The document contains appendices with design calculations, quantities and cost estimates, specifications, borehole profiles, laboratory test results, and drawings for geotechnical design projects at Ganchong Intake & WTP and Tg. Agas Reservoir. The appendices include settlement, prefabricated vertical drain, surcharge design, and slope stability calculations, as well as summaries of borehole logs, laboratory tests, 1-D tests, and drawings for each site.
The document contains appendices with design calculations, quantities and cost estimates, specifications, borehole profiles, laboratory test results, and drawings for geotechnical design projects at Ganchong Intake & WTP and Tg. Agas Reservoir. The appendices include settlement, prefabricated vertical drain, surcharge design, and slope stability calculations, as well as summaries of borehole logs, laboratory tests, 1-D tests, and drawings for each site.
The document contains appendices with design calculations, quantities and cost estimates, specifications, borehole profiles, laboratory test results, and drawings for geotechnical design projects at Ganchong Intake & WTP and Tg. Agas Reservoir. The appendices include settlement, prefabricated vertical drain, surcharge design, and slope stability calculations, as well as summaries of borehole logs, laboratory tests, 1-D tests, and drawings for each site.
Ganchong Intake & WTP APPENDIX D(i)b: Cross-section A-A/Soil Profile-1 For Ganchong APPENDIX D(i)c: Cross-section B-B/Soil Profile-2 For Ganchong APPENDIX D(i)d: Summary Of All Boreholes Profile For Ganchong APPENDIX D(ii)a: SI Layout Plan & Cross-section For Tg.Agas Reservoir APPENDIX D(ii)b: Summary Of All Boreholes Profile For Tg.Agas APPENDIX D(iii)a: SI Layout Plan & Cross-section For Peramu Reservoir APPENDIX D(iii)b: Summary Of All Boreholes Profile For Peramu Reservoir APPENDIX E: SUMMARY OF LABORATORY TEST RESULTS EXTRACTED FROM S.I. REPORT
APPENDIX E(i): Laboratory Test Result For
Ganchong Intake & WTP APPENDIX E(ii): Laboratory Test Result For Tg.Agas Reservoir APPENDIX E(iii): Laboratory Test Result For Peramu Reservoir APPENDIX F: SUMMARY OF 1-D TEST, VANE SHEAR TEST, UU & Cv VALUES APPENDIX G: DRAWINGS
APPENDIX G(i): Drawings For Ganchong
Intake & WTP APPENDIX G(ii): Drawings For Tg.Agas Reservoir APPENDIX H : REFERENCES
APPENDIX H(i): Permeability Ratio (Kh/Kv)
APPENDIX A: DESIGN CALCULATIONS
APPENDIX A(i): Settlement Calculations
APPENDIX A(i)a: Settlement Calculations For
Ganchong Intake & WTP
APPENDIX A(i)b: Settlement Calculations For
Tg.Agas Reservoir
APPENDIX A(ii): Prefabricated Vertical Drain
(PVD)
APPENDIX A(iii): Surcharge design
APPENDIX A(iv): Slope Stability Analysis
APPENDIX A(iv)a: Slope Stability Analysis For
Ganchong Intake & WTP
APPENDIX A(iv)b: Slope Stability Analysis
For Tg.Agas Reservoir
APPENDIX B: QUANTITIES & COST ESTIMATES
APPENDIX B(i): Quantities & Cost Estimates
For Ganchong Intake & WTP
APPENDIX B(ii): Quantities & Cost Estimates
For Tg.Agas Reservoir
APPENDIX C: SPECIFICATIONS
Appendix C(i): Geotechnical
Instrumentations
Appendix C(ii): Prefabricated Vertical
Drains (PVD)
APPENDIX D: SUMMARY OF BOREHOLE
PROFILE
APPENDIX D(i)a: SI Layout Plan For
Ganchong Intake & WTP
APPENDIX D(i)b: Cross-section A-A/Soil
Profile-1 For Ganchong
APPENDIX D(i)c: Cross-section B-B/Soil
Profile-2 For Ganchong
APPENDIX D(i)d: Summary Of All Boreholes
Profile For Ganchong APPENDIX D(ii)a: SI Layout Plan & Cross-section For Tg.Agas Reservoir