FORM CEKLIST PROJECT BX PCP

NO TANGGAL URAIAN BELUM PROSES SELESAI KETERANGAN


I. FIT OUT
a. Floor works at kitchen area
1. Raised floor
2. Floor water proofing included go up from floor to wall
3. Screeding for base waterproofing
4. Supply and install ceramic tile floor finish
5. Gutter box kitchen area

b. Floor works at dining area


1. Supply and install homogenous tile finish (fl-3)
2. Supply and install homogenous tile finish (fl-1)
3. Supply and install brick floor finsh (fl-2)
4. Supply and install steel floor inlay

c. Wall partition works


1. New brick wall partition H.480cm (kitchen wall)
2. Hidden concrete column and hidden ring concrete beam
3. Double side partition

d. Door & window works


*Door works
1. Door access to kitchen & storage
2. Rolling door
*Window works
1. Food access from kitchen
2. Window draw elev 2
3. Window decorative draw elev 4

e. Wall treatment & wall finish


*Dining area
1. Mirror glass panel with stell framing (w-5)
2. Mirror glass panel with stell framing (w-6)
3. Wooden panel in duco finish (w-2) H.300cm
4. Wooden panel in melamic finish (w-3) H.300cm
5. Wall in emuslion paint finish (hall entrance to kitchen)
6. Washtafel table
*Kitchen & open kitchen area
1. Supply and install wall in ceramic tile finish

f. Ceiling works
1. Gypsum plaster ceiling at dining & kitchen area
2. Drop ceiling edging H.1500mm
3. Gypsum ceiling painting
4. Exposed ceiling painting at kitchen area
5. Canopy

II. FIX FURNITURE & LOOSE FURNITURE


a. Fix furniture
1. Long sofa
2. Cashier table
3. Working desk + hanging cabinet (back office area)

b. Loose furniture
1. Dining table
2. Round dining table
3. Round dining table (existing in refinish)
4. Dining chair Betawi
5. Dining chair Betawi (existing in refinish)
6. Service table
7. Greeting table

III. MECHANICAL & ELECTRICAL


SUMMARY
a. Prelimenary
b. Fit out
1. Floor works
2. Wall,partition works
3. Door & window works
4. Wall treatment & wall finsh
5. Ceiling works

c. Fix furniture & loose furniture

d. Mechanical & electrical

Detail ME
1. Instalasi listrik
2. Instalasi gas
3. Instalasi AC
4. Instalasi exhaust
5. Instalasi CCTV
6. Instalasi sound system
7. Instalasi computer
8. Peralatan kitchen stainless steel
9. Peralatan pecah belah

IV. DAY TO OPENING


1. Logo Kafe Betawi+ lampu
2. Persiapan ATK
3. Media Promosi (Umbul- umbul, banner, LED TV, Dsb).
4. Kesediaan Bahan Baku

Checked By:

PIC Project Management