Professional Documents
Culture Documents
standardisation project
Company name
Software system
Spm
nummerert inndeling av kontinentalsokkelen i en størrelse på 15
breddeminutter og 20 lengdeminutter, med mindre tilstøttende
landområder, grenser mot andre staters kontinentalsokler eller andre
Petroleumsblokk forhold tilsier noe annet http://www.statkart.no/stan
Petroleumskvadra nummerert område mellom hele grader på kontinentalsokkelen http://www.statkart.no/stan
http://www.statkart.no/standard/sosi/html/arbeidsdokumenter/Olje/Olje%204.0%20011105.doc#_Toc118612036
http://www.statkart.no/standard/sosi/html/arbeidsdokumenter/Olje/Olje%204.0%20011105.doc#_Toc118612036
Main operations
Sub operation SUBOP Definition
MAINOP
MAINOP
SUBOP
MOVING
Rig transit time between last anchor retrieved at
previous location and arriving at present location.
Transit time for jackups begins when barge is afloat
MOVING TRANSIT
and tow lines are ready for tow. Transit time ends
when rig is ready to start anchoring or jacking up on
a new location.
All time associated with running and retrieving
anchors, adjusting initial anchor tensions and testing
anchors. Upon abandoning the well, all time after
MOVING ANCHOR
BOP and subsea equipment are retrieved is
included until last anchor is bolstered and rig is
ready to leave location.
Time spent on skidding the rig in place on the
SKID
location or from slot to slot on a fixed installation.
MOVING
Time spent on
running/installing/testing/removing/retrieving BOPs,
risers, spools, wellhead plugs and valves, X-mas
BOP/WELLHEAD EQ trees etc. Includes diving in sub sea completion's.
Does not include equipment fitted to the X-mas tree
or tieback riser for wire line (use sub operation
'WIRE LINE') or stimulation (use sub operation
STIMULATE) purposes.
COMPLETION
Time spent on
running/installing/testing/removing/retrieving BOPs,
risers, spools, wellhead plugs and valves, X-mas
BOP/WELLHEAD EQ trees etc. Includes diving in sub sea completion's.
Does not include equipment fitted to the X-mas tree
or tieback riser for wire line (use sub operation
'WIRE LINE') or stimulation (use sub operation
STIMULATE) purposes.
WORKOVER
CDRS
A cdrs operation mode class for grouping main operation classes. OPERATION
MODE CLASS
CDRS
A cdrs operation mode class for grouping sub operation classes. OPERATION
MODE CLASS
CLASS_OF_CLASS
CLASS_OF_CLASS
CLASS_OF_CLASS
CLASS_OF_CLASS
CLASS_OF_CLASS
PORT MAIN OPERATI SUPER CLASS?
Activity
Activity
Activity
Activity
Activity
WFT
Fjernes i henhold til OD
=Not in scope
= Unreseolved questions
=Link to WITSML (A least schema should
be stated )
=In RDL
= New class
= Audun, 28.02.2006 ++
Data elements from CDRS NB StatusENTITY Iso 15926 Name ISO 15926 Definition Remark Superclass Super Class definition Remarks Status WITSML link possible Remark1 Remark 2
A progress report containing standardized
Documents that contains information Common Daily Drilling
INFORMATION_CONTENT_CLCOMMON DAILY DRILLING REPORT information about the daily drilling activities PROGRESS REPORT
converning the progress of an activity. Report System
related to a well.
A cdrs report - part 1 - basic information class A section that contains information CDRS REPORT - PART I -
CDRS REPORT - PART 1A - WELL
3.1.1 REPORT part I a) - Well classification INFORMATION_CONTENT_CL
CLASSIFICATION CLASS NAME
name that is used in section 1a of the about well identification and well BASIC INFORMATION
referenced report form. classification. CLASS NAME
FUNCTIONAL_OBJECT_CLASS
APPRAISAL WELL An exploration well drilled in the vicinity of a discovery or a wildcal well in order to evaluate
EXPLORATION
the extentWELL
of the oil find
A well
and made
information
to search
about
forthe
commercially
reservoir. exploitable resources.
FUNCTIONAL_OBJECT_CLASS
PRODUCING WELL A well from which a material, normally a fluid, is obtained. WELL A device that is arranged to obtain, produce, store or inject a material into the earth.
FUNCTIONAL_OBJECT_CLASS
I NJECTION WELL A well intended for injecting a material into a reservoir, normally with a pressure higher
WELL
than the formation pressureA device that is arranged to obtain, produce, store or inject a material into the earth.
FUNCTIONAL_OBJECT_CLASS
OBSERVATION WELL A well that has been made for observation purposes WELL A device that is arranged to obtain, produce, store or inject a material into the earth.
A cdrs part i basic information class name that A section that contains information CDRS REPORT - PART I -
3.1.4 REPORT part I d) - Rig INFORMATION_CONTENT_CLCDRS PART 1D RIG CLASS NAME is the name of a sub section in the cdrs part 1 about rig name, rig heading, and BASIC INFORMATION
basic information section wellhead elevation. CLASS NAME
A date and time that is the date for which the A point in time when a particular activity took
RDATE / RDATE gives present date. CHARACTERISTIC_CLASS DATE OF REPORTED STATUS
well status is reported.
DATE AND TIME
place.
grp_opsReport grp_opsReport_dTim "last whole date?"
An inside diameter that is the inside diameter NOMINAL INSIDE An inside diameter which is an expected
MEASURE_CLASS BOREHOLE NOMINAL INSIDE DIAMETER BOREHOLE PHASE is an alternativ New after 6
of a borehole. DIAMETER (theoretical/as designed) inside diameter.
Normaly the outside diameter of the
A borehole nominal inside diameter that is the
BOREHOLE NOMINAL INSIDE DIAMETER AT part of the bottom hole assembly BOREHOLE NOMINAL An inside diameter that is the inside
MEASURE_CLASS expected diameter of a bore hole at end of a New after 6
REPORTING TIME (BHT) with the largest outside INSIDE DIAMETER diameter of a borehole.
reporting period.
diameter is reported.
BOREHOLE NOMINAL INSIDE DIAMETER AT A borehole nominal inside diameter at BOREHOLE NOMINAL A borehole nominal size that is given in
MEASURE_CLASS
REPORTING TIME - INCH reporting time that is measured in inches. SIZE - INCHES inches.
BOREHOLE NOMINAL A borehole nominal inside diameter that is
BOREHOLE NOMINAL INSIDE DIAMETER AT A borehole nominal inside diameter at
PHASE / PHASE gives size of the present phase. MEASURE_CLASS
REPORTING TIME - INCH reporting time that is measured in inches.
INSIDE DIAMETER AT the expected diameter of a bore hole at end New after 6 cs_bitRecord_diaBit
REPORTING TIME of a reporting period.
A measured depth that is the measured depth
MEASURED DEPTH TO CHANGE IN BOREHOLE
/ PCMD gives measured depth (RKB) where phase from rotary kelly bushing to where the
PCMD changed. MEASURE_CLASS NOMINAL DIAMETER RELATIVE TO RKB -
diameter (or phase) of a borehole has
MEASURED DEPTH cs_bitRecord
METRE
changed.
A boolean that indicates if a pilot hole is
A mathematical value which indicates CDRS removed from
PHOLE / PHOLE are you drilling a pilot hole ? INFORMATION_CONTENT_CLPILOT HOLE DRILLING INDICATOR beeing drilled or not. Values are "Yes/Y" or BOOLEAN
whether something is the case or not. name
"No/blank".
A nominal inside diameter that is the NOMINAL INSIDE An inside diameter which is an expected
PILOT HOLE NOMINAL INSIDE DIAMETER New after 6
expected diameter of a pilot hole. DIAMETER (theoretical/as designed) inside diameter.
A borehole nominal inside diameter that is the
PILOT HOLE NOMINAL INSIDE DIAMETER AT Normaly outer diameter of the drill PILOT HOLE NOMINAL A nominal inside diameter that is the
MEASURE_CLASS expected diameter of a bore hole at end of a New after 6
REPORTING TIME bit is reported. INSIDE DIAMETER expected diameter of a pilot hole.
reporting period.
PILOT HOLE NOMINAL A borehole nominal inside diameter that is
PILOT HOLE NOMINAL INSIDE DIAMETER AT A nominal inside diameter at reporting time
PHSIZE / PHSIZE gives size of the pilot hole. MEASURE_CLASS
REPORTING TIME - INCHES that is the expected diameter of a pilot hole.
INSIDE DIAMETER AT the expected diameter of a bore hole at end cs_bitRecord
REPORTING TIME of a reporting period.
A true depth that is the planned true depth of
A depth that is the vertical depth measured
PHTVD / PHTVD gives planned TVD of the pilot hole. MEASURE_CLASS PLANNED TRUE DEPTH OF PILOT HOLE a pilot hole measured from rotary kelly TRUE DEPTH
perpendicular to the surface.
RELATIVE TO RKB - METRE bushing.
A boolean that indicates if a side track is
A mathematical value which indicates
TST / TST are you performing a technical sidetrack? beeing performed or not. Values are "Yes/Y" BOOLEAN
whether something is the case or not.
INFORMATION_CONTENT_CLCDRS SIDE TRACK INDICATOR or "No/blank".
MEASURED FORMATION STRENGTH AT DEPTH A measured formation strength at depth MEASURED FORMATION A measured formation strength at a given
FSLM / FSLM gives measured formation strength. MEASURE_CLASS
- G PER CM3 measured in gram per centimeter cubed. STRENGTH AT DEPTH depth.
New after 6
Usually hydrostatic
pressure, or the
pressure exerted by a
column of water from
the formation's depth to
When impermeable rocks such as sea level. When
shales form as sediments are impermeable rocks
compacted, their pore fluids cannot such as shales form as
A pressure that is the pressure of fluids within
MEASURE_CLASS RESERVOIR PORE PRESSURE always escape and must then PRESSURE sediments are
the pores of a reservoir.
support the total overlying rock compacted, their pore
column, leading to anomalously fluids cannot always
high formation pressures. escape and must then
support the total
overlying rock column,
leading to anomalously
high formation
pressures.
When impermeable
rocks such as shales
form as sediments are
compacted, their pore
fluids cannot always
The pore pressure has to be reported in eqv. mud RESERVOIR PORE PRESSURE EQVIVALENT A formation pore pressure that is expressed RESERVOIR PORE A pressure that is the pressure of fluids
PPRESS weight - r.d. Two decimal can be given. MEASURE_CLASS escape and must then Sclumberger oilfiled dictionary.
MUD WEIGHT - G/CM3 by eqvivalent drilling fluid (mud) weight PRESSURE within the pores of a reservoir.
support the total
overlying rock column,
leading to anomalously
high formation
pressures.
DATE AND TIME OF DAILY DRILLING A date and time that is the date and time at A point in time when a particular activity took
RDATE x CHARACTERISTIC_CLASS DATE AND TIME grp_opsReport grp_opsReport_dTim RDATE brukt flere plasser "Note that the date given here always must be the next date after the report date given in REPORT Part I
REPORTING which the daily drilling report is submited. place.
/ TIME gives time of present operation. Present A duration that is the time of the actual drilling
TIME OF PRESENT REPORTED DRILLING
TIME operation is the actual operation carried out at the MEASURE_CLASS operation carried out at the date and time an DURATION The continuance or length of time TIME Brukt flere ganger (3.4, 3.11)
time the report is sent onshore. OPERATION
offshore drilling report is sent onshore.
Give a brief description of this operation. Variable A description that describes the drilling
REMARKS freetext length. INFORMATION_CONTENT_CLPRESENT DRILLING OPERATION DESCRIPTION
operation reported.
DESCRIPTION An information that describes something.
A method intended for deciding the orientation Definition derived from "Dictionary
A procedure which is a formal definition of a Issue from review
GYROSCOPIC DIRECTIONAL SURVEY METHOD (inclination and/or azimuth) of a wellbore of Petroleum Exploration, Drilling, & METHOD
type of activity. survey tool
using a gyroscope. Production", PennWell Books 1991
INFORMATION_CONTENT_CL
WIRELINE DIRECTIONAL SURVEY METHOD A method intended for deciding the orientation (inclination and/or azimuth) of a wellbore
METHOD
using a wireline tool. A procedure which is a formal definition of a type of activity. Issue from review survey tool
INFORMATION_CONTENT_CLASS
SINGLE SHOT DIRECTIONAL SURVEY METHOD A method intended for deciding the orientation (inclination and/or azimuth) of a wellbore
METHOD
using a single shot measurement
A procedure
tool.which is a formal definition of a type of activity.
INFORMATION_CONTENT_CLASS
SSM / SSM single shot measurement ? If the directional survey was performed by useINFORMATION_CONTENT_CLASS DIRECTIONAL
of a single shot, then this has to be confirmed by typing YSURVEY
(yes). If not,SINGLE
type blank.SHOT MEASUREMENT
A boolean
INDICATOR
that indicates if a directional survey was performed by a single shot. Values
BOOLEAN
are "Yes/Y" or "No/blank".A mathematical value which indicates whether something is the case or not. Fjernes i hht endringer fra OD/Ptil
DMD MEASURE_CLASS
/ DMD gives measured depth (RKB). Give the measured depth (MD) where the directional MEASURED
survey is taken. All types of directional surveysDEPTH
measuringTO DIRECTIONAL
azimuth SURVEY
and/or inclination have to POINT
A measured
RELATIVE
be reported. depth
TOcan
One decimal that
RKB
beisgiven.
-the
METRE
measured depth to a point where a single shot survey has
MEASURED
been done,
DEPTH
measured relative
A depth
to Rotary
that is the
Kelly
depth
Bushing
measured
(RKB).along the centre of a hole, pit or well. Finnes flere plasser (2.2.6,
NB i meter
3.3, 3.6, 3.10, 3.14, 3.15)
MEASURE_CLASS AZIMUTH A direction angle that is the angle between the vertical projection of a line of interest DIRECTION
onto a horizontal
ANGLE surface andAn
true
angle
north
made
or magnetic
by a given
north
linemeasured
with an axis
in aofhorizontal
reference.plane, typically measured clockwise from north.
MEASURE_CLASS AZIMUTH RELATIVE TO TRUE NORTH An azimuth that with true north as reference point. AZIMUTH A direction angle that is the angle between thetypically
vertical projection
measured ofclockwise
a line of from
interest
north.
onto a horizontal surface and true north or magnetic north measured in a horizontal plane.
A measured azimut of well bore relative to MEASURED AZIMUTH OF An azimut relative to true north that is the
MEASURED AZIMUTH OF WELLBORE AT
MEASURE_CLASS true north that is measured at a the point in a WELLBORE RELATIVE TO azimuth of a wellbore measured by a
SURVEY POINT RELATIVE TO TRUE NORTH
well where the survey took place. TRUE NORTH directional survey
MEASURED AZIMUTH OF
/ AZIMUTH gives the measured azimuth. The A measured azimuth of wellbore at survey A measured azimut of well bore relative to
MEASURED AZIMUTH OF WELLBORE AT WELLBORE AT SURVEY
AZIMUTH measured azimuth must be given in degrees ( 0-360 ) MEASURE_CLASS point relative to true north that is measured in true north that is measured at a the point in cs_trajectory Pål 7.2: WITSML har a
Schlumber Oilfiled Dictionary
with two decimals. SURVEY POINT - DEGREES POINT RELATIVE TO
degrees. a well where the survey took place.
TRUE NORTH
A date and time that is the date at which the A point in time when a particular activity took
RDATE CHARACTERISTIC_CLASS DATE OF SURVEY OPERATION DATE AND TIME grp_opsReport grp_opsReport_dTim RDATE brukt flere plasser
survey operational took place. place.
A geographical position that using the revision A functional point that is a location of a point
WORLD GEODETIC SERVICE 84 GEOGRAPHICAL
of 1984 of the World Geodetic Service as the or object on the earth surface designated by
GEOGRAPHICAL POSITION POSITION
fixed global reference. cartesian coordinates.
A world geodetic service 84 position that is A geographical position that using the
WORLD GEODETIC
position (NS deg, min ,sec - EW deg, min sec in ED50) FUNCTIONAL_OBJECT_CLASGEOGRAPHICAL POSITION OF SURVEY the location on the earth surface where a
SERVICE 84 POSITION
revision of 1984 of the World Geodetic Isse from review cs_well Ny i henhold til endr GEOGRAPHICAL LOCATION muligens nødvendig
directional survey of a wellbore was done. Service as the fixed global reference.
3.6 REPORT part VI - Operation/mode
RDATE DATE OF REPORTED OPERATION A date and time that is the date at which the reported operation took place. DATE AND TIME A point in time when a particular activity took place. grp_opsReport grp_opsReport_dTim RDATE brukt flere plasser REF. 131/START
CHARACTERISTIC_CLASS
STOP Give time when the operation stopped. The "start" time will always be equal to the previous "stop" time, and the systemDATE
will fill itAND TIME OFThe
in automatically. CDRS ACTIVITY
first start time in the END An
report shall always beend time
00:00 that
hours. is time
Stop the has
date and
to be timelike:
written whenIE1: a07:15
cdrsIE2:
defined
15:30 acticvity has come to an END
end. TIME A class of point in time when a particular event or activity ended. cs_activity_dTimEnd
MEASURE_CLASS
DMD MEASURE_CLASS
Give the relevant measured depth (MD) of the actual operation. As a rule, the sub MEASURED
operation will most likely determine the depth. See theDEPTH TOsub
list of legal OPERATION POINT
operation depths. RELATIVE
Also see Afor
the list measured
RKB
the main- operation
METRE
depth that is the
depths. measured
These depths hasdepth to anin operation
to be given metres and point related
one decimal canto
beRKB,
given. measure
MEASUREDgivenDEPTH
in metre. A depth that is the depth measured along the centre of a hole, pit or well. cs_activity_mdHoleEnd/cs_activity_mdHoleStart
Pål 7.2: Er det ved aktivitet
NB i meter
slutt eller start?
SUPERIOR To be able to differentiate between drilling and well activites performed by use ofCLASS_OF_CLASS CDRS SUPERIOR
different new drilling equipment and techniques, CLASS
a superior code A CDRS
to the "main operation" has been introduced. operation class that is a class of drilling activities involving the use of new CDRS
drilling OPERATION
equipment andCLASS
techniqes.
A CDRS class that is a class refering to classes of mainoperations andHydro
suboperations
to propose
asnew
well as the evaluation of these operations used by a CDRS report.
MAINOP CLASS_OF_CLASS
/ MAINOP gives the main operation. An operation will always best be described when CDRS
using two keywords. One for the main MAINand
operation, OPERATION CLASS
one for the sub A CDRS
operation. When for example running operation
in hole class
with a new that
bit, and theispurpose
a class defined
is to drill newby NPD to
formation, thebe a main
MAIN operation
OPERATION class.
will be CDRSand
DRILLING, OPERATION CLASS
the sub operation will beAtrip.
CDRS class
See the list ofthat
legalis a class
main refering
operations. to classes
Be sure to use the of mainoperations
correct andHydro
abbreviations. Each suboperations
main to propose
operation alsoasnew
wella sub
need as the evaluation
operation. of these operations used by a CDRS report.
SUBOP CLASS_OF_CLASS
/ SUBOP gives the sub operation. An operation will always best be described when CDRS
using two keywords. One for the main SUBand
operation, OPERATION
one for the subCLASS A cdrs
operation. When for example running operation
in hole with newclass
bit, andthat is a class
the purpose is to defined to be sub
drill new formation, theoperation.
main operation will be drilling, and CDRS
the SUBOPERATION
OPERATION willCLASS A CDRS
be TRIP. Each class that
main operation hasisa certain
a class refering
number to classes
of legal of mainoperations
sub operations. and
See the list of legal Hydro
suboperations
sub to propose
operations asnew
Be sure towell
use as
the the evaluation
correct of these
abbreviations. operations used by a CDRS report.
A cdrs operation class that is a class defined A CDRS class that is a class refering to
The main mode will describe the result of the main CDRS MAIN OPERATION ACTIVITY EVALUATION to be a main operation activity according to CDRS OPERATION classes of mainoperations and
MAINMODE operation. CLASS_OF_CLASS
CLASS the activity outcome, i.e. indicating whether CLASS suboperations as well as the evaluation of
the activity is accepted or failed. these operations used by a CDRS report.
Give time when the operation started. The first start An srat time that is the date and time when a A class of point in time when a particular
START time in the report shall always be 00:00 hours. x CHARACTERISTIC_CLASS DATE AND TIME OF CDRS ACTIVITY START
cdrs defined acticvity started.
START TIME
event or activity started.
New cs_activity_dTimStart Replaces 121/RDATE?
LOGRNO The log runs have to be numbered, starting with number one as the first log run.I NFOMATION_CONTENT_CLASS
WELL LOG RUN NUMBER An identification number that identifies a well log run. IDENTIFICATION NUMBER An identification code which is numeric.
cs_realtimeHeader
Definisjon mangler i WITSML arbeid
FDMD / FDMD gives measured depth at bottom of the log interval. MEASURE_CLASS MEASURED DEPTH TO BOTTOM OF DRILLING LOG
A measured
INTERVALdepth
RELATIVE
that isTO
theRKB
measured depth relative to rotary kelly bushing (RKB) at
MEASURED
the bottom DEPTH
of the wellbore A
interval
depth where
that is athe
well
depth
log has
measured
been run.
along the centre of a hole, pit or well.
TDMD / TDMD gives measured depth at top of the log interval. MEASURE_CLASS MEASURED DEPTH TO TOP OF DRILLING LOG INTERVAL
A measured
RELATIVE
depth that
TO RKB
is the measured depth relative to rotary kelly bushing (RKB) at
MEASURED
the top of aDEPTH
wellbore interval
A depth
wherethat
a drilling
is thelog
depth
hasmeasured
been run. along the centre of a hole, pit or well.
RDATE CHARACTERISTIC_CLASS DATE OF WELL LOGGING A date and time that is the date at which the reported well logging was performed. DATE AND TIME A point in time when a particular activity took place. RDATE brukt flere plasser
cs_wellLogHeader, cs_realtimeHeader, cs_logHeader
temperature MEASURE_CLASS LOG TOOL DOWNHOLE TEMPERATURE A temperature that is the temperature measured downhole by a log tool. TEMPERATURE Ny i henhold til endring fra OD
WELL INFORMATION_CONTENT_CLASS
NPD WELL IDENTIFICATION CODE A well official identification code that is identifying
Thea code
well or
is wellbore
a concatination
on the Norwegian
of three other
WELL
Continental
codes.
OFFICIAL
1Shelf.
Well
IDENTIFICATION
designation
The format
A well
determined
is given
identification
CODEby the
by the
"NPD
code
Norwegian
guidelines
that is defined
Petroleum
for designation
by the
Directorate
Concatination
authoritative
of wells
(NPD).
and
of
body
the
2wellbores".
Wellbore
of
following
the country
deignation
threewhere
codes:
detreimined
the
"NPD
well well
is by
situated.
designation",
the NPD. 3. Wellbore
"NPD wellbore
Mail
designation
sendt
designation"
tilmaintained
Jonas and
22.11
by
"Oilfield
the operator
operatorcompany
maintained
based
wellbore
on NPDdesignation".
guidelines.
Each core has to be numbered, starting with core An identification number that identifies the IDENTIFICATION
CNO number one as the first core cut in the well. INFORMATION_CONTENT_CLDRILLED CORE IDENTIFICATION NUMBER
sequence of cores taken from a formation. NUMBER
An identification code which is numeric. New
RDMD / RDMD gives number of core recovery in metres. MEASURE_CLASS CORE INTERVAL LENGTH - METRE A length that is the length of a recoverd core interval in metres. LENGTH New grp_convCore_lenRecovered
RPROS / RPROS gives the percentage core recovery. MEASURE_CLASS RECOVERD CORE PERCENTAGE A percentage that is the percentage of recoverd core relative to core taken out. PERCENTAGE A ratio that is quantity or amount reckoned as so much in the hundred, New
i.e. as so many hundredth
grp_convCore_recoverPc
parts of another, especially of the whole of which it is a part.
LENGTH MEASURE_CLASS
/ LENGTH gives the length of core barrel in meters, can be given with one decimal. CORE BARREL LENGTH - METRE A length that is the length of a core barrel. LENGTH New grp_convCore_lenCored
IBARREL / IBARREL use of inner barrel type 'Y' else the field must be blank. INFORMATION_CONTENT_CLASS
INNER BARREL TYPE USED INDICATOR A boolean that indicates if an inner barrel has been used during coring. Values are "Yes/Y"
BOOLEANor "No/blank". New grp_convCore_innerBarrelUsed
BTYPE / BTYPE gives the name of the inner barrel type. CLASS_OF_CLASS CDRS INNER CORE BARREL TYPE CLASS A CDRS equipment classification class that is a class defined to be an inner core barrel
CDRS on EQUIPMENT
a drilling rig. CLASS A CDRS class that is a class defined to be equipment on a drilling rig. grp_convCore_innerBarrelType
PHYSICAL_OBJECT_CLASS INNER CORE BARREL A pipe that is located inside a core barrel to hold the core sample. PIPE An artefact which is a long tube or hollow body intended for conducting liquid, gaseous or finely divided solid material or for structural purposes.
ALUMINIUM PHYSICAL_OBJECT_CLASS ALUMINIUM INNER CORE BARREL An inner core barrel made of aluminium. INNER CORE BARREL A pipe that is located inside a core barrel to hold the core sample.
An inner core barrel that that seals of the core A pipe that is located inside a core barrel to
GEL CORING PHYSICAL_OBJECT_CLASS GEL INNER CORE BARREL
sample using gel as sealing material.
INNER CORE BARREL
hold the core sample.
An inner core barrel that seals of the core
A pipe that is located inside a core barrel to
WL CORING PHYSICAL_OBJECT_CLASS WIRE LINE INNER CORING BARREL sample and is brought to the surface by a INNER CORE BARREL
hold the core sample.
wireline.
An inner core barrel made of glass fiber A pipe that is located inside a core barrel to
GRP PHYSICAL_OBJECT_CLASS GRP INNER CORE BARREL INNER CORE BARREL
reinforced plastic. hold the core sample.
A date and time that is the date at which A point in time when a particular activity took
RDATE CHARACTERISTIC_CLASS DATE OF CORING DATE AND TIME grp_opsReport grp_opsReport_dTim
coring was done. place.
TEXT
/ TEXT gives an description of the core in freetext.
INFORMATION_CONTENT_CLDRILLED CORE DESCRIPTION A description that describes a drilled core. DESCRIPTION An information that describes something. New grp_convCore_coreDescription
Variable freetext length.
NUMBER OF WELL PERFORMED PRODUCTION A count that is the total number of well
TESTNO The test numbers in this well has to be reported. MEASURE_CLASS TESTS production tests performed on or in a well. COUNT The number of something
The measured depth (RKB) at the highest part of the A measured depth at highest part of test A measured depth that is the measured
test interval has to be given (highest perforating MEASURED DEPTH AT HIGHEST PART OF WELL
TDMD interval). Has to be given in metres, and can be given MEASURE_CLASS interval that is measured realtive to rotary MEASURED DEPTH AT HIGHEST
depth to
PART
the highest
OF WELL partTEST
of the
INTERVAL
interval
TEST INTERVAL RELATIVE TO RKB - METRE
with one decimal. kelly bushing (RKB). beeing tested in a well.
x MEASURE_CLASS UPPER LIMIT ORIFICE BORE DIAMETER An orifice bore diameter that is the maximum possible for a given orifice configuration.
ORIFICE BORE DIAMETERAn inside diameter diameter of an orifice hole
An upper limit orifice bore diameter that is the An orifice bore diameter that is the
UPPER LIMIT CHOKE VALVE OPENING UPPER LIMIT ORIFICE
x DIAMETER
upper limit diameter of the orifice in a choke
BORE DIAMETER
maximum possible for a given orifice
valve. configuration.
Oil gravity has to be given in g/cm³. Can be given with A density of oil defined by rules given by API API DENSITY OF CRUDE A density liquid that is the density liquid of
OILGCC three decimals. MEASURE_CLASS API DENSITY OF CRUDE OIL - GRAM PER CM3
measured in gram per centimetre cubed. OIL crude oil measured according to API.
Gravity = density? Mulig feil i RDL. Se API DENSITY OF CRUDE OIL
A daily gross oil production volume that is the A gross standard oil volume that is the gross
The oil production per day (m³ Oil Per Day) at max DAILY GROSS OIL PRODUCTION VOLUME AT DAILY GROSS OIL
OILPROD flow conditions has to be given. MEASURE_CLASS
MAXIMUM FLOW CONDITIONS - SM3
oil production volume per day at maximum
PRODUCTION VOLUME
oil production volume the last 24 hours at a Må lage *** - M3 PER DAY. Trenger vi en "per well"?
flow conditions given in standard cubic metre. given date.
x
Force perpendicular to the area divided by
area. p = dF/dA where dF is the
A pressure that is the pressure of fluid at the
perpendicular component of the force acting
MEASURE_CLASS FINAL SHUT IN PRESSURE wellhead after the well has been closed for a PRESSURE Hva menes med final?Er dette det samme som FORMATION PRESSURE lenger ned?
on the area element dA. The pressure is
period of time.
positive when the force is acting into the
area.
A pressure that is the pressure of fluid at the
FSIP = Final Shut In Pressure. Has to be given in A final shut in pressure measured in FINAL SHUT IN
FSIP MPa. MEASURE_CLASS FINAL SHUT IN PRESSURE - MPA wellhead after the well has been closed for
megaPascal (Mpa) PRESSURE
a period of time.
A daily gas production volume that is the
DAILY GAS PRODUCTION VOLUME FROM WELL A daily gas production volume from well that DAILY GAS PRODUCTION daily (24 hour) calculated or measured Må lage *** - M3 PER
MEASURE_CLASS
AT MAXIMUM FLOW CONDITIONS is measured at maximum flow conditions. VOLUME FROM WELL natural gas production volume from a DAY
specific well at a given date.
A gas-oil ratio at t and p that is the ratio A ratio which is the ratio of dissolved gas
The gas oil ratio at max flow conditions has to be GAS-OIL RATIO DURING TEST AT MAXIMUM GAS-OIL RATIO AT T AND
GOR given in m³/m³. GOR = Gas/Oil Ratio. MEASURE_CLASS
FLOW CONDITIONS
between the volume of gas and the volume of
P
compared to an amount of oil at a given New
oil during a test at maximum flow conditions. temperature and pressure.
BTHP = Bottom Hole Pressure. Has to be given in A bottomhole pressure that is measured in BOTTOMHOLE
BTHP MPa. MEASURE_CLASS BOTTOMHOLE PRESSURE - MEGAPASCAL
mega pascal. PRESSURE
A pressure at the bottom of a well. New
Water oil ratio at max flow conditions has to be given WATER-OIL RATIO AT MAXIMUM FLOW A water-oil ratio that is measured at maximum A ratio that is the volume of produced water
WOR in m³/m³. x MEASURE_CLASS
CONDITIONS flow conditions.
WATER-OIL RATIO
compared to the produced oil.
Abbreviated WOR. New Sclumberger oilfiled dictionary.
Possible presence of CO2 has to be reported in ppm CO2 CONTENT IN HYDROCARBON GAS FROM The CO2 content in hydrocarbon gas from CO2 CONTENT IN A percentage that is the content of dissolved
PCO2 (parts per million). MEASURE_CLASS WELL - PPM tested well, measured in parts per million. HYDROCARBON GAS CO2 in hydrocarbon gas. Hvilken kontekst?
A chloride content that is the chloride content
The Cl (chloride) content of the produced water has to CHLORIDE CONTENT IN PRODUCED WATER - The average amount of Chloride reported in
WCL MEASURE_CLASS in produced water, reported in parts per CHLORIDE CONTENT Må lage *** - ppm
be given in ppm. (Parts per million.) PPM a number of samples.
million.
Possible presence of H2S has to be reported in ppm H2S CONTENT IN HYDROCARBON GAS FROM A H2S content in hydrocarbon gas from H2S CONTENT IN A measure describing the content of
PH2S (parts per million). MEASURE_CLASS Hvilken kontekst?
WELL - PPM tested well, measured in particles per million. HYDROCARBON GAS hyrogen sulphide in hydrocarbon gas.
A date and time that is the date at which well A point in time when a particular activity took
RDATE CHARACTERISTIC_CLASS DATE OF WELL TESTING
testing was performed.
DATE AND TIME
place. grp_opsReport RDATE brukt flere plasser
ALLOCATED PRODUCED OIL VOLUME - SM3 An allocated produced oil volume measured in standard cubic metre. ALLOCATED PRODUCED OIL
A produced
VOLUME oil volume which is the assumed oil volume produced from a well over a specified period of time.
TOTALPROD / TOTALPRODOIL gives amount of produced and burned oil per well test MEASURE_CLASS TOTAL OIL VOLUME PRODUCED DURING TESTINGAn oil volume that is the total amount of oil produced during a well test ALLOCATED PRODUCED OIL
AnVOLUME
allocated -produced
SM3 oil volume measured in standard cubic metre. ?
OIL
TOTALPROD / TOTALPRODGAS gives amount of produced and burned gas per well test MEASURE_CLASS TOTAL GAS VOLUME PRODUCED DURING TESTING
A gas
- SM3
volume that is the total amount of gas produced during a well test measured inALLOCATED
standard cubic
PRODUCED
metre. GAS
An allocated
VOLUMEproduced
- SM3 gas volume measured in standard cubic metre. ?
GAS
TOTALPROD / TOTALPRODWATER gives amount of produced water per well test MEASURE_CLASS TOTAL WATER VOLUME PRODUCED DURING TESTING
A water
- SM3
volume that is the total amount of water produced during a well test measured
ALLOCATED
in standard PRODUCED
cubic metre. WATER
An allocated
VOLUMEproduced
- M3 water volume measured in metre cubed. ?
WATER
TOTALOILST / TOTALOILSTOREDUP gives amount of oil stored per well test MEASURE_CLASS TOTAL OIL VOLUME STORED FROM WELL TEST An oil volume that is the resulting total amount of oil produced and stored after one well
ALLOCATED
test. PRODUCED OIL
AnVOLUME
allocated -produced
SM3 oil volume measured in standard cubic metre. ? (Stored?)
OREDUP
3.10 REPORT part X - Wireline Formation Test (WFT)
WELL NPD WELL IDENTIFICATION CODE A well official identification code that is identifying
Thea code
well or
is wellbore
a concatination
on the Norwegian
of three other
WELL
Continental
codes.
OFFICIAL
1Shelf.
Well
IDENTIFICATION
designation
The format
A well
determined
is given
identification
CODEby the
by the
"NPD
code
Norwegian
guidelines
that is defined
Petroleum
for designation
by the
Directorate
Concatination
authoritative
of wells
(NPD).
and
of
body
the
2wellbores".
Wellbore
of
following
the?country
deignation
threewhere
codes:
detreimined
the
"NPD
well well
is by
situated.
designation",
the NPD. 3. Wellbore
"NPD wellbore
Mail
designation
sendt
designation"
tilmaintained
Jonas and
22.11
by
"Oilfield
the operator
operatorcompany
maintained
based
wellbore
on NPDdesignation".
guidelines.
INFORMATION_CONTENT_CLASS
Data elements from CDRS NB StatusENTITY Iso 15926 Name ISO 15926 Definition Remark Superclass Super Class definition Remarks Status WITSML link possible Remark1 Remark 2
A measured depth that is the measured depth
MEASURED DEPTH TO MEASURE POINT A depth that is the depth measured along
DMD / DMD gives the depth to the measurement point. MEASURE_CLASS to a point where the measurement has been MEASURED DEPTH ?
RELATIVE RKB - METRE the centre of a hole, pit or well.
done.
A pressure that is the pressure of fluids within A pressure that is the force acting on an
the pores of a reservoir, usually hydrostatic object that is submerged in a fluid that is a
HYDROSTATIC
FPRESS / FPRESS gives the measured formation pressure. FORMATION PORE PRESSURE pressure, or the pressure exerted by a rest, such as water. The hydrostatic ? Er dette det samme Ref: http://www.fi.edu/fellows/fellow2/jan99/new/oilvocab.html
PRESSURE
column of water from the formation's depth to pressure is isotopic , i.e. the pressure acts in
MEASURE_CLASS sea level. all directions equally.
A boolean that indicates if a seal is good or A mathematical value which indicates
GSEAL / GSEAL was it a good seal?
INFORMATION_CONTENT_CLGOOD SEAL INDICATOR not. Values are "Yes/Y" or "No/N". BOOLEAN whether something is the case or not. New
MEASURED DEPTH TO SAMPLE POINT A measure depth that is the measured depth A depth that is the depth measured along
SDMD / SDMD gives the sample depth (MD).
MEASURE_CLASS RELATIVE RKB - METRE at which a sample was taken.
MEASURED DEPTH
the centre of a hole, pit or well.
New
/ GRAV gives the gravity of the hydrocarbon HYDROCARBON COMPONENT DENSITY AT T A density at T and P that is the density of the A density at a given temperature and
GRAV component. MEASURE_CLASS
AND P hydro carbon component of a fluid sample.
DENSITY AT T AND P
pressure.
New
A date and time that is the date at which the A point in time when a particular activity took
RDATE CHARACTERISTIC_CLASS DATE OF WIRELINE FORMATION TEST DATE AND TIME grp_opsReport RDATE brukt flere plasser
Wireline Formation Test (WFT)is performed. place.
A date and time that is the time at which the A point in time when a particular activity took
RDATE CHARACTERISTIC_CLASS DATE AND TIME OF WEATHER REPORT DATE AND TIME grp_opsReport RDATE brukt flere pl Fjernes ihht endringer
Covered
fra Ptil/OD
by 210/TIME?
weather report data is issued. place.
ref. 3.2
/ TIME gives time of day when weather data is DATE AND TIME FOR WEATHER DATA A date and time that is the date and time at A point in time when a particular activity took
TIME collected. CHARACTERISTIC_CLASS
COLLECTION which the weather data is collected.
DATE AND TIME
place.
? TIME Brukt flere ganger
Fjernes
(3.4, ihht
3.11)endringer
Covering
fra Ptil/OD
209/RDATE?
A temperature that referes to the mean The degree or intensity of heat or cold as
temperature of the ocean in the upper few measured on a thermometric scale, and a
meters. measure of whether two systems are
relatively hot or cold with respect to one
SEATEMP / SEATEMP gives sea temperature. MEASURE_CLASS SEA WATER TEMPERATURE TEMPERATURE
another. Two systems brought into contact
cs_weather Fjernes ihht endringer fra Ptil/OD
will, after sufficient time, be in thermal
equilibrium and will have the same
temperature.
A distance from the bottom to the top of
WHEIGHT / WHEIGHT gives wave height. MEASURE_CLASS WAVE HEIGHT A height which is the height of a wave HEIGHT Fjernes ihht endringer fra Ptil/OD
something standing upright.
A line or course on which something is
The direction from which the waves are
WDIR / WDIR gives wave direction. MEASURE_CLASS WAVE DIRECTION
coming, measured from true north.
DIRECTION moving or is aimed to move or along which Fjernes ihht endringer fra Ptil/OD
something is pointing or facing.
Duration between two up-, or two down-,
WPER / WPER gives wave period. MEASURE_CLASS WAVE PERIOD crossings of the mean level of the "Surface DURATION The continuance or length of time Fjernes ihht endringer fra Ptil/OD
elevation".
A distance from the bottom to the top of
SHEIGHT / SHEIGHT gives swell height. MEASURE_CLASS WAVE HEIGHT A height which is the height of a wave HEIGHT
something standing upright.
Swell = dønning? Fjernes ihht endringer fra Ptil/OD
An angle that is the measure of the side-to-side rotational movement of the rig due the combined effects of wind and waves, measured as the angle from vertical.
ROLL / ROLL gives platform roll. MEASURE_CLASS RIG ROLL ANGLE ANGLE An angle between two half-lines terminating at the same point is defined
cs_rigResponse
as the ratio of length of the included arc of the circle (with its centre at Fjernes
that point)
ihhttoendringer
the radius
fraofPtil/OD
that circle
An angle that is the measure of the fore-aft rotational movement of the rig due the combined effects of wind and waves, measured as the angle from horizontal.
PITCH / PITCH gives platform pitch. MEASURE_CLASS RIG PITCH ANGLE ANGLE An angle between two half-lines terminating at the same point is defined
cs_rigResponse
as the ratio of length of the included arc of the circle (with its centre at Fjernes
that point)
ihhttoendringer
the radius
fraofPtil/OD
that circle
WELL NPD WELL IDENTIFICATION CODE A well official identification code that is identifying
Thea code
well or
is wellbore
a concatination
on the Norwegian
of three other
WELL
Continental
codes.
OFFICIAL
1Shelf.
Well
IDENTIFICATION
designation
The format
A well
determined
is given
identification
CODEby the
by the
"NPD
code
Norwegian
guidelines
that is defined
Petroleum
for designation
by the
Directorate
authoritative
of wells
(NPD).
and
body
2wellbores".
Wellbore
of the?country
deignation
where
detreimined
the well is by
situated.
the NPD. 3. Wellbore Endret
designation
i internt
maintained
OD/PtilFjernes
Prosjekt
by theihht
operator
endringer
company
fra Ptil/OD
based on NPD guidelines.
INFORMATION_CONTENT_CLASS
RDATE CHARACTERISTIC_CLASS DATE OF CDRS REPORT REMARK A date and time that is the date to which the reported remark is related. DATE AND TIME A point in time when a particular activity took place. grp_opsReport Endret i internt OD/Ptil Prosjekt
Fjernes ihht endringer fra Ptil/OD
A description that gives additional information
TEXT / TEXT any additional information ? INFORMATION_CONTENT_CLCDRS REPORT REMARK
about the report. DESCRIPTION An information that describes something. Endret i internt OD/PtilFjernes
Prosjekt
ihht endringer fra Ptil/OD
3.13 REPORT part XIII - Lithology[5]
WELL NPD WELL IDENTIFICATION CODE A well official identification code that is identifying
Thea code
well or
is wellbore
a concatination
on the Norwegian
of three other
WELL
Continental
codes.
OFFICIAL
1Shelf.
Well
IDENTIFICATION
designation
The format
A well
determined
is given
identification
CODEby the
by the
"NPD
code
Norwegian
guidelines
that is defined
Petroleum
for designation
by the
Directorate
Concatination
authoritative
of wells
(NPD).
and
of
body
the
2wellbores".
Wellbore
of
following
the?country
deignation
threewhere
codes:
detreimined
the
"NPD
well well
is by
situated.
designation",
the NPD. 3. Wellbore
"NPD wellbore
Mail
designation
sendt
designation"
tilmaintained
Jonas and
22.11
by
"Oilfield
the operator
operatorcompany
maintained
based
wellbore
on NPDdesignation".
guidelines.
INFORMATION_CONTENT_CLASS
RDATE CHARACTERISTIC_CLASS
DATE OF LITHOLOGY REPORT A date and time that is the date at which the lithology data is reported. DATE AND TIME A point in time when a particular activity took place. grp_opsReport RDATE brukt flere plasser
FDMD / FDMD 'give measured depth where interval started.' MEASURE_CLASS MESURED DEPTH AT START OF LITHOLOGY INTERVAL
A measure
RELATIVE
depth RKB
that is- METRE
the measured depth of the upper end of a lithology interval. MEASURED DEPTH A depth that is the depth measured along the centre of a hole, pit or well.
MESURED DEPTH AT END LITHOLOGY A measure depth that is the measured depth A depth that is the depth measured along
TDMD / TDMD 'give measured depth where interval ended.' MEASURE_CLASS MEASURED DEPTH
INTERVAL RELATIVE RKB - METRE at the lower end of a lithology interval. the centre of a hole, pit or well.
TEXT INFORMATION_CONTENT_CLASS
Any geological/lithological description/evaluation is to be listed here (Variable freetext length.): WELLBORE INTERVAL LITHOLOGY DESCRIPTIONA description that gives a geological/lithological description/evaluation of the interval.DESCRIPTION An information that describes something.
RDATE A date and time that is the date and time at A point in time when a particular activity took RDATE brukt flere plasser
CHARACTERISTIC_CLASS DATE AND TIME OF EQUIPMENT FAILURE DATE AND TIME
STOP which the equipment failed. place. ?
A measured depth that is the measured depth
MEASURED DEPTH TO OPERATION END POINT A depth that is the depth measured along
DMD MEASURE_CLASS
DUE TO FAILURE RELATIVE TO RKB - METRE
to the point where the described operation MEASURED DEPTH
the centre of a hole, pit or well.
? Finnes flere plasser (2NB i meter
came to an end due to equipment failure.
Alternative name is KICK. Definition An event that is not part of the standard
An incident that is an unintended flow of derived from "Dictionary of operation of a service and which causes, or
WELL CONTROL INCIDENT INCIDENT
formation fluid into a well being drilled. Petroleum Exploration, Drilling, & may cause, an interruption to, or reduction
Production", PennWell Books 1991 in, the quality of that service.
ACTIVITY_CLASS
A date and time that is the date and time at
which the well control incident was detected A point in time when a particular activity took
RDATE CHARACTERISTIC_CLASS DATE AND TIME OF WELL CONTROL INCIDENT
and ongoing main and sub operations had to
DATE AND TIME
place. grp_opsReport RDATE brukt flere plasser Covering 254/STOP
be aborted.
DATE AND TIME OF WELL CONTROL INCIDENT A date and time that is the time when a well A point in time when a particular activity took
STOP CHARACTERISTIC_CLASS DATE AND TIME Covered by 253/RDATE
END control incident has come to an end. place.
SUPERIOR CLASS_OF_CLASS CDRS SUPERIOR CLASS A CDRS operation class that is a class of drilling activities involving the use of new CDRS
drilling OPERATION
equipment andCLASS
techniqes.
A cdrs class that is refering to classes of mainoperations and suboperations as well as the evaluation of these operations used by a cdrs report.
MAINOP CLASS_OF_CLASS CDRS MAIN OPERATION CLASS A CDRS operation class that is a class defined by NPD to be a main operation class.
CDRS OPERATION CLASS A cdrs class that is refering to classes of mainoperations and suboperations as well as the evaluation of these operations used by a cdrs report.
MEASURE_CLASS LOST TIME DUE TO WELL CONTROL INCIDENT A duration that is the lost time due to a well control incident, measured from the wellDURATION
control incident was detectedThe
until
continuance
the operation
or length
is resumed.
of time Changed since 6
MINUTES /MINUTES gives the miss minutes MEASURE_CLASS LOST TIME DUE TO WELL CONTROL INCIDENT - MINUTES
A lost time due to well control incident that is given in minutes. LOST TIME DUE TO WELL CONTROL
A duration INCIDENT
that is the lost time due to a well control incident, measured New
from since
the well
6 control incident was detected until the operation is resumed.
MEASURE_CLASS DRILL BIT OUTSIDE DIAMETER An outside diameter that is the outside diameter of a drill bit. OUTSIDE DIAMETER cs_bitRecord
A diameter which is across the outside cross section of a circular object.
BIT /BIT gives the bit size x MEASURE_CLASS DRILL BIT OUTSIDE DIAMETER AT TIME OF WELL A
CONTROL
drill bit outside
INCIDENT
diameter
- INCH
at time of well control incident that is given in inches. DRILL BIT OUTSIDE DIAMETER
A drillAT
bitTIME
outside
OFdiameter
WELL CONTROL
of the drillbit
INCIDENT
at the time when a well control incident occured
When impermeable
rocks such as shales
form as sediments are
compacted, their pore
fluids cannot always
RESERVOIR PORE PRESSURE EQVIVALENT A formation pore pressure that is expressed RESERVOIR PORE A pressure that is the pressure of fluids
PPRESS MEASURE_CLASS
MUD WEIGHT - G/CM3 by eqvivalent drilling fluid (mud) weight PRESSURE within the pores of a reservoir.
escape and must then
support the total
overlying rock column,
leading to anomalously
high formation
pressures.
NOMINAL OUTSIDE
A nominal outside diameter of the last A nominal outside diamater of a well casing
NOMINAL OUTSIDE DIAMETER OF THE LAST DIAMETER OF THE LAST
CSDIM MEASURE_CLASS installed well casing string that is measured in string that is the nominal outside diameter of
INSTALLED WELL CASING STRING - INCHES INSTALLED WELL
inches. the last run casing string in a wellbore.
CASING STRING
An well control incident where shallow gas is WELL CONTROL An incident that is an unintended flow of
ACTIVITY_CLASS SHALLOW GAS KICK wildcat drilling Changed since 6
flowing incidently into a well being drilled. INCIDENT formation fluid into a well being drilled.
An well control incident where water is flowing WELL CONTROL An incident that is an unintended flow of
ACTIVITY_CLASS WATERKICK wildcat drilling Changed since 6
incidently into a well being drilled. INCIDENT formation fluid into a well being drilled.
An well control incident where crude oil is WELL CONTROL An incident that is an unintended flow of
ACTIVITY_CLASS OILKICK Changed since 6
flowing incidently into a well being drilled. INCIDENT formation fluid into a well being drilled.
An well control incident where gas is flowing WELL CONTROL An incident that is an unintended flow of
ACTIVITY_CLASS GASKICK incidently into a well being drilled. INCIDENT formation fluid into a well being drilled. Changed since 6
TRUE DEPTH TO TOP OF FORMATION RELATIVE A true depth that is the true depth to the top of A depth that is the vertical depth measured
DEPTH_TVD MEASURE_CLASS TRUE DEPTH New
RKB - METRE a formation or well zone relative to RKB. perpendicular to the surface.
WELL INFORMATION_CONTENT_CLASS
NPD WELL IDENTIFICATION CODE A well official identification code that is identifying
Thea code
well or
is wellbore
a concatination
on the Norwegian
of three other
WELL
Continental
codes.
OFFICIAL
1Shelf.
Well
IDENTIFICATION
designation
The format
A well
determined
is given
identification
CODEby the
by the
"NPD
code
Norwegian
guidelines
that is defined
Petroleum
for designation
by the
Directorate
Concatination
authoritative
of wells
(NPD).
and
of
body
the
2wellbores".
Wellbore
of
following
the?country
deignation
threewhere
codes:
detreimined
the
"NPD
well well
is by
situated.
designation",
the NPD. 3. Wellbore
"NPD wellbore
Mail
designation
sendt
designation"
tilmaintained
Jonas and
22.11
by
"Oilfield
the operator
operatorcompany
maintained
based
wellbore
on NPDdesignation".
guidelines.
OPEN_DATE Date when perforation interval is opened CHARACTERISTIC_CLASS DATE FOR OPENING OF WELL PERFORATION INTERVAL
A date and time that is the date at which a well perforation interval is opened. DATE AND TIME A point in time when a particular activity took place. New
DATE FOR CLOSING OF WELL PERFORATION A date and time that is the date at which a A point in time when a particular activity took
CLOSE_DATE Date when perforation interval is closed CHARACTERISTIC_CLASS
INTERVAL well perforation interval is closed.
DATE AND TIME
place.
New
FROM_DEPT Top of perforation interval (m MD RKB) MEASURE_CLASS MEASURED DEPTH TO TOP OF PERFORATION INTERVAL
A measured
RELATIVE
depth that
RKBis -depth
METREat top of perforation interval measured from rotary kelly
MEASURED
bushing (RKB).
DEPTH A depth that is the depth measured along the centre of a hole, pit or well.
New
H
MEASURED DEPTH TO BOTTOM OF A measured depth that is depth at bottom of
A depth that is the depth measured along
TO_DEPTH Bottom of perforation interval (m MD RKB) MEASURE_CLASS PERFORATION INTERVAL RELATIVE RKB - perforation interval measured from rotary kelly MEASURED DEPTH New
the centre of a hole, pit or well.
METRE bushing (RKB).
Data elements from CDRS
Status ENTITY ISO 15926 Class name ISO 15926 Class definition ISO 15926 Comments
OK ACTIVITY_CLASS
FAIL ACTIVITY_CLASS
Legal sub
CLASS_OF_CLAS
modes S
SUBMODE1
To accept an operation
which means to approve
ACCEPTED OPERATION that the results of an TO ACCEPT
operation fulfills the
requirements set.
To stop functioning
To make a
rounded
hole or
cavity in a
A drilling activity or drilling operation
TO DRILL solid by
that is carried out with a drilling rig.
removing
bits with a
rotating
drill
INFORMATION_CO
OK NTENT_CLASS
INFORMATION_CO
FAIL NTENT_CLASS
Personnel injury in
connection with drilling INFORMATION_CO
INJURY
and/or drilling related NTENT_CLASS
operations.
Circulation impossible
INFORMATION_CO
M LOSS due to plugging or NTENT_CLASS
failure of equipment.
Operations had to be
INFORMATION_CO
HANG aborted due to a hang NTENT_CLASS
off operation.
DRILLING
OPERATION A cdrs sub operation outcome
CDRS SUB OPERATION
RESULTING IN informing that an operation has
OUTCOME
PERSONNELL involved a personnel injury.
INJURY
DRILLING
A cdrs sub operation outcome
OPERATION CDRS SUB OPERATION
informing that formation fluid
RESULTING IN WELL OUTCOME
invaded the wellbore.
KICK
DRILLING
A cdrs sub operation outcome
OPERATION
informing that circulation (of CDRS SUB OPERATION
RESULTING IN LOSS
drilling fluid) is lost to OUTCOME
OF DRILLING FLUID
formation.
TO FORMATION
DRILLING
OPERATION A cdrs sub operation outcome
CDRS SUB OPERATION
RESULTING IN informing that equipment got
OUTCOME
EQUIPMENT STUCK stuck in the hole / wellbore.
IN WELLBORE
DRILLING
A cdrs sub operation outcome
OPERATION CDRS SUB OPERATION
informing that equipment
RESULTING IN OUTCOME
failure occured.
EQUIMENT FAILURE
An information
A result that is information about the
RESULT which is output of
outcome of a cdrs main operation.
some action