Process Safety & Risk Management Topic: FFT 9 Name: Sahil Hariramani

Semester 1, 2018
Pump Isolation activity Group: 15
Cornell Notes Workshop: Friday
Date: 09/05/18

Questions: MAIN IDEAS/FINDINGS:


What did you learn from doing  The isolation of the pump was not a straight forward task
the pump isolation activity?  Requires planning among several engineers, including
chemical, mechanical and electrical engineers.
 Prior to working on any equipment, it is required to have a
permit.
 Locate the pump using tag numbering.
 Do not assume that the spare pump is functional, it is crucial
to first check the pump to see if it is reliable and in working
order.
 Pump isolation does not only mean to switch off the pump. It
requires attention to all valves, openings, inlets/outlets and
electrical connections.
What challenges did you  Navigation around the plant proved strenuous. There was a
encounter? difficulty in locating the pump and the switchgear.
 Each time I had to look for the pump, the application had a
drop down menu that had a non-intractable button which
brought me to the main page whereby I had to locate the
pump again.
What surprised you about the  Various equipment were very close to each other.
exercise? Furthermore, various buttons and valves were used
throughout the exercise which made in confusing to know
which ones had to be opened or closed.
 The application design of the VR plant is not efficient
What advice would you give to a  Locate the pump using its tag number [817LA].
fellow student who had to assist  Know the route to your equipment isolation.
in isolating a similar pump in  Account for all safety aspects and consider the hazards that
their vacation work? may occur.
 Do not blindly follow the steps, think about what can go
wrong.
Summary: