1 MR 2 TBE 3 NMR 4 ERECTION PLAN 5 SHOP DRAWINGS 6 WPS Require for structural Welding of Ladder 7 Repair Procedure for Structural Welding and Pipe Welding 8 WPS Require for sheet and Pipe Welding of tanks 9 Handling and Consumable Storage Procedure 10 Method of Statement for the fabrication and Installation of drinking Water Storage Tank 11 Method of Statement for the fabrication and Installation of ladder 12 Material Handling and Storage Procedure 13 NDT Procedures 14 Tank Alignment Procedure 15 Tank and Piping Hydrotest Procedure/Method of Statement 16 Coating and Surface Preparation procedure/Method of Statement 17 Repair Procedure for coating and Surface preparation
18 Method statement for scaffolding installation.
If any provision of workshop than please reflect details 19 and layout Provide documents for special procedure (if any) to 20 comply with Saudi Aramco standard.