NOTES
2 ROOF: CHROMADECK ROOFING SHEETS ON TRUSSES

7 584mm roof apex 7 584mm roof apex 7 584mm roof apex 7 584mm roof apex -PORTAL FRAME FOR THE ROOF FIXED TO WALL 114x38mm S.A PINE WALL PLATE

EMBEDDED AT LEAST 300mm INTO BRICKWORK WITH CONNECTING DEVICES ACCORDING TO


TABLE L2, SCHEDULE 1, OF SABS 0400
-ALL WEB MEMBERS TO BE MINIMUM 38x114mm GRADE 4 WITH EQUAL BAYS SMALLER
THAN 1500mm. APPROAVED BRACING MUST PREVENT BUCKLING AND KEEP TRUSSES UPRIGHT
-VALLEY AND HIP RAFTERS TO BE GRADE 6 50x228 SA PINE
-LAMINATED TIMBER TO COMPLY WITH SABS 876
-50mm GLASS FIBRE INSULATION TO BE INSTALLED ON CEILING
CONCRETE ROOF
W01 W01 W01 W01 W01 W01 W01
2 805mm below lintol 2 805mm below lintol 2 805mm below lintol 2 805mm below lintol
-CONCRETE ROOF TO ENGINEER'S DETAIL WITH MINIMUM 50mm THICKNESS
W06 W07 W02 D01 W06
2 125mm below lintol
W07 W07 W07 W07
2 125mm below lintol 2 125mm below lintol
W07
2 125mm below lintol -VERMICULITE SCREED GRADED TO 1:50 FALL TO 100m DIAMETER BILD IN DOWNPIPES

-WATERPROOFING BY SPECIALIST WITH A TEN YEAR GUARANTEE AS PER SPECIFICATION


WHB WHB
WC WC WC WC WC FLOORS AND WATERPROOFING
soil,waste & soil,waste & waste pipe
000mm floor finish level vent pipe
waste pipe DD01
vent pipe 000mm floor finish level 000mm floor finish level 000mm floor finish level
-GROUND FLOOR SLAB=85mm THICK 20mpa CONCRETE PERFECTLY LEVEL AND AT
-255mm ground level R.E -255mm ground level -255mm ground level GULLEY -255mm ground level
R.E R.E
MINIMUM 150mm ABOVE GROUND LEVEL ON PROPERLY COMPACTED HARDCORE FILL
INVERT LEVEL=+450 mm. I.E
INVERT LEVEL=+450 mm. -25mm THICK SCREED AND FINISHES AS INDICATED
I.E I.E I.E IF LESS ENCASE IN CONC I.E
IF LESS ENCASE IN CONC I.E min 1:40 fall connecting to municipal sewer
-SUSPENDED CONCRETE FLOOR SLABS TO ENGINEER'S DETAIL AND SPECIFICATIONS

EAST ELEVATION
min 1:40 fall connecting to municipal sewer
I.E I.E I.E SOUTH ELEVATION -DPC UNDER ALL WALLS (EXCEPT FREE STANDING), FLOORS AND WINDOW SILLS
AND TO ALL VERTICAL CHANGES IN FLOOR LEVELS
-FLUSHINGS TO ALL PARAPETS AND CHANGES IN ROOF LEVELS

SCALE 1:100 SCALE 1:100


FROM CATCHPIT FITTED WITH GRATING AND SILT TRAP
2 3 4 5 6 -PLANTERS TO BE WATERPROOFED AND DRAINAGE INSTALLED

FOUNDATIONS, BRICKWORK & PARTITIONS


-ALL FOUNDATIONS TO BE 25mpa CONCRETE , AT LEAST 200x700mm. MINIMUM
7 584mm roof apex 7 584mm roof apex 7 584mm roof apex 7 584mm roof apex
200mm UNDER GROUND TO ENGINEER'S DETAILS AND SPECIFICATIONS
-BOUNDARY WALLS' FOUNDATION MUST NOT ENCROACH ON BOUNDARY AND WALLS
ARE TO BE PLASTERED AND PAINTED ON THEW INNER WALL
-PARAPET WALLS TO BE ATLEAST 300mmHIGH AND MAXIMUM 500mm WITH BRICKFORCE
IN EVERY COURSE
-ALL SCREEN WALLS TO BE AT LEAST 1800mm HIGH ABOVE GROUND LEVEL
-LINTOLS TO BE SUPPORTED MINIMUM 150mm FOR OPENINGS UPTO 4800mm.BRICKFORCE
TO BE BUILT IN EVERY COURSE BELOW FLOOR LEVEL AND ABOVE WINDOW LEVEL, EVERY
THIRD COURSE BETWEEN BETWEEN IN CONTINOUS BANDS
W01 W01 W01 W01 W01
-NO TEETHING OR BLOCK BONDING WILL BE ALLOWED UNDER ANY CIRCUMSTANCES
W01 W01 W01
2 805mm below lintol 2 805mm below lintol 2 805mm below lintol 2 805mm below lintol
-ANY PARTITION TO BE RODENT PROOF
W02 W03 D01 W04 W02 W03 W05 W04 W04
W07
2 125mm below lintol 2 125mm below lintol 2 125mm below lintol 2 125mm below lintol STAIRS AND BALUSTRADES
-STAIRS TO BE 750mm MIN WIDTH, TREADS 300mm , RISERS 170mm WITH 6mm MAX DEVIATION
-1000mm HIGH BALUSTRADES TO ALL STAIRS AND BALCONIES
-MAX 3000mm VERTICAL RISE PER FLIGHT , WINDERS WHERE SHOWN ,TO BE AT LEAST 250mm
DD01
000mm floor finish level 000mm floor finish level 000mm floor finish level 000mm floor finish level WIDE, 450mm FROM THE NARROW END AND ANGLE BETWEEN THE RISERS TO BE CONSTANT
-255mm ground level -255mm ground level -255mm ground level -255mm ground level
-MINIMUM HEADROOM TO BE 2100mm MEASURED FROM PICHLINE

NORTH ELEVATION
-GLASS BALUSTRADES (IF SHOWN ) TO BE SAFETY GLASS

WEST ELEVATION GLAZING

SCALE 1:100 SCALE 1:100


-BATHROOM WINDOWS TO BE FROSTED GLASS
-ALL GLAZING ON DOORS TO BE SATETY GLASS
2 3 4 5 6 -ALL GLAZED AREA LESS THAN 300MM ABOVE FFL TO BE COVERED WITH SATETY GLASS
35800
AREA SCHEDULE
5180 25440 5180
220 900110900110900110 1930 220 11600 1800 9630 110 1860 2201100110 1730 110900110900 220
GROUND FLOOR AREA
I.E
TOTAL BUILDING AREA
I.E I.E I.E I.E I.E I.E
R.E R.E R.E SITE PLAN AREA
I.E I.E I.E R.E
R.E
DD01
SITE COVERAGE =33 %
W01 W01 W01 W01 W01 W01 W01 W06
220 1100110 1600 2201000 220

220
PA
1220

1220
1000
4.5kg RA DOORS & WINDOWS SCHEDULE
P WC
1800
W07 W07 W07 fire ext TI LE W07 W07
2280

LE G

220
S I SEE SCHEDULE DRAWINGS OF DOORS AND WINDOWS
C
whb

580
D01
1060

whb

1600
WC WC WC WC
DO NOT SCALE THE DRAWINGS

1100
300
3250

3470
D01 D01 D01 D01 D02 D02

110
2450

MALE
1640

FEMALE whb D02 TOILETS


REVISIONS

1320
W07 TOILETS TILES W07
TILES
urinal REV DATE DETAILS BY

220
4960 2700 300 17000 3356 1200 NOTE THAT: steel structure its an
A XX/XX/XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XX
CHURCH
10560

engineer specifications
6000

5400

1720

Klip-Lok Chromadek Roof Sheeting as


STAGE sink

2400
25000 gulley Per Manufacture's Spec
KITCHEN 7 584mm roof apex 7 584mm roof apex
2510

D01
3268

TILES I.E

HALL
12780

12780
W05 TILES
BOARD ROOM 175x75x20mm MS profile d Lipped-Channel
TILES D01
W06
R.E
To Engineers Spec STUDIO MEM PROFESSIONAL
Steel Roof Trusses; Column and ARCHITECTURAL DESIGNS

110
Concrete Footing to Engineers Details
SUNDAY GVM HOUSE, PLEIN STREET WEST
30 minutes fire
D02 KAREN PARK
SCHOOL 1010 110 1090 2750
220

0118
CLASSROOM 1 rated door
30 minutes fire
7810

Ernest Munarini: 083 681 2497 / 082 842 1996


300

2398

7590
D01
4370

D02 TILES
Tel: 012 549 3344
1640
rated door

W04
Fax: 086 651 5327
Email:

4860
2280

DINING ROOM studiomemarch@gmail.com


OFFICE
4102

TILES D01 W04


TILES 75x106mm precast Concrete
Lentol to Engineer's Spec
SACAP Reg no: Pr Arch T1615
1182

1182

4.5kg
fire ext W02 2 805mm below lintol 2 805mm below lintol

PROJECT TITLE
W04
CHURCH PROPOSED NEW BUILDING FOR
W01 W01 W01 W01 W01 W01 W01 W01 2 125mm below lintol HALL 2 125mm below lintol
1200

EVANGELICAL PRESBYTERIA
1280

1280

RAMP RAMP
TILES DD01
TILES
CHURCH
500 220

500220
580
500

500

W02 W03
W02 W03
STAGE ERF 253 TWALA TOWNSHIP
ceramic tiles
000mm floor finish level RAMP dpc ceramic tiles ceramic tiles dpc 000mm floor finish level
-255mm ground level TILES -255mm ground level

3650 1090 10000 4560 5004 4776 1090


220 220 220 220 220 220 220 220
4090 1090 25440 1090 4090 300X600mm Concrete
floor finish on 30mm screed on concrete
300X600mm Concrete
WORKING DRAWINGS
Strip Foundation to slab or 85 ground slab approved damp proof Strip Foundation to
Engineer's Spec Engineer's Spec SCALE DATE DESIGNED BY DRAWN BY CHECKED BY
35800 course on 20mm sand blinding 200mm well AS SHOWN 17/04/2015 M.E.M N.A M.E.M
SECTION A-A on compacted hardcore on shelldrite termiteprufe
2 3 4 5 6 SCALE 1:100 soil poisoner treated soil
DRAWING
TITLE
ENGINEER'S
GROUND FLOOR PLAN SIGNATURE

LAYOUT ENGINEER'S
REF Number
SCALE 1:100
CLIENT'S DATE
SIGNATURE