SESB

OPEN and VENDOR DAY


15 – 17 July 2010

SOLAR HYBRID
SYSTEM
IN MALAYSIA
CONTENTS

1.TNBES Business
2. Hybrid System in Malaysia
3. Current Projects
4. Project Pictures/Info
SERVICES OFFERED

There are 3 Core Units in TNBES

¾ 1. Renewable Energy Hybrid System


¾ 2. Renewable Energy Mini Hydro/Biomass
¾3. Power Quality/Energy Efficiency
TNB-ES BUSINESS
TNB-ES supports Government
Policy on Renewable Energy, i.e. to be 5th
fuel source and to generate 200MW by:

ƒ Implementing Demand Side Management as part of an


Energy Efficiency Program
ƒ Carry out energy audits and energy performance contracting
for large power consumers
ƒ Establish wide applications of Renewable Energy and
alternative power supply solutions in the absence of
grid supply
ƒ Provide consultancy services related to Power Quality
issues and solutions
TNB-ES supports Small Renewable Energy Program
(SREP)

„ Providing consultancy/liason services


for SREP licence, power system study
and EPC.
TNB-ES supports Malaysian Government policy on
Rural Electrification

„ Providing facilities for 24hr electricity supply to


remote areas/islands not connected to the
national grid

„ Providing least cost option solution, as


compared to grid supply
CONTENTS

1. TNBES Business

2.Hybrid System in Malaysia


3. Current Projects
4. Project Pictures/Info
Why Solar Hybrid?

Supply from National Grid:


• High cost – far from grid system (current
distance considered for grid < 5km) –
• Not available – remote
Diesel Stand Alone (Genset):
• 6 to 12 hour supply
• High fuel cost and consumption
• High Operation, Maintenance, Repairs &
Replacement Cost (OMR&R)
• Low reliability
Why Solar Hybrid?
Operational problems;
Disadvantage of Stand-alone Genset

„ Generator set starting failure, requires unscheduled


site visits/permanent manpower for fault rectification.
„ Generator engine life also proved unsatisfactory.
„ For isolated areas, fuel logistics and handling will
increase operational costs.
Why Solar Hybrid?

„ Able to provide 24hr supply


„ Remote Monitoring
„ Least cost option
FUNDING OF SHS PROJECTS

„ Majority of Wind/Solar Hybrid Projects undertaken by TNB-ES


are funded by Government:

1. AAIBE (Electricity Supply Industry Trust Fund)


2. Ministry of Finance (MOF)
3. Ministry of Rural Development (KKLW)
4. Ministry of Education (MOE)
TNB-ES has Constructed > 30 SHS since 2001
List of SHS projects by TNBES
TNB-ES has Constructed 35 SHS with > 4MW
Total Capacity

Solar Wind Battery Gen Set Total


(excluding
battery)

620 kW 200 kW 5139 kWh 3520 kW 4340 kW


Typical Solar /Diesel Hybrid System Configuration

Controller
Controller

Solar
Bi
Bi-directional
-directional
Rectification Load
Load
DC Inverter
Inverter
DC AC
AC

Battery
Battery Diesel
Genset

During Daytime
During Short Fall/ Deficit
During Night Time
CONTENTS

1. TNBES Business
2. Hybrid System in Malaysia

3.Current Projects
4. Project Pictures/Info
On-going Projects

„ 5MW Solar Farm - TNB


„ SHS for Remote Schools - MOE
PROJECT PICTURES
Wind/Solar Hybrid in Pulau Perhentian, Trengganu
PROJECT PICTURES

Solar Hybrid Stations


off Mersing, Johore
PROJECT PICTURES

Langkawi Cable Car,


Langkawi
„ PAST PROJECT INFORMATION
THANK YOU

www.tnbes.com.my