf
29.76 sqf
12.00 sqf
91.24 sqf
154.44 sqf
111.96 sqf
4.32 sqf
(F+G)D*E*
H
655.2
297.6
952.8
21
17.5
38.5
914.3 sqf 84.97 890 75,625.19
380.80 SQFT
500.00 SQFT
310.00 SQFT
270.00 SQFT
158.40 SQFT
673.80 SQFT
215.00 SQFT
80.00 SQFT
2,588.00 SQFT
49 SQFT
126 SQFT
35 SQFT
108 SQFT
35 SQFT
6 SQFT
96 SQFT
455 SQFT
500.00 SQFT
310.00 SQFT
270.00 SQFT
93.90 SQFT
130.00 SQFT
79.20 SQFT
250.00 SQFT
120.00 SQFT
90.19 SQFT
93.60 SQFT
174.30 SQFT
29.76 SQFT
12.00 SQFT
91.24 SQFT
154.44 SQFT
966,366.98
8.00% 77,309.36
8.00% 77,309.36
1,120,985.69
120
40
15
90000
16,189.65 16,189.65
2600
80000
80000
16,700.05 16,700.05
9,000.00 9,000.00
1,162,875.39
82.08 sqf
15.8125 sqf
16,189.65
44 sqf
31.5 sqf
39 sqf
6.75 sqf
16,700.05
sand aggregate
sand aggregate
0.41 0.82
3 0.181818
KG 12.34 cum 24.68
cum
F*6.68 F*0.0187
1,013.86 2.84 cum
F*2.67 F*0.0075
189.96 0.53 cum
21,246.70 kg 18.69 cum
424.93 begs
0.818182 1145.455
G.F. Estimate from 45' x49'
DEPTH/HEI
SOR ITEMS NO. side LENGTH WIDTH GHT
FILLING PLINTH
beam detail bed room 1 12.00 10.00
staire 1 11.52 12.66
drawing hall 1 11.70 8.00
drg hall 1 11.52 13.00
bed room 1 12.00 10.75
2.27.3 tiolet 1 4.00 7.44
tiolet 1 10 10.75
ots 1 4.00 3.00
sit out 1 11.52 10.52
open back 1 11.50 3.13
COLUMN
balcony 4 4 0.75 0.75 10
main 13 4 0.75 0.75 10
CONCRETING
SLAB BEAM
COLUMN
balcony 4 4 0.75 0.75 10
main 13 4 0.75 0.75 10
BRICK WORK
up to SLAB
d VIII/3 CEMENT MORTAR 1:6 BEAM 10'6-1'-4.5"
Brick work with well burnt chimeny
bricks in bull patent trench kiln
crushing strength not less than long wall 1 2 24.92 0.75 9.12
25/sqcm & water absorption not long wall 1 2 12.92 0.75 9.12
more than 20% in foundation & short wall 1 2 30.21 0.375 9.12
plinth
short wall 1 2 29.56 0.375 9.12
short wall 1 2 12.39 0.375 9.12
short wall 1 2 12.79 0.375 9.12
short wall 2 2 10.79 0.375 9.12
short wall 1 2 8.79 0.375 9.12
short wall 3 2 11.5 0.375 5.00
DEDUCTION
D 3 3.5 0.75 7
D1 2 3 0.75 7
D2 2 2.5 0.375 7
W1 3 4 0.75 4.5
w2 1 2.5 0.75 3.5
V 0 2 0.375 1.5
BRICK WORK
FRAME WORK
FRAME WORK
PANNEL
B 9.6.2 Sal, bija sal, benteak, haldu
pannel providing & fixing 35 . Th paneled
glazed or panneled glazed or D 3 3.5 7
door ,window,I/C ms but hinges & D1 2 3 7
necessary screws. D2 2 2.5 7
W1 3 4 4.5
w2 1 2.5 3.5
V 0 2 1.5
Pannels
VIII Grills
providing & fixing ms satty grills of
req.pattern in wooden framed
window etc. with round head nuts
by screws etc plain grills
73 kg/sqf
W1 3 1.5 4 4.5
w2 1 1.5 2.5 3.5
V 0 1.5 2 1.5
grills Grills
MARBLE
MARBLE
marble chips
ots 1 0 4 3
sit out 1 0 11.52 10.52
open back 1 0 11.5 3.13
MARBLE chips
PLASTER
12 mm cemant plaster (inside wall)
both side ignore outer
long wall 1 2 24.92 10
long wall 1 1 12.92 10
short wall 1 1 30.21 10
short wall 1 1 29.56 10
short wall 1 1 12.39 10
short wall 1 1 12.79 10
short wall 2 2 10.79 10
short wall 1 2 8.79 10
TOTAL
DEDUCTION D 3 2 3.5 7
D1 2 2 3 7
D2 2 2 2.5 7
W1 3 2 4 4.5
w2 1 2 2.5 3.5
V 0 2 2 1.5
TOTAL
Stair Table
Shuttering 1 27.36 3
Rcc 1 27.36 3 0.375
steel 1 0.87 1
trade wt riser
Brick step 18 0.92 3.00 0.58
Total
shuttering
concrete
M20 cement
floar to slab 578.10 1:1.5:3 390
staire 30.78
608.88 cuf 17.24 cum 6,723.19
steel
1:4 ratio
plaster
12mm 1658 sqf 154.09 sqm
total
UNIT (in QU.M.(in
QUT f) m) RATE AMOUNTS(RS)
18.69 sqf
9.69 sqf
22.66 sqf
22.17 sqf
9.29 sqf
9.59 sqf
16.19 sqf
6.59 sqf
114.87 10.68
49.84 sqf
25.84 sqf
60.42 sqf
59.12 sqf
24.78 sqf
25.58 sqf
43.16 sqf
17.58 sqf
69.00 sqf
60.98 sqf
375.32 sqf
90
292.5
382.5 SQFT
120.00 sqf
145.84 sqf
93.60 sqf
149.76 sqf
129.00 sqf
29.76 sqf
107.50 sqf
12.00 sqf
787.46 sqf
7.01 cuf
3.63 cuf
4.25 cuf
4.16 cuf
1.74 cuf
1.80 cuf
3.03 cuf
1.24 cuf
18.69 cuf
9.69 cuf
22.66 cuf
22.17 cuf
9.29 cuf
9.59 cuf
16.19 cuf
6.59 cuf
22.50 cuf
73.13 cuf
0.00 cuf
95.63 2.71
45.00 cuf
54.69 cuf
35.10 cuf
56.16 cuf
48.38 cuf
11.16 cuf
40.31 cuf
4.50 cuf
45.45 cuf
787.4632
340.75 cuf 9.65
170.45 cuf
88.37 cuf
103.32 cuf
101.10 cuf
42.37 cuf
43.74 cuf
73.80 cuf
30.06 cuf
64.69 cuf
717.91 cuf
55.13 cuf
31.50 cuf
13.13 cuf
40.50 cuf
6.56 cuf
- cuf
146.81
0.93 cuf
1.23
0.53 cuf
3.70
0.44 cuf
1.23
2.12 cuf
4.76
0.44 cuf
1.85
- cuf
0.26
73.5 sqf
42 sqf
35 sqf
54 sqf
8.75 sqf
0 sqf
18 kg
3.75 kg
0 kg
120.00 sqf
145.84 sqf
93.60 sqf
149.76 sqf
129.00 sqf
29.76 sqf
107.50 sqf
12.00 sqf
121.19 sqf
36.00 sqf
12.00 sqf
121.19 sqf
36.00 sqf
(F+G)D*E*
H
416.64
1075
1491.64
35
35
1456.64 sqf 135.38 890 120,484.16
498.40 SQFT
129.20 SQFT
302.10 SQFT
295.60 SQFT
123.90 SQFT
127.90 SQFT
431.60 SQFT
175.80 SQFT
2,084.50 SQFT
147 SQFT
84 SQFT
70 SQFT
108 SQFT
17.5 SQFT
0 SQFT
426.5 SQFT
129.20 SQFT
302.10 SQFT
295.60 SQFT
61.95 SQFT
63.95 SQFT
120.00 SQFT
145.84 SQFT
93.60 SQFT
149.76 SQFT
129.00 SQFT
29.76 SQFT
107.50 SQFT
12.00 SQFT
121.19 SQFT
36.00 SQFT
696,441.11
8.00% 55,715.29
8.00% 55,715.29
807,871.69
120
40
15
90000
16,189.65 16,189.65
2600
80000
80000
16,700.05 16,700.05
9,000.00 28,994.00
869,755.39
82.08 sqf
15.8125 sqf
16,189.65
44 sqf
31.5 sqf
39 sqf
6.75 sqf
28,994.00
sand aggregate
0.41 0.82
3 0.181818
KG 7.07 cum 14.14
cum
F*6.68 F*0.0187
529.43 1.48 cum
F*2.67 F*0.0075
234.41 0.66 cum
F1
10 %
extra 106.47 306.63 40.68 191.99 98.80 744.56
Bar banding Beam & colm G. F schedule
AL DIM IN M
bar schedule Total bar Length in all col
ht/len( G
col no of len width L TO #8 #10 #12 #16 #8 #10 #12 #16
type col SLAB)
C1 13 0.23 0.23 3.8 6 0 0 296.4 0
Total 18 0 0 326.8 0
col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16
Total 0 363.89 0 0
col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16
FB2
FB3
FB4
FB5
Total - - 313.64 -
PB1 PB2
no len total no len total no
1 19.04 19.04 1
2 25 50 2
1 31 31 1
1 27 27 1
1 7.92 7.92 3
3 11.23 33.69 1
1 10.75 10.75 1
1 4 4
1 9.39 9.39
1 13 13
1 7.92 7.92
1 25 25
205.75 FT Total 0 FT 0 FT
62.729 MF - MF - MF
Bar banding Beam & colm G. F schedule
AL DIM IN M
bar schedule Total bar Length in all col
ht/len( G
col no of len width L TO #8 #10 #12 #16 #8 #10 #12 #16
type col SLAB)
C1 13 0.23 0.23 3.8 6 0 0 296.4 0
Total 18 0 0 326.8 0
Total 0 313.7 0 0
col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16
FB2
FB3
FB4
FB5
Total - - 381.89 -
PB1 PB2
no len total no len total no
1 19.04 19.04 1
2 25 50 1
1 31 31 1
1 27 27 4
1 7.92 7.92 2
3 11.23 33.69 1
1 10.75 10.75 1
1 4 4
1 9.39 9.39
1 13 13
1 7.92
1 25
Total 205.79 FT Total 0 FT
62.7409 MT 0 MF
Total
bar weight 16 158025
g Beam & colm G. F schedule
AL DIM IN M
strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 25 0.92 299 - - 263.47 - 118.12
250.52 FT Total 0 FT 0 FT
76.378 MF - MF - MF
Bar banding Beam & colm F. F schedule
AL DIM IN M
bar schedule Total bar Length in all col
ht/len( G
col no of len width L TO #8 #10 #12 #16 #8 #10 #12 #16
type col SLAB)
C1 13 0.23 0.23 3.8 6 0 0 296.4 0
C2
C3
Total 13 0 0 296.4 0
col no of
type col DEPTH width LEN #8 #10 #12 #16 #8 #10 #12 #16
FB2
FB3
FB4
FB5
Total - - 187.18 -
no
1
1
1
1
1
1
2
1
3
1
Total
bar weight 16 158025
g Beam & colm F. F schedule
AL DIM IN M
strips main bar steel weight
strips
Total steel
bar no of 1 strips strips
size# C/c dis bar #8 #10 #12 #16 weight
strips len in all col
8 0.15 25 0.92 299 - - 263.47 - 118.12
122.79 FT Total 0 FT 0 FT
37.436 MF - MF - MF