You are on page 1of 16

2017

LG HVAC Control Solution

01. Line-up 04. Appendix


02. Design Guide - Address setting for Central control
- Group Control
03. Product Introduction
01. Line-up
Individual
PREMTA000 : English / Portuguese / Spanish / French
PREMTA000A : English / Italian / Russian / Chinese
Premium PREMTA000B : English / German / Polish / Czech
PREMTA000(A/B)

Wired Standard
PREMTB100 PREMTB001

Simple
Simple
(for Hotel)
PQRCVCLOQ(W) PQRCHCA0Q(W)

Wireless
PQWRHQ0FDB
Centralized

AC Ez ACP IV
PQCSZ250S0 PACP4B000

AC Ez Touch ACS I/O Module


PACEZA000 PEXPMB000

AC Smart IV AC Manager 5
PACS4B000 PACM5A000
Gateway & Etc.

BMS BACnet LonWorks


PBACNA000 PQNFB17C0 PLNWKB000

PDI
PPWRDB000 (2 Ports) PQNUD1S40 (8 Ports)

PDRYCB000 (1 Input) PDRYCB400 (2 Inputs) PDRYCB300 (for Thermostat)


Dry Contact

PDRYCB500 (Modbus RTU) PVDSMN000 (for ODU)


* Line-up in January 2017
02. Design Guide
[ Compatibility Table ]
Multi V ERV Heating Multi/ LG AHU 2) LG Chiller
Single1)
AC Ez ● ● - ● - -
AC Ez Touch ● ● - ● - -
AC Smart IV ● ● ● ● ● ●3)
ACP IV ● ● ● ● ● ●3)
AC Manager 5 ● ● ● ● ● ●
AC Smart BACnet ● ● ● ● ● ●3)
ACP BACnet ● ● ● ● ● -
ACP LonWorks ● ● ● ● ● -
Dry Contact
DI ● ● ● ● - -
Modbus ● - - ● - -
1) Need to check PDB of Multi/Single Model 2) LG AHU Control Kit 3) Chiller Option Kit (PCHLLN000)

[ Design Specification ]
Max. IDUs1) 485 Port2) Max. ODU 3) Cable Standards
(Qty.) (Qty.) (Qty. per 485 port) (Equal or Above)
AC Ez 32 1 VCTF - SB 1.0 x 2C (485)

AC Ez Touch 64 1 <Quantity>
- Multi V ODU : "X" EA
AC Smart IV 128 1 - PI485 VCTF- S B 1.0 x 2C (485)
(Multi / Single / ERV)
ACP IV 256 4 : "Y" EA UTP CAT.5E (LAN)
- Slave Controller : BACnet IP, Modbus TCP
AC Smart BACnet 128 1 : "Z" EA
ACP BACnet 256 4 “2X + Y + Z <=32 EA”
VCTF - SB 1.0 x 2C
ACP LonWorks 64 4 TP / FT - 10 (LON)
AC Manager 5 8,192 - - UTP CAT.5E

Standard 128 1 Multi V / Multi / Single : 2 EA VCTF - SB 1.0 x 2C (485)


(2 ports)
PDI
Premium 128 1 Multi V / Multi / Single : 8 EA VCTF - SB 1.0 x 2C (485)
(8 ports)
1 Input 1 - - VCTF - SB 1.0 x 2C
Dry
Contact 2 Inputs 1 - -
VCTF - SB 1.0 x 2C
or UTP CAT.5E
Modbus 1 1 -
1) Need to distribute IDU for each port according to field condition.
2) Only for "Multi V, Multi / Single, ERV, Heating" (Except LG AHU, LG Chiller)
3) Max, total length : 1km (per port)
03. Product Introduction
AC Ez
[ Specification ]
Max. IDUs 32 EA
Dimension (WxHxD) 190 x 120 x 17 (mm)
PQCSZ250S0 Unit / Group Control ○
Fan Speed ○
Cooling / Heating / Auto /
Mode Dehumidification / Fan
Locking ○
Error Checking LED & Error code
Master / Slave setting ○
Operation Status,
Display Set Temp. , Room Temp.
Power DC 12V, 1A

[ System diagram ]
[RS485 Comm.]

····· IDU : 8EA


····· [00] … [07]

[Master] [Slave] IDU : 8EA


·····

Group Number [0] Group Number [7] ····· [00] … [0F]

* Max. Quantity : 8EA - including Master and Slave IDU : 8EA


(Need to supply additional power adapter) ····· [70] … [77]

Feature
1 Checking A/C & Ventilation status at a glance
· Monitoring various information through the LCD
· Intuitive LED for operation and locking status
· LCD Back-light for night time
2 Easy to install and Low installation cost
· Installing max. 8 EA AC Ez on one communication line
3 Providing various control function
· A/C : Mode, Fan Speed, Set Temp., Room Temp., Error, etc…
· ERV : Mode, Fan Speed, Error, etc…

If AC Ez is installed with AC Smart and AC Manager,


Tip! customer can manage more conveniently.
AC Ez
[ Installation Flow chart ]

IDU & ODU operation Check point!


without Central controller is O.K. 1. Power source of IDU & ODU
(Circuit Breaker, Elecrical wiring)
NO 2.Comm. wiring between IDU and ODU
YES
& Individual controller normality

Basic check points are O.K. Check point!


(Central control address & Comm.Line, etc…)
1. Checking central control address by
→ refer to the appendix for detail information Individual controller
2. Checking polarity of communication line
for central controller
NO > Composition of comm. terminals
ODU PI485 G/W
AC Ez (including PI485) (Optional)
YES VCC 12V 12V
GND GND GND
BUS A INT A BUS A
BUS B INT B BUS B

Master / Slave setting is O.K. Check point!


(There should be only one Master device 1. AC Ez function setting
on a communication line.) Push install mode button (5 sec.) > Setting for each
function button > exit

NO
YES
Function
button Function Remarks
1 Master / Slave setting M(Master), S(Slave)
2 Group 1 Number setting
3 Group 2 Number setting
Quantity of IDUs in AC Ez 4 Re-searching A/C & ERV. Master only
is O.K.
Check point!
YES NO
1. Finding missed central control address
2. AC Ez Master setting and Group number
3. AC Ez power supply
Complete ! (Adapter or DC 12V power in ODU)
AC Ez touch
[ Specification ]
Max. IDUs 64 EA
Dimension (WxHxD) 137 x 121 x 25 (mm)
PACEZA000 LCD Size 5"
Unit / Group Control ○
Fan Speed ○
Mode Cooling / Heating / Auto /
Dehumidification / Fan
Locking Set temp. / Temp. range / Mode /
Fan Speed / Whole
Error Checking Error Code
Schedule Daily / Weekly / Monthly /
Periodical / Exceptional day
Energy saving mode ○
Master / Slave setting ○
Display Operation Status / Set Temp. /
Room Temp.
Power DC 12V (Adapter is included)
[ System diagram ]
[RS485 Comm.]

IDU : 8EA
·····
[00] … [07]

[Master] [Slave] [Slave] ····· IDU : 8EA


[10] … [17]
A / C [0]~[2] A / C [1] A / C [2]
ERV [3] IDU : 8EA
·····
[20] … [27]

ERV : 3 EA
* Adaptor Spec.
(Input : AC 100-240 V, Output : DC 12 V, 3.33A) [30] … [32]
Feature

1 Easy to control and monitoring and emotional design


· Intuitive interface with Touch screen and Color display
· Optimum configuration with naming and group setting
2 Better management by improved functions
· Flexible control level (Unit, Group, Whole)
· Effective management by schedule and locking function
3 Easy to install and low cost
· Wall mounted type and small size

Tip PC access is available with LAN cable.


AC Ez touch
[ Installation Flow chart ]

IDU & ODU operation Check point!


without Central controller is O.K. 1. Power source of IDU & ODU
(Circuit Breaker, Elecrical wiring)
NO 2. Comm. wiring between IDU and ODU
YES & Individual controller normality

Basic check points are O.K. Check point!


(Central control address & Comm.Line, etc…)
1. Checking central control address
→ refer to the appendix for detail information by Individual controller
2. Checking wiring status (Comm. line, Polarity, Power)
> Composition of comm. terminals
NO Terminals of ODU PI485 G/W
YES AC Ez touch (including PI485) (Optional)
INT A BUS A
RS485 A B INT B BUS B
Power DC12V
Enclosed power apaptor

Controller setting is O.K. Check point!


Function Setting of AC Ez touch
ex) Master / Slave setting
(There should be only one Master Main >Setting > Installer
device on a communication line.) * Master / Slave setting and device registration is
available in the installer mode,
Menu Specific function
Auto, Energy saving cycle, Differential,
Operation Holiday setting.
Group A/C Group number setting
NO
General Date, Time, Controller name, Speaker,
YES System Temp. Unit, Language
Advanced Network, Password, S/W version
Screen Theme, Screen saver, Waiting time, Brightness
Installer Master/Slave, Device Management

Total IDU qty. is correct Check point!


after setting. 1. Finding missed central control address
2. Device Registration
Main > Setting > Installer > Device Management >
NO Auto or Manual > Complete
YES Device Manage Auto Edit Complete Auto Search Device x
Type Name Address Model Capa
<

aircon01 00 DEF...
Find out the connected unit Auto Search will
IDU 3
take about 5~10 minutes and installing
IDU aircon02 02 DEF... 3 1 information will be replace with searched
ERV vent01 01 DEF... 3 2 information.
ERV vent02 02 DEF... 5
Do you want to continue?

Complete !
<

ERV DX ventde01 03 DEF... 5 Cancel OK


AC Smart IV
[ Specification ]
Max. IDUs 128 EA
Dimension (WxHxD) 254 x 168 x 29 (mm)
PACS4B000 LCD size 10.2"
Visual Navigation ○
Web Access ○
Energy Monitoring 1) ○
Peak Control IDU Priority / ODU Capacity
Report Run time, Energy consumption
2 Setpoint Auto ○
Interlocking ○
Schedule ○
Power DC 12V 2)
* 1) Need to install PDI 2) Adapter is included
[System diagram] (Input : AC100 ~ 240V)
[RS485 Comm.]

[System Air
····· Conditioner]

[Master] [LG AHU]


with Comm. Kit /
Control kit

[LG Chiller]
[Internet] with Chiller Option kit
(PCHLLN000)

* This is simple diagram,


[Web Access] [AC Manager] [Slave] Please refer to manual for detail information.

Feature
1 Touch control with 10.2" Large display & Web access control by PC
· User Frendly interface with fancy graphic design
2 Easy intergrating solution for LG HVAC
· LG AHU (Max. 16 EA) and LG Chiller (Max. 5EA)
· Embedded DI (2EA) and DO (2EA) for interlocking control
· Expandability through ACS I/O Module
3 Energy saving by various energy management contents(Need to install with PDI)
· Easy to manage energy consumption data ( Excel export )
· IDU Priority control, ODU Capacity control, Time limit control, etc.
4 PC & Mobile access via embedded web server and flash program

Tip Building manager can control HVAC system without PC.


AC Smart IV
[ Installation Flow chart ]

IDU & ODU operation Check point!


without Central controller is O.K. 1. Power source of IDU & ODU
(Circuit Breaker, Elecrical wiring)
NO
YES 2. Comm. wiring between IDU and ODU
& Individual controller normality

Basic check points are O.K. Check point!


(Central control address & Comm.Line, etc…) 1. Checking central control address
→ refer to the appendix for detail information
by Individual controller
2. Checking wiring status (Comm. line, Polarity, Power)
> Composition of comm. terminals
Terminals of 605 Terminals of
NO AC Smart 606 AHU
YES
A RTX+ Terminals of
CH1* RTX- Chiller
B
ODU PI485 G/W
A (including PI485) (Optional)
CH2 INT A BUS A
B INT B BUS B
Network setting is O.K. * CH1 should be used for only one device. (AHU or Chiller)

NO Check point!
YES
1. Direct connection to PC
ex) If PC IP is 192.168.1.101, AC Smart IP should be set
"192.168.1.XXX (except 101)".
2. Remote access via Internet*/ Intranet
* Setting AC Smart IP, Gateway, Netmask
Normality check * Configurations of the Internet Router are
for AC Smart web access. out of LG scope.
(Ex : ACP IP = 192.168.1.101)
3. Ping Test (Network setting normality)
* Start > Run > CMD (in Windows OS)
* Ping 192.168.1.XXX (AC Smart IP)
> Normal status
192.168.1.101 : bytes=32 time<1ms TTL=64
NO
YES
Check point!
1. Adobe flash player installation check
Device registration and function 2. Delete Searching history & Temporary files in
setting in AC Smart. (refer to manual) IE browser
3. Registrarion "Trusted sites" in IE browser
Internet option > Security > Trusted sites > Site registration
YES * If you can't solve the web access problem,
please refer to step
Complete ! 4. Using "Chrome Browser"
PDI (Power Distribution Indicator)
[ Specification ]
PPWRDB000 PQNUD1S40
(2 ports) (8 ports)
PPWRDB000
Max. IDUs EHP : 128 EA EHP : 128 EA
PQNUD1S40
Max. WHM Qty 2 EA 8 EA
Pulse width : 50~400 ms
Minimum sink current capability : 3mA
Pulse spec
Pulse ratio setting
of WHM
1W/pulse, 2W/pulse, 4W/pulse,
6W/pulse, 8W/pulse, 10W/pulse, 100W/pulse
* WHM of CT type is available also.
* Please refer to Techincal bulletin for detail information

[System diagram] ACP IV


or
PDI AC Smart IV *
Pulse
Main Power source signal
Ethernet
R S T N
PC

RS-485

·····

·····

* Also include ACP BACnet & ACP Lonworks

Feature

1 Distributing ODU power consumption for each IDU


· Real time value, Accumulated consumption
· Selectable distribution type for Standby power (Auto/Manual)
2 Easy energy consumption management for Large building or rental office
· Energy report (weekly, monthly) through central controller
3 Reducing installation space ( vs Old PDI )

When PDI is installed with ACP or AC Smart,


Tip! Building manager can check energy comsumption by PC
PDI (Power Distribution Indicator)
[ Installation Flow chart ]

Check point!
A/C test run is complete.
1. Power source of IDU & ODU
NO (Circuit Breaker, Elecrical wiring)
YES
2. Check WHM specification
Central control address setting
is finished.
Check point!
→ refer to appendix
1. Checking central control address by
NO Individual controller
YES

Check point!
Press Menu button and Select button
at the same time.
Pulse and address setting WHM 1 : NOT USE WHM W / PULSE SELECT
in PDI is O.K. WHM 2 : NOT USE
WHM 3 : NOT USE
1. NOT USE
2. 2W / PULSE
WHM 4 : NOT USE 3. 4W / PULSE DOWN
Selecting port for WHM Pulse setting

NO CONSUME UNIT SELECT INDOOR ADDRESS SET


YES 1. OUTDOOR UNIT
2. INDOOR UNIT
( START ) > (END)
(00) > (00)

Selecting ODU or IDU Address range of IDUs

Check point!
1. Power consumption in WHM is increased
Power consumption with A/C operation
(Instance & Accum.) in PDI YES NO
reflects A/C operation. Periodcal power consumption WHM malfunction
between WHM and PDI is same. -> Replacement
YES NO
* ER-01 Error (Comm. Error)
Complete ! Re-checking "pulse ratio"
value between WHM - without central controller : Master
and PDI. - with central controller : Slave
NO * ER-02 Error (No pulse)
YES OR - Re-checking after turn on
Re-Checking address - Length of pulse line (<-10m)
range for each pulse port - Polarity

2 . Customer wants to distribute standby power


for all IDU.
YES NO

Complete ! Auto Manual


Dry Contact
[ Specification ]

PDRYCB000 PDRYCB400 PDRYCB500

Model code PDRYCB000 (1 Input) PDRYCB400 (2 Inputs) PDRYCB500


(Comm. type)
Operation Digital input Digital Input Modbus RTU
type (AC 220V) (Non or DC 5~12V) Communication
On/Off Control
On/Off control On/Off control
Mode / Fan Speed /
Function Operation status Operation status
Temperature / Lock
Error Status Error Status
Error Status

[ System diagram ]
Connecting to CN-CC or CN-DRY port in IDU

....
[Key Tag] [Switch] [Timer] [Sensor] [lighting, Door, etc…]

· AC 220V
· DC 5~12V
· Comm.(Modbus)

Feature

1 Customizing solution for field condition


· Making various scenario with multiple inputs.
· Control for vacant office (or lecture room)
· Interlocking control with ventilation system
· Low cost key-tag system

2 Easy interlocking system with open protocol (PDRYCB500)


· Hotel or Home automation (MODBUS-RTU RS-485 serial communication)
Dry Contact
[ Installation Flow chart ]

Dry contact model is Check point!


met with 1. Simple On/Off control and monitoring
customer request. PDRYCB000 / PDRYCB400
NO 2. Mode change and Set Temperature, etc.
YES PDRYCB500

Check point!
Product is suitable
for operation type. Kinds of Operation type
Operation type Model code
DI (AC 220V) PDRYCB000
NO
YES DI (Non or DC 5~12V) PDRYCB400
Comm. (Modbus) PDRYCB500

Check point!
Cable is suitable for
Operation type. Recommended spec. of Wiring
Operation type Wiring Spec
NO DI (AC 220V) VCTF 1.0 x 2C (Equal or More)
YES DI (Non or DC 5~12V) VCTF / UTP Available
Comm. (Modbus) VCTF / UTP Available

Check point!
When input is open(off),
IDU is turned off Operating status with dry contact connection.
automatically. Setting dry contact mode
※ Default : Manual
→ Please refer to IDU manual for auto mode setting
ex) [Auto mode setting for Cassette type]
1 . Dip S/W #4 in IDU PCB
- On : Auto
NO - Off : Following RMC setting
YES 2 . Installer code #9 in Remote controller
- 00 : Manual / - 01 : Auto

Button during 3 seconds


→ enter the installer mode
→ installer code : 09
→ Setting Value
3 . Press the Set/Clear button on wireless R/C three times
- Auto > Manual > Auto
- Buzzer alarm three times
* Need to set Auto/Manual according to customer request
* Auto : Operation automatically (Input status : short)
Complete ! * Manual : Just Ready to operate. Unlock status. (Input status : short)
ACP IV
[ Specification ]
Max. IDUs 256 EA
PACP4B000 Dimension (WxHxD) 270 x 155 x 65 (mm)
Visual Navigation ○
Web Access ○
Energy Monitoring 1) ○
Peak Control IDU Priority / ODU Capacity
Report Run time, Energy consumption
2 Setpoint Auto ○
Interlocking ○
Schedule ○
Power DC 12V 2)
* 1) Need to install PDI 2) Adapter is included
[ System diagram ] (Input : AC100 ~ 240V)

[RS485 Comm.]

[System Air
····· Conditioner]

[LG AHU]
[Master]
with Comm. Kit
/ Control kit

[LG Chiller]
[Internet] with Chiller Option kit
(PCHLLN000)

* This is simple diagram,


[Slave]
Please refer to manual for detail information.
[Web Access] [AC Manager]

Feature
1 PC & Mobile access via embedded web server
· User Frendly interface with fancy graphic design
2 Easy integrating solution for LG HVAC
· LG AHU (Max. 16 EA) and LG Chiller (Max. 10EA)
· Embedded DI (10EA) and DO (4EA) for interlocking control
· Expandability through ACS I/O Module
3 Energy saving by various energy management contents (Need to install with PDI)
· Easy to manage energy consumption data ( Excel export )
· IDU Priority control, ODU Capacity control, Time limit control, etc.

Tip With ACS I/O module, LG control system can integrate external devices.
BMS G/W
[ Specification ]

PBCANA000 Protocol BACnet IP Modbus TCP


AC Smart BACnet : 128 EA
Max. IDUs
ACP BACnet : 256 EA

- Indoor unit
PQNFB17C0 - ERV, DX ERV - Indoor unit
- AHU - ERV, DX ERV
Device
- Outdoor unit - AHU
(Monitoring) - AWHP
- AWHP
* BACnet and Modbus protocol work at the same time

PLNWKB000 Protocol LONwork


Max. IDUs 64 EA
Device Indoor unit, ERV, DX ERV, AHU1)
1) AHU and other units are not supported simultaneously

[ Joint Matching Test Flow ] Consulting with H.Q No

Offering
Check all of LG unit Mapping BACnet
information of JMT*PASS? End
status by using points with BMS
BACnet points
Web server S/W S/W
to BMS
* Joint Matching Test
Feature
1 Flexible solution for 3rd party BMS
· Various open protocol : BACnet, Lonworks, Modbus
2 Easy Back-up System for BMS failure
· Web Access function
· All of central controller function is available
3 Set up linked control system between LG HVAC with BMS
04. Appendix
[ Address setting for Central control ]
Standard remote controller AHU (HMI)
* Pressing Button (for 3sec.) 1. C
 lick LG Logo (for 3sec.)
1. Entering into address setup mode > enter Password
by using button 2. Click setting after log-in SVC mode
Standard : Code 02 : XX 3. Select system setting
Heating : Code 07 : XX 4. System setting 3 -> address setting
2. Address setting by 4-way buttons
3. OK / Clear button
4. ESC (Save completion)

Standard III Wireless


*M
 enu > Setting > Press "^" button * Press "Mode + reset" button
(for 3sec.) 1. address setting by temp button
1. Enter the Installer mode 2. On / Off Button (Save)
* For password, 3. Press reset (Finish)
refer to the installation manual
2. Enter the address setting menu * FUNC. + reset (Address check)
3. Cenral control address setting 1. Press On / Off button toward the IDU once.
4. Press OK button (Address check)
2. Press reset (Finish)

[Group control of Wired remote controller]


What is "Group control" ?
One Wired remote controller can control multiple IDUs.

Maximum IDUs ? Connection between IDU and


Up to 16 EA wired remote controller ?

...

Wired remote controller


Dip Switch setting in IDU ?
For different IDU models ?
Function control setting : Off
- Standard : Installer code 19 > 00 setting
- Standard III
Installer mode >
Function control with Group control : Off
* Please refer to manual for using installer mode # 3 Off # 3 On
• Master (Default) • Slave
Copyright © 2016 LG Electronics. All rights reserved.

You might also like