Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
Certificate No. Date:
Equipment: Service Fluid:
System Lay-up Duration: Start - End Date:
Hydro Test Medium: Type of Lay-up:
METHOD OF LAY-UP Actual Pass Fail Remarks
Wet Lay-Up
Minimum residual oxygen scavenger concetration in water
shall be 20 ppm & maximum O2 concentration of 10 ppb
Maintain the system under a positive pressure between 30
to 50 psig using nitrogen, sweet hydrocarbon gas or
hydraulic pressure of the treated water
Use gages to monitor the positive pressure in the system
during lay-up with a scale range not exceeding three times
the target pressure. (Gages must withstand MAOP)
Dry Lay-Up
When the bulk of the water has been removed, blow vapor
phase corrosion inhibitor Cortec VpCI 309 or equivalent Volume of System: _______
with nitrogen until it is visibly discharged at the bottom of Amount of VCI Applied: _______
the valve.
Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
System Lay-up Report (Certificate) SATR-A-2009 15-Dec-09 Mech-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
System shut-in to prevent ingress of moisture and debris