Building Name:

Project Name:
Date of Estimate:
Anticipated Construction Start:

UNIFORMAT ESTIMATE FORMAT


BUILDING SQUARE FOOTAGE 0
CONCEPTUAL BUDGET SUMMARY COST / % OF
BUDGET¹ S. F. TOTAL²
A SUBSTRUCTURE SUBTOTAL SUBSTRUCTURE 0

B SHELL SUBTOTAL SHELL 0

C INTERIORS SUBTOTAL INTERIORS 0

D SERVICES
D1 Conveying System 0
D2 Plumbing 0
D3 Heating, Ventilation And Air Conditioning 0
D4 Fire Protection 0
D5 Electrical 0
D SERVICES SUBTOTAL SERVICES 0

E EQUIPMENT & FURNISHINGS SUBTOTAL EQUIPMENT & FURNISHINGS 0

F SPECIAL CONSTRUCTION & DEMOLITION SUBTOTAL SPECIAL CONST. & DEMO 0

G BUILDING SITE WORK SUBTOTAL BUILDING SITE WORK 0

TOTAL PRELIMINARY BUDGET 0


Y MISC.
DESIGN CONTINGENCY 0
ESCALATION 0
TOTAL ESTIMATED TRADE COSTS 0
CM / GC GENERAL CONDITIONS 0
PRECONSTRUCTION SERVICES 0
CM / GC PERSONNEL 0
CM FEE / GC PROFIT 0
SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION 0
PROJECT SUBTOTAL 0
CM CONTINGENCY 0
SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION 0
PROJECT SUBTOTAL 0
CHILLED WATER CONNECTION FEE ALLOWANCE 0
SIDEWALK CLOSURE ALLOWANCE FOR AA 0
SUBTOTAL ALLOWANCES 0
PROJECT SUBTOTAL 0
Z ALTERNATES
ALTERNATE #1
DESCRIPTION #1 0
DESCRIPTION #2 0
CONTINGENCY 0
SUBTOTAL ALTERNATE #1 0
PROJECT SUBTOTAL 0
ALTERNATE #2
DESCRIPTION #1 0
DESCRIPTION #2 0
CONTINGENCY 0
SUBTOTAL ALTERNATE #2 0
PROJECT SUBTOTAL 0

file:///conversion/tmp/scratch/401205655.xls
Building Name:
Project Name:
Date of Estimate:
Anticipated Construction Start:

UNIFORMAT ESTIMATE FORMAT


BUILDING SQUARE FOOTAGE 0
CONCEPTUAL BUDGET SUMMARY COST / % OF
BUDGET¹ S. F. TOTAL²
PROJECT TOTAL 0

This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted.

¹ Budget = Cost/SF x Building Square Footage


² % of Total = Budget/Total Preliminary Budget

file:///conversion/tmp/scratch/401205655.xls
Building Name:
Project Name:
Building Square Footage:
Date of Estimate:
Anticipated Construction Start:
Anticipated Construction Finish:
UNIFORMAT ESTIMATE
COST / % OF
LEVEL 1 INFORMATION LEVEL 2 INFORMATION LEVEL 3 INFORMATION BUDGET¹ S. F. TOTAL²
A SUBSTRUCTURE A10 - FOUNDATIONS A1010 - STANDARD FOUNDATIONS 0%
A1020 - SPECIAL FOUNDATIONS 0%
A1030 - SLAB ON GRADE 0%
A20 - BASEMENT CONSTRUCTION A2010 - BASEMENT EXCAVATION 0%
A2020 - BASEMENT WALLS 0%
SUBTOTAL SUBSTRUCTURE 0 0%
B SHELL B10 - SUPERSTRUCTURE B1010 - FLOOR CONSTRUCTION 0%
B1020 - ROOF CONSTRUCTION 0%
B20 - EXTERIOR CLOSURE B2010 - EXTERIOR WALLS 0%
B2020 - EXTERIOR WINDOWS 0%
& EXTERIOR DOORS 0%
B30 - ROOFING B3010 - ROOF COVERING & OPENINGS 0%
0%
SUBTOTAL SHELL 0 0%
C INTERIORS C10 - INTERIOR CONSTRUCTION C1010 - PARTITIONS 0%
C1020 - INTERIOR DOORS 0%
C1030 - FITTINGS / SPECIALTIES 0%
C20 - STAIRCASES C2010 - STAIR CONSTRUCTION 0%
C2020 - STAIR FINISHES 0%
C30 - INTERIOR FINISHES C3010 - WALL FINISHES 0%
C3020 - FLOOR FINISHES 0%
C3030 - CEILING FINISHES 0%
SUBTOTAL INTERIORS 0 0%
D SERVICES D10 - CONVEYING SYSTEMS D1010 - ELEVATORS & LIFTS 0%
D1020 - ESCALATORS & MOVING WALKS 0%
D1030 - OTHER CONVEYING SYSTEMS 0%
D20 - PLUMBING D2010 - PLUMBING FIXTURES 0%
D2020 - DOMESTIC WATER DISTRIBUTION 0%
D2030 - SANITARY WASTE 0%
D2040 - RAIN WATER DRAINAGE 0%
D2090 - SPECIAL PLUMBING SYSTEMS 0%
D30 - HVAC D3010 - ENERGY SUPPLY 0%
D3020 - HEAT GENERATING SYSTEMS 0%
D3030 - REFRIGERATION 0%
D3040 - HVAC DISTRIBUTION SYSTEMS 0%
D3050 - TERMINAL & PACKAGE UNITS 0%
D3060 - HVAC CONTROLS & INSTRUMENTATION 0%
D3070 - TESTING, ADJUSTING & BALANCING 0%
D3090 - OTHER SPECIAL HVAC SYS. & EQUIPT. 0%
D40 - FIRE PROTECTION D4010 - FIRE PROTECTION SPRINKLER SYSTEM 0%
D4020 - STAND-PIPE & HOSE SYSTEMS 0%
D4030 - FIRE PROTECTION SPECIALTIES 0%
D4090 - OTHER FIRE PROTECTION SYSTEMS 0%
D50 - ELECTRICAL D5010 - ELECTRICAL SERVICE & DISTRIBUTION 0%
D5020 - LIGHTING & BRANCH WIRING 0%
D5030 - COMMUNICATION & SECURITY SYSTEMS 0%
D5090 - OTHER ELECTRICAL SYSTEMS 0%
SUBTOTAL SERVICES 0 0%
E EQUIPMENT & FURNISHINGS E10 - EQUIPMENT E1010 - COMMERCIAL EQUIPMENT 0%
E1020 - INSTITUTIONAL EQUIPMENT 0%
E1030 - VEHICULAR EQUIPMENT 0%
E1090 - OTHER EQUIPMENT 0%
E20 - FURNISHINGS E2010 - FIXED FURNISHINGS 0%
E2020 - MOVABLE FURNISHINGS 0%
SUBTOTAL EQUIPMENT & FURNISHINGS 0 0%
F SPECIAL CONSTRUCTION F10 - SPECIAL CONSTRUCTION F1010 - SPECIAL STRUCTURES 0%
& DEMOLITION F1020 - INTEGRATED CONSTRUCTION 0%
F1030 - SPECIAL CONSTRUCTION SYSTEMS 0%
F1040 - SPECIAL FACILITIES 0%
F1050 - SPECIAL CONTROLS & INSTRUMENTATION 0%
F20 - SELECTIVE BUILDING F2010 - BUILDING ELEMENTS DEMOLITION 0%
DEMOLITION F2020 - HAZARDOUS COMPONENTS ABATEMENT 0%

file:///conversion/tmp/scratch/401205655.xls form date: September 2005


Building Name:
Project Name:
Building Square Footage:
Date of Estimate:
Anticipated Construction Start:
Anticipated Construction Finish:
UNIFORMAT ESTIMATE
COST / % OF
LEVEL 1 INFORMATION LEVEL 2 INFORMATION LEVEL 3 INFORMATION BUDGET¹ S. F. TOTAL²
SUBTOTAL SPECIAL CONST. & DEMO 0 0%
G BUILDING SITE WORK G10 - SITE PREPARATION G1010 - SITE CLEARING 0%
G1020 - SITE DEMOLITION & RELOCATIONS 0%
G1030 - SITE EARTHWORK 0%
G1040 - HAZARDOUS WASTE REMEDIATION 0%
G20 - SITE IMPROVEMENTS G2010 - ROADWAYS 0%
G2020 - PARKING LOTS 0%
G3030 - PEDESTRIAN PAVING 0%
G2040 - SITE DEVELOPMENT 0%
G2050 - LANDSCAPING 0%
G30 - SITE CIVIL / MECHANICAL UTILITIES G3010 - WATER SUPPLY & DISTRIBUTION SYSTEMS 0%
G3020 - SANITARY SEWER SYSTEMS 0%
G3030 - STORM SEWER SYSTEMS 0%
G3040 - HEATING DISTRIBUTION 0%
G3050 - COOLING DISTRIBUTION 0%
G3060 - FUEL DISTRIBUTION 0%
G3090 - OTHER CIVIL / MECHANICAL UTILITIES 0%
G40 - ELECTRICAL UTILITIES G4010 - ELECTRICAL DISTRIBUTION 0%
G4020 - EXTERIOR LIGHTING 0%
G4030 - EXTERIOR COMMUNICATION & SECURITY 0%
G4090 - OTHER SITE ELECTRICAL UTILITIES 0%
G90 - OTHER SITE CONSTRUCTION G9010 - SERVICE TUNNELS 0%
G9090 - OTHER SITE SYSTEMS & EQUIPMENT 0%
SUBTOTAL BUILDING SITE WORK 0 0%
0%
TOTAL PRELIMINARY BUDGET 0 0%
Y MISC.
DESIGN CONTINGENCY
ESCALATION
TOTAL ESTIMATED TRADE COSTS 0
CM/GC GENERAL CONDITIONS
PRECONSTRUCTION SERVICES
CM/GC PERSONNEL
CM FEE/GC PROFIT
SUBTOTAL AE FIXED LIMIT OF CONSTRUCTION 0
PROJECT SUBTOTAL 0
CM CONTINGENCY
SUBTOTAL CM FIXED LIMIT OF CONSTRUCTION 0
PROJECT SUBTOTAL 0
CHILLED WATER CONNECTION FEE ALLOWANCE
SIDEWALK CLOSURE ALLOWANCE FOR AA
SUBTOTAL ALLOWANCES 0
PROJECT SUBTOTAL 0
Z ALTERNATES ALTERNATE #1
DESCRIPTION #1
DESCRIPTION #2
CONTINGENCY
SUBTOTAL ALTERNATE #1 0
PROJECT SUBTOTAL 0
ALTERNATE #2
DESCRIPTION #1
DESCRIPTION #2
CONTINGENCY
SUBTOTAL ALTERNATE #2 0
PROJECT SUBTOTAL 0

PROJECT TOTAL 0 0%

This template includes pre-set formulas, however, estimating professionals are ultimately responsible for the accuracy of the information submitted.

¹ Budget = Cost/SF x Building Square Footage


² % of Total = Budget/Total Preliminary Budget