You are on page 1of 43

Here is Your Customized Document

Your Configuration is:

Plan installation
Model - DLm8100
Backend storage type - Data Domain
Document ID - 1401718243167

Reporting Problems

To send comments or report errors regarding this document,


please email: mydocs.dlm@emc.com.
For Issues not related to this document, contact your service provider.
Refer to Document ID:
1401718243167
Content Creation Date June 2, 2014
EMC Disk Library for mainframe
Version 4.0.0

Physical Planning Guide for DLm8100 with


Data Domain
Copyright © 2013 EMC Corporation. All rights reserved. Published in USA.

Published September, 2013

EMC believes the information in this publication is accurate as of its publication date. The information is subject to change
without notice.

The information in this publication is provided as is. EMC Corporation makes no representations or warranties of any kind with
respect to the information in this publication, and specifically disclaims implied warranties of merchantability or fitness for a
particular purpose. Use, copying, and distribution of any EMC software described in this publication requires an applicable
software license.

EMC², EMC, and the EMC logo are registered trademarks or trademarks of EMC Corporation in the United States and other
countries. All other trademarks used herein are the property of their respective owners.

For the most up-to-date regulatory document for your product line, go to EMC Online Support (https://support.emc.com).

EMC Corporation
Hopkinton, Massachusetts 01748-9103
1-508-435-1000 In North America 1-866-464-7381
www.EMC.com

2 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
CONTENTS

Tables 5

Figures 7

Preface 9

Chapter 1 Physical Planning 13


Planning overview......................................................................................... 14
DLm system presite considerations............................................................... 14
Physical specifications.....................................................................14
General considerations.................................................................... 14
Transportation and delivery guidelines.............................................15
Pre-installation considerations......................................................................15
Environmental specifications........................................................... 15
System host cabling requirements................................................... 15
Layout and space recommendations................................................ 15
Remote support............................................................................... 16
EMC Secure Remote Support............................................................ 16
Planning for upgrades...................................................................... 16

Chapter 2 System Configuration and Host Connectivity 17


DLm8100 overview........................................................................................18
VTEC bay.......................................................................................... 18
VNX bay........................................................................................... 18
VNX storage bay...............................................................................18
Data Domain bay..............................................................................19
DAE..................................................................................................19
Modems...........................................................................................19
Installation information.................................................................................19

Chapter 3 Physical and Environmental Specifications 21


Physical data.................................................................................................22
DLm8100......................................................................................... 22
External network and phone line requirements..............................................22
DLm8100......................................................................................... 22
Environmental specifications........................................................................ 23
Air flow.............................................................................................24
Environment acclimation..................................................................24
Power and cooling data....................................................................25
Dimensions and service area.........................................................................25
Shipping dimensions and clearance requirements........................................ 26
System placement.........................................................................................28
DLm8100 configuration floor cutouts............................................... 28
Anti-tip and anti-move brackets....................................................... 29

EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain 3
CONTENTS

Chapter 4 Power Requirements 31


DLm power requirements.............................................................................. 32
Single-phase power extension cords and connectors....................... 33
DLm touch current compliance...................................................................... 35
Regulatory compliance.................................................................................. 36
Choosing a UPS.............................................................................................36

Chapter 5 Package Removal 39


Inspect the system shipment.........................................................................40
Unpacking procedure.................................................................................... 40

4 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
TABLES

1 Pre-installation responsibility summary......................................................................... 14


2 External dependencies.................................................................................................. 19
3 DLm physical specification for a single bay.................................................................... 22
4 DLm8100 external network and phone line requirements.............................................. 23
5 DLm environmental data................................................................................................23
6 Environmental requirements for shipping and storage................................................... 24
7 Environmental acclimation............................................................................................ 24
8 DLm8100 power consumption and heat dissipation...................................................... 25
9 North American, single-phase, electrical specifications................................................. 32

EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain 5
TABLES

6 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
FIGURES

1 External connections for DLm8100................................................................................ 23


2 DLm cabinet dimensions and access area......................................................................26
3 Shipping dimensions.....................................................................................................27
4 Unloading the pallet...................................................................................................... 28
5 DLm8100 configuration floor cutout.............................................................................. 28
6 Rack measurement for anti-tip brackets.........................................................................29
7 Rack measurements for anti-move brackets...................................................................30
8 Power distribution cabling — DLm8100......................................................................... 33
9 EMC model number DLmP40U-60-US cable description................................................. 34
10 Power cords and connectors.......................................................................................... 35
11 Cutting the tape and straps............................................................................................41
12 Removing the packing material of the bay......................................................................42

EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain 7
FIGURES

8 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Preface

As part of an effort to improve and enhance the performance and capabilities of its
product lines, EMC periodically releases revisions of its hardware and software.
Therefore, some functions described in this document may not be supported by all
versions of the software or hardware currently in use. For the most up-to-date information
on product features, refer to your product release notes.
If a product does not function properly or does not function as described in this
document, please contact your EMC representative.
This document provides information about the physical and environmental requirements,
floor placement, connectivity, and power requirements for planning the installation of
DLm systems.
Audience
This manual is part of the documentation set for the EMC Disk Library for mainframe
(DLm) system and is intended for customers, including the system administrators, the
customer’s electrician, and EMC Sales and Customer Support personnel involved in
planning the installation of DLm systems.
Chapter 1, “Physical Planning,” on page 13 provides an overview of the physical
planning for the DLm systems.
Chapter 2, “System Configuration and Host Connectivity” on page 17 provides an
overview of the connectivity for the DLm systems.
Chapter 3, “Physical and Environmental Specifications” on page 21 explains the
physical and environmental requirements for DLm systems.
Chapter 4, “Power Requirements,” on page 31 provides the power requirements and
information about connecting the DLm systems to a customer’s source PDU.
Chapter 5, “Package Removal,” on page 39 provides the suggested system floor
placement for DLm systems.
Related documentation:
u EMC Disk Library for mainframe User Guide
u EMC Disk Library for mainframe Unpacking Guide
u EMC Disk Library for mainframe Release Notes
The EMC documents specified here and additional Celerra information are available in
the EMC Online Support website:
http://support.emc.com
Additional Data Domain information are available in the Data Domain portal:
https://my.datadomain.com
Conventions used in this document
EMC uses the following conventions for special notices.

Note

A note presents information that is important, but not hazard-related.

EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain 9
Preface

CAUTION

A caution contains information essential to avoid data loss or damage to the system or
equipment.

IMPORTANT

Note

An important notice contains information essential to software or hardware operation.

WARNING

DANGER

A warning contains information essential to avoid hazardous situations that can cause
severe personal injury, death, or substantial property damage if you ignore the warning.

DANGER

DANGER

A danger notice contains information essential to avoid hazardous situations that will
cause severe personal injury, death, or substantial property damage if you ignore the
message.

Typographical conventions
EMC uses the following type style conventions in this document:

Normal Used in running (nonprocedural) text for:


u Names of interface elements (such as names of windows, dialog
boxes, buttons, fields, and menus)
u Names of resources, attributes, pools, Boolean expressions,
buttons, DQL statements, keywords, clauses, environment
variables, functions, utilities
u URLs, pathnames, filenames, directory names, computer names,
filenames, links, groups, service keys, file systems, notifications

Bold Used in running (nonprocedural) text for:


u Names of commands, daemons, options, programs, processes,
services, applications, utilities, kernels, notifications, system
calls, man pages
Used in procedures for:
u Names of interface elements (such as names of windows, dialog
boxes, buttons, fields, and menus)
u What user specifically selects, clicks, presses, or types

Italic Used in all text (including procedures) for:


u Full titles of publications referenced in text
u Emphasis (for example a new term)
u Variables
Courier Used for:

10 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Preface

u System output, such as an error message or script URLs, complete


paths, filenames, prompts, and syntax when shown outside of
running text
Courier Used for:
Bold
u Specific user input (such as commands)
Courier, Used for:
Italic
u Arguments used in examples of command-line syntax
u Variables in examples of screen or file output
u Variables in path names
Courier, Variables used in a command-line sample
bold,
italic

<> Angle brackets enclose parameter or variable values supplied by the


user
[] Square brackets enclose optional values
¦ Vertical bar indicates alternate selections - the bar means “or”
{} Braces indicate content that you must specify (that is, x or y or z)
… Ellipses indicate nonessential information omitted from the example

Where to get help


EMC support, product, and licensing information can be obtained as follows.
Product information — For latest documentation, release notes, software updates, or for
information about EMC products, licensing, and service, go to the EMC Online Support
website (registration required) at:
http://support.emc.com
Technical support — Go to EMC Online Support and click Service Center. You will see
several options for contacting EMC Technical Support. Note that to open a service
request, you must have a valid support agreement. Contact your EMC sales
representative for details about obtaining a valid support agreement or with questions
about your account.
Your comments
Your suggestions will help us continue to improve the accuracy, organization, and overall
quality of the user publications. Please send your opinions of this document to:
mailto:techpubcomments@EMC.com
If you have issues, comments, or questions about specific information or procedures,
please include the title and, if available, the part number, the revision (for example, A04),
the page numbers, and any other details that will help us locate the subject you are
addressing.

EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain 11
Preface

12 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
CHAPTER 1
Physical Planning

This chapter covers the tasks to be completed when planning an installation of DLm
systems at the customer site.

u Planning overview................................................................................................. 14
u DLm system presite considerations....................................................................... 14
u Pre-installation considerations..............................................................................15

Physical Planning 13
Physical Planning

Planning overview
This section provides an overview of the planning requirements for EMC® Disk Library for
mainframe (DLm) installation. It reviews EMC's responsibilities and outlines your
responsibilities as a DLm user.

Note

Inform EMC of any labor union-based restrictions or security clearance requirements prior
to delivery

The DLm systems must be installed in a properly equipped computer room with
controlled temperature and humidity, proper airflow and ventilation, proper power and
grounding, system cable routing facilities, fire equipment, and so on. A raised floor is
recommended, although it is not required. One or more planning sessions with your EMC
Systems Engineer and EMC Customer Support Representative will be necessary to close
all the details related to installation. The table below lists the responsibility summary at
the first planning session.

Table 1 Pre-installation responsibility summary

EMC Customer
Provide all details necessary for site Provide an environment that supports safe installation of
planning and preparation. the DLm system and promotes its reliable long-term
operation.

Complete and process the Provide appropriate modem phone line, power, cooling
Installation Planning Task Sheet and and ventilation, humidity control, floor load capability, and
Presite Survey. service clearances as required.

Arrange for shipment and delivery Participate in planning sessions as required to ensure a
through an appropriate method. smooth and uncomplicated installation.

Install a properly working system.

DLm system presite considerations


When planning the installation site for your DLm system, meet with your EMC
representative to complete the presite plan.

Physical specifications
Chapter 3, “Physical and Environmental Specifications,” on page 21 provides overall
system dimensions for the DLm systems.

General considerations
Before installing the DLm system at your site, consider these factors:
u Weight capacities of the service elevator if delivery is to another floor
u Availability of an equipment ramp if the receiving floor is not on the same level as the
computer room floor.

14 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Physical Planning

Note

All portions of the bay should clear ramp and threshold slopes up to 1:10 (rise to run
ratio), per Code of Federal Regulations – ADA Standards for Accessible Design, 28
CFR Part 36.
u Weight capacities of the loading dock
u Weight capacities of the tailgate
Other requirements are:
u Appropriate floor covering for protection
u Direct dial-up phone line (for remote support) within 6 ft (two meters) of the unit
u Hardware power requirements
Chapter 4, “Power Requirements,” on page 31 specifies the power requirements for
the DLm bays.

Transportation and delivery guidelines


Mode of transport guidelines:
u For a DLm system delivered within the United States or Canada, EMC recommends an
air-ride truck. The DLm system is wrapped in custom-designed shipping material,
crated, and palletized.
u For a DLm system delivered internationally, EMC recommends shipment by air freight.
Unless otherwise instructed, the EMC Traffic Department arranges for delivery directly
to the customer’s computer room.
To ensure successful delivery of DLm systems, EMC has formed partnerships with
specially selected moving companies. These companies have moving professionals
trained to properly handle large, sensitive systems. These companies provide the
appropriate personnel, floor layouts, and any ancillary moving equipment required to
facilitate delivery.

Pre-installation considerations
Install the DLm in a properly equipped and well-ventilated computer room.

Environmental specifications
DLm requires the environmental specifications outlined in “Environmental
specifications” on page 23. Ensure that the site meets or exceeds the specifications
listed for both raised and non-raised floor environments.

System host cabling requirements


The Presite Survey, completed with the EMC Systems Engineer, reports the Fibre
connection (FICON) cable length required for each host connection to the DLm. From a
physical planning perspective, review the routing paths from the hosts to the DLm
system. Resolve any physical access issues before the installation day.

Layout and space recommendations


Layout and space considerations are described in “System placement” on page 28.

Transportation and delivery guidelines 15


Physical Planning

CAUTION

When moving the DLm bays down an incline, the rear of the bay must go first and when
moving up an incline, the rear of the bay must go last.

Remote support
Remote support is an important and integral part of the EMC customer service and
support strategy. Communication between the EMC Customer Support Center and the
DLm occurs either through IP connections to the customer's local area network, or
through the external serial modem connected to the DLm, which requires customers to
provide one dedicated phone line for the modem. You can move phone lines between
modems connected to the Management VTEs and Control Stations as needed.

Note

EMC recommends that you provide one dedicated phone line for the DLm system to
enable ConnectEMC call-homes.

DLm supports one modem in each of its Management VTEs and Control Stations.
“Modems” on page 19 section provides more information about the modems DLm8100
supports.

EMC Secure Remote Support


DLm 4.0 and later supports EMC Secure Remote Support (ESRS) Gateway that provides a
secure, IP-based, distributed remote service support solution giving you command,
control, and visibility of remote support access.
Contact EMC Customer Support to configure ESRS. This is an optional feature.

Planning for upgrades


When planning for upgrades, consider space, power, and environmental concerns.

16 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
CHAPTER 2
System Configuration and Host Connectivity

This chapter covers the configuration and host connectivity details of the DLm system.

u DLm8100 overview................................................................................................18
u Installation information.........................................................................................19

System Configuration and Host Connectivity 17


System Configuration and Host Connectivity

DLm8100 overview
A DLm8100 configuration is composed of a VTEC bay, up to two VNX bays, up to two Data
Domain bays (DD890 or DD990), and up to 10 VNX storage bays.
DLm supports DAEs with 2 TB drives.

CAUTION

The DLm8100 VTEC, VNX, Data Domain, and VNX storage bay equipment enclosures and
power systems are designed to support DLm8100 system equipment only. EMC does not
support any other components in these bays, and recommends that you do not install
any additional equipment in the DLm8100 bays.

VTEC bay
The DLm8100 VTEC bay contains:
u Two to six VTEs including two management VTEs
u Two 10 GbE switches
u Two 1 GbE switches
The DLm VTEC bay has two power zones with independent power cables—one for each
side, capable of powering the fully configured bay.

Note

Channel extenders are not supported.

VNX bay
The DLm8100 VNX bay contains:
u One network server (VNX7500) and integrated storage arrays with:
l Two to eight storage controllers (Data Movers)
l Two Control Stations
l Two storage processors—SPA and SPB
l Dual standby power supplies
u Up to nine DAEs
The DLm8100 VNX bay has four power zones with independent power cables—one for
each side, capable of powering a fully configured bay.

Note

The DLm8100 VNX bay needs 2 power drops if the VNX bay has up to 7 Data Movers and
4 power drops if it contains 8 Data Movers.

Chapter 4, “Power Requirements” on page 31 contains specifications for DLm power


requirements.

VNX storage bay


The DLm8100 storage bay is configured with up to 13 storage DAEs.

18 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
System Configuration and Host Connectivity

The storage bay normally connects to two power zones through two connectors.

Data Domain bay


DLm8100 can have either a DD890 or a DD990 backend. The Data Domain bay contains:
u One DD controller
u ES30 enclosures:

For new DLm 4.0 with Data Domain shipped from the factory—2 to 6 ES30 enclosures
containing 2 TB drives per DD890/DD990.
Each enclosure can accommodate fifteen 2 TB drives.
u Two power drops

DAE
Each storage DAE includes:
u Fifteen 2 TB SAS disk drives
u Two LCCs
u Redundant power supplies
The boot DAE includes:
u Four SAS drives
u Two LCCs
u Redundant power supplies
u Two power drops for maximum configuration

Modems
DLm8100 is shipped with a minimum of two modems. Each Management VTE supports a
modem.
In addition, DLm8100 systems with unified file storage (VNX) can support two or four
more modems depending on the number of VNX7500 network servers attached. Each
VNX network server supports two Control Stations and each Control Station supports a
modem. So a DLm8100 system with two VNX7500 network servers supports six modems.
The DD890/DD990 does not need a modem and is therefore not shipped with one.

Installation information
Discuss and obtain the following site profile information from the EMC Sales
Representative. The below table lists the external dependencies that need to be
considered for configuring DLm systems.

Table 2 External dependencies

Requirements Specifications
Mainframe software l Operating system and version number
l JES2 or JES3

Channel information l Channel type

Data Domain bay 19


System Configuration and Host Connectivity

Table 2 External dependencies (continued)

Requirements Specifications

l Number of channels
l Type of channels: FICON

Configuration information l LPARs which will use DLm


l Physical Control Unit Address (CUADD)
l Physical Device Addresses (UNITADD)
l Device type
l Device name— logical device name for VTE display
l Tape volume prefix

Tape management system l Tape management system


information
l Version
l Scratch reports used

Tape volume information l Volume serial number range for VTE tapesa
l Quantity of tape volumes

Purpose of DLm l Number of physical drives that will be replaced by virtual tapes
l Mainframe applications that will access the virtual tapes
l Backup software that will be used on the VTE

a. DLm can support many such VOLSER ranges.

20 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
CHAPTER 3
Physical and Environmental Specifications

This chapter covers the physical and environmental specifications for DLm.

u Physical data.........................................................................................................22
u External network and phone line requirements......................................................22
u Environmental specifications................................................................................ 23
u Dimensions and service area.................................................................................25
u Shipping dimensions and clearance requirements................................................ 26
u System placement.................................................................................................28

Physical and Environmental Specifications 21


Physical and Environmental Specifications

Physical data
This section provides the physical data requirements for DLm systems.

DLm8100
DLm8100 has a maximum configuration of one VTEC bay, two VNX bays, 10 VNX storage
bays, and two DD890 or DD990 bays.
When fully configured, the weight of each bay is:
u VTEC bay—925 lb (396.89 kg)
u VNX7500 bay—1345 lb (610.08 kg)
u VNX storage bay—1270 lb (576.06 kg)
u DD890/DD990 bay—1270 lb (576.06 kg)
Despite the differences in weight, the physical dimensions of all the bays are the same.
The below table lists the physical specifications for DLm.

Table 3 DLm physical specification for a single bay

Description Measurements
Height 76.66 in (194.7 cm)a

Width 24.02 in (61.0 cm)

Depth DLm 41.88 in (106.4 cm)

Clearance for service and airflow

Front 42 in (106.7 cm)

Rear 42 in (106.7 cm)

Top 18 in (45.7 cm)

a. With trim kit (optional) attached.

External network and phone line requirements

DLm8100
DLm8100 has two Management VTEs. Each Management VTE has two 1 GbE ports (for
redundancy) which should be connected to your organization's network. It is
recommended that one port from each Management VTE is connected to one network
switch and the other two ports are connected to another network switch. This ensures
that failure of one switch does not affect Management VTE connectivity.
The cables to connect these ports to your network are not supplied with DLm. Therefore,
you should provide four network cables to connect the Management VTE to your network.
In addition to these cables, the customer is also required to provide network cables for
each VNX and DD replication connection. The number of cables required depends on the
number of data movers and the number of Data Domain systems. Each data mover has 8
ports to choose from for replication: 4x1 GbE copper ports and 4x1 GbE fiber ports.
Similarly each Data Domain system can have 2 to 4 ports for replication.

22 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Physical and Environmental Specifications

DLm8100 provides modems as an optional mechanism for calling home and remote
access. (The preferred mechanism is to use ConnectEMC/ESRS.) DLm8100 has at least
two modems - one for each Management VTE. You will need to provide phone lines for
these modems. Each VNX also has two modems. If DLm8100 has one VNX, you might
need to provide two additional phone lines; if it has two VNX systems, you might need to
provide four additional phone lines.
The below table lists the external network and phone line requirements for DLm8100.

Table 4 DLm8100 external network and phone line requirements

DLm8100 1 GbE cables (Copper) 1 GbE cables (Fiber) Phone lines


Management VTE1 2 0 1

Management VTE2 2 0 1

VNX-1 0 - [4 * # of Data Movers] 0 - [4 * # of Data Movers] 2

VNX-2 0 - [4 * # of Data Movers] 0 - [4 * # of Data Movers] 2

Data Domain-1 2-4

Data Domain-2 2-4

The below figure shows external connections for DLm8100.


Figure 1 External connections for DLm8100

DAE 8

DAE 7

DAE 6

10 GbE Switch 2 DAE 5


10 GbE Switch 1
Cable Management DAE 4
10 GbE Switch 2
10 GbE Switch 1 DAE 3
Cable Management
Sliding Tray
DAE 2
ES 30 #6
DAE 1
ES 30 #4
Vault DAE 0
VTE 6 ES 30 #2 Control Station 1 Phone
Control Station 0 Phone
VTE 5 0-4 IP Replication DM Enclosure 7 (optional)
2-4 Replication Controller 0-4 IP Replication
DM Enclosure 6 (optional)
VTE 4 0-4 IP Replication DM Enclosure 5 (optional)
ES 30 #1 DM Enclosure 4 (optional) 0-4 IP Replication
VTE 3 0-4 IP Replication DM Enclosure 3 (optional)
DM Enclosure 2 (optional) 0-4 IP Replication
2 IP Connections VTE 2 Phone ES 30 #3 0-4 IP Replication DM Enclosure 1
DM Enclosure 0 0-4 IP Replication
2 IP Connections VTE 1 Phone
SP - A SP - B
ES 30 #5
SPS

VTEC DD890/DD990 VNX7500 GEN-002107

Environmental specifications
The below table provides the environmental specifications for the DLm system.

Table 5 DLm environmental data

Condition Limits
Operating temperature 50°F – 90°F (10°C to 32°C)

Operating altitude (at 32°) 7500 ft (2286 m)

Environmental specifications 23
Physical and Environmental Specifications

Table 5 DLm environmental data (continued)

Condition Limits
Operating altitude (maximum) 10,000 ft (3048 m) 1.1° derating per 1000 ft

Operating humidity 20% to 80% non-condensing

Raised floor environment Recommended but not required

Air flow
The below table lists the required environmental conditions during shipping and storage
of the DLm system.

Note

The air flow direction for cooling the systems should be from front to rear

Table 6 Environmental requirements for shipping and storage

Condition Setting
Ambient temperature -40°F to 149°F (-40°C to 65°C)

Temperature gradient 43.2°F/hr (24°C/hr)

Relative humidity 10% to 90% non-condensing

Maximum altitude 35000 ft (10667.6 m)

Environment acclimation
A DLm system requires time to get acclimated to a computer room environment before
and after you unpack it. Before unpacking the unit, allow it to stabilize for 16 hours. After
unpacking the unit, do not connect it to AC power for at least the number of hours
specified in the below table.

Table 7 Environmental acclimation

Transit / storage environment Hours required before applying power (minimum)

Condition (°F) (°C) %RH


Nominal 68–72 20–22 <30% 0–1

Cool/Damp <68 <20 >30% 4

Cold/Dry <68 <20 <30% 4

Hot/Dry 72–149 22–65 <30% 4

Hot/Humid 72–149 22–65 30–45% 4

72–149 22–65 45–60% 8

72–149 22–65 60–90% 16

24 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Physical and Environmental Specifications

Note

The system's environment must have temperature and humidity values that prevent
condensation to occur on any system part. Altitude and atmospheric pressure
specifications are referenced to a standard day at 58.7°F (14.8°C). Maximum wet bulb
temperature is 82°F (28°C).

Power and cooling data


The below table provides details of power consumption and heat dissipation for
DLm8100 systems.

Table 8 DLm8100 power consumption and heat dissipation

System configuration Total power consumption Heat dissipation (Btu/Hr)


descriptiona
VTEC bay 3.20 kVA 11,000

VNX bay 5.44 KVA 16,700

VNX storage bay 3.47 KVA 10,800

DD890/DD990 bay 5.81 KVA 19,000

a. All VTEC bay values are calculated for a fully loaded configuration. Contact your EMC Sales
Representative for specific supported configurations.

Dimensions and service area


Because DLm cabinets (or bays) ventilate through the rear, you must provide adequate
clearance to service and cool the system, as illustrated in the below figure.

Power and cooling data 25


Physical and Environmental Specifications

Figure 2 DLm cabinet dimensions and access area


EMC Width
Disk Library for mainframe 24.02 in.
cabinet (61.0 cm)

Height
76.66 in.
(194.7 cm)

Depth
41.88 in.
(106.4 cm) Top access
18.0 in.
(45.7 cm)

EMC
Disk Library for mainframe
cabinet

Rear access
42.00 in.
(106.7 cm)

Front access
42.00 in.
(106.7 cm) GEN-001156

Shipping dimensions and clearance requirements


All the bays have the same dimensions.

Note

Read the entire procedure before unpacking.

Ensure that your doorways and elevators are adequately wide and tall enough to
accommodate the shipping pallet and bay as shown in the below figure.

26 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Physical and Environmental Specifications

Figure 3 Shipping dimensions

81.00 in.
(205.7 cm)

48.00 in. 42.00 in.


(121.9 cm) (106.7 cm)
GEN-001140

Use a mechanical lift or pallet jack to position the packaged bay in its final location.
Leave approximately 96 in. of clearance at the back of the bay to unload the unit and roll
it off the pallet as illustrated in the below figure.

Shipping dimensions and clearance requirements 27


Physical and Environmental Specifications

Figure 4 Unloading the pallet

System placement
You can install a DLm system on a solid floor or a raised floor.
Although not required, the raised floor environment is preferred.

DLm8100 configuration floor cutouts


DLm8100 supports a maximum of 15 bays with two fully configured VNX7500 systems
and two DD890 or DD990 systems. The below figure illustrates the configuration and the
recommended floor tile cutouts for the DLm8100 configuration. The illustrations assume
that the floor tiles are 24 x 24 in. (61 x 61 cm).
Figure 5 DLm8100 configuration floor cutout
VNX Storage bays VNX Storage bays

VNX bay DD bay VTEC bay DD bay VNX bay


42.00 in.
Service area

24.02 in.

6.00 in.
8.00 in.

41.88 in.
Includes
front and
rear doors

Front 42.00 in.


Service area Floor tiles
24 in. sq. GEN-002108

When planning the placement of DLm8100, note the following:

28 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Physical and Environmental Specifications

u Both VNX bays are cabled to the VTEC bay using 8-meter 1 GbE cables and 10-meter
fiber optic 10 GbE cables. The VNX bays can be up to five bays away from the VTEC
bay, with the cabling under a raised floor.
u The first storage bay of a VNX7500 is connected to its VNX bay using a 5-meter 4 Gb
SFP to HSSDC2 cable. The first storage bay can be up to two bays away from its VNX
bay.
u Other storage bays are daisy chained together using 8-meter cables and can be up to
five bays away from its VNX bay with cabling under a raised floor.
u The Data Domain bay is cabled to the VTEC bay using 8-meter GbE cables and 10-
meter fiber optic 10 GbE cables. The Data Domain bays can be up to five bays away
from the VTEC bay with the cabling under a raised floor.

Anti-tip and anti-move brackets


If you intend to secure additional stabilizer brackets to your site floor, prepare the
location for the mounting bolts. (The additional brackets help to prevent the cabinet from
tipping while you service cantilevered levels.) The brackets provide two levels of
protection for stabilizing the unit:
u Anti-tip bracket—Use this bracket to provide an extra measure of anti-tip security.
One or two kits can be used. For cabinets with sliding components, two kits are
recommended.
Figure 6 Rack measurement for anti-tip brackets

61.00
7.00 42.56 7.00
.438

21.25
Front

Rear
17.25

3.39

2.78 1.56
All measurements are in inches. EMC2853

u Anti-move bracket —Use this bracket to permanently fasten the unit to the floor.

Anti-tip and anti-move brackets 29


Physical and Environmental Specifications

Figure 7 Rack measurements for anti-move brackets


42.88
40.88

Front

Rear
16.92

.438
8.46 21.25

3.55

2.00 All measurements are in inches. .50 EMC2854

If your system will be secured by one or more of these anti-tip brackets, ensure that the
cabinet is in its final location before attaching them. Use the supplied bolts and
mounting holes to fasten the bracket to the cabinet and floor. (The additional brackets
help to prevent the cabinet from tipping while you service devices on slide rails.)

Note

The Data Domain bay requires the anti-tip brackets to be installed.

The 40U-C Cabinet Unpacking and Setup Guide provides information about installing the
anti-tip and anti-move brackets.

30 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
CHAPTER 4
Power Requirements

This chapter describes the power requirements for the DLm system configurations. The
procedures for connecting customer power to the system are also covered.

u DLm power requirements...................................................................................... 32


u DLm touch current compliance.............................................................................. 35
u Regulatory compliance.......................................................................................... 36
u Choosing a UPS.....................................................................................................36

Power Requirements 31
Power Requirements

DLm power requirements


This section describes the North American electrical specifications, power cables,
connectors, and extension cords for a DLm configuration.
The below table summarizes power requirements for a single bay.

Table 9 North American, single-phase, electrical specifications

Specification Requirements
Input voltage 200 V AC to 240 V AC -10%/+10% single-phase

Frequency 50 Hz to 60 Hz

Circuit breakers 30 A

Power zones Two

Power requirements at l Four single-phase drops for each DLm8100 VNX bay with 8
customer site (for each bay) Data Movers
l Two single-phase drops each for:

DLm8100 VTEC bay


VNX bay with 1 to 7 Data Movers
VNX storage bay
Data Domain bay

Power distribution panel NEMA L6-30P


connectors Facility power mating receptacle is L6-30R

Before delivery, the customer must supply and install the required receptacles to zone A
and zone B power for the DLm bays. The below figure shows the required power cabling
for DLm8100 systems.

32 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Power Requirements

Figure 8 Power distribution cabling — DLm8100

Single-phase power extension cords and connectors


Each DLm bay has four single-phase Power Distribution Panel (PDP) assemblies and four
Power Distribution Units (PDU).
The following bays require two power drops each:
u VTEC bay
u VNX bay with 1 to 7 Data Movers
u VNX storage bays
u Data Domain bays
For these bays, the upper PDUs are cabled to the lower PDPs in manufacturing.
A VNX bay with 8 Data Movers requires four power drops.
VNX bays that are shipped with eight Data Movers are configured as required during
initial setup. If it is shipped with less than eight Data Movers and you want to add more
to reach eight Data Movers (assuming the VNX bay has 9 DAEs), contact EMC Customer
Service for power requirement changes.
Regardless of the number of power drops required, each DLm bay comes with a DLm
power kit that includes two 15-ft power cords and two 21-ft power cords. Assuming a
raised floor setup, the 21-ft cords are used with the two upper PDPs, and the 15-ft cords
are used with the two lower PDPs.
The below figure shows extension cables for North American installations. Connector
L6-30R connects to the DLm bay connector L6-30P. Connector L6-30P on the other end of
cable connects to a customer-supplied L6-30R. EMC provides similar cable sets with
appropriate wiring and couplers for all supported international installations.

Single-phase power extension cords and connectors 33


Power Requirements

Figure 9 EMC model number DLmP40U-60-US cable description


L6-30R L6-30P

X Y
Y X
P1 P2
G G

Marker, Label ID

180.0 in. +/- 6.0 in.


(457.2 cm)

Electrical/Wiring Specification

Color From To Signal

BLK P1-X P2-X L

WHT P1-Y P2-Y N

GRN P1-G P2-G GND


GEN-001153

The below figure shows the various power cords and connectors.

34 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Power Requirements

Figure 10 Power cords and connectors

DLm touch current compliance


DLm is designated as a fixed (stationary) electrical equipment with high earth-leakage
markings. Connect the cabinets to the customer AC supply with the recommended rated
current breakers and the attached cables. “DLm power requirements” on page 32
provides details of the recommended circuit breaker ratings. These recommended
breaker ratings are based on the maximum kW loading of the cabinet and not on the kVA
figures of a particular configuration. The kVA values listed in this manual are intended for
air conditioning and utility loading purposes only. “Power and cooling data” on page
25contains detailed information.

DLm touch current compliance 35


Power Requirements

CAUTION

Do not connect the DLm VTEC bay power supplies on separate Main and Auxiliary circuit
panels to differential trip devices. These devices are typically called Ground Fault Circuit
Interrupter (GFCI), Ground Fault Interrupter (GFI), Earth Leakage Circuit Breaker (ELCB), or
Residual Current Circuit Breakers.

Because DLm systems are high earth-leakage devices, differential trip devices (typically
30 mA) are not recommended due to random activation during utility feed distortions and
power line transients interacting with the cabinet noise filters. These differential devices
have trip ratings of 5 mA to 500 mA and are mostly intended for consumer goods rather
than fixed devices.
If the DLm cabinet is correctly grounded to the customer’s AC power source, leakage
current will not produce a voltage leading to electrical shock. Serious insulation
breakdowns will trip the breakers feeding the cabinet or, preferably first clear fuses in
individual internal modules closest to the fault.

Regulatory compliance
DLm meets regulatory requirements as referenced by the following UL/IEC/EN 60950 3rd
Edition:
5.1.7 Equipment with touch (leakage) current exceeding 3.5mA.
For Stationary Permanently Connected Equipment, or Stationary Pluggable Equipment
Type B, having a main protective earthing terminal, if the Touch (Leakage) Current
measurements exceed 3.5mA r.m.s., following conditions apply:
u The r.m.s. Protective Conductor Current will not exceed five percent of the input
current per line under normal operating conditions. If the load is unbalanced, the
largest of the single-phase currents shall be used for this calculation.
To measure the Protective Conductor Current, the procedure for measuring Touch
Current is used, but the measuring instrument is replaced by an ammeter of negligible
impedance.
u The cross-sectional area of the Protective Bonding Conductor will not be less than 1.0
mm squared in the path of high Protective Conductor Current.
u A label with similar wording shall be affixed adjacent to the equipment AC MAINS
SUPPLY connection:

HIGH LEAKAGE CURRENT


Earth connection essential
before connecting supply.

The DLm configurations are Stationary Pluggable Type B systems, and the application of
the warning label, EMC P/N 046-000-309, are in English and French. The label location
for the DLm configuration is on the inside of the front door.

Choosing a UPS
The VTEC and Storage Controllers (Data Movers) are stateless, so no battery backup is
required. In the event of a power failure, the Storage Processor writes contents of the
write cache to disk, before shutdown. Although DLm does not require a battery backup to

36 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Power Requirements

ensure data integrity, to avoid potential downtime, purchase a UPS from a qualified
vendor.
EMC neither offers nor recommends any specific UPS suppliers or product type to its
customers. However, EMC uses preferred suppliers for UPS systems in their facilities.
Therefore, if you, the customer, are implementing a UPS, EMC recommends the following:
u When you are planning the UPS solution for a DLm and the host system is presently
(or will potentially be) protected with a UPS, the battery backup time you propose for
the DLm UPS solution should match that of the host system.
u The DLm requires independent zone B and zone A power feeds for each bay.
u The UPS should be equipped with an internal output isolation transformer.
u The UPS should be installed as a separately derived AC source using neutral and
ground wiring to preserve the fault tolerance specification of the DLm power system.
u Depending on the power requirements for your DLm system operation, an isolation
transformer/stabilizer installed in front of the UPS could further buffer the AC utility
environmental factors from reaching DLm. To determine if an isolation transformer/
stabilizer is needed, consult a licensed electrician.

Choosing a UPS 37
Power Requirements

38 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
CHAPTER 5
Package Removal

This chapter describes the procedures for unpacking and then positioning the DLm
cabinets.

u Inspect the system shipment.................................................................................40


u Unpacking procedure............................................................................................ 40

Package Removal 39
Package Removal

Inspect the system shipment


Inspect the outer packaging for signs of possible shipping damage. If you notice visible
damage:
Procedure
1. Note the damage on the waybill.
2. Photograph the damage.
3. Notify the EMC Traffic department and Customer Support management.
4. File a freight claim with the carrier.

Unpacking procedure
Before unpacking the unit, allow it to stabilize for 16 hours.

CAUTION

Before moving the unit over a raised floor, ensure that the floor meets the requirements
listed under “System placement” on page 28.

Follow these steps to unload and unpack the cabinets:


Procedure
1. Use a mechanical lift or pallet jack to position the packaged cabinet in its final
location.

Note

Before placing each bay, note the correct placement (based on the overall system
configuration) and the floor tile cutouts.

Leave approximately 96 in. of clearance at the back of the cabinet to unload the bay
and roll it off the pallet.
2. Remove the shipping material:
a. Cut the tape and straps that hold the cardboard carton together as illustrated in
the below figure.

40 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain
Package Removal

Figure 11 Cutting the tape and straps

EMC2838

b. Remove the cardboard packing hood and wraparound sleeve as illustrated in the
below figure.

Unpacking procedure 41
Package Removal

Figure 12 Removing the packing material of the bay

SYM-000862

c. Cut the wrap strap that secures the plastic shipping bag around the bay.
The 40U-C Cabinet Unpacking and Setup Guide provides information about unpacking
and setting up the DLm hardware.

Note

After unpacking the unit, allow it to stabilize in the new environment as specified in
“Environment acclimation” on page 24. EMC recommends that you open both the
front and the rear doors to facilitate environmental acclimation.

42 EMC Disk Library for mainframe 4.0.0 Physical Planning Guide for DLm8100 with Data Domain