SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT
System Lay-up Report (Certificate) SATR-A-2009 15-Dec-09 Mech-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
Certificate No. Date:
Equipment: Service Fluid:
System Lay-up Duration: Start - End Date:
Hydro Test Medium: Type of Lay-up:
METHOD OF LAY-UP Actual Pass Fail Remarks
Wet Lay-Up
Minimum residual oxygen scavenger concetration in water
shall be 20 ppm & maximum O2 concentration of 10 ppb
Maintain the system under a positive pressure between 30
to 50 psig using nitrogen, sweet hydrocarbon gas or
hydraulic pressure of the treated water
Use gages to monitor the positive pressure in the system
during lay-up with a scale range not exceeding three times
the target pressure. (Gages must withstand MAOP)
Dry Lay-Up

Remove the hydrotest water from the system. For facilities


other than pipelines, drain the system completely, sweep
and mop as required to ensure that no visible traces of
water remain.

When seawater or similar high salinity water has been used


as the hydrotest media, remove salts from the metal surface
by rinsing with a low-salinity water containing less than
4,500 ppm total dissolved solids.

Immediately after dewatering, start drying the system to a


dew point that will ensure a dew point of -1°C or less at the
final lay-up pressure at all exit points.

Shut in the system, maintain and monitor the pressure per


SAES-A-007 para 5.2.2.4 during the lay-up period.

Measure Dew Point Temp -1°C or less after Shut-In Period

Shut in system, maintain & monitor during lay-up period.

Inert Gas Lay-Up


Displace the hydrostatic test water with nitrogen or sweet
gas until no water drains out of the system.
Shut in the system at 2-10% of operating pressure but not
exceeding 50 psig with nitrogen or hydrocarbon gas.
Ambient Lay-Up

Displace the hydrostatic test water by positive pressure with


nitrogen or sweet gas until no water drains out of the
system.

Ensure that systems being drained have vacuum relief


valves and pressure relief valves as necessary to protect
the system.

Shut in the system under positive pressure until


commissioning and start-up.

Vapor-Phase Corrosion Inhibitor (VCI)

When the bulk of the water has been removed, blow vapor
phase corrosion inhibitor Cortec VpCI 309 or equivalent Volume of System: _______
with nitrogen until it is visibly discharged at the bottom of Amount of VCI Applied: _______
the valve.

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
System Lay-up Report (Certificate) SATR-A-2009 15-Dec-09 Mech-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
System shut-in to prevent ingress of moisture and debris

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2