SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT
Pre-Test Punch List Form SATR-A-2011 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

RABIGH II PROJECT Interconnecting Package (UO1) 111580 GSCA / Raymond


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

SEE ATTACHED 14" and 18" dia. Fire Water Line TP-UO1-C230-FW-0043-1 Phase II (UO1)
DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SEE ATTACHED Hydrostatic Test YES

Item
Description A or B Origi- ETC
Verified
Concur
# (Use with applicable Pre-Test Punchlist Reference complete
Item nator (Note 3) (PID Inspector)
Checklist) by QC

Test Package must be sign by Engineering and


Construction Hydrotesting Team before turn-over J. V.
1 SAES-S-070 A Alcontin
to QC Inspection Team for review.
Pipeline must be partially backfilled prior for
J. V.
2 Hydrotesting. SAES-S-070 A Alcontin

All joints must be expose for visual inspection


J. V.
3 during Hydrotesting. SAES-S-070 A Alcontin

Joint Data must be visible prior for Line Checking


J. V.
4 inspection SAES-S-070 A Alcontin

Line Checking must be joint Inspected by


Construction and QC Inspection Team prior for J. V.
5 SAES-S-070 A Alcontin
Hydrotesting.
Proper supports must be installed in every
change in direction and flange end prior for J. V.
6 SAES-S-070 A Alcontin
Hydrotesting.
Trench must be free from debris and foreign
J. V.
7 materials prior for Hydrotesting. SAES-S-070 A Alcontin

Proper protection and cover all flange-end after


J. V.
8 Hydrotesting. SAES-S-070 B Alcontin

Isometric Drawings must be rectify. Reflect all


J. V.
9 test limits. SAES-S-070 A Alcontin

Joint Summary reports must be attach and


J. V.
10 updated prior for Hydrotesting SAES-S-070 A Alcontin

Air blowing must be done prior for Hydrotesting.


J. V.
11 SAES-S-070 A Alcontin

Proper water disposal must be conducted after J. V.


12 SAES-S-070 B Alcontin
hydrotesting.

13

14

15

Page 1 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Pre-Test Punch List Form SATR-A-2011 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

RABIGH II PROJECT Interconnecting Package (UO1) 111580 GSCA / Raymond


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

SEE ATTACHED 14" and 18" dia. Fire Water Line TP-UO1-C230-FW-0043-1 Phase II (UO1)
DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

SEE ATTACHED Hydrostatic Test YES

16

Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Pre-Test Punch List Form SATR-A-2011 25-Dec-13 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQD?

Item
Description A or B Origi- ETC
Verified
Concur
# (Use with the applicable Pre-Test Reference complete
Item nator (Note 4) (PID Inspector)
Punchlist Checklist) by QC

Page 3 of 3