CLIENT SAUDI ARAMCO & SUMITOMO CHEM

MAIN
CONTRACTOR
GS CONSTRUCTION ARABIA

RABIGH II REFINING AND PETROCHEMI


PROJECT
INTERCONNECTING PACKAGE (UO1)

JOB NO. 111580

PLANT
AREA PHASE II (UO1) SUB-SYTEM
NO.

LIST OF BLIND FLANGE


S/N ISO DWG NO. BLIND NO. SIZE RATING THICKNESS

1.0 C230NU-FW-C230-0120-01 TB1 14" 150


2.0 C230NU-FW-C230-0120-07 TB2 4" 150
3.0 C230NU-FW-C230-0120-02 TB3 6" 150
4.0 C230NU-FW-C230-0120-03 TB4 6" 150
5.0 C230NU-FW-C230-0120-03 TB5 14" 150
x x x x x x x x NOTHING FOLLOWS x x x x x x x x