DEEPEX 2018 – USER’S MANUAL 

 
 

 
 

USER’ S MANUAL 
DeepEX software program (Version 2018) 

Version 18.0.0.1 

Issued: 15-Jan-2018 

Deep Excavation LLC 

 
www.deepexcavation.com 

DEEP EXCAVATION  1 

 
DEEPEX 2018 – USER’S MANUAL 
 
Table of Contents
 

Table of Contents .......................................................................................................................................... 2 
CHAPTER 1: INTRODUCTION TO DeepEX ...................................................................................................... 5 
1.1 About DeepEX (Deep Excavation Engineering Program) ..................................................................... 6 
1.2 Software Compatibility & Installation ................................................................................................. 7 
1.3 Support & Technical Assistance........................................................................................................... 7 
1.4 DeepEX training and examples ........................................................................................................... 7 
1.5 End User License Agreement .............................................................................................................. 8 
1.6 What is new! ..................................................................................................................................... 12 
1.7 Activating the software ..................................................................................................................... 13 
1.7.1 Activating the stand-alone license ............................................................................................. 13 
CHAPTER 2: USING DeepEX ......................................................................................................................... 14 
2.1 Deep Excavations Background .......................................................................................................... 15 
2.1.1. Background ................................................................................................................................... 15 
2.1.2. Retaining systems for deep excavations ....................................................................................... 16 
2.1.2. A. Soldier Pile and Lagging Walls .............................................................................................. 16 
2.1.2. B. Sheet Pile Walls ..................................................................................................................... 18 
2.1.2. C. Secant Pile Walls ................................................................................................................... 19 
2.1.2. D. Soil Mix Walls ........................................................................................................................ 20 
2.1.2. E. Diaphragm Walls (Slurry walls US) ........................................................................................ 21 
2.1.3 Support systems for deep excavations ........................................................................................... 22 
2.1.3. A. Tiebacks/Rock Anchors ......................................................................................................... 22 
2.1.3. B. Cross-lot/Internal Bracing ..................................................................................................... 24 
2.1.3. C. Top/Down Construction ........................................................................................................ 25 
2.2 Using DeepEX .................................................................................................................................... 27 
2.3.1 DeepEX Toolbar Functions ............................................................................................................. 29 
2.3.2 Wall List, Design Section List, Project Tree View and 3D Model .................................................... 33 
2.4 General menu .................................................................................................................................... 36 
2.5 Seismic menu .................................................................................................................................... 74 
2.6 Analysis menu ................................................................................................................................... 78 

DEEP EXCAVATION  2 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.7 Slope Stability menu ....................................................................................................................... 101 
2.8 Stability+ menu ............................................................................................................................... 107 
2.9 Design menu ................................................................................................................................... 113 
2.10 Results menu ................................................................................................................................. 119 
2.11 Report menu ................................................................................................................................. 121 
2.12 View menu .................................................................................................................................... 124 
2.13 Optimize menu .............................................................................................................................. 125 
2.14 Help menu ..................................................................................................................................... 129 
CHAPTER 3: DATA ENTRY ........................................................................................................................... 134 
3.1 Data entry: General ......................................................................................................................... 135 
3.2 Design codes ................................................................................................................................... 136 
3.3 Data entry: Project information ...................................................................................................... 141 
3.4 Data entry: Soil Data ....................................................................................................................... 142 
3.5 Data entry: Soil Layers ..................................................................................................................... 150 
3.6 Data entry: Water ............................................................................................................................ 153 
3.7 Data entry: Wall data ...................................................................................................................... 154 
3.7.1 Data entry: Wall sections ......................................................................................................... 156 
3.7.2 Wall type: Soldier piles ............................................................................................................. 163 
3.7.3 Wall type: Sheet piles ............................................................................................................... 170 
3.7.4 Wall type: Secant - tangent piles .............................................................................................. 173 
3.7.5 Wall type: Diaphragm walls (slurry walls US) ........................................................................... 179 
3.7.6 Wall type: Soldier pile and tremied concrete walls ................................................................. 183 
3.7.7 Wall type: Custom .................................................................................................................... 184 
3.7.8 Wall type: Combined walls ....................................................................................................... 186 
3.7.9 Wall type: Box Sheet Pile walls ................................................................................................ 187 
3.8 Data entry: Ground Anchors ........................................................................................................... 188 
3.8.1 Data entry: Tiebacks ................................................................................................................. 188 
3.8.2 Data entry: Tieback sections .................................................................................................... 190 
3.8.3 Data entry: Helical anchor sections ......................................................................................... 194 
3.9 Data entry: Strut sections ............................................................................................................... 196 
3.9.1 Mechanical and Hydraulic Strut sections ................................................................................. 199 

DEEP EXCAVATION  3 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.10 Data entry: Slab sections and slab supports ................................................................................. 206 
3.11 Data entry: Fixed supports ............................................................................................................ 209 
3.12 Data entry: Springs ........................................................................................................................ 209 
3.13     Data entry: Slope Stability ......................................................................................................... 210 
3.13.1 Slope Stability Analysis ........................................................................................................... 210 
3.13.2 Soil nailing .............................................................................................................................. 223 
3.14     Data entry: Wale beams ............................................................................................................ 229 
3.15     Data entry: Heel blocks (passive heel blocks)............................................................................ 239 
3.16     Data entry: Waler supports ....................................................................................................... 241 
CHAPTER 4: MODIFYING MODELS & VIEWING RESULTS .......................................................................... 245 
4.1 Modifying surface elevations .......................................................................................................... 246 
4.2 Adding supports graphically ............................................................................................................ 250 
4.3 Adding Surcharges Graphically ........................................................................................................ 253 
4.4 Viewing Results on Main Form........................................................................................................ 255 
4.5 Report Options (Printed Reports) ................................................................................................... 261 
4.6 Footing Loads (3-Dimensional Loads) ............................................................................................. 263 
4.7 Buildings, Building Wizard and Building Damage Assessment Module .......................................... 266 
4.8 Surcharge load options ................................................................................................................... 273 
4.9 Project cost module ........................................................................................................................ 277 
4.10 3D Model in DeepEX (3D Frame Analysis Module) ....................................................................... 286 
4.11 Export drawings in DXF (DXF Module) .......................................................................................... 303 
4.12 Gravity walls in DeepEX (Gravity walls module)............................................................................ 312 
 

DEEP EXCAVATION  4 

 
DEEPEX 2018 – USER’S MANUAL 
 

CHAPTER 1: INTRODUCTION TO DeepEX


 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DEEP EXCAVATION  5 

 
DEEPEX 2018 – USER’S MANUAL 
 
1.1 About DeepEX (Deep Excavation Engineering Program)

DeepEX is a user friendly robust software program that evaluates and aids the design of deep 
excavations. The design of deep excavations can be a very complicated matter. The designer has 
to  content  with  many  unknowns  and  factors  that  influence  the  behavior  of  the  excavation. 
Typically,  there  are  two  systems  in  excavations  that  must  be  designed: A)  the Earth  Retention 
System that contains the earth i.e. the support wall (sheet pile, diaphragm wall, etc.), and b) the 
Support  System  (i.e.  the  internal  or  external  bracing  such  as  rakers,  struts,  or  tiebacks)  that 
supports the earth retention system.  

Performing  detailed  calculations  for  both  systems  can  be  a  very  time-consuming  process, 
especially when parameters must be changed. In addition, many current software programs do 
not offer an integrated platform of structural and geotechnical analyses required to design deep 
excavations. As a result, the designer is forced to use numerous software programs to analyze the 
excavation and the structural system separately. Apart from finite element analyses, there are 
very few theoretical solutions for calculating lateral soil pressures from complex surface profiles. 
Furthermore, the designer must save under different filenames the different stages of the same 
excavation.  As  a  result,  the  whole  process  can  become  unnecessarily  complicated  and  time 
consuming.  DeepEX  addresses  most  of  these  issues  and  provides  an  integrated  structural  and 
geotechnical platform for designing deep excavations. 

The current version of DeepEX  offers both traditional methods of analyses and discrete soil
spring solutions. Finite Element Analysis Method is available as an additional module in DeepEX 
software.  While  it  is  generally  accepted  that  traditional  methods  of  analysis  have  obvious 
limitations in predicting real behavior accurately, they are important for framing the problem and 
providing a back-check for more rigorous finite element methods. Soil spring solutions can give a 
better  approximation  to  real  wall  behavior.  The  beauty  of  DeepEX  is  that  it  can  perform  both 
traditional  and  spring  analyses  so  efficiently  that  it  leaves  the  designer  with  ample  time  to 
perform more time consuming finite element analysis.  

 
 
 
 
 
 
 

DEEP EXCAVATION  6 

 
DEEPEX 2018 – USER’S MANUAL 
 
1.2 Software Compatibility & Installation
 
DeepEX is compatible with Windows (OS) XP, Vista, 7, 8 and 10. A minimum of 380 Mb must be 
available on your hard disk.  

1.3 Support & Technical Assistance


 
Support and technical assistance for DeepEX is offered through our web site at: 
www.deepexcavation.com 

Please send us any question at: support@deepexcavation.com 

1.4 DeepEX training and examples


 
You can find extensive examples and videos in our official websites (www.deepexcavation.com 
and www.deepex.com).  

For examples please visit: 


www.deepex.com/training/examples 
www.deepexcavation.com/en/examples-2015 
For training videos, please visit: 
www.deepex.com/training/training_videos 
Projects designed with DeepEX: 
DeepEX  is  used  as  a  main  deep  excavation  design  tool  by  many  engineers  and  companies 
worldwide.  As  a  result,  a  lot  of  projects  (more  than  10000  projects  worldwide)  have  been 
designed with our software program (Southeastern Asia, North America, Australia, Europe etc.). 
All the projects that are designed with DeepEX met the requirements of the relevant DOTs.  
DeepEX is used by major companies in US (i.e. Hayward Baker, Langan, CH2M, Skanska, Mountain 
Pacific, Arup, Schnabel etc.). 
You can find details of some of our projects and clients in our websites, using the following links:  
https://www.deepex.com/projects/projects_with_deepex 
http://www.deepexcavation.com/en/deep-excavation-library 
Software training/online presentations:
We can always arrange a free online presentation (up to one hour), where we can present the 
main  features  and  capabilities  of  our  software.  Extensive  training  (online  or  on  spot)  can  be 
arranged  upon  request.  The  cost  of  the  full  training  course  can  be  defined  according  to  your 
needs. To arrange a presentation and for additional information, please contact: 
mamoglou@deepexcavation.com

DEEP EXCAVATION  7 

 
DEEPEX 2018 – USER’S MANUAL 
 
1.5 End User License Agreement
 
"TERMS OF USE / LICENSE AGREEMENT" 

This  legal  document  is  an  agreement  between  you  (the  end  user)  and  Deep  Excavation.  BY 
CONTINUING WITH/OPENING/DOWNLOADING THIS SOFTWARE PROGRAM, YOU ARE AGREEING 
TO  BECOME  BOUND  BY  THE  TERMS  OF  THIS  AGREEMENT,  WHICH  INCLUDES  THE  SOFTWARE 
LICENSE,  SOFTWARE  DISCLAIMER  OF  WARRANTY,  AND  HARDWARE  LIMITED  WARRANTY 
"collectively the "Agreement". 

This agreement constitutes the complete agreement between you and Deep Excavation. IF YOU 
DO NOT AGREE TO THE TERMS OF THIS AGREEMENT, DO NOT CONTINUE WITH THIS SOFTWARE 
PROGRAM. Promptly return or delete the software program (cd and jewel case) and other items 
that are part of this product to Deep Excavation, for a complete refund if a purchasing fee was 
charged.  

DEEP  EXCAVATION  ENGINEERING  PROGRAM,"SOFTWARE  LICENSE",  APPLICABLE  TO  ALL 


VERSIONS  

THE  LICENCE  APPLIES  TO  PURCHASHED  AND  FREE  OF  PURCHASE  VERSIONS  OF  THE  DEEP 
EXCAVATION SOFTWARE. 

LICENSE. In consideration of payment of the LICENSE fee, which is a part of the price you paid for 
this product, Deep Excavation, as Licensor grants to you, the LICENSEE, a nonexclusive right to 
use and display this copy of Deep Excavation Engineering Program, Software (hereinafter referred 
to  as  "SOFTWARE"  on  a  single  COMPUTER  (i.e.,  with  a  single  CPU)  at  a  single  location.  Any 
"networking",  namely  operating  this  program  on  a  "network"  is  strictly  forbidden.  You  as  a 
Licensee are strictly forbidden to operate, utilize, transfer, distribute, connect, network, link to, 
attach, or operate in any manner this software on the internet, worldwide web, via email, any 
website, networking, any multimedia device, electronic or otherwise or any form of electronic 
media whatsoever. This includes but is not limited to the written materials, results, output, or 
resulting answers and/or printed matter without the prior written consent of Deep Excavation. 
Deep Excavation reserves all rights not expressly granted to LICENSEE.  

SOFTWARE  OWNERSHIP.  As  the  LICENSEE,  you  own  the  magnetic  or  other  physical  media  on 
which the SOFTWARE is originally or subsequently recorded or fixed, however, Deep Excavation 
retains  title  and  ownership  of  the  SOFTWARE  recorded  on  the  original  disk  copy(ies)  and  any 
subsequent copies of the SOFTWARE, regardless of the form or media in or on which the original 
and  other  copies  may  exist.  This  License  is  not  a  sale  of  the  original  SOFTWARE  or  any  copy 
thereof. 

DEEP EXCAVATION  8 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

COPY  AND/OR  MODIFY  RESTRICTIONS.  All  Licensed  Products  are  copyrighted  and  may  not  be 
further copied, without the prior written approval of Deep Excavation except that You may make 
one  copy  for  backup  purposes  provided  You  reproduce  and  include  the  complete  copyright 
notice,  disclaimer,  etc.,  on  the  backup  copy.  Any  unauthorized  copying  is  in  violation  of  this 
Agreement and also a violation of the United States Copyright law. You may not use, transfer, 
modify, copy of otherwise reproduce the License Product, or any part of it, except as expressly 
permitted in this End User License Agreement. 

USE  RESTRICTIONS.  As  the  LICENSEE,  you  may  physically  transfer  the  SOFTWARE  from  one 
computer to another provided that the SOFTWARE is used on only one computer at a time. You 
may not electronically transfer the SOFTWARE from one computer to another over a network. 
You may not distribute copies of the SOFTWARE or accompanying written materials to others. You 
may not operate, utilize, transfer, distribute, connect, network, link to, attach, or operate in any 
manner this software on the internet, worldwide web, via email, any website, networking, any 
multimedia device, electronic or otherwise or any form of electronic media whatsoever. You may 
not modify, adapt, translate, reverse engineer, decompile, disassemble, or create derivative works 
based on the SOFTWARE. In addition, you may not modify, adapt, translate, or create derivative 
works based on the written materials, results, output, or resulting answers and/or printed matter 
without the prior written consent of Deep Excavation. 

RESTRICTIONS AGAINST TRANSFER. This SOFTWARE is licensed only to you, the LICENSEE, and 
may not be transferred to anyone without the prior written consent of DEEP EXCAVATION. Any 
authorized  transferee  of  the  SOFTWARE  shall  be  bound  by  the  terms  and  conditions  of  this 
Agreement.  In  no  event  may  you  transfer,  assign,  copy,  rent,  lease,  sell,  or  dispose  of  the 
SOFTWARE  in  any  manner  on  a  temporary  or  permanent  basis  except  as  expressly  provided 
herein. 

TERM. This End User License Agreement is effective from the date of purchase by You or granting 
to you of the Licensed Product and shall remain in force until terminated. You may terminate this 
End User License Agreement at any time by destroying the Licensed Product together with any 
backup  copy  in  any  form  made  by  You  or  received  by  You.  In  addition,  your  right  to  use  the 
Licensed Product will terminate if You fail to comply with any of the terms or conditions of this 
End User License Agreement. Upon such termination You shall destroy the copies of the Licensed 
Product in your possession. 

DISCLAIMER OF WARRANTY AND LIMITED WARRANTY 

DEEP EXCAVATION  9 

 
DEEPEX 2018 – USER’S MANUAL 
 
THE SOFTWARE AND ACCOMPANYING WRITTEN MATERIALS (INCLUDING RESTRICTIONS FOR USE) 
IF ANY, ARE PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND. FURTHER, DEEP EXCAVATION 
DOES NOT WARRANT, GUARANTEE, OR MAKE ANY REPRESENTATIONS REGARDING THE USE, OR 
THE  RESULTS  OF  THIS  USE,  OF  THE  SOFTWARE  OR  WRITTEN  MATERIALS  IN  TERMS  OF 
CORRECTNESS, ACCURACY, RELIABILITY, CURRENTNESS, OR OTHERWISE. THE ENTIRE RISK AS TO 
THE RESULTS AND PERFORMANCE OF THE SOFTWARE IS ASSUMED BY YOU 

. Deep Excavation warrants to the original LICENSEE (a) the disk(s) on which the SOFTWARE is 
recorded to be free from defects in materials and workmanship under normal use and service for 
a period of sixty (60) days from the date of delivery as evidenced by a copy of the receipt. In 
addition, Deep Excavation hereby limits the duration of any implied warranty(ies) on the disk or 
such hardware to the respective period stated above.  

Deep Excavation's entire liability and your exclusive remedy as to the disk(s) or hardware shall be, 
at Deep Excavation's option, either (1) return of the purchase price or (2) replacement of the disk 
or hardware that does not meet Deep Excavation's Limited Warranty and which is returned to 
Deep Excavation with a copy of the receipt. If failure of the disk or hardware has resulted from 
accident, abuse or misapplication, Deep Excavation shall have no responsibility to replace the disk 
or hardware or refund the purchase price. Any replacement disk or hardware will be warranted 
for the remainder of the original warranty period or thirty (30) days, whichever is longer. 

THE ABOVE ARE THE ONLY WARRANTIES OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING 
BUT  NOT  LIMITED  TO  THE  IMPLIED  WARRANTIES  OR  MERCHANTABILITY  AND  FITNESS  FOR  A 
PARTICULAR PURPOSE THAT ARE MADE BY DEEP EXCAVATION ON THIS PRODUCT. NO ORAL OR 
WRITTEN INFORMATION OR ADVICE GIVEN BY DEEP EXCAVATION, ITS DEALERS, DISTRIBUTORS, 
AGENTS, OR EMPLOYEES SHALL CREATE A WARRANTY OR IN ANY WAY INCREASE THE SCOPE OF 
THIS WARRANTY, AND YOU MAY NOT RELY ON ANY SUCH INFORMATION OR ADVICE. 

NEITHER  DEEP  EXCAVATION  NOR  ANYONE  ELSE  WHO  HAS  BEEN  INVOLVED  IN  THE  CREATION, 
PRODUCTION,  OR  DELIVERY  OF  THIS  PRODUCT  SHALL  BE  LIABLE  FOR  ANY  DIRECT,  INDIRECT, 
CONSEQUENTIAL,  OR  INCIDENTAL  DAMAGES  (INCLUDING  DAMAGES  FOR  LOSS  OF  BUSINESS 
PROFITS, BUSINESS INTERRUPTION, LOSS OF BUSINESS INFORMATION, AND THE LIKE) ARISING 
OUT OF THE USE OF OR INABILITY TO USE SUCH PRODUCT EVEN IF DEEP EXCAVATION HAS BEEN 
ADVISED  OF  THE  POSSIBILITY  OF  SUCH  DAMAGES.  IN  ALL  CASES  A  LICENCED  PROFESSIONAL 
ENGINEER  SHALL  APPROVE  AND  STAMP  ANY  RESULTS  BY  D.E.E.P.  AND  THAT  ENGINEER  IS 
ULTIMATELY RESPONSIBLE FOR ANY CONSEQUENCES OR MISUSE OF THE SOFTWARE.  

This Disclaimer of Warranty and Limited Warranty is governed by the laws of the State of New 
York. Should you have any questions regarding this agreement please email: 

DEEP EXCAVATION  10 

 
DEEPEX 2018 – USER’S MANUAL 
 
Deep Excavation, 

deepexcavation@deepexcavation.com 

DEEP EXCAVATION  11 

 
DEEPEX 2018 – USER’S MANUAL 
 
1.6 What is new!
 
The latest version of DeepEX 2018 comes with many exciting new features that include: 

i. Improved speech recognition commands and interactions. 
ii. DXF drawings for plan views, elevation drawings to DXF. 
From plan view and 3D model, export drawings to DXF. Elevation drawings to be added 
soon in a free upgrade 
iii. Support points for struts in plan-view. 
Provide  intermediate  supports  in  the  3D  plan  view  for  struts  to  reduce  the  unbraced 
length. 
iv. Reductions in axial loads on walers (3D). 
Reduce the axial force on walers due to static friction. 
v. Improved report output: Condensed quick input/output summary. 
vi. Structural Steel Code Updates: AISC 2016. 
vii. New Wall Types: Secant walls with different reinforcement for main & secondary piles. 
viii. Automatic optimization with depth change for supports. 
DeepEX will vary the support elevation to achieve minimal wall moment, or cost (for 1 
support level). 
ix. Distribution load approach on surcharge for 3D loads. 
x. Soil mix block walls. 
xi. Base resistance for wall embedment safety factor calculations when embedded walls are 
end bearing. 
xii. Inclined walls from vertical axis. 
xiii. CIRIA recommendations. 
Additional options for recent CIRIA C760 publication such as geotechnical axial capacity of 
walls. 
xiv. New water flow analysis options. 
xv. New diagnostic features added. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DEEP EXCAVATION  12 

 
DEEPEX 2018 – USER’S MANUAL 
 
1.7 Activating the software

1.7.1 Activating the stand-alone license

To activate the license, the following steps are required: 

1) Download and install the software. 
2) Keep the SHIFT key pressed (or CAPS locked) and start DeepEX 2018 
3) The activation window should appear (Figure 1.6.1).  
4)  E-mail us the SITE and MID codes that appear in this window (see Figure 1.6.1). 
5) We will then e-mail back the user’s activation code 
6) Restart the program (with CAPS locked) and enter the activation code in the DeepEX 
activation window (select the option Activate license). 
(please pay attention not to paste the activation code with any additional space 
characters)  
7) Select Enter Application and press Continue.  

Figure 1.6.1: The DeepEX activation window – SITE and MID codes. 

This procedure is used to activate all DeepEX modules. 

1.7.2 Activating the network license


 
Network license instructions are included in a separate manual. 

DEEP EXCAVATION  13 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

CHAPTER 2: USING DeepEX

DEEP EXCAVATION  14 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1 Deep Excavations Background

2.1.1. Background
A deep excavation is typically defined as an excavation in soil or rock that is deeper than 15 ft (4.5 
m).  Deep  excavations  require  careful  design  and  planning  especially  when  constructed  in 
congested  urban  areas.  Selecting  and  designing  an  appropriate  earth  retaining  and  support 
system can have significant impact on cost, time, and performance.  

Figure 2.1.1: Diaphragm wall excavation supported by soil anchors. 

Deep excavations involve two main systems a) The Retaining System that contains earth and water 
from entering directly into the excavated site, and b) The Support System (or bracing system) that 
contains the resist forces generated by soil, surcharges, and water. Cantilever excavations do not 
require bracing.  

 
The term "Retaining System" for a deep excavation refers to the structural system that retains soil 
and water and prevents it from collapsing into the open cut. Many types of retaining systems 
exist. The selection of the proper retaining system depends on a wide range of factors such as: 
Economical,  soil  conditions,  protection  of  adjacent  structures,  ease  of  construction, 
environmental issues and so on. Typical retaining systems include soldier pile and lagging, sheet 
piling, secant pile or tangent pile walls, soil mix walls, and diaphragm walls (also known as slurry 
walls in the U.S.). 

DEEP EXCAVATION  15 

 
DEEPEX 2018 – USER’S MANUAL 
 
The role of support systems is to provide lateral bracing for retaining walls. Support systems can 
be  subdivided  into  external  and  internal  depending  on  the  load  transfer  mechanism.  External 
supports (namely tiebacks) work by transferring lateral excavation loads beyond the active zone 
of soil movements (retained side). On the other hand, internal supports such as struts, rakers, or 
floor slabs, transfer lateral loads within the excavation (across opposing walls or to other internal 
structures). In all cases, support and retaining systems must work closely together to guarantee 
a high level of performance.  

More  detailed  descriptions  of  typical  retaining  and  support  systems  are  available  in  following 
sections. 

2.1.2. Retaining systems for deep excavations

2.1.2. A. Soldier Pile and Lagging Walls


 

Figure 2.1.2: Soldier Pile & Timber Lagging Walls. 

Soldier  pile and  lagging  walls  are  some  of  the  oldest  forms  of  retaining  systems  used  in  deep 
excavations. These walls have successfully been used since the late 18th century in metropolitan 
cities like New York, Berlin, and London. The method is also commonly known as the "Berlin Wall" 
when steel piles and timber lagging is used. Alternatively, caissons, circular pipes, or concrete 
piles can also be used as soldier piles (but at an increased cost). Timber lagging is typically used 
although reinforced concrete panels can also be utilized for permanent conditions. Soldier pile 
and lagging walls are formed by: 

1. Constructing soldier piles at regular intervals (6 ft to 12 ft, typically) 

2. Excavating in small stages and installing lagging. 

3. Backfilling and compacting the void space behind the lagging.  

DEEP EXCAVATION  16 

 
DEEPEX 2018 – USER’S MANUAL 
 
Moment resistance in soldier pile and lagging walls is provided solely by the soldier piles. Passive 
soil  resistance  is  obtained  by  embedding  the  soldier  piles  beneath  the  excavation  grade.  The 
lagging bridges and retains soil across piles and transfers the lateral load to the soldier pile system. 

Soldier pile and lagging walls are the most inexpensive systems compared to other retaining walls. 
They are also very easy and fast to construct. The major disadvantages of soldier pile and lagging 
systems are:  

1. They are primarily limited to temporary construction.  

2. Cannot be used in high water table conditions without extensive dewatering. 

3. Poor backfilling and associated ground losses can result in significant surface settlements.  

4. They are not as stiff as other retaining systems. 

5. Because only the flange of a soldier pile is embedded beneath subgrade, it is very difficult to 
control basal soil movements.  

DEEP EXCAVATION  17 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1.2. B. Sheet Pile Walls

Figure 2.1.3: Sheet Pile Section. 

Sheet pile walls are constructed by driving prefabricated sections into the ground. Soil conditions 
may allow for the sections to be vibrated into ground instead of it being hammer driven. The full 
wall is formed by connecting the joints of adjacent sheet pile sections in sequential installation. 
Sheet pile walls provide structural resistance by utilizing the full section. Steel sheet piles are most 
commonly  used  in  deep  excavations,  although  reinforced  concrete  sheet  piles  have  also  been 
used successfully. 

Steel  sheet  piling  is  the  most  common  because  of  its  several  advantages  compared  to  other 
materials: 

1. Provides high resistance to driving stresses. 

2. Light weight 

3. Can be reused on several projects. 

4. Long service life above or below water with modest protection. 

5. Easy to adapt the pile length by either welding or bolting 

6. Joints are less apt to deform during driving.  

 
 

DEEP EXCAVATION  18 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1.2. C. Secant Pile Walls
 

Figure 2.1.4: Typical Secant Pile Wall Section. 

Secant pile walls are formed by constructing intersecting reinforced concrete piles. The piles are 
reinforced with either steel rebar or with steel beams and are constructed by drilling under mud. 
Primary piles are installed first with secondary piles constructed in between primary piles once 
the latter gain sufficient strength. Pile overlap is typically in the order of 3 inches (8 cm). In a 
tangent pile wall, there is no pile overlap as the piles are constructed flush to each other. The 
main advantages of secant or tangent pile walls are: 

1. Increased construction alignment flexibility. 

2. Increased wall stiffness compared to sheet piles. 

3. Can be installed in difficult ground (cobbles/boulders). 

4. Less noisy construction. 

The main disadvantages of secant pile walls are: 

1. Verticality tolerances may be hard to achieve for deep piles. 

2. Total waterproofing is very difficult to obtain in joints. 

3. Increased cost compared to sheet pile walls. 

DEEP EXCAVATION  19 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1.2. D. Soil Mix Walls
 
Various  methods  of  soil  mixing,  such  as  mechanical,  hydraulic,  with  and  without  air,  and 
combinations of both types have been used widely in Japan for about 20 years. Soil mixing has 
been used for many temporary and permanent deep excavation projects including the Central 
Artery  project  in  Boston.  Known  methods  include  as  Jet  Grouting,  Soil  Mixing,  Cement  Deep 
Mixing (CDM), Soil Mixed Wall (SMW), Geo-Jet, Deep Soil Mixing, (DSM), Hydra-Mech, Dry Jet 
Mixing (DJM), and Lime Columns. Each of these methods aims at finding the most efficient and 
economical method to mix cement (or in some cases fly ash or lime) with soil and transform soil 
to become more like a soft rock. 

Mechanical soil mixing is performed using single or multiple shafts of augers and mixing paddles. 
The auger is slowly rotated into the ground, typically at 10-20 rpm, and advanced at 2 to 5 ft (0.5 
to 1.5 m) per minute.  

Cement slurry is pumped through the hollow stem of the shaft(s) feeding out at the tip of the 
auger  as  the  auger  advances.  Mixing  paddles  are  arrayed  along  the  shaft  above  the  auger  to 
provide mixing and blending of the slurry and soil. Slurry lubricates the tool and assists in the 
breaking up of the soil into smaller pieces. Spoils come to the surface since fluid volume is being 
introduced into the ground. These spoils comprise cement slurry and soil particles with similar 
cement content as what remains in the ground. After final depth is reached, the tools remain on 
the bottom of the hole, rotating for about 0.5 to 2 minutes for complete mixing. At this point, the 
tools are raised while continuing to pump slurry at a reduced rate. Withdrawal is typically at twice 
the speed of penetration, 4 ft to 10 ft (1 m to 3m) per minute.  

Steel beams are typically inserted in the fresh mix to provide reinforcement for structural reasons. 
A  continuous  soil  mix  wall  is  constructed  by  overlapping  adjacent  soil  mix  elements.  Soil  mix 
sections are constructed in an alternating sequence with primary elements being formed first and 
secondary elements following once the first have gained sufficient strength. 

The soil mix method can be very effective at providing very stiff and waterproof retaining systems. 
However, it is rather limited to medium and large-scale projects because of its high mobilization 
costs. Insufficient mix strength may result when mixing organic soils unless a high replacement 
ratio  is  maintained.  Other  issues  such  as  difficulties  in  maintaining  consistent  compressive 
strengths throughout the section of a soil mix wall can also emerge.  

DEEP EXCAVATION  20 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1.2. E. Diaphragm Walls (Slurry walls US)
 

Figure 2.1.5: Typical Diaphragm Wall Section. 

The continuous diaphragm wall (also referred to as slurry wall) is a structure formed and cast in a 
slurry  trench  (Xanthakos,  1994).  The  trench  is  initially  supported  by  either  Bentonite  polymer 
based  slurries.  The  term  "diaphragm  walls"  refers  to  the  final  condition  when  the  slurry  is 
replaced by tremied concrete that acts as a structural system either for temporary excavation 
support or as part of the permanent structure. This construction sequence is illustrated in Figure 
1. The term slurry wall is also applied to walls that are used as flow barriers (mainly in waste 
containment), by providing a low permeability barrier to contaminant transport.  

Slurry  wall  technology  hinges  on  specialized  equipment  for  excavating  slurry  trenches.  The 
simplest  type  of  trenching  equipment  is  the  mechanical  clamshell  attached  on  a  kelly  bar. 
Individual contractors have developed their own specialized trenching equipment like hydraulic 
clamshells,  fraise  or  hydromills  (sample  manufacturers:  Icos,  Bauer,  Casagrande,  Case 
Foundation, Rodio etc.).  

The first diaphragm walls were tested in 1948 and the first full scale slurry wall was built by Icos 
in Italy in 1950 (Puller, 1996) with Bentonite slurry support as a cut-off wall. Icos constructed the 
first structural slurry wall in the late 1950s for the Milan Metro (Puller, 1996). Slurry walls were 
introduced in the US in the mid-1960s by European contractors. The first application in the US 
was  in  New  York  City  [1962]  for  a  7m  diameter  by  24m  deep  shaft  (Tamaro,  1990),  that  was 
followed  by  the  Bank  of  California  in  San  Francisco  (Clough  and  Buchignani,  1980),  the  CNA 
building in Chicago (Cunningham and Fernandez, 1972), and the World Trade Center in New York 
(Kapp, 1969, Saxena, 1974). The majority of diaphragm wall projects in the US are in six cities 
Boston, Chicago, Washington DC, San Francisco and New York.  

Diaphragm  walls  are  extensively  used  in  the  Central  Artery/Tunnel  project  (CA/T)  in  Boston, 
Massachusetts.  Work  in  the  CA/T  involves  many  cut  and  cover  tunnels  constructed  under  the 
existing artery. Some of the deepest T-slurry walls, extending 120' below the surface have been 
constructed for the Central Artery (Lambrechts et al., 1998).  

DEEP EXCAVATION  21 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1.3 Support systems for deep excavations

2.1.3. A. Tiebacks/Rock Anchors

Figure 2.1.6: General installation sequence of tiebacks. 

Anchored walls have become popular in braced excavations because of a) the substantial progress 
in the technology and availability of high-capacity anchor systems, and b) the absence of interior 
obstructions  that  permit  uninterrupted  earth  moving  and  thus  improve  the  construction 
conditions of the underground portion of a building (Xanthakos, 1994). In some projects tiebacks 
have been used in combination with rakers and soil berms and/or corner braces (Gnaedinger et 
al., 1975). Tieback anchors comprise a barrel anchorage located either in a bearing layer which is 
tensioned  at  the  front  face  of  the wall.  The  part  of  the  anchor  that  transfers  the force  to  the 
surrounding soil is frequently called the "fixed length", while the "free length" transmits forces 
from the fixed length through the anchor head to the slurry wall. 

To minimize wall movement and ground settlement, tieback anchors are designed to achieve the 
highest stiffness possible within economic considerations. In urban cities like Boston, Chicago, 
New  York,  and  Washington  where  land  is  precious  such  deep  excavations  are  more  common. 
Tieback  capacity  depends  on  the  vertical  and  horizontal  spacing  of  anchors  and  on  surcharge 
conditions.  Prestress  levels  typically  range  from  40  to  250  kips  when  the  grouted  portion  of 
tiebacks is within soil, higher loads are used when the ties are installed in bedrock. Typical tieback 
spacing ranges from 7ft to 13ft in the vertical, and from 5ft to 15ft in the horizontal direction. 
Tieback  capacity  is  reduced  if  the  spacing  is  too  close  due  to  interference  between  adjacent 
grouted zones.  

Often the tiebacks are used only for temporary excavation support, while the basement floors 
provide permanent lateral earth support. In such projects the tiebacks are detensioned when the 
basement floors have gained sufficient strength. The basement floors should be designed to resist 

DEEP EXCAVATION  22 

 
DEEPEX 2018 – USER’S MANUAL 
 
permanent lateral earth pressures, since stress transfer from the tiebacks to the floor system will 
take place when the ties are detensioned. This stress transfer has reportedly caused long-term 
cracking of many the basement floors.  

Tieback installation follows a predetermined sequence as to minimize soil movements and speed 
the excavation construction. The excavation is carried a couple of feet below the tieback to enable 
access for the drill rig. Further excavation occurs only after prestressing and proof-testing of the 
anchors. The process can be repeated for additional levels of tiebacks. Building codes require that 
all tiebacks are proof-tested to an excess percentage of their  final lock-off load, which usually 
ranges from 120 to 150% of the final lock-off load. Regroutable tiebacks are most commonly used 
because their capacity can be increased by regrouting (to meet test requirements) without having 
to drill a new anchor hole. 

A tieback is made by first drilling a hole with an auger and then placing a bar (tendon) in the hole, 
concrete  is  then  poured  in  the  hole  and  the  connection  with  wall  is  made.  Different  types  of 
augers  are  used  to  drill  the  tieback  holes.  The  choice  of  the  drilling  method  depends  on  the 
soil/rock conditions on the site.  

Drilling should be done carefully since inadequate procedures can cause significant soil losses. 
The byproduct of drilling is removed by flushing the hole with air, water, or slurry. Air is most 
efficient in dry ground, but it requires special attention because it can become entrapped during 
drilling, building up zones of high pressure in the soil that can eject material for several feet and 
at high speeds (potentially injuring workers). Water flushing is best used in sticky clayey soil, and 
it also cleans the sides of the hole by its sweeping action, providing a stronger bond at the grout-
anchor interface. Bentonite slurry flushing works the best since it keeps particles in suspension, 
while the sealing action keeps the hole from collapsing.  

Significant soil losses through the tiebacks cause significant settlements even if the retaining walls 
do not move towards the excavation. In granular soils the drilled hole must be cased to avoid 
collapse.  

Some tieback creep can be expected especially if the ties are very short and the fixed length of 
the tie is within soft ground. For stability reasons, the fixed anchor should be located beyond the 
active zone of movements. As a result, tieback anchors may not be an option at sites congested 
where there are adjacent underground utilities or when adjacent owners do not grant permission 
to drill them under their properties.  

Special attention should be given to the waterproofing details at the anchor heads and at the 
tieback holes. Significant leakage can be caused by inadequate water stopping details at these 
locations. 

DEEP EXCAVATION  23 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1.3. B. Cross-lot/Internal Bracing
 

Figure 2.1.7: A cross-lot project. 

Cross-lot or internal bracing transfers the lateral earth (and water pressures) between opposing 
walls  through  compressive  struts.  Rakers  resting  on  a  foundation  mat  or  rock  offer  another 
internal bracing alternative. Typically, the struts are either pipe or I- beam sections and are usually 
preloaded to provide a very stiff system. Installation of the bracing struts is done by excavating 
soil locally around the strut and only continuing the excavation once preloading is complete. The 
struts typically rest on a series of wale beams that distribute the strut load to the diaphragm wall.  

Pre-loading  ensures  a  rigid  contact  between  interacting  members  and  is  accomplished  by 
inserting a hydraulic jack as each side of an individual pipe strut between the wale beam and a 
special jacking plate welded to the strut. The strut load can either be measured with strain gages 
or can be estimated using equations of elasticity by measuring the increased separation between 
the wale and the strut.  

In  some  earlier  projects  the  struts  were  not  preloaded,  and  as  a  result  when  the  excavation 
progressed deeper the soil and the wall movements were large (C1). Thus, it has become standard 
practice to preload struts to minimize wall movements. Cross-lot bracing makes sense in narrow 
excavations  (60ft  to  120ft)  when  tieback  installation  is  not  feasible.  The  struts  can  bend 
excessively  under  their  own  weight  if  the  excavation  spacing  is  too  large.  In  addition,  special 
provisions must be taken to account for thermal expansion and contraction of the struts.  

The typical strut spacing is in the range of 15ft, both in the vertical and the horizontal direction. 
This is larger than the typical spacing when tiebacks are used, because the pre-loading levels are 
much higher. A clear benefit of using struts is that there are no tieback openings in the slurry wall, 
thus eliminating one source of leakage. 

DEEP EXCAVATION  24 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.1.3. C. Top/Down Construction

Figure 2.1.8: Typical Top/Down Sequence.

Top/down  or  up/down  construction  methods  are  another  method  for  constructing  deep 
excavations. In this case the basement floors are constructed as the excavation progresses. The 
top/down method has been used for deep excavation projects where tieback installation was not 
feasible and soil movements had to be minimized. The general top/down construction sequence 

DEEP EXCAVATION  25 

 
DEEPEX 2018 – USER’S MANUAL 
 
is shown in the figure above. The Post Office Square Garage in Boston (7-levels deep) is one of 
the best-instrumented and documented top/down projects in the US (Whittle, et al., Whitman et 
al., 1991).  

The sequence construction begins with retaining wall installation and then load-bearing elements 
that  will  carry  the  future  super-structure.  The  basement  columns  (typically  steel  beams)  are 
constructed before any excavation takes place and rest on the load bearing elements. These load 
bearing elements are typically concrete barrettes constructed under slurry (or caissons). Then the 
top floor slab is constructed with at least on construction (glory) hole left open to allow removal 
of spoil material. 

The excavation starting at the glory hole begins once the top floor has gained sufficient strength. 
Soil under the top basement floor is excavated around the basement columns to slightly lower 
than the first basement floor elevation to allow for the installation of the forms for the first level 
basement slab. Glory holes are left open within each newly formed basement floor slab and the 
procedure is repeated. Each floor rests on the basement columns that were constructed earlier. 

DEEP EXCAVATION  26 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.2 Using DeepEX
 
DeepEX is a user-friendly software program and includes powerful features and versatile options. 
In DeepEX we can work with many design sections of an excavation. In a sense, a design section 
is a design scenario. Each design section can be independent or can be linked to a parent model. 
This way, multiple conditions can be examined simultaneously. The main interface is shown in 
Figure 2.2. The general philosophy in creating an excavation model in DeepEX is: 

1) Specify the global coordinates. 

2) Specify the soil types and properties. 

3) Specify the layers. 

4) Create a generalized water table. 

5)  Specify  the  retaining  wall  system  (soldier  pile,  sheet  pile,  secant  pile,  tangent  pile,  and 
diaphragm wall options). 

6) Create a database of support members (tiebacks, struts, or concrete slabs). 

7) Add a stage and draw in new supports. 

8) Modify the stage elevations. 

9) Specify load cases or design approach combinations. 

10) Analyze the project. 

11) Perform slope stability analysis. 

The general tabs that appear on the top of the program have the following functions.

1. General: This  tab  includes  general  information  about  the  project,  model  limits  and  all  the 
model options. Here we can define borings, number of walls used, surface and water elevations, 
add or delete stages and modify/edit options for supports and external loads. 
 
2. Analysis: In  this  tab  we  can  define  the  type  of  the  analysis  performed  (limit  equilibrium, 
elastoplastic or both). 
 
3. Seismic: In this tab we can include and edit seismic effects. 
 
4. Slope: This is an extra module which includes options for slope stability. 
 

DEEP EXCAVATION  27 

 
DEEPEX 2018 – USER’S MANUAL 
 
5. Stability +: In this tab we can control options for the calculation of wall embedment safety 
factors, surface settlements and Clough basal stability method. 
 
6. Design: In this tab we can control the structural design codes and other options for calculating 
the design capacities of walls and supports. 
 
7. Results: In this tab we can select to present results directly to the screen after the analysis is 
performed. 
 
8. Report: In this tab we can select options for generating output reports, or viewing calculation 
progress files. 
 
9. View: In this tab we can modify various view options or generate a top view of the model. 
 
10. Optimize:  This  tab  provides  options  for  optimizing  walls  and  supports  after  an  analysis  is 
completed. 
 
11. Help: This tab provides links to help and technical manuals. 
 

 
Figure 2.2: General DeepEX 2018 Interface 

DEEP EXCAVATION  28 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.3.1 DeepEX Toolbar Functions
The  following  section  provides  a  detailed  list  of  all  toolbar  functions.  The  first  tab  group  to 
encounter contains the following options:

 Start button  
 

Figure 2.3.1: Main button

Tool Description 

  Create a new project. 

  Open an existing project. 

  Saves the project. 

  Save  a  project  with  different  name  or  destination  folder,  or  in  an  older 
version.  

List of recently created or modified projects. 
 

Exits the program. 
 

DEEP EXCAVATION  29 

 
DEEPEX 2018 – USER’S MANUAL 
 
A toolbox is available on the left screen side under the design sections list. The available tools are 
described in the table below:

Tool  Description 
Turn the snap on or off (when snap is on, the points in the model area are 
 
rounded to .5) 
Zoom in 
 
Zoom out 
 
Zoom to 1 to 1 horizontal to vertical scale 
 
Zoom Original (all) 
 
Show/Hide axis 
 
Show/Hide dimensions 
 
Show/Hide point coordinates on the model area 
 
Show/Hide tieback dimensions 
 
Show/Hide soil properties 
 
Show/Hide assumptions table 
 
Show/Hide Ka and Kp values on model 
 
Show boring on a specific x coordinate on model 
 
Show boring on model 
 
  Show boring in table 
  Show/Hide SPT values (if SPT record is assigned) 
Show/Hide CPT tip resistance on model (CPT log must be applied) 
 
  Sleeve friction (CPT log must be applied) 
  Standard soil description for CPT tests according to Robertson (CPT log must be 
applied) 
Water pressure (CPT log must be applied) 
 
  Select tool – drag and move objects 
  Erase an item. Select an item on the model to erase. 
Splits a surface line and inserts a point. 
 
Performs an excavation (click on screen to define the excavation limits). 
 
  Performs a backfill operation (click on screen to define the backfill limits). 
  Perform an integrity check of the model 
 

DEEP EXCAVATION  30 

 
DEEPEX 2018 – USER’S MANUAL 
 
On the top left side of the program, right under the design section list appears a toolbar that helps 
the user deal with the design sections (Figure 2.3.2). The icons are presented and described in 
the table below:

Tool Description 

  Edit the name of the selected design section 

  Generate a new view of the current design section 

  Add a new design section 

  Delete design section 

  Move design section up on the list 

  Move design section down on the list 

  Add a new design section (empty – including only stage 0) 

Figure 2.3.2: Design section toolbars 

DEEP EXCAVATION  31 

 
DEEPEX 2018 – USER’S MANUAL 
 
On  the  bottom  left  corner  of  the  program  there  is  a  toolbar  that  helps  the  user  perform 
calculations and control viewing options. 

Figure 2.3.3: View and calculate tools

Tool Description 

Calculate the current design section on view 
 

Calculate all design sections 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DEEP EXCAVATION  32 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.3.2 Wall List, Design Section List, Project Tree View and 3D Model
DeepEX offers features that include multiple design sections and a tree-style project view. The 
tree view enables the user to quickly access vital project data, as well as visualize crucial project 
settings. The next table briefly describes the functionality of the Wall list, Design Section List, and 
Tree View items. 

Selects current design section, shows available 
design sections. 

 
Selects on which wall on current design section 
the settings should be applied. 
 
Shows available design sections 
 
Shows used wall types 
 
Lists supports (right click to add or erase) 
Line loads (right click to add or erase) 
Surcharges (right click to add or erase) 
Prescribed  conditions  (right  click  to  add  or 
erase) 
Moment loads (right click to add or erase) 
Available  soil  types  (by  clicking  the  user  can 
select which soil’s properties to modify) 
Available  boreholes  (by  clicking  the  user  can 
select which borehole’s properties to modify) 
Structural  materials  (by  clicking  the  user  can 
select to change the properties of the structural 
materials) 
Available wall sections (By clicking the user can 
see  the  available  wall  sections,  delete  them, 
activate and deactivate them) 
Available  structural  sections  (buildings  and 
footings) 
Other 3D loads (Area loads, 3D point loads and 
vehicle loads) 

DEEP EXCAVATION  33 

 
DEEPEX 2018 – USER’S MANUAL 
 
To use the 3D Model feature of DeepEX, we first need to create a design section in DeepEX with 
two walls, loads and all design stages. Next, we can use the 3D wizard of DeepEX in order to create 
a 3D model of the site. Figure 2.3.4 presents the options in the 3D model tab of DeepEX. 

Figure 2.3.4: 3D Model options. 

The following table describes the functionality of the 3D Items tree view. Paragraph 4.9 includes


all the options that are available in this feature of DeepEX. 

Available 3D Nodes. By double clicking, we can 
manage the existing nodes or add new ones 

Available 3D perimeters and 3D surfaces. By 
double clicking on them we can manage the 
perimeter and surfaces parameters 
 

Available wall perimeters. By double clicking 
on them we can manage the wall perimeter 
options 
 

Available supports (walers, anchors, struts and 
slabs) 
 
 

DEEP EXCAVATION  34 

 
DEEPEX 2018 – USER’S MANUAL 
 
In DeepEX 2018 user can give voice commands and the software responds, creating models with 
all construction stages within seconds. Figure 2.3.5 presents common orders that can be used in 
DeepEX. User can combine multiple commands. 

 
Figure 2.3.5: 3D Model options. 

DEEP EXCAVATION  35 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.4 General menu
 

Figure 2.4.1: Wizard, Project info, Model limits, Soils, Structural sections, Borings, Surface and 


water options, Stage options, loads and supports. 

- Project Info: by pressing the button , we can change the project, file, company and engineer 


name 

Figure 2.4.2: Project information dialog. 

- Move model elevation: by pressing the button , we can change the model elevation by 


entering a new top of wall elevation. 

Figure 2.4.3: Model Elevation dialog. 

DEEP EXCAVATION  36 

 
DEEPEX 2018 – USER’S MANUAL 
 
The user can choose the objects to be affected by the change in elevation. These are: 

The design section coordinates 
The soil layers elevation (of current borehole) 
All the soil layer elevations of all boreholes 
Elevations of all stages 
Elevations of walls 
Elevations of all supports 
Elevations of all surcharges 
Elevations of all footings and buildings 
The top of the wall is used as point of reference for the change of elevations.

- Model Dimension - Limits: by pressing the button , we can change the Design Section 


name, the used Stratigraphy or Boring and the Model Limits to create a nice view of the model.

Figure 2.4.4: Model Dimension – Limits dialog. 

This dialog includes the following options: 

 The design section name. 
 The model limits. Here we can define the top, bottom, left and right limits of the model. 
These are absolute coordinates. 
 Define the angle of the wall in-plane from y’-y axis (plan view i.e. from top). 
 Define the excavation type (Long 2D excavation, Box-type excavation, Circular shaft, 
Corner (enables out-of-plane for supports)). 
 
 
 

DEEP EXCAVATION  37 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Wizard: by pressing the button , the Wizard dialog appears. The wizard can create a model 
fast.  
 
 Set Units: Here the user can define the model units. 
 

Figure 2.4.5: Wizard – Set units dialog. 

 Welcome Tab: Here the user can define the Analysis method.

 
Figure 2.4.6: Wizard – Welcome Tab. 

DEEP EXCAVATION  38 

 
DEEPEX 2018 – USER’S MANUAL 
 
User  can  choose  to  perform  a  beam  on  elastoplastic  foundations  (nonlinear)  analysis,  a 
conventional (limit equilibrium) analysis, or both analyses. If only the limit-equilibrium analysis is 
selected, then the program offers the ability to optimize the wall embedment. 
 
In addition, in case of limit-equilibrium analysis or conventional analysis, we can define the earth 
pressures choosing among FHWA pressures, Custom Trapezoidal pressures, Peck 1969 pressure, 
adaptive  pressures  from  active  or  Hexc,  apparent  between  Ka  and  Ko,  and  German  EAB  from 
active or increased pressures.  

User can also choose from the following list of options: 

 Blum’s method (pins at supports, and at zero net load) 
 Tributary area method 
 Simplified span analysis (FHWA approach) 
 Simplified span analysis with negative moments 
 California Trenching Manual 2011 (option negative moments) 
 California Trenching Manual 2011 (20% negative moments) 
 Hydrostatic water pressures (groundwater analysis) 
 One dimensional flow around wall (groundwater analysis options) 
 Two dimensional flownet analysis (groundwater analysis options) 

For one wall and limit equilibrium analysis only, user can choose to optimize the wall embedment 
length, defining the wall embedment safety factor and the increment length for wall embedment 
search. 
In this tab, DeepEX also provides an option to include arching effects in non-linear analysis. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DEEP EXCAVATION  39 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Dimensions Tab: Here we can define units and basic model dimensions. 

Figure 2.4.7: Wizard – Dimensions Tab. 

Here user can define the project type from the available list: 

ICON  DESCRIPTION (PROJECT TYPE) 

One wall with tieback supports 
 

Two walls with tieback supports 
 

Dead man wall with tierod 
 

Bin type wall 
 

Two walls braced with internal struts 
 

One wall with raker supports 
 

DEEP EXCAVATION  40 

 
DEEPEX 2018 – USER’S MANUAL 
 

One wall with raker supports and a heel block 
 

Concrete slabs top/down construction 
 

Rectangular shaft with walers 
 

Struts and 3D frame 
 

Circular shaft (half-space modelled with uniform loading conditions 
all around shaft) 
 
Depending on the project type that we select, in this tab we can also define the structural section, 
spacing and installation angle of the supports that we will use. The following parameters should 
be defined: 

 Final Excavation depth
 Wall length
 Excavation width (especially in case of opposite walls)
 Top of wall elevation
 Ground water elevation
 Length of second wall (in case of Dead man wall design)
 Initial ground elevation (in case of Dead man wall design)
 Depth to tierod (in case of Dead man wall design)
 Support horizontal spacing
 Support structural section
 Inclination angle (in case of tiebacks or rakers)
 Option to bring rakers to the base point (in case of rakers)
 Free length of tiebacks (user selected, Italian m=0.2H, Canadian m=0.15H)
 Option to estimate structural properties for tiebacks (tiebacks only)
 Option to include Prestress force for tiebacks (tiebacks only)
 Option to use hydraulic or mechanical struts (struts and rakers only) 
 Change in temperature (struts and rakers only) 
 Temperature load correction factor (struts and rakers only) 

 Soil layers Tab: Here we can define soil layer properties and stratigraphy. 
 

DEEP EXCAVATION  41 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 2.4.8.A: Wizard – Soil layers tab 

This tab offers three main options: 

1. Edit  soil  types:  By  pressing  this  button,  the  Soil  properties  dialog  appears.  All 
properties that are available in this dialog are described in Paragraph 3.4. 
2. Edit borings: By pressing this button, the Edit Borings dialog appears, where we can 
define the stratigraphy. All properties that are available in this dialog are described 
in Paragraph 3.5. 
3. Define soils from text description. This option loads the dialog presented in Figure 
2.4.8.B, where user can describe soil conditions and define SPT values and DeepEX 
can estimate and create a soil profile. 

DEEP EXCAVATION  42 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.4.8.B: Soils defined from text description. 

DEEP EXCAVATION  43 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Wall Type Tab: Here we can define the basic wall type to be used. 

 
Figure 2.4.9: Wizard – Wall Type Tab. 

By pressing on the button Edit Section Data, the wall sections dialog appears. The properties in 
this dialog are described in paragraph 3.8. 

DEEP EXCAVATION  44 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Stages Tab: Here the user can define the surface elevations for each construction stage. 
There are three main choices: 
 
 Automatic elevations: 
 
With this option the program will equally space supports and automatically determine 
excavation depths for each stage. There are also options to include an initial stage with 
no excavation (recommended). 
 

Figure 2.4.10: Wizard – Stages Tab, Automatic elevations. 

DEEP EXCAVATION  45 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Tabulated elevations: 
 
With  this  option  support  elevations  can  be  manually  defined.  The  height  difference 
between the lowest support and the subgrade can also be defined.

Figure 2.4.11: Wizard – Stages Tab, Tabulated elevations. 

 Cantilever:
Select this option to create a cantilever excavation (with no supports). 

Figure 2.4.12: Wizard – Stages Tab, Cantilever. 

DEEP EXCAVATION  46 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Surcharges Tab: Here the user can define a loading surcharge that will be applied as an 
external load to the wall. 

 
Figure 2.4.13: Wizard – Surcharges Tab. 

We can choose between a two-step wall surcharge, a triangular surcharge, a strip load or not 
using a wall surcharge at all. 

Here, we can also define the surcharge modelling options for LEM analysis: 

Elasticity Equations 
 

Two way distribution angle 
 

One way distribution angle 
 

One-way distribution angle from soil friction 
 

Elasticity to vertical stress x Ka (or Ko) 
 

CIRIA Special Pub 95-1993 
 
 

DEEP EXCAVATION  47 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Codes  Tab:  In  this  tab  we  can  define  the  structural  and  geotechnical  codes  used  to 
analyze this project. 
 

Figure 2.4.14: Wizard – Codes Tab. 

DEEP EXCAVATION  48 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Edit soil type data: by pressing the button , the soil properties dialog appears. Here 


we can add, delete and modify available soils by changing their type, the general properties 
like unit weights, strength parameters and permeability, modify the elastoplastic parameters 
and modify the bond resistance for tiebacks. A soil can be used in a boring more than one 
time. Many estimation tools that help the user estimate values are also included. Paragraph
3.4 includes all the options that are available in this form.
 

Figure 2.4.15: Edit soil properties dialog. 

DEEP EXCAVATION  49 

 
DEEPEX 2018 – USER’S MANUAL 
 
By pressing the arrow under the soil types button in the General tab of DeepEX, the following 
options are available: 

 
 
 Soil change commands:  we  can choose  to  change  structural  material and  soil  properties 
during a specific stage. A change property command is valid for all subsequent stages, unless 
it is superseded by another change command or another model change. Please use these 
options with care.  

Figure 2.4.16: Change soil property dialog. 

DEEP EXCAVATION  50 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the Change soil properties dialog, the following properties are available: 

Describe material change 
Select stage to Make material change effective 
Select soil property 
Select soil to modify 
Initial property value 
New property value 
Choose wall side to apply change 
 

Estimate properties from SPT or CPT: This  option  opens  the  “Options  for  estimating  soil 
properties from SPT or CPT” dialog. 

Figure 2.4.17: Options for estimating soil properties from SPT or CPT dialog. 

The following options are available: 

 Option to estimate Ko-OCR from SPT 
 Option to estimate loading Elasticity Modulus 
 Option to estimate undrained shear strength for clays 
 Choose method for using CPT 
 
 
 
 

DEEP EXCAVATION  51 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Borings (Soil layers): by pressing the button , the soil layer dialog appears. In 
this dialog we can edit the borings available for use in the project. In each boring the user 
can add soil layers. To do this, we can type the new soil layer’s elevation, choose the soil type 
from the list of soil types and define the new layers OCR and Ko. In addition, by clicking on 
Edit  button,  we  can  modify  the  selected  soil’s  properties  (see paragraph 3.4).  The 
coordinates X and Y refer to the plan location of the boring and do not affect analysis results. 
 

Figure 2.4.18: Edit soil layers dialog.

- CPT logs: by pressing the arrow next to the button , we can add borings and soils 


by using a CPT test results file as performed by Geologismiki CPT. The options of Figure 2.4.19 
are available. By choosing a CPT log input file, the following dialog appears: 
 

Figure 2.4.19: Available options for CPT logs. 

DEEP EXCAVATION  52 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following options are available: 

Import from Geologismiki CPT  Select a CPT file to import 
Extract CPT to Borings and soils  Choose to add the soils from CPT log to the 
model’s soils and borings databases 
CPT table  This opens the CPT dialog 
www.geologismiki.gr  This leads to the site of Geologismiki 

Figure 2.4.20: Available CPT logs dialog. 

In this dialog we can export the CPT test borings and soils to the program’s database.

- Custom layers:  by  pressing  the  button ,  we  can  choose  the  Custom  layer 
mode and possibly define non-horizontal soil layers. In this mode, a model will not use a 
borehole to define soil layers. Instead, the user can define arbitrary layer lines from left to 
right and create non-horizontal soil layer conditions.

Figure 2.4.21: Custom layers mode. 

DEEP EXCAVATION  53 

 
DEEPEX 2018 – USER’S MANUAL 
 
- The option Use custom layers switches on the custom layer mode. 
- The  reset  layers  from  boring  option,  resets  all  custom  layer  lines  to  horizontal  using  the 
boring applicable for the current design section. 
- The draw layer line tool enables the user to draw a layer line by clicking in the model (left to 
right). Press enter to complete.
 

- Add second wall: by pressing the button , we can add a second wall to the 


model on the right side of the existing wall.
 

Figure 2.4.22: Add second wall.

- Draw left wall element: By pressing the option to draw a left beam (arrow next to the Edit 


1st wall button), we can draw a second wall beam additional to the existing wall and modify 
its properties, as shown in Figures 2.4.23 and 2.4.24. To draw a wall beam, click on one point 
near the wall and then select the next wall beam point.
 

Figure 2.4.23: The draw left wall beam button. 

DEEP EXCAVATION  54 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.4.24: Edit wall beam data dialog.

The options available in the Edit wall data form are described in paragraph 3. 7. The option 
Draw right wall beam is available when we choose to use a second wall in the model (Figure 
2.4.25).  

Figure 2.4.25: The draw right wall beam button.

DEEP EXCAVATION  55 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Surface options:  By  clicking  on  the  button   we  can  edit  the  surface  options.  These 
options are presented in the table below. In addition, we can change the elevation next to 
the wall in the area signed in Figure 2.4.26. 
 

Figure 2.4.26: Surface options.

Icon Description 

Resets global surface levels 
 

Sets right surface level 
 

Sets left surface level 
 

Table of coordinates of surface points 
 

Create a bench on the left side 
 

  Create a slope on the left side 

  Create a bench on the right side 

  Create a slope on the right side 

DEEP EXCAVATION  56 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Water elevation: In this area we can define the water elevations next to the wall.
 

Figure 2.4.27: Water elevation - settings. 

- With the draw custom water surface tool, we can draw a non-horizontal groundwater table. 
To do this, select this option and then start clicking the left mouse button from left to right 
(press enter to complete). To delete the custom water line, move on top in the model and 
press delete. 
- The draw a U line tool is used to draw a line of constant pore pressure in the model. This line 
is only used in slope stability analysis. 
- The define user water pressures tool launches the dialog for defining custom values of water 
pressures next to the walls. Please note that in the non-linear engine, two consecutive zero 
values of water pressure still count in increasing the total vertical stress by γw (see theory 
manual). 

- By clicking on the button  , the Ground water table dialog shows up.

Figure 2.4.28: Ground water table. 

DEEP EXCAVATION  57 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following table presents the options that are included in the ground water table dialog. 

Define the retained side water elevation (left side) 
Option to use hydrostatic ground water pressures 
Option to use simplified flow net for ground water (1D flow calculations) 
Option to perform full flow net analysis (finite difference) 
Choice for constant head on lower boundary (if the previous option is selected) 
Option to use user defined water pressures 
Option to maintain center region water at subgrade 
Option to dewater center region water below subgrade 
Option to use general elevation for center region water 
Choice to create seal at excavation bottom 
Define the water density γw 
Choice to specify different center water elevation for second wall (this option is 
available only if a second wall is used in the model) 
- Stages: In this area we can add, delete, insert or copy a construction stage. 
 

Figure 2.4.29: Water elevation - settings.

Icon Description 

Add a new construction stage 
 

  Deletes the current construction stage 

Insert a construction stage after the current stage 
 

  Copy selected construction stage 

  Paste construction stage 

DEEP EXCAVATION  58 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Supports:  By  selecting  an  option  from  this  drop-down  menu,  a  support  or  other  related 
support entities can be drawn on the model. The following options are available:

Figure 2.4.30: Support options.

Tool Description 

  Adds a tieback – anchor (first click on the wall and then in the ground). 
  Adds a strut (first click on the wall and then in the ground, or on the second 
wall). 
Adds a raker click on the wall and then in the ground). 
 
  Adds a slab (first click on the wall and then define the end point of the slab). 

  Adds a fixed support (click on the wall to add a fixed support). 
  Adds a spring (click on the wall to add a spring). 
  Adds a waler support (click on the wall to add a waler). 
  Adds a waler beam on a support (click on a support to add a wale beam). 
    Adds a passive heel block (click on the bottom of a raker support to add). 
  Defines  the  free  length  of  tieback  supports.  Options  include 
recommendations for the minimum free length according to well accepted 
international Building codes. 
 
Supports can be added by selecting the desired wall type and then clicking on the desired 
wall where the support must be applied. A second click is required for the end point of the 
support for tiebacks, struts, rakers, and slabs. If a support can connect to two walls (left and 
right), then the end point can be defined by simply clicking on the 2nd wall (tiebacks, struts, 
and slabs). 
 

DEEP EXCAVATION  59 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Loads: This drop-down menu contains tool buttons for adding external loads (surcharges) 
and some related surcharge options. The following options are available: 
 

Figure 2.4.31: Load options. 


 
  Adds a surface surcharge (define the start and end point of the surcharge). 
Adds a surface line load (click a surface point to add a point load). 
 
Adds a surcharge on the wall (define two wall points to add a surcharge). 
 
Adds a line load on the wall (define a wall point to add a wall point load) 
 
Adds a prescribed condition at a wall (click on the wall to add a prescribed 
 
condition).  A  prescribed  condition  is  a  predefined  displacement  or  wall 
rotation (non-linear analysis) 
  Adds a footing load (3D) (define a point where to install a footing load). 
  Creates a new building (define a point where to install a building). 
Adds  a  3D  surface  load  (click  on  it  and  draw  a  3D  load  in  the  Plan  view 
  
screen). 
Click to manage the elastic load options (see paragraph 4.8). 
 
  Edit load combinations. Load combinations are user defined combinations 
where a load can be selected manually if it is favorable or unfavorable. 
  Assign  a  load  combination.  With  this  option,  a  load  combination  can  be 
assigned to a specific design section. 
 
 

DEEP EXCAVATION  60 

 
DEEPEX 2018 – USER’S MANUAL 
 
- 3d building:  By  pressing  the  button   ,  we  can  add  a  building  in  the  model,  using  the 
building wizard dialog.
The properties contained in this dialog are described in paragraph 4.7. 

Figure 2.4.32: Building Wizard dialog.

- Add footing: By pressing the button  , we can add a footing load in the model, 


using the footing options dialog.
The properties contained in this dialog are described in paragraph 4.6.

Figure 2.4.33: Footing options dialog.

DEEP EXCAVATION  61 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Wales: By pressing the button  we can add a wale beam to a support. Wale beams are 
simply treated as structural members and their stiffness is not accounted in the non-linear 
analysis. The wale beam dialog opens, and the user can define the type and the loading case 
of the waler. The properties contained in this dialog are described in paragraph 3.14. 
 

Figure 2.4.34: Wale beam dialog.

- Load combinations: the load combinations option, the Load combinations dialog appears 


(Figure 2.4.35). Within this dialog an unlimited number of load combinations can be created. 
Each  load  combination  can  control  how  the  load  is  treated  when  a  design  approach  is 
applied, in terms of the load character (favorable, unfavorable, automatic, ignored).  This 
definition can be applied on each load that has been applied to the model (surcharges, line 
loads, footings, buildings and other 3D loads). 

Figure 2.4.35: Load combinations dialog – Local loads. 

DEEP EXCAVATION  62 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.4.36: Load combinations dialog – Footings-Buildings. 

Figure 2.4.37: Load combinations dialog – Other 3D loads.

DEEP EXCAVATION  63 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Structural sections: From the drop-down button   of the General tab of DeepEX 2018, we 


can modify the structural properties of all sections that will be used in our model:

- Edit wall sections:  by  pressing  the  button ,  the  Edit  wall  properties  dialog  appears. 
Here we can choose the wall type and dimensions, choose the wall sections and edit the 
rebar options for concrete walls. The properties that exist on this form and can be modified
are described in paragraph 3.7. 
 

Figure 2.4.38: Edit wall properties dialog. 

DEEP EXCAVATION  64 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Edit anchor sections:  By  pressing  the  button ,  we  can  edit  the  structural  and 
geotechnical  properties  of  the  sections  used  in  anchors  and  tiebacks,  or  select  to  import 
specific sections from the program’s database. The properties that exist on this form and
can be modified are described in paragraph 3.8.
 

Figure 2.4.39: Edit anchor sections dialog.

- Edit slab sections: By pressing the button , we can edit the structural and reinforcement 


properties of the slab sections that are included in the model. The properties that exist on
this form and can be modified are described in paragraph 3.10.
 

Figure 2.4.40: Edit slab sections dialog. 

DEEP EXCAVATION  65 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Edit strut sections: By pressing the button   we can edit the structural properties of the 


strut sections that are be included in the model. The properties that exist on this form and
can be modified are described in paragraph 3.9. 
 

Figure 2.4.41: Edit strut sections dialog. 

- Edit strut sections: By pressing the button   we can edit the structural properties of the 


mechanical or hydraulic strut sections that are be included in the model. The properties that
exist on this form and can be modified are described in paragraph 3.9.1. 
 

 
Figure 2.4.42: Edit hydraulic and mechanical strut sections dialog.

DEEP EXCAVATION  66 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Edit helical anchor sections: By pressing the button  we can edit the structural and 


geotechnical  properties  of  the  helical  anchor  sections  (can  be  used  in  tiebacks).  The
properties that exist on this form and can be modified are described in paragraph 3.8.
 

Figure 2.4.43: Edit helical anchor sections dialog. 

DEEP EXCAVATION  67 

 
DEEPEX 2018 – USER’S MANUAL 
 

 Wale sections: By pressing the button   we can edit the structural properties of the 


wale  beams. The properties that exist on this form and can be modified are described in
paragraph 3.14.

Figure 2.4.44: Edit wale sections dialog.

 Waler support sections: By pressing the button   we can edit the structural properties 


of the waler supports. The properties that exist on this form and can be modified are described
in paragraph 3.14.

Figure 2.4.45: Edit wale sections dialog.


 

DEEP EXCAVATION  68 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

- Structural materials: In this area we can edit the structural material properties. 
 
The following options are available: 
 
Concrete 
Reinforced steel 
Steel 
Timber (wood) 
User defined material 

 Edit steel properties:  Here  we  can  edit  the  structural  steel  properties.  We  can  import 
already available materials from the “Import standard steel materials” box. 
 

Figure 2.4.46: Edit structural steel properties dialog. 

In this form we can define the following properties: 

The steel name 
The yield strength Fy 
The ultimate strength Fu 
The modulus of elasticity E 
The density g 
The steel material used 
Import and replace selected material 
Import and add as a new material 

DEEP EXCAVATION  69 

 
DEEPEX 2018 – USER’S MANUAL 
 
 
 Edit concrete properties:  Here  we  can  edit  the  concrete  properties.  We  can  import 
already available materials from the “Import standard concrete materials” box. 
 

Figure 2.4.47: Edit concrete properties dialog. 

In this form we can define the following properties: 

The steel name 
The concrete strength Fc 
The tension strength Ft (% of compressive strength) 
The modulus of elasticity E 
The density g 
The standard concrete material reference standard 
The concrete material 
Import and replace selected material 
Import and add as a new material 

DEEP EXCAVATION  70 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Edit reinforcement steel properties:  Here  we  can  edit  the  reinforcement  (rebar)  steel 
properties. We can import already available materials from the “Import standard rebar 
materials”  box.  Steel  reinforcement  materials  can  be  used  for  tiebacks  and  reinforced 
concrete sections.

Figure 2.4.48: Edit reinforcement steel properties dialog. 

In this form we can define the following properties: 

The steel name 
The yield strength Fy 
The modulus of elasticity E 
The standard rebar material reference standard 
The steel material used 
Import and replace selected material 
Import and add as a new material 

DEEP EXCAVATION  71 

 
DEEPEX 2018 – USER’S MANUAL 
 
 User Materials:  Here  we  can  create  a  custom  material,  by  defining  the  modulus  of 
elasticity. User materials are used for custom defined wall sections. 
 

Figure 2.4.49: Edit user material properties dialog.

 Edit wood properties: Here we can modify the wood material properties. Wood (timber) 


materials are used in laggings for soldier pile walls. 
 

Figure 2.4.50: Edit wood properties dialog. 

DEEP EXCAVATION  72 

 
DEEPEX 2018 – USER’S MANUAL 
 
In this form we can define the following properties: 

The wood name 
The ultimate bending strength Fbu 
The ultimate tensile strength Ftu 
The ultimate shear strength Fvu 
The modulus of elasticity E 
The density g 
 

DEEP EXCAVATION  73 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.5 Seismic menu
 

Figure 2.5.1: The Seismic tab menu. 

In this menu, we can choose to include Seismic options and loads in the model’s analysis. The 
following options are included:

- General – accelerations:  In this area we can define the earthquake’s accelerations for both 


directions (horizontal ax and vertical az).
 

Figure 2.5.2: Seismic accelerations.

- Method:  In this area we can choose the Seismic method. We can either choose from the 

available list (Figure 2.5.3) or press the full seismic options button   and load the 
seismic effects dialog (Figure 2.5.4). 
 

Figure 2.5.3: Seismic accelerations. 

DEEP EXCAVATION  74 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.5.4: Seismic effects dialog. 

The following=g table presents the options that are available in the Seismic effects dialog. 

Choice to include seismic effects in this stage 
Horizontal design acceleration Axdesign 
Vertical design acceleration Azdesign 
Option to use a building code 
Define building code and soil type class (if the previous option is selected) 
Define the horizontal base acceleration Axbase 
Define the site soil response factor Ss 
Define the topographic site response St 
Define the Importance factor l 
Option to use rigid wall behavior (wood method) 
Option to use flexible wall behavior 
Option to use a user defined response factor R (if the flexible wall option is selected) 
Option define response factor R according to Building code (if the flexible wall option is 
selected) 

DEEP EXCAVATION  75 

 
DEEPEX 2018 – USER’S MANUAL 
 
Option define response factor R according to Richards Elms (if the flexible wall option is 
selected) 
Option define response factor R according to Liao Whitman (if the flexible wall option is 
selected) 
Define value of R (if user defined R option is selected) 
Define the Permanent design displacement Dxperm (after the seismic event) 
Define the Vmax (peak velocity) 
Define the amax (peak acceleration) 
Define the Vmax/amax (option   available for estimation) 
Option to use Semirigid method for seismic pressures 
Option to use Mononobe-Okabe method for seismic pressures 
Option to use Richards-Shi method for seismic pressures 
Option to use user specified external pressures 
Option to use Wood automatic procedure 
Option to use Wood manual procedure 
Define the user defined seismic pressures for top and bottom 
Define the water behavior as Pervious, impervious or automatic 
Choice to use actual water pressures for Hydrodynamic effects (instead of γw x hw) 
Option to calculate thrust to excavation subgrade 
Option to calculate thrust to bottom of the wall 
Choice to include wall inertia for non-gravity walls 
Choice to apply settings to all stages 
Recalculate design accelerations 
With  Mononobe-Okabe  there  is  the  option  to  define  a  custom  trapezoidal  pressure 
distribution. 
 

- Conventional Seismic:  In this area we can control options for controlling the height of 


application for seismic loads, and also define the Semirigid seismic multiplier B (factor for 
creating a rectangular seismic thrust diagram).
 

Figure 2.5.5: Conventional seismic options.

DEEP EXCAVATION  76 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Seismic:  In this area we can define the water behavior (Figure 2.7.6) and seismic pressures 
(Figure 2.5.7) regarding the Non-linear analysis. The pervious and impervious options control 
how the water is treated in a seismic condition. In the pervious case hydrodynamic loading 
is  applied  according  to  the  Westeergard  solution.  If  the  automatic  EC8  limit  option  is 
selected, then the pervious/impervious state is automatically controlled from the horizontal 
soil permeability according to the limits specified in Eurocode 8.

Figure 2.5.6: Water behavior options. 

Figure 2.5.7: Elastoplastic seismic pressure options. 

DEEP EXCAVATION  77 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.6 Analysis menu
 

Figure 2.6.1: The Analysis tab menu. 

In this menu we can edit the basic analysis settings.

- Analysis:  In this area we can define the analysis method.  We can choose to perform:  
 a conventional analysis (Limit Equilibrium Method)  
 a non-linear analysis (Beam on Elastoplastic Foundations Method) 
 a combination of both limit equilibrium and non-linear analysis  
 Finite Element Analysis 
 a combination of both limit equilibrium and finite element analysis 
In addition, here we can define the spacing among the points of the wall (mesh delta). In general, 
it is recommended that a mesh that generates at least 100 nodes is adopted. 
 

Figure 2.6.2: Analysis options. 

Additional information regarding the non-linear engine: 

The elastoplastic engine is a separate executable that communicates with DeepEX through a text 
interface file. The analysis method works by defining active and passive soil springs, and elastic 
elements for structural members. The analysis method was originally proposed by Nova et al.  in 
1987  and  was  originally  incorporated  in  the  paratie  program  by  CeAS,  Italy.  This  original 
elastoplastic  engine  concept  has  since  been  expanded  to  incorporate  new  features  and 
capabilities. Because the analysis is Winkler based, the elastoplastic analysis cannot capture basal 
movements under the excavation. 

DEEP EXCAVATION  78 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Design approach:  In this area we can define the design load cases of standards. There is a 
possibility to choose a specific case of a design standard (Figure 2.6.3), or to generate all 
load cases/design approaches of a design code (Figure 2.6.4). Paragraph 3.2 presents all
these options.

Figure 2.6.3: Single load case. 

Figure 2.6.4: Multiple load cases. 

DEEP EXCAVATION  79 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Water behavior:  In this area we can define the clay behavior and the water analysis type 
for each stage (Figures 2.6.5 and 2.6.6 respectively).

Figure 2.6.5: Clay behavior. 

For drained analysis the program will use effective strength parameters (for clays c’ is used in LEM 
analysis and global stability). The default behavior uses the initial drained/undrained setting as 
defined in the soil’s dialog. 

The split button on the right controls how ground water pressures are calculated. Figure 2.6.6 
below presents the available options in the drop-down menu. If we click within the button the 
Water options dialog will appear (Fig. 2.6.7). In essence, from this dialog the appropriate water 
pressure methodology that fits the modeled stage conditions should be selected for each stage. 

Figure 2.6.6: Water analysis options. 

DEEP EXCAVATION  80 

 
DEEPEX 2018 – USER’S MANUAL 
 
Hydrostatic  Water pressures are calculated as hydrostatic (γw x h) 
Simplified flow  Water pressures next to the walls are calculated from a 1D flow analysis 
Balanced  Water  pressures  are  calculated  as  hydrostatic  up  to  the  excavation  depth 
and as simplified flow after this 
Full flownet  Water pressures are calculated from a 2D finite difference flownet analysis. 
No drop in groundwater elevations near the walls is considered. 
User pressures  Switches water pressures to the user defined values. Please note that in the 
NL engine, for proper modeling zero water pressures should only start on 
any  side  from  the  exact  water  elevation  on  that  side.  In  essence,  do  not 
define zero pressure points for elevations above. 
Seal excavation  This is an advanced option. With this, we can seal the excavation and define 
an internal water level that is higher than the excavation level. In this case it 
is  important  to  maintain  positive  effective  vertical  stress  within  the 
excavation 
Use net water  Uses  net  water  pressure  when  load  combinations  (or  design  approaches) 
method  are  used.  In  some  cases,  like  the  Chinese  code,  this  option  should  be 
deselected. In this case, the driving and resisting side water pressures will 
be adjusted by different load and resistance factors. 
 

 
Figure 2.6.7: Water analysis options dialog. 

DEEP EXCAVATION  81 

 
DEEPEX 2018 – USER’S MANUAL 
 
Thrust options:  The split button on the left controls the trust options for the model. Figure 2.6.8 

below  presents  the  available  trust  modes.  If  we  click  within  the  button   ,  the  Ka  Kp  main 
options dialog appears (Figure 2.6.9). In this dialog, we can choose the procedure for calculating 
lateral earth pressure coefficients. In the most cases, the full automatic procedure will deliver the 
best results. 

Figure 2.6.8: The thrust options button. 

The following options are available: 

DeepEX automatically selects the Ka and Kp equations depending on wall friction and 
  seismic conditions. This mode is recommended. 
User defines which equations will be used from DeepEX for Ka and Kp at every stage. 
 
  In this mode, DeepEX uses the Ka and Kp values defined in the Soils Type dialog of the 
software. In this mode, a separate tab appears in this dialog for Ka and Kp values for 
each soil type. 
 

DEEP EXCAVATION  82 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.6.9: The Ka Kp main options dialog. 

In this dialog the following options are available: 

Full automatic procedure (automatic selection of Ka and Kp) 
User input procedure 
Option A: Total user input (if the user input procedure option is selected)  
Option B: Approximate update of initial parameters (if the user input procedure option is 
selected)  
Option to enable automatic readjustment of Ka and Kp for friction angle and design approach 
changes (if the option B is selected) 
Option to enable automatic readjustment of Ka and Kp for surface slope angle modifications (if 
the option B is selected) 
Option to enable automatic readjustment of Ka and Kp for earthquake effects (if the option B is 
selected) 
Option to adjust Ko when friction angle changes 
Option to allow modification of Ka and Kp on each stage and each design section. 
 

DEEP EXCAVATION  83 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Include wall friction:  In this area we can choose to include wall friction to the calculations 
on any wall side (resisting and driving side), as well as define how the wall friction is to be 
calculated.

Figure 2.6.9: Include wall friction. 

Option to set the wall friction to zero 
Option to add wall friction as a percentage of soil friction (0 to 100%) 
Option to use a specific value for the wall friction 
Choice to set vertical adhesion on Su driving (limit equilibrium analysis) 
Choice to set vertical adhesion on Su resisting (limit equilibrium analysis) 
Choice to also include wall friction for clays 
 

When the “User Mode” thrust, option is selected (see Figure 2.6.8 above), user can manually 
select a method for the calculation of active/passive earth coefficients. 

Figure 2.6.10.A: User Mode: Include wall friction for driving side options. 

Option ignore wall friction 
Option to use Coulomb method (with wall friction) 
 

DEEP EXCAVATION  84 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 2.6.10.A: User Mode: Include wall friction for resisting side options. 

- Limit equilibrium methods – Drive Pressures:  In this area we can define the type of lateral 


earth pressures used on the driving side for a limit equilibrium analysis. 
 

Figure 2.6.11: Active pressures. 

DEEP EXCAVATION  85 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Active pressures: By choosing the active pressures option we can choose to use active 
pressure for the driving side. 
 Between Ka and Ko:    DeepEX  calculates  and  uses  a  value  between  active  and  at  rest 
pressures. User has to review and define the parameter m, as shown in Figure 2.6.12. 
 

 
Figure 2.6.12: Pressures between Ka and Ko. 

 At-rest pressures: By choosing the at-rest pressures option we can choose to use at-rest 
pressures for the driving side. 
 Peck 1969 apparent: By choosing the Peck pressures option and by pressing the button
 , the Peck pressure options dialog appears.

Figure 2.6.13: The peck pressures options dialog. 

In the Peck pressures options dialog, we can define the multiplier for clay pressures mClays, and 
in addition there is a choice in stiff soil profiles not to allow pressures to drop to zero. 

DEEP EXCAVATION  86 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Custom trapezoidal: By choosing the Custom trapezoidal pressures option and by pressing 
the button  , the Trapezoidal pressure options dialog appears.

Figure 2.6.14: The trapezoidal pressures options dialog. 

In  the  trapezoidal  pressures  options  dialog,  we  can  define  the  multiplier  for  the  active  earth 
pressures M, the top triangular pressure to a percentage of excavation depth from top and the 
bottom triangular pressure to a percentage of excavation depth from bottom. 

DEEP EXCAVATION  87 

 
DEEPEX 2018 – USER’S MANUAL 
 
 FHWA apparent: By choosing the FHWA pressures option and by pressing the button  
, the FHWA pressure options dialog appears. 
 

Figure 2.6.15: The FHWA pressures options dialog. 

Here  we  can  define  the  multiplier  for  undrained  clay  pressures  mClays,  the  multiplier  for  the 
active earth pressures M and in addition there is a choice in stiff soil profiles not to allow pressures 
to drop to zero. 

 Adaptive apparent pressures: This method presents a more rational approach for creating 


apparent earth pressure envelopes for sites with mixed soil stratigraphy. The method is 
based  on  the  original  FHWA  approach,  but  pressures  are  adjusted  for  each  layer  by 
attributing a weighing factor that is calculated according to the strength of each soil. 
 
 German EAB: By choosing this option, the apparent pressures will be calculated with the 
German EAB method. 
 
 
 Two step rectangular:  By  choosing  the  Two  step  rectangular  pressures  option  and  by 
pressing the button  , the Two step rectangular pressure options dialog appears. With 
this option lateral earth pressures above the excavation are calculated as M1 x Hexc above 
the water table and as Mz x Hexc below the water table. 
 

DEEP EXCAVATION  88 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.6.16: The Two step rectangular pressures options dialog. 

Here we can define the multiplier for above water table M1 and the multiplier below water table 
M2. 

 User pressures: By choosing the user pressures option and by pressing the button  
the custom pressures dialog appears. 
 

Figure 2.6.17: The custom pressures dialog. 

Here we can define the values of pressures at several elevations. 

DEEP EXCAVATION  89 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Automatic search method options: This button launches a dialog for controlling how the 
program  calculates  active  and  passive  thrusts  when  irregular  ground  surfaces  are 
encountered. The available options are to either 
a) Perform  a  Culman’s  method  of  analysis  where  the  program  computes  active  and 
passive thrusts from a wedge search analysis, or 
b) Let  the  program  perform  an  automatic  search  analysis  where  the  search  limits  are 
adjusted based on user defined options. 
 

 
Figure 2.6.18: Options for wedge search analysis.

The following table presents the options that are available in the wedge analysis options dialog: 

Choice to use active wedges for the two walls 
Choice to use passive wedges for the two walls 
Choice to optimize wedge analysis 
Define the minimum and maximum active and passive wedge 
search limits. These limits are used when the Optimize wedge 
analysis option is selected. 
 

DEEP EXCAVATION  90 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 2.6.19: Options for automatic search with non-linear surfaces.

DEEP EXCAVATION  91 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Limit equilibrium methods – below grade pressures:   By  clicking  on  the  button
 , we can choose how lateral soil pressures below the excavation are 
calculated  on  the  driving  side.  In  general,  it  is  recommended  to  keep  the  Normal  option 
selected. The = 0 pressures option will apply zero earth pressures below the excavation, while 
the Ka-Active option forces active earth pressures below excavation. There is also an option 
to define soil pressures with a starting pressure and active pressure slopes above and below 
the water table (Fig. 2.6.18):

Figure 2.6.20: Options for driving soil pressures below grade 

Figure 2.6.21: User defined active pressure and pressure slopes below grade

   

DEEP EXCAVATION  92 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Limit equilibrium methods – Resist Pressures:  In this area we can choose the type of 
lateral earth pressures used on the resisting side. The resisting side refers to the excavation 
side that is providing resistance to the driving soil (typically within the excavation).
 

Figure 2.6.22: Resist pressures – options for resisting pressures 

1: Use passive pressures at the resisting side (Figure 2.6.23) 
2: Set resisting earth pressures from passive divided by a safety factor. 
(Figure 2.6.24)  
3: Set resisting pressures as at-rest pressures  
4: Set resisting pressures as at-rest pressures times a multiplier  
5: Define passive pressures with a starting passive pressure and user 
defined pressure slopes below and above the water table. 
6: Option to include-edit a maximum passive pressure limit (Figure 2.6.25) 
7: Option to ignore resisting pressures for a specified depth below the 
excavation subgrade 
8: Option to assume 3D effects for passive pressures 
 

DEEP EXCAVATION  93 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.6.23: Passive pressures Multiplier dialog (for at-rest pressures). 

Here we can define the multiplier M for the resisting at rest pressures. 

Figure 2.6.24: Passive pressures Safety factor dialog. 

Here we can define the safety factor FS. Passive earth pressures will be divided by this FS to obtain 
the resisting earth pressures. 

DEEP EXCAVATION  94 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.6.25: Maximum passive pressure limit dialog. 

Here we can define the maximum passive limit sp’max. User defined pressures can be defined by 

selecting the “User defined passive pressures option”, and then clicking inside the   
button: 

 
Figure 2.6.26: User defined passive pressures dialog

DEEP EXCAVATION  95 

 
DEEPEX 2018 – USER’S MANUAL 
 
To ignore passive pressures for a specified depth below the excavation: 

 
Figure 2.6.27: Ignoring passive soil pressures below excavation

- Limit equilibrium methods – Cantilever:  In this area we can choose the method for 


analyzing cantilever walls.

Figure 2.6.28: Cantilever method. 

The following methods are available in DeepEX: 
a) Free Earth Method
b) Fixed Earth Method
c) Rowe’s Moment Reduction Method: This method can be applied to cantilever walls in only 
clay or frictional conditions. It is used to reduce free earth moments and it should be used in 
caution.
   

DEEP EXCAVATION  96 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Limit equilibrium methods – Beam analysis options:  When multiple supports are present, 
DeepEX offers a number of accepted ways to analyze the beam structurally and compute 
bending moments, and other design forces:
 

 
Figure 2.6.29: Wall beam analysis options

Each of the method here offers simplistic means of analyzing a braced wall, and the user 
should be aware of the inherent limitations with each method (as limit-equilibrium ignores 
stage interaction effects, etc.). The available analysis methods are: 

d) Blum’s method: Blum’s method is a very popular analysis method in the East coast, as well 


as in Germany. The method involves assuming hinges at support locations as well as at the 
point of zero net loading below the excavation subgrade.
e) FHWA simple span method: The method is described in FHWA GEC4. It assumes simple 
span bending between supports (with the exception of the top brace, where a continuous 
beam is assumed to the 2nd bracing level or to the excavation subgrade). The method 
assumes a hinge at the excavation subgrade.
f) Simple span with negative moments: Method is similar to FHWA described in b), but a hinge 
is assumed below the excavation at the point of zero net loading (similar to Blum’s method.) 
The program also offers a method to reduce maximum moments by introducing a negative 
moment as a percent of the maximum positive span moments.
g) California Trenching and Shoring Manual 2011: This method is described in the CALTRANS 
Trenching and Shoring manual (2011), and is very popular in California. The method is similar 
to FHWA but fixity below the excavation is assumed at a point where rotational moments 

DEEP EXCAVATION  97 

 
DEEPEX 2018 – USER’S MANUAL 
 
about the lowest bracing level are equal to zero (considering loads below the lowest support 
only). As a result, the method always computes a zero shear and zero moment at the point 
of assumed fixity. The program offers the option to consider reductions in the moments by 
including  a  negative  moment  percentage.  Further  options  are  available  by  selecting 
“Additional options for California Trenching Manual approach”, as shown in Figure 2.6.30:
 

Figure 2.6.30: Options for Caltrans shoring manual analysis. 


CALTRANS  offers  methods  for  producing  smaller  cantilever  displacements  by  assuming  a 
virtual fixity point well above the point of moment equilibrium. While this assumption may 
produce more realistic cantilever wall displacements it has a very limited theoretical basis. 
In reality, this option really adjusts results to account for cases where design soil properties 
are very conservative (i.e. ignoring effective cohesion, etc.). 
 
CALTRANS  also  adjusts  wall  displacements  for  multiple  bracing  levels  below  the  lowest 
support.  While  little  guidance  is  given,  results  consistent  with  what  is  presented  in  the 
manual appear to be produced when the negative displacement is assumed at 15% of the 
simple span displacement.  

DEEP EXCAVATION  98 

 
DEEPEX 2018 – USER’S MANUAL 
 
Consistent with California practice, some engineers choose to apply a load increase on the 
topmost support brace, according to DM 7.2, pg. 103 which postulates a 15% increase in 
computed brace reactions. 
 

- Advanced options:  By pressing the button  , we can find some advanced choices 


regarding at-rest pressures and tension gap effects for slave elements.
 

Figure 2.6.31: Advanced options. 

Adjust Ko with friction Adjust Ko when φ’ changes due to a material change (Eurocode 7) 
Allow tension gaps to form  Allows  the  formation  of  tension  gaps  between  master  and  slave 
for slave elements  nodes  when  slave  elements  have  been  defined  (supports  or  wall 
elements).  This  option  can  be  used  when  liner  walls  have  to  be 
modeled 

- Analysis Arching:  The split button   is used to define the arching for non-linear 


analysis. The drop-down button provides two options:
 Option to consider arching in non-linear analysis 
 Options to ignore arching in non-linear analysis 
By pressing on the button, the arching dialog appears (Figure 2.6.32).  

DEEP EXCAVATION  99 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 2.6.32: Soil arching options for NL analysis dialog. 

  The following options are available: 

 Option to Edit advanced options 
 Option to reset parameters 
 Define the maximum arching reduction ratio between excavation and support 
 Define ratio of height at zero arching change 
 Define change of stress ratio at support 
 Define span ratio above support with zero arching 
 Define negative pressure arching between supports 
 Option to automatically adjust arching stress method 
 Option to use initial Ka stresses at lowest support to adjust arching pressures 
 

For arching options, we recommend that the software default values should be used. 

DEEP EXCAVATION  100 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.7 Slope Stability menu
 

Figure 2.7.1: The Slope tab menu.

- Import from DXF: By pressing the button , we can import a DXF file in DeepEX and use 


the defined geometry. Some limitations in the import apply. 
 

- Options: By pressing the button , the slope stability options dialog appears. Here we 


can define the method and options for the slope stability analysis. The properties contained
in this dialog are described in paragraph 3.13. 
 

Figure 2.7.2: The Slope stability options dialog. 

DEEP EXCAVATION  101 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Analysis method: By  pressing  the  button ,  we  can  define  the  slope  stability  analysis 
method. 
 

Figure 2.7.3: Slope stability analysis methods. 

Bishop  Use the Bishop simplified method for analyzing slope stability (only 
circular surfaces) 
GLE  Use the Morgenstern – Price method for analyzing slope stability 
Spencer  Use the Spencer method for analyzing slope stability 
Ordinary  Use the Swedish Ordinary method for analyzing slope stability 
Store intermediate  With  this  option  the  program  will  store  all  intermediate  slope 
surface results  stability surfaces and safety factors 
 

In  some  design  codes  (such  as  AASHTO)  minimum  safety  factors  are  defined  for  different 
conditions  (long  term,  short  term  etc.).  These  minimum  safety  factors  will  appear  once  the 
analysis has been performed. 

Typical slope conditions  Uses a general safety factor
Temporary excavation  Used for an excavation designed to last 48 hours
Temporary structure  Used for a temporary long-term structure
Permanent structure  Used for a permanent long-term structure
Extreme event - seismic  Describes an extreme event (seismic)
Extreme event – high water  Describes an extreme event (high water)
 

DEEP EXCAVATION  102 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Failure surface: By clicking on the button , we can define the shape of the failure surface. 


 

Figure 2.7.4: Sliding surface shape options.

- Radius search: By clicking on the button , we can define some options for the radius 


search. 
 

Figure 2.7.5: Radius search options. 

Single radius  One radius 
Radii passing from  Radii defined from two points 
specified limits 
Radii between specified  Radii defined from a first radius value to a second radius value 
values 
Radii start from wall  Radius  search  will  start  from  the  bottom  of  the  wall  to  a  value 
bottom  defined by user 
 

DEEP EXCAVATION  103 

 
DEEPEX 2018 – USER’S MANUAL 
 
Draw tools: The user can use this toolbar to  
- Draw the sliding surface or draw the search rectangle etc. The icons are explained in the table 
below: 
 
Icon  Description 
  Draw a single radius failing surface. 
Draw a custom failure surface by clicking on a series of points on the 
 
screen. 
  Define the start and end points where the failing surface is to pass from. 
  Define the base limits for s block wedge analysis. 
  Draw a rectangular box that contains the centers of the failure surfaces 
  Define a single point for the center of the sliding surface (circular type 
surfaces). 
 

- Soil nails: In this area we can define the properties of soil nails used within the model. 


 

 Soil nails table: By  pressing  the  button ,  the  Soil  nails  table  appears.  This  table 
contains the basic dimensions and properties of each soil nail. By clicking the button, we 
can choose some further options regarding the slope stability analysis with soil nails. This 
option can also be set for each soil nail separately. 
 

Figure 2.7.6: Soil nails table dialog. 

DEEP EXCAVATION  104 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.7.7: Soil nails options. 

The following table contains the soil nail options that are available: 

Include shear for all soil nails 
Ignore shear for al soil nails 
Consider only external stability 
Include both external and internal analysis 
Reposition nails on surface 
Activate all nails 
Deactivate all nails 
Erase all nails permanently 
 

External stability assumes that the soil nail fails by pullout of the nail beyond the failure surface. 
When internal analysis is included, the possibility on a nail failing from the head face (internal 
side) is also considered. 

DEEP EXCAVATION  105 

 
DEEPEX 2018 – USER’S MANUAL 
 

 Draw a soil nail: By pressing the button , we can add a single soil nail to the model. 


To add a nail first click on the surface (head) and then on the end point of the nail.

Figure 2.7.8: Add a soil nail. 

 Draw a nail group: By pressing the button , we can add a group of soil nails to the 


model. To do so, click on the first point (close to the surface) and then click on the second 
point. 

  
Figure 2.7.9: Add a soil nail group. 

 Analyze: By pressing the button , the program will perform a slope stability 


analysis and calculate the factor of safety of the slope, without performing a wall analysis. 
To  use  this  option  the  general  analysis  must  be  performed,  and  general  settings  not 
changed. 
 
 
 
 
 

DEEP EXCAVATION  106 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.8 Stability+ menu
 

Figure 2.8.1: The Stability+ tab menu. 

In  this  area  we  can  control  options  regarding  the  calculation  of  wall  embedment  safety 
factors, basal stability and surface settlement. 
 
- Limit equilibrium FS: In this area we can select to use a conventional factor of safety when 
the non-linear analysis is performed (Passive pressures will be calculated from LEM analysis). 
- Non-linear FS: In this area we can force the passive and active force limits to be calculated 
from LEM analysis. 
- B.E.F. Stability: In  this  area  we  can  use  a  Zcut  command  in  the  non-linear  analysis.  This 
command deactivates all wall nodes below this elevation.
- Wall embedment stability equations: In this area we can control which Factors of Safety 
regarding  the  wall  embedment  are  included  within  the  limit  equilibrium  analysis  (Figure 
2.8.2.) 
 

Figure 2.8.2: The wall embedment safety equations. 

DEEP EXCAVATION  107 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Basal stability and Clough method: In this area we can define whether to estimate maximum 
wall  displacements  according  to  the  semi-empirical  Clough  method.  We  can  select  from 
options presented in Figure 2.8.3. By clicking on the button  , the dialog in Figure 2.8.4 
appears. 
 

Figure 2.8.3: Basal stability and Clough options. 

Figure 2.8.4: Basal stability and Clough options dialog. 

In  this  form  we  can  choose  to  calculate  the  basal  stability  FS,  and  to  calculate  the  maximum 
horizontal wall displacements with Clough method. 

DEEP EXCAVATION  108 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Surface settlements: In this area we can define whether to estimate surface settlements or 
not. We can select the options that are presented in Figure 2.8.5. By clicking on the button 
,  the  dialog  in  Figure  2.8.6  appears.  For  LEM  analysis,  the  original  method  uses  the 
Clough calculated displacements with some modification factors. These modification factors 
can be enabled by selecting the “Use modifications for Clough” option.

Figure 2.8.5: The surface settlement options. 

Figure 2.8.6: The settlement calculation options dialog. 

The following table presents the parameters that we can define in this dialog: 

Define the Sprandel length Ds in terms of the excavation height 
Define the concave maximum settlement Dcmin 
Inflection point constant 
Settlement points (where settlement is calculated)  
Cantilever Avs/Ahs (vertical Sprandel volume to horizontal displaced Sprandel volume) 
Supports remain Av/Ah (ratio of vertical to horizontal volume) 
Supports remove Av/Ah (ratio of vertical to horizontal volume when the supports are 
removed) 
Option to use Clough method in BEF analysis. This option forces the program to calculate the 
horizontal displacement volume with the Clough method. 
 

DEEP EXCAVATION  109 

 
DEEPEX 2018 – USER’S MANUAL 
 
Building Damage Assessment (Optional Module) 

DeepEX  includes  an  additional  optional  module  for  the  damage  assessment  of  surrounding 
buildings. The module estimates potential damage based on anticipated wall displacements and 
structural  type.  Various  semi-empirical  methods  are  incorporated  based  on  horizontal 
movement, surface settlement, and angular distortion. 

By  pressing  the  button ,  the  Building  damage  calculation  options  dialog  appears 
(Figure 2.8.7). In this dialog user can define the analysis method used for the damage assessment, 
as well as some analysis parameters. 

 
Figure 2.8.7: The building damage assessment options dialog. 

For more information please see theory manual.

DEEP EXCAVATION  110 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Geotechnical axial capacity:  In  this  area  we  can  define  whether  to  calculate  axial 
geotechnical capacity or not. In addition, by pressing the button   the 
pile calculation settings dialog appears (Figure 2.8.8). All the options included in this dialog 
are described in the following table.

Figure 2.8.8: The pile calculation settings dialog.

Item Description 
Allowable safety factor FSall  This factor is used to divide the ultimate geotechnical pile 
capacity and obtain the design service capacity. 
Earthquake safety factor FSeq  Safety factor applied when seismic conditions are 
encountered. 
End bearing safety factor FSbear  Safety factor applied on ultimate end bearing capacity. 
Skin friction percentage for TENSION  = Tensile geotechnical resistance/Skin friction 
compression resistance  
Option to include end bearing (for  If this option is selected, then pile end bearing will be 
compression piles)  included in the calculations. 
Option to plug in open pipes (uses full  If this option is selected, then open pipe piles will be 
area)  considered as plugged for end bearing capacity 
calculations.  
Option to use pile head for H-Beams  In concreted H type pile walls, this option forces the 
bearing area to always be the H beam section area. 
Option to limit skin friction (limiting  This option turns on the limiting skin friction theory 
depth)  approach for pile capacity. In this approach, a limiting skin 
friction is reached at a specified depth in terms of the pile 
size. Please note that while conservative, according to 
many researchers this theory has been proven wrong. 
Skin friction percentage for steel  The wall frictional skin resistance for walls with steel in 
contact with soil is controlled from this percentage. 
Basically this is δ/Soil φ (%)  

DEEP EXCAVATION  111 

 
DEEPEX 2018 – USER’S MANUAL 
 
Item Description 
Skin friction percentage for concrete  The wall frictional skin resistance for walls with concrete 
in contact with soil is controlled from this percentage. 
Basically this is δ/Soil φ (%) 
Option to multiply frictional resistance by  The pile resistance obtained by effective soil friction can 
a specific multiplier  be multiplied by a factor. This factor may account 
installation such as pressure grouting or loosening effects. 
Option to use soil bonds for capacity  If this option is selected, then the skin friction for 
calculations when the wall type permits  concreted walls from the soil dialog will be used when the 
wall type permits (walls that have concrete in contact 
with soil). 
Option to multiply cohesional resistance  The pile resistance obtained by adhesion (cohesive soil 
by a specific multiplier  component) can be multiplied by a factor. This factor may 
account installation such as pressure grouting or 
loosening effects. 
Option to use adhesion factors  With this option the soil-pile adhesion due to soil 
cohesion can be calculated from a trilinear approach 
where soils with greater c' or Su tend to provide smaller 
adhesion. 

- Geotechnical axial capacity: In this area we can define whether to calculate axial geotechnical capacity 


of the piles. 

DEEP EXCAVATION  112 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.9 Design menu
 

Figure 2.9.1: The Design tab menu.

- Code options: By clicking on or inside the button , we can define which structural code’s 


settings to apply in analysis. These code settings control structural codes and other options.

Figure 2.9.2: Code options. 

DEEP EXCAVATION  113 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following options are available: 

Use Eurocode 2, 3 settings  Apply Eurocode settings to the design
Use EC2, 3 FS= 1.5  Apply Eurocode settings with a safety factor 1.5 
Use US allowable settings  Apply US allowable settings to the design
Use AISC 2010 allowable settings  Apply AISC allowable settings to the design 
Use US LRFD settings  Apply US LRFD settings to the design
Use AASHTO (US) LRFD settings  Apply AASHTO LRFD settings to the design
Use US LRFD Settings (with FS= 1.6)  Apply LRFD settings with a safety factor 1.6 
Use Italian DM08 settings  Apply the Italian DM08 settings to the design 
Enable individual codes  Enables the possibility to use different codes for 
concrete and steel design
Do not perform wall design  This cancels the wall design
Use high seismic criteria  Uses high seismic criteria for structural design 
(when applicable)
 

Concrete Codes:

DEEP EXCAVATION  114 

 
DEEPEX 2018 – USER’S MANUAL 
 
Steel Codes:

- Members: By clicking on the button , we can define which standards to be used in 


selecting steel members and reinforcement bars.

Figure 2.9.3: Steel member code options. 

In DeepEX, the following options are available: 

All sizes 
US sizes 
European sizes 
Universal beam system (UK) 
South Korean sizes 
Chinese standards 
Australian sizes 
Canadian sizes (AISC Metric) 
 

DEEP EXCAVATION  115 

 
DEEPEX 2018 – USER’S MANUAL 
 
- General settings: This dialog allows you to select some default settings that are typical in a 
specific country (units, design codes, safety factors, size standards, etc.).

Figure 2.9.4: General settings.

- Wall STR Safety: In this area we can define the wall structural Factor of Safety. This factor is 


used to divide the yield wall capacity and produce the design wall capacity. 
 

Figure 2.9.5: Wall STR safety options.

- Include axial load on walls: With this option we can include axial loads on walls from tiebacks 


etc. Please note that these loads are not factored.

- Tiebacks Safety: In  this  area  we  can  define  the  geotechnical  Factor  of  Safety  used  for 
calculating the design pullout capacity of a tieback. By selecting the Custom STR option, the 
allowable stress factor for tieback steel can be manually defined for all tiebacks in this design 
section (Capacity = factor x Asteel x Fy). Please note that certain design codes will overwrite 
this setting (EC7, DM08 etc.).  
 

DEEP EXCAVATION  116 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.9.6: Tieback safety options. 

- Load combinations: In DeepEX 2018 we can define different load combinations, assigning to 


them the loads that exist on the current model. This allows user to calculate different load 
combinations fast. Since we need to define load combinations, we should press the button 
over  the  Options  button.  This  will  cause  the  Load  combinations  dialog  to  appear  (Figure 
2.9.8). 

Figure 2.9.7: Load combinations options. 

Figure 2.9.8: Load combinations dialog. 

In this dialog user can: 
 Add a new combination 
 Delete selected combination 
 Copy combination 
 Paste combination 
 Delete all combinations 
All loads that have been defined on the model in any stage, appear in the respective area (Line 
loads,  strip  surcharges,  footings,  buildings,  3D  loads).  Next  to  each  load  there  is  a  drop-down 
menu, that defines the load behavior. The following options are available: 

DEEP EXCAVATION  117 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Automatic 
 Favorable 
 Unfavorable 
 Ignore load 
User can create several load combinations. Through the drop-down list in the Design tab of 
DeepEX we can define which load combination is used in the specific design section (see Figure 
2.9.7). 

- Wall embedment optimization: In  this  area  we  can  choose  to  optimize  wall  embedment 
safety factors regarding the conventional analysis. Please note that this option should only 
be used when one wall is present, and it is available only when a limit-equilibrium analysis
is performed.  The  Min  Toe  Safety,  is  the  minimum  wall  embedment  safety  factor  that  is 
desired (for the current stage), while the Length increment DL is used by the program as the 
wall length increment for evaluating the new safety factors. 

Figure 2.9.9: Wall embedment optimization options. 

- Sheet pile corrosion

When we select to use sheet piles in the model (by double clicking on the wall and assigning a 
sheet pile section), then an additional button appears in the Design tab of DeepEX. By pressing 

on the button , a dialog appears that allows user to define corrosion effects by examining the 
design  life  of  the  structure.  This  option  is  usually  applied  to  an  additional  final  stage,  after  the  last 
excavation stage. This dialog and the available options and properties are presented in Paragraph 3.7.3.  

DEEP EXCAVATION  118 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.10 Results menu
 

Figure 2.10.1: The Results tab menu. 

This tab contains a list of results that can be either viewed on the model or presented in diagrams 
or tables. Results can be presented when the analysis has been completed.

Icon Description 
  Wall embedment Safety Factors 

  Global Slope Stability Factor of Safety 

  Global Slope Factor of Safety Contours 

  Results for slope stability slices 
Show all slope stability results (when intermediate surfaces are stored) 
 
Show interslice forces and other forces for slope stability analysis: 
 
Last option shows critical sliding surfaces for determining Ka and Kp from 
automatic search methods. 

  Wall bending moment 

  Wall shear 

  Wall Axial force 

  Wall Displacement (horizontal) 
Surface settlements 
 
Support reactions 
 
Combined capacity ratio (Moment and Axial force combined check) 
 
Moment capacity ratio = Actual moment/Design wall moment capacity  
 
≤ 1.0 Good 
  Shear capacity ratio = Actual shear/Design wall shear capacity 
≤ 1.0 Good 
  Structural capacity ratios for supports = Actual load/design capacity 

DEEP EXCAVATION  119 

 
DEEPEX 2018 – USER’S MANUAL 
 
  Wall moment capacity 

  Wall shear capacity  

  Effective horizontal soil pressure 

  Total vertical stress 

  Effective vertical stress 

  Net total wall pressures 

  Wall surcharge 

  Seismic pressures 

  Net water pressure 

  Water pressure on walls 
Hydraulic gradient 
 
Minimum – Maximum values 
 
  Local result envelopes: shows envelopes of results for current design section 
Global envelope: shows envelopes of results for all linked design sections  

Result tables: Launches a results table 
 
  Water pressure shadings (when a flow net analysis has been performed) 

  Water head shadings (when a flow net analysis has been performed) 

  Water head grid (when a flow net analysis has been performed) 

  Hydraulic safety factor (when a flow net analysis has been performed) 

  Total vertical stress shadings (when a flow net analysis has been performed) 

  Effective  vertical  stress  shadings  (when  a  flow  net  analysis  has  been 
performed) 
  Project cost 
Show shear strength for elastoplastic analysis 
Hide results for wall elements (show results only for main walls) 
 

In  addition,  we  can  choose  to  see  result  diagrams  on  a  separate  form  by  pressing  the  button

DEEP EXCAVATION  120 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.11 Report menu
 
From the Report tab we can control options for viewing reports in pdf or word formats as well 
as see summary tables of all calculations. 

Figure 2.11.1: The Reports tab menu. 

Figure 2.11.2: Report options. 

Option to create a quick report 
Option to create a quick report and include slope stability 
Option to create an only stage graphs report 
Option to create a typical report 
Option to use saved templates 
 

DEEP EXCAVATION  121 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Report - print:  By pressing the button , the Reports dialog appears. In this dialog we 


can choose what parts of calculations and results we wants to be included in the reports and 
the type of file to be exported. 
 

 
Figure 2.11.3: The Report dialog. 

- Show calculations for stage:  By pressing the button , an xml file opens, containing 


all calculations that have been performed in the current stage. 
 

- Calculation Warnings:  By pressing the button , the Calculation warnings dialog appears. 


Here  we  can  see  general  warnings  that  are  generated  when  calculations  have  been 
performed. 
 

 
Figure 2.11.4: Calculation warnings. 

DEEP EXCAVATION  122 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Calculation summary for all design sections – current design section:  By pressing the button

, the Calculation Summary dialog appears. This dialog presents a list of results for 
all  and  each  one  individual  design  section.  Select  the   option  to 
show  available  results  for  one  design  section.  The    option  controls  if 
results for additional wall elements are included in the model. 
 

Figure 2.11.5: Calculation summary dialog. 


 
- Current stage (screen):  This creates a preview of the model as it appears on the screen.  
(This preview can then be printed).  
    
- BEF Raw data - results:  By pressing one of the buttons here, a .TXT document is created, 
containing the input or output data of the model for the non-linear analysis. 
 
- Calculation progress file: By pressing one of the buttons here, a .TXT document is created, 
containing  the  solution  progress  file  that  contains  basic  progress  calculations  during  the 
analysis.
 

DEEP EXCAVATION  123 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.12 View menu
 

Figure 2.12.1: The View tab menu.

- Transparency:  By pressing the button  we can make the model transparent when 


results are shown. The transparency can be adjusted from the vertical bar.

- Result legend:  By pressing the button  we can turn the result legend on or off.

- Moment shear diagrams: By pressing the button  we can change the view settings of 


the moment and shear diagrams.

- Pressure diagrams: By  pressing  the  button   we  can  change  the  view  settings  of  the 
pressure diagrams.

- Display results: By  pressing  the  button   we  can  change  the  display  settings  of  the 
results. 
 
- User axis position:  By  pressing  the  button   we  can  change  the  axis  position 
(elevation). 
 
- Grid/snap: By pressing the button  we can change the view options of the snap and 
axis or show a grid. 
 
- Zoom and Dimension: These icons are explained in chapter 2.3.1. 
 
- Top view: By pressing the button , a top plan view of the site is created. This allows 
the  user  to  see  the  position  of  the  design  section  and  the  location  of  3D  objects  (i.e.  
buildings, footing loads etc.).
 

DEEP EXCAVATION  124 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.13 Optimize menu
 

Figure 2.13.1: The Optimize tab menu.

- Redesign options: By pressing the button , the structural redesign – optimization dialog 


appears. Here we can define the redesign options for walls and supports. 
 

Figure 2.13.2: The redesign - optimization dialog – Walls tab. 

The table below presents the options that are available in the walls tab: 

Option to keep section within limits: Keeps the optimized section within the specified 
limits from the original section. 
Define the maximum (D+) and minimum (D-) limit, if the previous option is selected 
Choice that the redesigned sheet pile wall must be of the same manufacturer 
Minimum and maximum bar sizes for diaphragm walls and concrete elements 
 

DEEP EXCAVATION  125 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.13.3: The redesign - optimization dialog – Tiebacks tab. 

The table below presents the options that are available in the tiebacks tab: 

Define the maximum length Lmax 
Define the minimum length Lmin 
DL = Length increment for optimization 
 

Figure 2.13.4: The redesign - optimization dialog – Struts tab. 

DEEP EXCAVATION  126 

 
DEEPEX 2018 – USER’S MANUAL 
 
The table below presents the options that are available in the struts tab: 

Option to keep section within limits (from original dimensions) 
Define the maximum (D+) and minimum (D-) limit, if the previous option is selected 
Define the maximum (DPmax) and minimum (DPmin) pipe diameter 
Define the maximum (Tp_max) and minimum (Tp_min) pipe diameter 
 

Figure 2.13.5: The redesign - optimization dialog – Slabs tab. 

The table below presents the options that are available in the slabs tab: 

Minimum and maximum bar sizes for slabs 
 

- Auto design a design section: By pressing the button  after the calculations are 


performed, the program performs an automatic structural optimization of all model 
supports and walls. 

- Auto design a support: By pressing the button  after the calculations are performed 


and choosing a support, the program performs an automatic structural optimization of the 
selected support. 
 

- Auto design a wall: By pressing the button  after the calculations are performed and 


choosing a wall, the program performs an automatic structural optimization of the selected 
wall. 
 

DEEP EXCAVATION  127 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Auto design fixed length for a ground anchor: By pressing the button  after the 


calculations  are  performed  and  choosing  a  ground  anchor,  the  program  performs  an 
automatic optimization of the fixed length of the selected ground anchor.
 

- Cost options: Cost options are available with the Cost-estimations module within DeepEX. 
Here we can calculate project costs with the general calculation of the project, or we can 

choose to estimate cost without wall analysis, by pressing the button  . 

By pressing the button . The cost options dialog appears (Figure 2.13.6).  In this dialog 
we  can  define  several  cost  properties  and  options  that  should  be  considered  to  better 
estimate  the  project  cost.  The  cost  module  does  not  produce  exact  costs.  It  is  used  to 
produce  rough  project  cost  estimations.  The  main  idea  is  that  costs  are  subdivided  into 
installation and material costs. Installation costs include labor and equipment while material 
costs refer to the actual material cost as delivered on site.

 
Figure 2.13.6: The cost options dialog.

The properties contained in this dialog are described in paragraph 4.9. 

DEEP EXCAVATION  128 

 
DEEPEX 2018 – USER’S MANUAL 
 
2.14 Help menu
 

Figure 2.14.1: The Help tab menu.

- What is new: By pressing the button , we can check what is new in the latest version of 


DeepEX. 
 

- Open help manual: By pressing the button , we can open the DeepEX help file.


 

Figure 2.14.2: The DeepEX help file.

DEEP EXCAVATION  129 

 
DEEPEX 2018 – USER’S MANUAL 
 

- Manuals: By pressing the buttons and , the folders that contain the 


technical documentation and the theory manual of DeepEX are displayed. 
 

- Other: By pressing the buttons and , the user can read the terms of use of 


DeepEX and learn about the current version.
 

- Settings: by pressing the button , the Default Settings dialog appears.

 General tab: In this tab we can define the default units, company and engineer name 
and the Auto save directory. The option save files in default directory saves temporary 
progress files in the folder where the .deep file is saved. 
 

Figure 2.14.3: Settings – General Tab. 

DEEP EXCAVATION  130 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Fonts/View tab: In this tab we can define the fonts and some other viewing options. 
 

Figure 2.14.4: Settings – Fonts/View Tab. 

The available view options are: 

 Show axes. 
 Show soil information. 
 Show soil layers on left side of model. 
 Show Ka and Kp values next to the wall. 
 Show assumptions table on model.
 

Furthermore, here we can define some view options regarding the result presentation. 

DEEP EXCAVATION  131 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Soil/Properties tab: Here we can define the steel member standard (European or US) 
and whether to read the members metric database or not.

Figure 2.14.5: Settings – Soil/Properties Tab. 

 Design tab: Here we can define the default code used for structural design of steel and 
concrete members. 
 

Figure 2.14.6: Settings – Design Tab. 

DEEP EXCAVATION  132 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Non-linear tab: Here we can define the default folder location for Non-linear analysis 
engine. It is recommended that the initial settings are not modified. 

Figure 2.14.7: Settings – Non-linear Tab. 

IMPORTANT: In order to change the software default settings, you have to start the software as 
administrator, open the Settings dialog from the Help tab and press to set the current project as 
default. 

1. With the software closed, take your mouse over the software icon in your Desktop 
and RIGHT-CLICK on it.  

2. From the menu that appears, please select to run the software as administrator. 

- Examples: by pressing the buttons , or  the folders that contain the 
example files of DeepEX are displayed

DEEP EXCAVATION  133 

 
DEEPEX 2018 – USER’S MANUAL 
 

CHAPTER 3: DATA ENTRY


 

DEEP EXCAVATION  134 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.1 Data entry: General
 
DeepEX is a very user-friendly software program and includes powerful features and versatile 
options. The main interface is shown below. The general philosophy in creating an excavation 
model in DeepEX is: 

1) Specify the global coordinates 

2) Specify the soil types and properties 

3) Specify the layers 

4) Create a generalized water table 

5) Specify the retaining wall system (soldier pile, sheet pile, secant pile, tangent pile, and 
diaphragm wall options). 

6) Create a database of support members (tiebacks, struts, or concrete slabs) 

7) Add a stage and draw in new supports  

8) Modify the stage elevations  

9) Analyze the project. 

This chapter describes the data that should be entered by the user in order to create a proper 
excavation model.  

DEEP EXCAVATION  135 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.2 Design codes
 
DeepEX includes all Eurocode and AASHTO LRFD load specifications. The design approach can be 
selected from the Analysis tab. There, by pressing the “Single” button, the user can choose to 
include the factors of a single load case of a specification to the model (Figure 3.2.1).  By pressing 
the “Mult.” button, we can choose to generate all load cases of a specification. With this choice, 
several new design sections are created automatically, including each one a different load case of 
the  selected  specification  (Figure  3.2.2).  Each  newly  generated  design  section  is  automatically 
linked to its parent design section (all settings except design approach and load combinations).          

Figure 3.2.1: Single load case                           Figure 3.2.2: Multiple load cases   

The table below presents a list of main load specifications included in DeepEX.

Code Country 
DM 08  Italy 
BS EN-1997-1 DA1  Great Britain 
DIN - 1054  Germany 
XP 94  France 
Eurocode 7 Greece  Greece 
AASHTO LRFD 5th  USA 
Eurocode 7  Europe, general 
PEN DOT AASHTO (2012)  USA 
CALTRANS LRFD  USA 
Chinese Load Combinations  China 
 

DEEP EXCAVATION  136 

 
DEEPEX 2018 – USER’S MANUAL 
 
By selecting the Select Standard Code choice of the Single load case list, the dialog of Figure 
3.2.3 appears. In this dialog we can define the design code and specify the load case that should 
be used in the current design section. 

Figure 3.2.3: Select Standard Code dialog. 

By selecting to generate all load cases of a specification (i.e. all AASHTO LRFD cases), after the 
new design sections are automatically created, the user can read the factors used in each load 
case  by  pressing  the  “Mult.”  button.  Then,  the  Summary  of  Soil  codes  dialog  appears  (Figure 
3.2.4). In this dialog, we can manually define load combinations. (Figure 3.2.5) 

Figure 3.2.4: The Summary of Soil codes dialog. 

DEEP EXCAVATION  137 

 
DEEPEX 2018 – USER’S MANUAL 
 
By selecting some options (i.e. US codes in case we use European standards for concrete and steel 
for the design), we are asked to confirm the change to these standards as well. 

The table below presents the load combination factors that are contained in the Design 
approach tab of the summary of soil codes dialog: 

Seismic multiplier  Factor for earthquake loads 
Variable loads factor  Load factor for variable loads (traffic etc.) 
Permanent loads factor  Load factor for permanent loads 
Temporary anchors factor  Partial resistance factor for temporary anchors (typical design 
life ≤2 years 
Permanent anchors factor  Partial resistance factor for temporary anchors (typical design 
life ≤2 years 
Tan of the friction angle factor  Factor for the soil’s friction angle 
Effective cohesion factor  Factor for the soil’s effective cohesion 
Shear strength factor  Partial safety factor on undrained shear strength 
Earth favorable factor  Partial safety factor on earth pressures (on the resisting side) 
Earth unfavorable factor  Partial safety factor on earth pressures (on the driving side) 
Water unfavorable factor  Partial safety factor on water pressures (on the resisting side) 
Water favorable factor  Partial safety factor on water pressures (on the driving side) 
Hydraulic favorable factor  Partial factor for hydraulic heave checks 
Hydraulic unfavorable factor  Partial factor for hydraulic heave checks 
Uplift favorable factor  Partial factor for uplift checks 
Uplift unfavorable factor  Partial factor for uplift checks 
Used structural wall safety  Applied safety factor on ultimate wall capacity 
factor 
Nails qS factor  Partial factor for ultimate bond resistance for soil nails with 
presumptive values (from charts) 
Nails qS (tests) factor  Partial factor for ultimate bond resistance for soil nails with 
values from actual in-situ tests 
Pressuremeter PL factor  Factor for pressure limit of pressuremeter test  
Tan of the nail friction angle  Factor for the nail’s friction angle 
factor 
Effective cohesion for nail  Parameter that is used within the soil mass enclosed within 
mass factor  soil nails 
Undrained shear strength for  Parameter that is used within the soil mass enclosed within 
nail mass factor  soil nails 
 

DEEP EXCAVATION  138 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 3.2.5: User defined combinations. 

The table below presents the factors that are contained in the user defined combinations tab of 
the summary of soil codes dialog: 

Option to define if the  This option enables the serviceability checking for 
combination Is service (SLS)  concrete cracking 
F(tan(fr))  Tan of the friction angle factor 
F(c’)  Effective cohesion factor 
F(Su)  Shear strength factor 
F(wall)  Overall safety factor on wall capacity 
F(temp load)  Temporary load factor 
F(perm load)  Permanent load factor 
F(temp sup.)  Temporary support factor 
 (perm sup.)  Permanent support factor F 
Fg(Dstab)  Factor for destabilizing gravity loads 
Fg(stab)  Factor for stabilizing gravity loads 
F(Earth Res)  Resisting earth factor. This factor is used to divide earth 
pressures 
F(Earth Drive)  Driving earth factor 
F(Water Drive)  Driving water factor 
F(Water Res)  Resisting water factor 
FHyd (stab)  Hydraulic stabilizing factor (used in hydraulic heave 
calculations) 
Hydraulic destabilizing factor  Hydraulic destabilizing factor (used in hydraulic heave 
FHyd (dStab)  calculations) 

DEEP EXCAVATION  139 

 
DEEPEX 2018 – USER’S MANUAL 
 
Option to use multiplication  If this option is selected, then the initial non-linear 
analysis is standardized by F(earth drive). The non-linear 
analysis is then performed, and the obtained results are 
amplified by F(earth drive) to obtain the ultimate design 
wall moments/shears and support reactions 
Option to use F(wall)  Select this option to enable F(wall) 
Option to use custom safety  Select this option to use a custom safety factor for 
factor for qskin  ultimate bond resistance for tiebacks 
Anchors qskin factor  Partial safety factor for ultimate bond resistance for 
tiebacks  
Soil nails qskin factor  Partial safety factor for ultimate bond resistance for soil 
nails  
Pressuremeter PL factor FS  Pressuremeter PL factor: factor for pressure limit of 
PL(nails)  pressuremeter test for soil nails 
Tan of the nail friction angle  Tan of the nail friction angle factor for soil nail mass 
factor F(Fr nail mass) 
Effective cohesion for nail  Effective cohesion for nail mass factor 
mass factor F(c’ nail mass) 
F(Su nail mass)  Undrained shear strength for nail mass factor 
Use FS_STR_Nails  Option to use structural factor of safety for soil nails 
FSstrNail  Structural factor of safety for soil nails 
Divide Fpassive at end  With this option the wall embedment GEO checks are 
performed separately after the basic wall analysis. Hence, 
the STR and GEO checks in EC7 can be separated 
Use soil nail facing FS  Forces the program to include a structural safety factor for 
soil nail facings 
Soil nail facing permanent 
safety factor
Option to use soil 
reinforcement safety factor*
Steelstrips Static safety 
factor*
Steelstrips Seismic safety 
factor*
Steelgrids Static safety factor*
Steelgrids Seismic safety  
factor*
Geosynthetics Static safety 
factor*
Geosynthetics Seismic safety 
factor*
* The soil reinforcement safety factors are included and refer to a future module. 

DEEP EXCAVATION  140 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.3 Data entry: Project information
 

By clicking on the button  , the Project Information dialog appears (Figure 3.3.1). In this dialog 
we can specify the Project Name, file number (or job number) and the name of the engineer 
preparing the analysis.  

Figure 3.3.1: Project information dialog.

DEEP EXCAVATION  141 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.4 Data entry: Soil Data
 
By pressing the Edit soil type data button of the General tab, the Soil Types dialog appears. Here 
the user can create as many soil types as needed and define their properties. First the user should 
select to add a new soil type, or choose one from the list in order to modify its properties (Figure 
3.4.1). 

Figure 3.4.1: Add a new soil or select a soil to modify. 

DEEP EXCAVATION  142 

 
DEEPEX 2018 – USER’S MANUAL 
 
We  can  change  the  basic  soil  information  such  as  soil  name,  preview  color  and  soil  type.  The 
available soil types are Sand, Clay, Silt, Gravel, Intermediate geomaterial and Rock. If the soil is 
clay, a drained or undrained behavior of the clay can be defined at this point. All these details can 
be  modified  in  the  area  presented  in  Figure  3.4.2.  Next,  the  user  can  modify  the  general  soil 
properties  in  the  area  marked  in  Figure  3.4.3.  The  basic  properties  are  described  in  the  table 
below.

Symbol Description 
γt  Total unit weight of soil (used below the water table) 
γdry  Dry unit weight of soil (used above the water table) 
c’  Effective soil cohesion 
Su  Undrained  shear  strength  (used  for  clays  when  undrained  modeling  is 
selected). In the non-linear analysis this is used as an upper limit strength 
v  Poisson’s ratio (used for loads calculated with theory of elasticity) 
Φ’  Effective soil friction angle 
Φcv’  Constant  volume  effective  shearing  soil  friction  angle  used  in  the  non-
linear analysis for clays 
Φpeak’  Peak effective soil friction angle used in the non-linear analysis for clays 
Kx  Soil permeability at horizontal direction 
Kz  Soil permeability at vertical direction 
KoNC  Coefficient  of  at-rest  lateral  earth  pressures  for  normally  consolidated 
conditions 
nOCR  Exponent for calculating Ko with Ko=KoNC*[(OCR)^(nOCR)] 
 

DEEP EXCAVATION  143 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.4.2: Define basic soil information. 

Figure 3.4.3: Define main soil data. 

DEEP EXCAVATION  144 

 
DEEPEX 2018 – USER’S MANUAL 
 
If the user presses the Show Test Data button the dialog expands to the right. Here are available 
tools for estimating main soil data properties from in-situ tests. Data for standard penetration 
tests, cone penetrometer tests and pressuremeter tests are included (Figures 3.4.4 and 3.4.5).  

Figure 3.4.4: Test Data. 

Figure 3.4.5: SPT Estimator. 

DEEP EXCAVATION  145 

 
DEEPEX 2018 – USER’S MANUAL 
 
In addition, next to the main data there is the symbol . This symbol opens a list of tools that can 
help the user estimate the soil data values according to published literature. Depending on the 
soil parameter, the software will either recommend specific values, or it will guide the user to 
define some test data and open graphs according to scientific methods. 

The tab B. Resistance is initially hidden. It appears when the user selects the User input procedure 
at the Ka Kp main options dialog (which appears when the user selects the Thrust options choice 
of the Analysis tab menu, see paragraph 2.9). In this tab, the user can define the initial active and 
passive coefficients calculation method (Figure 3.4.6).  Ka can be calculated by Rankine Equation, 
or estimated from Graph Correlations (Figure 3.4.7). Kp can be defined either graphically, or by 
the Rankine or Caquot equations. It is strongly recommended that all initial Ka and Kp values are 
set to Rankine unless special conditions have to be modeled. 

Figure 3.4.6: Ka and Kp calculation (when manual option is selected in thrust mode). 

DEEP EXCAVATION  146 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.4.7: Graph correlations. 

Next, in the tab C we can define the soil elasticity behavior of each soil type (Figure 3.4.8). The 
elasticity  model  can  be  linearly  elastic  –  perfectly  plastic,  exponential,  subgrade-modulus 
behavior or HS small. There are some tools that can help the user estimate loading and reloading 
elasticity as well as other parameters. In general, the reloading modulus for soils is taken as three 
times (or greater) than the loading modulus.

   

DEEP EXCAVATION  147 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.4.8: Loading – reloading elasticity parameters.

The following table presents the properties that are available in the C. Elastoplastic tab: 
  Symbol Description 
Elastic-plastic soil Evc  Virgin compression modulus of elasticity 
behavior  rEur  Ratio of Reloading to loading elasticity modulus 
(typical range 3 to 5) 
Eload  Loading elasticity modulus 
exp  Exponent 
av  Coefficient for vertical stress 
Exponential soil
ah  Coefficient for horizontal stress 
behavior 
Pref  Reference pressure 
rEur  Ratio of Reloading to loading elasticity modulus 
(typical range 3 to 5) 
Subgrade-modulus Kvc  Loading subgrade reaction modulus 
soil behavior  rKur  Ration of reloading to loading subgrade reaction 
modulus 
 

Finally, if tiebacks or soil nails are going to be used in the model, the user has to define or estimate 
the Ultimate Bond Resistance.  

DEEP EXCAVATION  148 

 
DEEPEX 2018 – USER’S MANUAL 
 

  
Figure 3.4.9: Ultimate Bond Resistance definition. 

The following table presents the properties that are available in the D. Bond tab:

Symbol Description 
qskin.u  Ultimate bond resistance for tiebacks 
ks  Subgrade modulus for calculating the shear resistance (in slope stability 
for soil nails) 
qskin.u  Ultimate bond resistance for soil nails 
qskin.u  Ultimate  bond  resistance  for  concrete  type  walls  (geotechnical  pile 
capacity calculations). 
 

DEEP EXCAVATION  149 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.5 Data entry: Soil Layers
 

By pressing the Borings button  of the General tab, the Soil Layers dialog appears. Here we 
add or remove soil layers, specify their top elevation and the soil type to be used. In addition, we 
can define the exact position of the boring on the screen. This dialog also appears if the user 
double-clicks on the boring, or if he selects it from the tree view. All these are presented in Figure 
3.5.1. The OCR (over consolidation ratio) can be defined herein. The user can include as many 
borings as desired. Each independent design section can include a different boring. 

 
Figure 3.5.1: The soil layers dialog. 

With clays in the elastoplastic analysis, the OCR is very important as clay strength increases with 
increased OCR. 

DEEP EXCAVATION  150 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Generate design sections from SPT: If one or more SPT records are defined, the program 
can replicate the current design section and assign an SPT log to each design section. In 
such a case, it is important that a separate boring (soil layers) are prescribed so that the 
stratigraphy matches the available SPT record on each design section. 

Figure 2.5.2: SPT records options dialog. 

- CPT logs: by pressing the button , we can see the dialog of figure 


2.5.3. CPT records can be used within DeepEX, with the program being able to export soil 
properties by processing CPT logs. 

DEEP EXCAVATION  151 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 2.5.3: Available CPT records options. 


The following options are also available in the properties tab of DeepEX, related to the 
CPT logs: 
 
  Shows CPT tip resistance on model (CPT log has to be applied) 
  Sleeve friction (CPT log has to be applied) 
  Standard soil description for CPT tests according to Robertson (CPT log has to 
be applied) 
  Water pressure (CPT log has to be applied) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DEEP EXCAVATION  152 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.6 Data entry: Water
 
In the Analysis tab, the user can select the water analysis method. DeepEX contains the 
following water analysis methods: 

 Hydrostatic 
 Simplified flow 
 Full flownet 
 User pressures
 

The option Seal Excavation (create liner) seals the bottom of the excavation against water flow. 

Figure 3.6.1: Water options. 

The  user  is  asked  after  choosing  one  of  the  methods  above  whether  to  apply  this  to  all 
construction stages or to apply it only to the current stage. All these options have been presented
in paragraph 2.6. 

DEEP EXCAVATION  153 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7 Data entry: Wall data
 
In DeepEX, each wall within the model uses a wall section. A wall section can be used in many 
walls across many design sections. By double clicking on a wall or by choosing a wall from the tree 
view, the Edit wall data dialog appears. The following options are available:  

 Edit the wall name 
 Select/Edit the wall section properties 
 Define wall top elevation 
 Define wall depth 
 Option to use a custom passive elevation 
 Option to define if the wall is permeable 
 Option to include wall weight in the analysis 
 Define wall coordinates and number of nodes used in LEM calculations. 
 Option to rotate wall from vertical and inclination angle 

Figure 3.7.1: Wall data dialog and general tab 

DEEP EXCAVATION  154 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.2: Wall data dialog and advanced tab. 

The  element-behaves-as-slave  option  controls  if  the  wall  is  connected  to  the  slave  nodes 
(advanced option). With slave nodes it is possible to attach a wall to secondary parallel nodes 
(non-linear analysis). Then tension gap effects can be modeled between the main wall nodes and 
the slave nodes if the option is selected from the Analysis tab under advanced.  

For the beam continuity it is recommended to keep all options selected. 

DEEP EXCAVATION  155 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.1 Data entry: Wall sections
Wall sections are databases of wall properties that can be used in any wall within a design 
section. 

Figure 3.7.1.1: Edit wall properties dialog. 

The following table presents the dimension properties that are available in the wall sections 
dialog:

Symbol Description 
d  The width of the wall 
S  The horizontal spacing of the wall 
Passive  Passive horizontal tributary width 
width 
Active  Active horizontal tributary width 
width 
Water  Water horizontal tributary width 
width 
 

DEEP EXCAVATION  156 

 
DEEPEX 2018 – USER’S MANUAL 
 
DeepEX contains the wall types that are presented in the table below. The data entry of each wall 
type will be described in the following paragraphs.

Option Description 

Select this option to use a soldier pile and lagging wall, 
supported by H-section steel beams. This option will 
deactivate all other wall type parameters. 

Select this option to use a soldier pile and lagging wall, 
supported by reinforced concrete beams. This option 
will deactivate all other wall type parameters. 
 

Select this option to use a soldier pile and lagging wall, 
supported  by  pipe-section  steel  beams.  This  option 
will deactivate all other wall type parameters. 
 

Select this option to use a soldier pile and lagging wall, 
supported  by  pipe-section  steel  beams,  filled  with 
concrete. This option will deactivate all other wall type 
  parameters. 

Select this option to use a soldier pile and lagging wall, 
supported  by  channel-section  steel  beams.  This 
option will deactivate all other wall type parameters. 
 

Select this option to use a soldier pile and lagging wall, 
supported  by  double  channel-section  steel  beams. 
This  option  will  deactivate  all  other  wall  type 
  parameters. 

Select this option to use a soldier pile and lagging wall, 
supported  by  plain  concrete  beams.  This  option  will 
deactivate all other wall type parameters. 
 

DEEP EXCAVATION  157 

 
DEEPEX 2018 – USER’S MANUAL 
 

Select this option to use a soldier pile and lagging wall, 
supported by timber piles. This option will deactivate 
all other wall type parameters. 
 

Wall Type - Sheet Piles 
Select this option to use a sheet pile wall. This option 
will deactivate all other wall type parameters. 

 
 

Select this option to use a secant pile wall, supported 
by H-section steel beams. This option will deactivate 
              all other wall type parameters. 

Select this option to use a secant pile wall, supported 
by  reinforced  concrete  piles.  This  option  will 
deactivate all other wall type parameters. 

Select this option to use a secant pile wall, supported 
by pipe-section steel beams, filled with concrete. This 
option will deactivate all other wall type parameters. 

Select this option to use a secant pile wall. This option 
will deactivate all other wall type parameters. 

Select this option to use a secant pile wall, supported 
by  channel-section  steel  beams.  This  option  will 
deactivate all other wall type parameters. 

Select this option to use a secant pile wall, supported 
by  double  channel-section  steel  beams.  This  option 
will deactivate all other wall type parameters. 

DEEP EXCAVATION  158 

 
DEEPEX 2018 – USER’S MANUAL 
 
Select this option to use a secant pile wall, supported 
by reinforced concrete piles. The secondary piles can 
be  reinforced  as  well.  This  option  will  deactivate  all 
other wall type parameters. 

Select this option to use a secant pile wall, supported 
by H-section steel beams. The secondary piles can be 
reinforced as well. This option will deactivate all other 
wall type parameters. 

  Select this option to use a tangent pile wall, supported 
by H-section steel beams. This option will deactivate 
all other wall type parameters. 

Select this option to use a tangent pile wall, supported 
by  reinforced  concrete  piles.  This  option  will 
deactivate all other wall type parameters. 

Select this option to use a tangent pile wall, supported 
by  -section  steel  beams,  filled  with  concrete.  This 
option will deactivate all other wall type parameters. 

Select this option to use a tangent pile wall, supported 
by  double  channel-section  steel  beams.  This  option 
will deactivate all other wall type parameters. 

Select  this  option  to  use  a  tangent  pile  wall.  This 


option will deactivate all other wall type parameters. 

Select this option to use a tangent pile wall, supported 
by  channel-section  steel  beams.  This  option  will 
deactivate all other wall type parameters. 

DEEP EXCAVATION  159 

 
DEEPEX 2018 – USER’S MANUAL 
 
 
Select this option to use diaphragm wall. This option 
will deactivate all other wall type parameters. 

Select this option to use T-section diaphragm wall. This 
option will deactivate all other wall type parameters. 
 

Select this option to use inverted T-section diaphragm 
wall.  This  option  will  deactivate  all  other  wall  type 
parameters. 
 

Select  this  option  to  use  a  soldier  pile  and  tremied 


concrete  wall,  supported  by  H-section  steel  beams. 
This  option  will  deactivate  all  other  wall  type 
  parameters. 

Select  this  option  to  use  a  soldier  pile  and  tremied 


concrete  wall,  supported  by  double  channel-section 
steel beams. This option will deactivate all other wall 
  type parameters. 

Select  this  option  to  use  a  soldier  pile  and  tremied 


concrete  wall,  supported  by  -section  steel  beams, 
filled  with  concrete.  This  option  will  deactivate  all 
  other wall type parameters. 

Select  this  option  to  use  a  soldier  pile  and  tremied 


 
concrete  wall,  supported  by  channel-section  steel 
beams. This option will deactivate all other wall type 
parameters. 

Select  this  option  to  create  a  wall  with  manually 


defined  properties.  This  option  will  deactivate  all 
other wall type parameters. 
 

DEEP EXCAVATION  160 

 
DEEPEX 2018 – USER’S MANUAL 
 
  Select  this  option  to  use  a  combined  wall  with  H-
section  beams  and  sheet  piles.  This  option  will 
deactivate all other wall parameters. 

  Select this option to use a combined wall with double 
H-section  beams  and  sheet  piles.  This  option  will 
deactivate all other wall parameters. 

Select  this  option  to  use  a  combined  wall  with  pipe 


section  beams  and  sheet  piles.  This  option  will 
deactivate all other wall parameters. 
 

Select this option to use a box sheet pile wall with CAZ 
sheet pile sections. This option will deactivate all other 
wall parameters. 
 

  Select this option to use a box sheet pile wall with CUZ 
sheet pile sections. This option will deactivate all other 
wall parameters. 

By clicking on the button  of the wall sections dialog, the dialog in Figure 3.7.2.b appears. This 
dialog contains useful information regarding the passive and active widths. 

DEEP EXCAVATION  161 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.1.2: Help for passive and active widths dialog. 

DEEP EXCAVATION  162 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.2 Wall type: Soldier piles
 
At the wall sections dialog, we user can choose to use a soldier pile wall. The user can choose to 
use a standard steel section from the area marked in Figure 3.7.2.1. DeepEX includes all European 
and US standard sections. In this dialog can modify the dimensions of the wall. 

 
Figure 3.7.2.1: General section and dimensions for Soldier pile walls. 

In E. Lagging tab (Figure 3.7.2.2), we can modify the lagging properties, such us the lagging type 
(timber or concrete), and the lagging thickness and section. Finally, here we can also define the 
lagging position in the wall.  

Figure 3.7.2.2: Lagging properties. 

DEEP EXCAVATION  163 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following table presents the options that are included in this dialog tab.

Parameter Description 
Option to use Timber  Defines the lagging type, allowing user to define the exact 
or Concrete lagging  parameters 
Defines the timber lagging section from the provided options 
Timber lagging 
(it can be edited) 
Lagging thickness  Defines the lagging thickness 
Defines the timber material (option to use construction timber 
Mat. 
or regular grade) 
Defines the concrete lagging section from the provided 
Concrete lagging 
options (it can be edited) 
Defines the lagging arch angle (0 deg means parallel to the 
Arch Angle 
wall) 
Defines the lagging position according to the wall piles. 
Provided options: 
 Left side outside of pile face 
Lagging position   Left side inside pile flange 
 Center of the wall 
 Right side outside of pile face 
 Right side inside pile flange 
Defines the calculation method for the lagging. 
Provided options: 
Calculation Method   California trenching and shoring manual 
 Full active earth pressures 
 User defined 
Defines the bending moments and shear calculation method. 
Provided options: 
Bending and shear 
 Simple span bending 
calculations 
 50% pressure at center 
 User defined 
 

In B. Steel Beams tab, we can define the steel beam properties or select a standard section. The 
section can either be a normal H-section (Figures 3.7.2.3 and 3.7.2.4), a single or double channel 
section (Figures 3.7.2.5 and 3.7.2.6) or a Pipe section, filled or not with concrete (Figures 3.7.2.7 
and 3.7.2.8). 

The reduced steel pipe capacity due to threads option reduces the section modulus of a steel 
pipe to account for strength reductions due to the presence of threads in the piping. Fully 
welded pipes will likely provide all the theoretical capacity and will likely not require that this 
feature is activated. 

DEEP EXCAVATION  164 

 
DEEPEX 2018 – USER’S MANUAL 
 
The available section properties are presented and described in the table below. 

Symbol Description 
D  Depth or diameter 
A  Area 
Ixx  Strong axis moment of inertia 
Iyy  Weak axis moment of inertia 
Sxx  Strong axis elastic section modulus 
Syy  Weak axis elastic section modulus 
rx  Strong axis radius of gyration 
ry  Weak axis radius of gyration 
Zxx  Strong axis plastic section modulus 
Zyy  Weak axis plastic section modulus 
tP  Thickness 
J  Rotational moment of inertia 
W  Wrapping constant 
 

 
Figure 3.7.2.3: T-sections. 

The parameters unsupported length Lb and unsupported length Lx factor below excavation 
control the buckling calculations for the wall capacity. 

Some other useful options like Reduce steel pipe capacity due to threads and Effectiveness of 
concrete for stiffness calculations are available in this dialog (Figure 3.7.2.9). Finally, the user can 
manually set the section properties my choosing the Edit strut properties manually option (Figure 
3.7.2.10). 

DEEP EXCAVATION  165 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.2.4: H-section soldier pile wall plan. 

Figure 3.7.2.5: Double channel sections. 

DEEP EXCAVATION  166 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.2.6: Double channel section soldier pile wall plan. 

Figure 3.7.2.7: Pipe sections filled with concrete. 

DEEP EXCAVATION  167 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.2.8: Pipe section filled with concrete soldier pile wall plan. 

Figure 7.3.2.9: Other options. 

DEEP EXCAVATION  168 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 7.3.2.10: Edit sections manually. 

 
 
 
 
 
 
 
 
 
 
 
 
 

DEEP EXCAVATION  169 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.3 Wall type: Sheet piles
 
At the wall sections dialog, we can select to use sheet pile walls. The user can choose to use a 
standard sheet pile section from the area marked in Figure 3.7.3.1.  

Figure 3.7.3.1: General section and dimensions for sheet pile walls. 

In C. sheet piles tab (Figure 3.7.3.2), we can change the sheet pile properties. These properties 
are  presented  in  the  following  table.  Figure  3.7.3.3  shows  the  plan  of  a  sheet  pile  wall  as 
presented in F. Draw tab. 

Symbol Description 
h  Height 
A  Area 
b  Base length 
tf  Flange thickness 
Ixx  Strong axis moment of inertia 
Sxx  Strong axis elastic section modulus 
s  Web thickness 
α  Base angle of web from horizontal axis 
 

DEEP EXCAVATION  170 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.3.1: Sheet pile properties. 

Figure 3.7.3.2: Sheet pile wall plan. 

DEEP EXCAVATION  171 

 
DEEPEX 2018 – USER’S MANUAL 
 
When we select to use sheet piles in the model (by double clicking on the wall and assigning a 
sheet pile section), then an additional button appears in the Design tab of DeepEX. By pressing 

on the button , the Sheep pile corrosion options dialog appears (Figure 3.7.3.3). In this dialog user 
can choose to examine the design life of the structure, adding corrosion effects to the sheet pile walls. This 
option is usually applied to an additional final stage, after the last excavation stage.  

 
Figure 3.7.3.3: Sheet pile corrosion options dialog. 

The following options are available: 

Option to examine design life 
Define the design life (in years) 
Choose to define corrosion rates or thickness loss properties 
Define corrosion rate or thickness loss in splash zone (high attack) 
Define corrosion rate or thickness loss in soil 
Define corrosion rate or thickness loss in intertidal zone 
Option to use absolute water elevations 
Define water elevations (mean high water, low water table, splash depth zone) 
Define the minimum recommended thickness for sheet piles 
Option to examine minimum section properties percentage 
 

DEEP EXCAVATION  172 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.4 Wall type: Secant - tangent piles
 
At the wall sections dialog, we can select to use secant pile or tangent pile walls. The user can 
choose to use a standard steel section for the piles from the area marked in Figure 3.7.4.1. DeepEX 
includes all European and US standard sections.  

Figure 3.7.4.1: General steel section and dimensions for secant pile walls. 

In B. steel beams tab (Figure 3.7.4.2), the user can modify the steel section properties. These 
properties are presented and described in the table below. The section can either be a normal T-
section (Figures 3.7.4.3 and 3.7.4.4), a channel section with one or two channels (Figures 3.7.4.5 
and 3.7.4.6) or a Pipe section, filled or not with concrete (Figures 3.7.4.7 and 3.7.4.8). User can 
choose  to  have  multiple  unreinforced  piles  with  the  same  or  different  section  size  than  the 
reinforced  ones  (Figure  3.7.4.9).  Finally,  in  the  Steel  Beams  or  Concrete-Rebar  tab  of  DeepEX 
(depending on the selected wall type), user can assign different reinforcement sections for the 
secondary piles (Figures 3.7.4.10 and 3.7.4.11). 

DEEP EXCAVATION  173 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.4.2: Steel section properties. 

Figure 3.7.4.3: H-sections. 

DEEP EXCAVATION  174 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.4.4: H-section secant pile wall plan. 

Figure 3.7.4.5: Double channel sections. 

DEEP EXCAVATION  175 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.4.6: Double channel section secant pile wall plan. 

Figure 3.7.4.7: Pipe sections filled with concrete. 

DEEP EXCAVATION  176 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.4.8: Pipe section filled with concrete secant pile wall plan. 

 
Figure 3.7.4.9: Secant pile wall with multiple unreinforced piles plan. 

DEEP EXCAVATION  177 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 3.7.4.10: Option to define secondary pile reinforcement. 

    
Figure 3.7.4.911: Secant pile wall with reinforced secondary piles. 

DEEP EXCAVATION  178 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.5 Wall type: Diaphragm walls (slurry walls US)
 
At the wall type, we can select to use diaphragm walls. We can modify the dimensions of the wall 
in the marked area of Figure 3.7.5.1. In D. Concrete –Rebar tab we can change the concrete and 
rebar steel properties and define the wall’s reinforcement (Figure 3.7.5.2).  When the option to 
use more than one reinforcement sections is selected, the multiple reinforcement options tab 
appears (Figure 3.7.5.3). The properties included in this tab are presented and described in the 
table below.  Figure 3.7.5.48 shows the plan of a diaphragm as presented in F. Draw tab. In DeepEX 
2018,  user  can  additionally  choose  to  use  T-Section  or  inverted  T-Section  diaphragms  (Figure 
3.7.5.5) 

Figure 3.7.5.1: Dimensions for diaphragm walls. 

DEEP EXCAVATION  179 

 
DEEPEX 2018 – USER’S MANUAL 
 
Symbol Description 
D  Wall thickness (height) 
A  Area 
B  Wall bare length 
Bw  Wall length 
Ixx  Strong axis moment of inertia 
N  Number of reinforcement bars 
Bar#  Rotational moment of inertia 
As top  Top reinforcement area 
As bot  Top reinforcement area 
Ctop  Top clearance to center of bar 
Cbot  Bottom clearance to center of bar 
sV  Vertical spacing of shear reinforcement 
sH  Horizontal spacing of shear reinforcement 
Use more than one  Option that turns on the use of multiple reinforcement for the wall 
reinforcement sections 
Treat wall as slab  Option that is used only for diaphragm walls and allows them to be 
treated as slabs for the shear capacity calculations 
 

Figure 3.7.5.2: Concrete and rebar properties. 

DEEP EXCAVATION  180 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.5.3: The multiple reinforcement options tab. 

The following table presents the properties that are available in the multiple reinforcement 
options tab: 

Length of the reinforcement (starting from top) 
Left bar size 
Number of left bars 
Area of left bars 
Clearance for the left bars 
Right bar size 
Number of right bars 
Area of right bars 
Clearance for the right bars 
Option to use shear reinforcement 
Dimension of shear reinforcement bars 
Area of shear reinforcement 
Horizontal spacing of shear reinforcement 
Vertical spacing of shear reinforcement 
Option to use and edit multiple reinforcement layers 
 

DEEP EXCAVATION  181 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

Figure 3.7.5.4: Diaphragm wall plan. 

 
Figure 3.7.5.5: T-section diaphragm wall plan. 

DEEP EXCAVATION  182 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.6 Wall type: Soldier pile and tremied concrete walls
 
At the wall sections dialog, the user can choose to use soldier pile and tremied concrete walls. 
The  user  can  choose  to  use  a  standard  steel  section  from  the  area  marked  in  Figure  3.7.6.1. 
DeepEX includes all European and US standard sections.  

Figure 3.7.6.1: General section and dimensions for Soldier pile and tremied concrete walls. 

The  steel  beam  properties  and  options  are  the  same  as  described  in  paragraph  3.7.1.  Figure 
3.7.6.2 shows the plan of a sheet pile wall as presented in F. Draw tab. 

Figure 3.7.6.2: Soldier pile and tremied concrete wall plan. 

DEEP EXCAVATION  183 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.7 Wall type: Custom
 
By using this wall type the user can define directly the wall moment of inertia, the wall thickness 
and the top and bottom wall releases without using any of the available wall types. Figures 3.7.7.1 
and 3.7.7.2 show the custom wall properties and the custom wall plan respectively. 

Figure 3.7.7.1: Custom wall properties. 

Top  Top elevation of section 
Mat  Section material 
Ixx  Moment of inertia 
Bottom release  Bottom or the section releases 
Top release  Top of the section releases 
t  Section thickness 
 

DEEP EXCAVATION  184 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.7.7.2: Custom wall plan.

DEEP EXCAVATION  185 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.8 Wall type: Combined walls

At the wall sections dialog, we can select to use combined walls. We can choose to use a standard 
steel  section  from  the  area  marked  in  Figure  3.7.8.1.  DeepEX  includes  a  number  of  Arcelor 
specified sections. However, the user is free to specify his own data. Then, the program directly 
passes the selected section’s properties to the sheet pile page and the steel beam page. We can 
later change the steel beam or sheet pile sections individually from the tabs (Figure 3.7.8.2), but 
it is recommended to keep the predefined values.

Figure 3.7.8.1: Combined wall dialog. 

Figure 3.7.8.2: Combined wall dialog-sheet piles. 

DEEP EXCAVATION  186 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.7.9 Wall type: Box Sheet Pile walls

At the wall sections dialog, we can select to use box sheet pile walls. We can choose to use a 
standard  steel  section  from  the  area  marked  in  Figure  3.7.8.1.  DeepEX  includes  a  number  of 
specified sections. However, the user is free to specify his own data. Then, the program directly 
passes the selected section’s properties.

Figure 3.7.9.1: Box sheet piles dialog. 

Figure 3.7.9.2: Box sheet pile wall section.

DEEP EXCAVATION  187 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.8 Data entry: Ground Anchors

3.8.1 Data entry: Tiebacks


By choosing to add a tieback to the model, the Edit support dialog appears (Figure 3.8.1). In this 
area we can define the precise support coordinates, the free and the fixed length. In addition, the 
user can define the support’s installation angle, the horizontal spacing of the tiebacks and the 
section used in each support. This section can be edited by clicking on the edit button.  

 
Figure 3.8.1: Edit support data dialog.

Symbol Description 
X  The X-coordinate of the support 
Z  The Z-coordinate of the support 
Lfree  Free length of the tieback  
Lfix  Fixed length of the tieback Here the user can define the following 
properties: 

Effective Lfix  Effective fixed length, defined as a percentage of Lfix 
a  Tieback installation angle 
Horizontal Spacing  Horizontal spacing of installed tiebacks 
Prestress  Option to apply prestress in the stage that the tieback is activated 
Structural section  Define structural section of the tieback used 
Helical anchor  Option to use helical anchor sections for the tieback 
Change support  Option to use a different type of support 
type 
Activate/Deactivate  Choose to activate/deactivate the support for the current stage 
Temporary support  Define if the support is temporary or permanent 

DEEP EXCAVATION  188 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the tab B. Options of the Edit Support Data dialog, we can choose to connect the support either 
with the main wall (main nodes) or with the wall elements (slave nodes). 

Figure 3.8.2: Edit support data dialog – Options Tab. 

At the Results tab the user can see the results of the support, after the model is calculated. 

Figure 3.8.3: Tieback results. 

DEEP EXCAVATION  189 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following results are available:

Symbol Description 
Paxial  Axial load of the tieback support 
M  Moment 
Pall  Allowable structural axial capacity  
Pult  Ultimate structural axial capacity 
Pall  Allowable structural axial capacity  
Pult  Ultimate structural axial capacity 
Used FS  Overall applied safety factor for geotechnical design capacity in 
terms of the ultimate capacity y 
 

After the calculation of the model, by pressing on the button Show Full Calculations in this form, 
an html file opens, containing all calculations and equations that have been performed for the 
current support in the current stage. 

3.8.2 Data entry: Tieback sections


 
 By clicking the Edit Section button of the support dialog, the Tieback – Anchors dialog appears 
(Figure 3.8.4). 

In  this  dialog  we  can  define  the  strand  material  and  diameter,  the  grout  options  and  a 
geotechnical factor of safety. In most cases, tiebacks are pressure grouted in order to achieve 
greater  capacities.  We  can  capture  such  effects  by  including  a  densification  multiplier  for  the 
frictional  and  cohesional  components  of  the  shear  resistance.  These  factors  require  careful 
consideration and can be used to obtain a preliminary estimate of geotechnical tieback capacity 
(Figure 3.8.5). In the overwhelming majority of projects, all tiebacks have to be tested. For the 
cohesional component you can select an adhesion factor behavior (multiplier for the cohesion). 
The frictional component of the tieback capacity is calculated from the average effective confining 
stress at the tieback (at-rest on sides + vertical on top & bottom). Bearing capacity is ignored. The 
tieback section can be selected from three main types:  

A) Strands or user bars 
B) Solid bar 
C) User area 
D) Pipe micropile 
E) Beam micropile 

DEEP EXCAVATION  190 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 3.8.4: Tieback - anchor sections dialog. 

Here the user can define the following properties:

Symbol Description 
Name  Define the section name 
Rebar steel mat  Define the rebar steel material 
fy  The yield strength for the steel  
E  Modulus of elasticity 
Strand diam  Diameter for strands (if strands option is selected) 
Di  Internal strand diameter (if strands option is selected) 
No  Number of strands used (if strands option is selected) 
Bar #  The bar diameter (if solid bars option is selected) 
No  Number of bars used (if solid bars option is selected) 
A  Reinforcement area (if user area option is selected) 
Concrete mat  Define the concrete material used as grout 
Dfix  Fixed (grouted) diameter. This diameter is usually a function of the 
performed diameter (or drill diameter) 

DEEP EXCAVATION  191 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.8.5: Advanced geotechnical options. 

The geotechnical safety factor in this dialog is used when the custom Geo FS option is not 
selected in the mail program. 

Here the user can define the following properties:

Symbol Description 
Ultimate  Define ultimate pressure bond (if the option is selected), so that 
Pressure bond  the ultimate geotechnical capacity to be calculated from the 
pressure bond 
-  Use and define densification of frictional shear resistance (if option 
is selected) 
-  Use and define densification of cohesional shear resistance (if 
option is selected) 
Adhesion factor  Define adhesion factors (if the option is selected) 
 

DEEP EXCAVATION  192 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.8.6: Advanced options. 

Here the user can define the following properties:

Symbol Description 
-  Define the structural allowable stress factor for steel 
-  Define the color of the free length and fixed body 
Fall  Define the allowable geotechnical capacity (if the use user defined 
capacity option is selected) 
Fmax  Define the maximum geotechnical capacity (if the use user defined 
capacity option is selected) 
Fall  Define the allowable structural capacity 
Fmax  Define the maximum structural capacity 
Ixx.strand  Moment of inertia of the strand 
Sxx.strand  Elastic section modulus for one strand (used in soil nails) 
Zxx.strand  Plastic section modulus for one strand (used in soil nails) 
-  Option to ignore capacities for spring methods (will create a non-
yielding element, recommended option) 
 

DEEP EXCAVATION  193 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.8.3 Data entry: Helical anchor sections
 
From the Helical Anchors dialog (Figure 3.8.7) the user can select an anchor from the existing 
database of anchors or add some sections to the database. These anchors can use in the project. 
The  General  tab  contains  basic  structural  information.  The  Geotechnical  capacity  tab  contains 
options for calculating the geotechnical tieback capacity. In the Advanced tab the user can specify 
safety  factors  as  well  as  customize  the  allowable  and  ultimate  geotechnical  and  structural 
capacities. The properties included in this dialog are presented and described in the table below.

Symbol/Option Description 
Fy  Tensile Yield Strength of anchor 
Fu  Tensile Ultimate Strength of anchor 
Diameter  Anchor diameter 
Thickness  Anchor thickness 
Ixx  Moment of inertia 
Sxx  Elastic section modulus 
Zxx  Plastic section modulus 
Telastic  Torsional elastic pipe capacity 
Tplastic  Torsional plastic pipe capacity 
E  Modulus of elasticity 
Apipe  Area of the pipe of the anchor 
Qyield  Tensile yield shaft capacity 
Qultimate  Tensile ultimate shaft capacity 
Helix diameter  The diameter of the helical plate 
Helix spacing  The spacing between the helical plates 
Helix thickness  The thickness of the helical plate 
Effective helix area  The effective area of the helical plate 
Helix pitch  The helical plate inclination 
Qhelix  Ultimate tension capacity for one helical plate 
FS  Factor of safety 
σ’ vmax  Limiting vertical stress 
 

DEEP EXCAVATION  194 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.8.7: Helical anchor sections dialog. 

DEEP EXCAVATION  195 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.9 Data entry: Strut sections

The strut section properties can be modified either by clicking on the Edit strut sections button

 of the Properties tab, or by clicking on the Edit section button of the Edit support data dialog 
that opens when the user adds a raker or a strut to the model. Struts and rakers in DeepEX can 
be either H-section steel beams, hollow square sections, or pipes. DeepEX includes all European 
and US standard sections. The user can choose a section from the program’s database or edit the 
strut  properties  manually  (Figure  3.9.1)  The  properties  are  presented  and  described  in  the 
following table. 

Figure 3.9.1: Strut sections dialog. 

From DeepEX 2018 double member struts can be defined. With this option, the flange bracing, 
and member offset may have to be defined. For H type strut sections, it is advisable to use a 
vertical orientation with this option. 

DEEP EXCAVATION  196 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
 

Symbol Description 
D  Depth or diameter 
A  Area 
fy  Yield strength 
Ixx  Strong axis moment of inertia 
Iyy  Weak axis moment of inertia 
Sxx  Strong axis elastic section modulus 
Syy  Weak axis elastic section modulus 
rx  Strong axis radius of gyration 
ry  Weak axis radius of gyration 
Zxx  Strong axis plastic section modulus 
Zyy  Weak axis plastic section modulus 
tP  Thickness 
J  Rotational moment of inertia 
W  Wrapping constant 
Member offset  For double members this is the horizontal offset 
Lb  This is the unbraced flange length. This means that lateral bracing 
(lacing) is provided at regular intervals. The lateral bracing is not 
designed by the program. 
 

After defining the strut section properties, the user can define the strut or raker prestress in the 
edit support dialog (Figure 3.9.2). If prestress is applied, it must be applied ONLY in the support 
installation stage. For struts a negative prestress would indicate compression (recommended).

DEEP EXCAVATION  197 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.9.2: Strut prestress dialog. 

After the calculation of the model, by pressing on the button Show Full Calculations in this form, 
an html file opens, containing all calculations and equations that have been performed for the 
current support in the current stage (Figure 3.9.3). 

Figure 3.9.3: Strut support calculations. 

DEEP EXCAVATION  198 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.9.1 Mechanical and Hydraulic Strut sections

The  strut  section  properties  can  be  modified  either  by  clicking  on  the  Edit  mechanical  and 

hydraulic strut sections button  of the General tab, or by clicking on the Edit section button 
of the Edit support data dialog that opens when the user adds a raker or a strut to the model. In 
order to access the Edit mechanical and Hydraulic struts dialog from the Edit Strut dialog, user 
should also choose the option “Use mechanical or Hydraulic struts”. Mechanical and Hydraulic 
struts and rakers in DeepEX can be either hollow square sections, or pipes. Users can choose a 
section from the program’s database or edit the strut properties manually (Figures 3.9.4 to 3.9.7). 
The properties are presented and described in the following tables. 

 
Figure 3.9.4: Mechanical and Hydraulic Struts dialog – Type-Dimensions tab. 

DEEP EXCAVATION  199 

 
DEEPEX 2018 – USER’S MANUAL 
 
Symbol Description 
D  Depth or diameter 
A  Area 
fy  Yield strength 
Ixx  Strong axis moment of inertia 
Iyy  Weak axis moment of inertia 
Sxx  Strong axis elastic section modulus 
Syy  Weak axis elastic section modulus 
rx  Strong axis radius of gyration 
ry  Weak axis radius of gyration 
Zxx  Strong axis plastic section modulus 
Zyy  Weak axis plastic section modulus 
tP  Thickness 
J  Rotational moment of inertia 
W  Wrapping constant 
Option to use a pipe section and list of available pipe sections 
Option to use a hollow section and list of available hollow sections 
Option “Use a Jack  Allows the use of a hydraulic or mechanical jack 
Define jack type (mechanical or hydraulic) 
Define piston or jack area (depending on the jack type) 
Define number of units 
Define outer unit size 
Define inner unit size 
Define fluid modulus Efluid (in case of hydraulic jack) 
Define fluid length Lfluid (in case of hydraulic jack) 
Lcon  Start connector length 
Lhydraulic unit  Hydraulic unit length (when used) 
Option to modify strut section properties manually 
Option to model strut section as non-yielding (in non-linear analysis) 
 

DEEP EXCAVATION  200 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

 
Figure 3.9.5: Mechanical and Hydraulic Struts dialog – Strength tab. 

In  this  tab,  user  can  define  either  to  define  rated  strength,  defining  allowable  and  maximum 
strength for the strut, or insert manually the axial capacity vs length graphs, usually provided by 
the strut manufacturers. In this case, there are options to define whether the capacity profile is 
allowable or not, and if the profile should be used in the model. 

DEEP EXCAVATION  201 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

 
Figure 3.9.6: Mechanical and Hydraulic Struts dialog – Transition struts tab and dialog. 

Here user can choose to use transition units. For each transition unit, user can choose to modify 
the unit properties. The following options are available: 

Edit item ID or name 
Option to use a pipe section or a hollow rectangular section 
Define element length 
Define element thickness 
Define start and end element dimensions 
Define connection flange thickness 
Define start and end flange dimensions 
Option that stiffeners are continuous from start to end 
Options to use stiffeners on each side 
Stiffener dimensions (when any of the previous options is selected) 
 

DEEP EXCAVATION  202 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 3.9.7: Mechanical and Hydraulic Struts dialog – Connector plated tab. 

In  this  dialog  user  can  choose  to  use  connector  plates  and  define  the  connector  types.  The 
following options are available: 

 Edit start plate at connector (dialog in Figure 3.9.8)
 Edit start plate at strut
 Edit end plate at strut
 Edit end plate at connector
 Edit connector type (dialog in Figure 3.9.9)
 

DEEP EXCAVATION  203 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

 
Figure 3.9.8: Plate connection data dialog. 

In this dialog user can choose to use plate connection, to use stiffeners and define the plate and 
stiffeners dimensions. The following properties are available: 

Option to use connection plate 
Define plate shape (circular, rectangular)  
Define plate thickness 
Define plate depth or diameter 
Option to use stiffeners 
Define stiffener depth 
Define stiffener length at top 
Define stiffener length at bottom 
Define stiffener thickness 
Define number of plates 
 

DEEP EXCAVATION  204 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

 
Figure 3.9.9: Connector type and data dialog. 

In this dialog user can define the connector type and properties. The following properties are 
available: 

Define connector name or ID 
Choose connector type (Pin type/swivel or Base plate for mechanical)  
Define connector thickness and diameter 
Define number of plates at start and at end of the strut 
 

DEEP EXCAVATION  205 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.10 Data entry: Slab sections and slab supports
 
The slab section properties can be modified either by clicking on the Edit slab sections button 

 of the Properties tab, or by clicking on the Edit section button  of the Edit support  data 


dialog that opens when the user adds a slab to the model. In A. Section Properties tab, we can 
modify  the  concrete  and  rebar  steel  properties  and  define  the  wall’s  reinforcement  (Figure 
3.10.1). The properties included in this tab are described in the following table. Sometimes we 
may choose to define the slab’s prestress in the edit support dialog (Figure 3.10.2) 

Figure 3.10.1: Slab Sections dialog. 

DEEP EXCAVATION  206 

 
DEEPEX 2018 – USER’S MANUAL 
 
Symbol Description 
D  Wall thickness 
A  Area 
B  Wall length 
Bw  Wall length 
Ixx  Strong axis moment of inertia 
tf  Flange thickness 
Bar#  Reinforcement area 
As, top  Top reinforcement area 
As, bot  Top reinforcement area 
Ctop  Top clearance to center of top bar 
Cbot  Bottom clearance to center of bottom bar 
sX  Horizontal spacing of shear reinforcement 
sY  Spacing of shear reinforcement in out of plane direction (in the 
model screen) 
 

Figure 3.10.2: Slab elevation on wall, spacing (effective length) and section.  

DEEP EXCAVATION  207 

 
DEEPEX 2018 – USER’S MANUAL 
 
At the C. Results tab, results for the slab are available when the model is calculated. 
 

Figure 3.10.2: Slab results. 
The following results are available in the results tab:
Symbol Description 
Paxial  Axial load on slab 
M  Moment at center span 
Pall  Allowable axial capacity  
Pult  Ultimate axial capacity 
Mleft  Left moment (>0 when slab is restrained) 
MLdesign  Left side design moment (factored with safety factor) 
Mright  Right side moment (>0 when slab is restrained) 
MRdesign  Right side design moment (factored design moment) 
Mcapacity top  Moment capacity of the slab for negative moments 
Ubottom  Water pressure SLS (unfactored water pressure at bottom of slab 
when the slab is used to seal the excavation) 
Vleft  Left side shear 
VLdesign  Left side design shear 
VLcap  Left side shear capacity 
Vright  Right side shear 
VRdesign  Right side design shear 
VRcap  Right side shear capacity 

In addition, we can see the geotechnical and the structural allowable and ultimate axial 
capacities of the slab. 

DEEP EXCAVATION  208 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.11 Data entry: Fixed supports
 
We  can  choose  to  add  a  fixed  support  to  the  model  by  clicking  on  the    button  of  the 
Loads/supports tab. A fixed support is a support that provides horizontal restraint. After selecting 
this tool, select any wall with your mouse where you want your support to be added. 

3.12 Data entry: Springs


 
We can choose to add a spring support to the model by clicking on the button . After selecting 
this tool, select any wall with your mouse where you want your support to be added. 

When the spring is added to the model, the Edit support data dialog appears. At A. General Tab 
we can define the axial and rotational spring stiffness and the exact spring location on the wall 
(Figure 3.12.1). 

Figure 3.12.1: Spring support dialog. 

DEEP EXCAVATION  209 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.13 Data entry: Slope Stability

3.13.1 Slope Stability Analysis


 
The slope stability analysis can be performed using the Slope module of DeepEX. The program 
can perform slope stability analysis of slope surfaces using the simplified Bishop method, the GLE 
(Morgenstern – Price) method or the Spencer (Force – Moment) method. To illustrate this a slope 
example will be presented. First, a slope or bench surface is created (right click on the model, set 
left bench surface). Then, the bench options dialog appears (Figure 3.13.1). Here we set the bench 
surface by specifying the bench angle or the Vertical – Horizontal step. 

Figure 3.13.1: Set bench surface. 

Next, we define the exact center or the rectangle containing the centers for the slope surfaces 
that to be analyzed (Figures 3.13.2 and 3.13.3).  

DEEP EXCAVATION  210 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.13.2: Slope circle center. 

Figure 3.13.3: Rectangular center point search. 

Next, the user should select the points where the sliding surface will pass. Using DeepEX, the user 
can use the following options: 

DEEP EXCAVATION  211 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Single search radius option (Figure 3.13.4): the user adds a single sliding surface to the 
model. 

Figure 3.13.4: Single radius. 

 Custom failure surface option (Figure 3.13.5). The user adds a custom sliding surface to 
the model by adding specific points with the mouse. 
 

Figure 3.13.5: Custom sliding surface. 

DEEP EXCAVATION  212 

 
DEEPEX 2018 – USER’S MANUAL 
 
 End point limits option (Figure 3.13.6): The user specifies points where the radii 
for search surfaces pass through (for a failure surface that contains a circular 
portion).
 

Figure 3.13.6: End point limits. 

 Draw the base points for a block (Figure 3.13.7). With this the user can specify 2 points 
from which the search surfaces pass through for the block type analysis.
 

Figure 3.13.7: Two end points. 

DEEP EXCAVATION  213 

 
DEEPEX 2018 – USER’S MANUAL 
 
By clicking on the options button, the slope stability options dialog appears. In the method tab 
(Figure 3.13.8), we can define the slope stability method used to analyze the model. 

Figure 3.13.8: Slope stability options – method tab. 

The following properties are available in this tab:

Symbol Description 
Bishop  Select Bishop simplified method for the slope stability analysis 
Morgenstern Price  Select Morgenstern Price method for the slope stability analysis 
Ordinary (Swedish)  Select Ordinary (Swedish) method for the slope stability analysis 
m   Factor for interslice force equation (if MP method is selected) 
v   Factor for interslice force equation (if MP method is selected) 
FS0  Initial assumption for factor of safety (if MP method is selected) 
λ0  Initial assumption for scaling factor  (if MP method is selected) 
Spencer  Select Spencer method for the slope stability analysis 
Janbu  Select Janbu method for the slope stability analysis 
-  Define the maximum number of iterations for each search point 
-  Define the convergence Tolerance 
DX  Define the preliminary slice width 
-  Define the minimum number of slices 
 

DEEP EXCAVATION  214 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the center tab (Figure 3.13.9), the user can define the properties for the centers of the circles 
used in the slope stability analysis. 

Figure 3.13.9: Slope stability options – center tab. 

The following properties are available in this tab:

Symbol Description 
Use only one point for the  Choose to use only one point for the center of the circular type 
analysis  failure 
Use exact coordinates for  Choose to use exact coordinates for center search. Otherwise 
center search  coordinates will be relative to the left wall (top corner) 
Left  Left search limit (for a rectangular type search) 
Right  Right search limit (for a rectangular type search) 
steps   Search steps between the two horizontal limits (for a rectangular 
type search) 
Top  Top search limit (for a rectangular type search) 
Bottom  Bottom search limit (for a rectangular type search) 
steps   Search steps between the two vertical limits (for a rectangular type 
search) 
Rotation   Rotation angle (used for rectangular search) 
 

DEEP EXCAVATION  215 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the Radius search tab (Figure 3.13.10), we can define the properties for the radius of the circles 
used in slope stability analysis. 

Figure 3.13.10: Slope stability options – radius search tab. 

The following properties are available in this tab:

Symbol Description 
Use a single radius for search  Choose to use a single radius for search 
Specify exact radii limits  Choose to Specify exact radii limits (for start and end radius) 
Initial R  Initial radius limit ( if the choice to Specify exact radii limits is 
selected) 
Final R  Final radius limit ( if the choice to Specify exact radii limits is 
selected) 
Specify exact coordinates  Choose to search radii with two points 
Initial X  Initial search point X-coordinate 
Initial Z  Initial search point Z-coordinate 
Final X  Final search point X-coordinate 
Final Z  Final search point Z-coordinate 
Radius starts at  Define the Radius start limits (if no other option is selected) 
Radius ends at  Define the Radius end limits (if no other option is selected) 
Radii increments  Define the radii increments 
 

DEEP EXCAVATION  216 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the Active/passive tab (Figure 3.13.11), we can control options for including active and passive 
wedges for the slope stability analysis. 

Figure 3.13.11: Slope stability options – Active/passive tab. 

The following properties are available in this tab:

Symbol Description 
Include active angle  Choose to include active angle limit and define it 
limit 
Sweep active angle  Choose to sweep active angle (if the previous option is selected) 
Angle Range+ , steps  Define Angle range and steps (if the sweep option is selected) 
Include passive angle  Choose to include passive angle limit and define it 
limit 
Sweep passive angle  Choose to sweep active angle (if the previous option is selected) 
Angle Range+ , steps  Define Angle range and steps (if the sweep option is selected) 
Use block analysis  Choose to use block analysis 
Initial X  Initial block point X-coordinate (if the block analysis option is selected) 
Initial Z  Initial block point Z-coordinate (if the block analysis option is selected) 
Final X  Final block point X-coordinate (if the block analysis option is selected) 
Final Z  Final block point Z-coordinate (if the block analysis option is selected) 
steps  Define steps for block analysis (if the block analysis option is selected) 
 

DEEP EXCAVATION  217 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the Supports tab (Figure 3.13.12), the user can define how support forces are included within 
the slope stability analysis. 

Figure 3.13.12: Slope stability options – Supports tab. 

The following properties are available in this tab:
Symbol Description 
Include support reactions  Includes support reactions as analyzed by the wall 
analysis 
Include support service capacities  Includes support service capacities as analyzed by the 
wall analysis 
Include support ultimate capacities  Includes support ultimate capacities as analyzed by the 
wall analysis 
Ignore support forces  Ignores support forces in slope stability analysis 
Determine soil nail forces from  Determines mobilized soil nail forces from iteration 
iteration   (when FS = 1) 
Define minimum mobilization factor  Defines minimum mobilization factor as a percentage of 
as a percentage of the ultimate  the ultimate capacity (if the previous option is selected) 
capacity 
Inails.mob  Mobilization interaction factor (if the previous option is 
selected). This factor is used to determine mobilized 
soil nail forces from: 
Fmob = (Fx,ultimate – Fx,FS) x Inails.mob + Fx,FS = 1 

DEEP EXCAVATION  218 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the Miscellaneous tab (Figure 3.13.13), we can control how the wall shear is accounted in the 
slope stability analysis (when a wall is intersected). 

Figure 3.13.13: Slope stability options – Miscellaneous tab. 

The following properties are available in this tab:

Description 
Choose to include shear capacity of wall in stability 
Choose to include ultimate wall capacities (design shear x FS.structural) 
Option to include the tensile pile wall resistance into the calculations. 
Choose to include support ultimate capacities 
Choose ignore soil shear on vertical faces (at ends) 
Choose to use at-rest pressures on a vertical face 
Define the number of vertical intervals (when a vertical end face is included) 
Choose to include tieback shear on slice base (if tiebacks used in the model). With this 
feature, the normal stress and shear is increased when the fixed part of the tieback 
intersects the base of the slice (Bishop method) 
 

DEEP EXCAVATION  219 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the 3D Loads tab (Figure 3.13.14), we can define how 3D Loads are accounted in slope stability 
analysis. 

Figure 3.13.14: Slope stability options – 3D Loads tab. 

The following properties are available in this tab: 

 Ignore all footing loads (and other 3D loads) 
 Include all footing loads (and other 3D loads) 
 Include footing loads within maximum support spacing from wall Y coordinate 
 Include footing loads only between out-of-plane search limits, relative to wall Y coordinate

DEEP EXCAVATION  220 

 
DEEPEX 2018 – USER’S MANUAL 
 
In  the  Tension  crack  tab  (Figure 3.13.15), we  can  control  options for including a tension crack 
within the slope stability analysis. 

Figure 3.13.15: Slope stability options – Tension crack tab. 

The following properties are available in this tab: 

 Include tension crack 
 Use a specified tension crack depth 
 Define the tension crack depth (if the previous option is selected) 
 Use automatic crack depth (from top layer) 
 Fill the tension crack with water
 

DEEP EXCAVATION  221 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the Automatic Search tab (Figure 3.13.16), we can control options for automatic radius search 
within the slope stability analysis. 

Figure 3.13.16: Slope stability options – Tension crack tab. 

The following properties are available in this tab: 

 Number of points 
 Initial DX and DZ for search 
 Left horizontal search limits (XLmin and XLmax) 
 Right horizontal search limits (XRmin and XRmax) 
 Maximum number of iterations per search point 
 
 
 

DEEP EXCAVATION  222 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.13.2 Soil nailing
 
Soil nails can be used to reinforce the slope surface and prevent failure. A single soil nail or nail 
group can be added to the model (Figures 3.13.16 and 3.13.17 respectively). By double-clicking 
on a single soil nail, the Edit soil nail dialog appears, where we can modify the nail’s properties. 

Figure 3.13.16: Add a single soil nail to the model. 

Figure 3.13.17: Add a soil nail group to the model. 

In the general tab of the Edit soil nail dialog (Figure 3.13.18) we can set the soil nail’s position 
on the slope, the nail free and fixed length and the nail installation angle. In addition, the user 
defined the head plate angle and the structural section of the nail can be defined. By pressing 
the Edit button (Figure 3.13.19) the Tieback Anchors – Sections dialog appears, where the 
user can choose the strand sections for the soil nail. Next, the user can choose to use capacity 
loss due to corrosion, as well as some other analysis options (Figure 3.13.20). 

DEEP EXCAVATION  223 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.13.18: Edit soil nail dialog.

Symbol Description 
X  The start X-coordinate of the soil nail 
Z  The start Z-coordinate of the soil nail 
Lfree  The soil nail’s free length 
Lfix  The soil nail’s fixed length 
a  The soil nail’s installation angle 
Horizontal Spacing  The soil nail’s horizontal spacing 
β  The cover plates angle 
 

The following options are also available: 

 Define the structural section of the soil nail and choose to edit it 
 Choose to use capacity loss. Then, the user has to define the following properties: 
 The thickness loss tC, or 
 The capacity loss as a percentage of the total capacity. 
 Choose to activate or deactivate the support in the current stage. 
 Define whether the support is permanent or not (affects results when a design approach 
is used). 
 Choose to use only external load analysis for the soil nail. 
 Choose to include shear when the nail is intersected by a failure surface.

DEEP EXCAVATION  224 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.13.19: Edit soil nail section. 

Figure 3.13.20: Analysis options. 

DEEP EXCAVATION  225 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the results tab of dialog (Figure 3.13.21), we can see the following results: 

Figure 3.13.21: Results options.

Symbol Description 
Paxial  Axial force of the nail 
M  Moment of the nail 
Po. At face  Reaction at the facing of the nail 
Pmax.mob  The mobilized axial force of the nail 
Pmax. stage  Maximum reaction for current stage 
Pmax. All stages  Maximum reaction of all stages 
Pmax. Global  Maximum reaction of all linked design sections 
Pgeo. Design  Geotechnical design capacity 
P geo. ultimate  Geotechnical ultimate capacity 
Pdesign  Structural design capacity 
Pult  Structural ultimate capacity 

DEEP EXCAVATION  226 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the detailed results tab of the Edit soil nail dialog (Figure 3.13.22) we can see the following 
results in a tabulated format:

Figure 3.13.22: Detailed results options.

 Tension: This  column  contains  the  tension  of  the  soil  nail  because  of  the  critical  slope 
surface.

 Tension max:  This  column  contains  the  maximum  tension  that  occurs  to  this  soil  nail 
because of all slope surfaces that intersect this nail.

 Tension Capacity STR: This column contains the geotechnical (pullout) capacity of the soil 


nail.

 Critical Shear GEO: This column contains the minimum shear from those calculated from 


the three criteria (see below).

 Shear Capacity STR: This column contains the structural shear capacity.

 Shear C2: This column contains the shear as calculated from the three criteria (C1, C2, C4)  
(see slope stability manual, pages 31 – 33).

 Shear C3: Same as above.

 Shear C4: Same as above.

DEEP EXCAVATION  227 

 
DEEPEX 2018 – USER’S MANUAL 
 

 Shear C4 LE: Same as above (LE: Limit equilibrium analysis)

 Modulus ks: This column contains the lateral subgrade reaction modulus at the critical 
intersection surface point.

 Lateral pressure: See slope stability manual, page 31.

 Ultimate lateral pressure: See slope stability manual, page 31.

 Length:  This  column  includes  the  calculated  transfer  length  of  the  soil  nail  at  the 
intersection with the critical slope surface.

 Ixx calc: This column includes the calculated moment of inertia of the nail (includes all 
reductions for corrosion etc).

 Sxx calc: This column includes the section modulus (European designation is Wel)

 Thickness loss: This column includes the soil reinforcement thickness loss.
 % STR loss: This  column  includes  the  percentage  of  structural  capacity  loss  (when 
corrosion is included).

DEEP EXCAVATION  228 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.14 Data entry: Wale beams
 
In DeepEX, it is possible for to add walers to supports. DeepEX calculates the capacity and the 
loads of the installed walers. Wale beams are added at the connection points of the supports with 
the walls. In order to install a new waler, we first have to install a support. Next, by pressing the 

Wales  button   in  the  Loads/supports  menu  and  choosing  the  support,  the  Wales  dialog 
appears (Figure 3.14.1). In this area we can choose the loading type of the waler. Several loading 
cases are included, using point or uniform loads. These cases are presented in the following table. 

In this dialog the user can: 

 Edit the waler name. 
 Define the section used for the waler and edit it. 
 Define the vertical spacing of the waler amongst: 
 Use support spacing 
 Use wall spacing 
 Use a user defined value 
 Define the axial force amongst: 
 Use zero axial force 
 Use as axial force a percentage of support reactions 
 Use a user defined value 
 Define the loading type: 
 Use point loads (ideal for soldier pile walls) 
 Use uniform loads
 

DEEP EXCAVATION  229 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.14.1: The waler dialog. 

DEEP EXCAVATION  230 

 
DEEPEX 2018 – USER’S MANUAL 
 

Point load type 0 

Point load type 1 

Point load type 2 

Point load type 3 

Point load type 4 

DEEP EXCAVATION  231 

 
DEEPEX 2018 – USER’S MANUAL 
 

Point load type 5 

Uniform type 0 

Uniform type 1 

Uniform type 2 

Uniform type 3 

Uniform type 4 

DEEP EXCAVATION  232 

 
DEEPEX 2018 – USER’S MANUAL 
 

Uniform type 5 

Uniform type 6 

Uniform type 7 

Uniform type 8 

 
 

Next, we can choose the wale section by pressing the Edit button (Figure 3.14.2). The user can 
select among using a steel or a concrete section waler (Figures 3.14.3 and 3.14.4 respectively).  

DEEP EXCAVATION  233 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.14.2: The edit waler section button. 

Figure 3.14.3: Steel section. 

DEEP EXCAVATION  234 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.14.4: Concrete section. 

By choosing to use a steel section, the following options are available: 

 Use multiple beams: With this selection, more than one beams can be used to the same 
support. These beams can be used with a clearance or without one. 
 Autorotate  the  waler:  This  is  possible  for  some  kinds  of  supports  (tiebacks,  spring 
supports), and only if more than one beams are used. The waler can be installed using the 
support’s angle (Autorotate), or the user can define a custom angle (Figure 3.14.5). For 
other kinds of supports, the waler is installed horizontally (Figure 3.14.6). Rotation is used 
only for steel section beams.

Figure 3.14.5: Rotated wale beam, used with a tieback. 

DEEP EXCAVATION  235 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.14.6: Horizontal wale beam, used with a raker. 

 Enable manual change of steel section properties: With this option, the user can modify 
manually the waler’s properties (the steel beam properties and options are the same as 
described in paragraph 3.7.1.).
 

By choosing to use a concrete section (Figure 3.13.7), the user has to define the reinforcement 
properties. These properties are presented in the table below. 

Symbol Description 
D  Waler height (thickness) 
A  Area of section 
B  Waler base dimension 
N  Number of bars 
Bar#  Reinforcement bars 
As, top  Top reinforcement area 
As, bot  Top reinforcement area 
Ctop  Top clearance (to center of top bar) 
Cbot  Bottom clearance (to center of bottom bar) 
sV  Vertical spacing for shear reinforcement 
sH  Horizontal spacing for shear reinforcement 
 

DEEP EXCAVATION  236 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.14.7: Concrete section beam, used with a raker. 

Figure 3.14.8: The waler dialog - results. 

DEEP EXCAVATION  237 

 
DEEPEX 2018 – USER’S MANUAL 
 
Symbol Description 
Paxial  Axial force on the waler 
Mspan XX  Span moment along X-axis 
Msup XX  Moment along X-axis at support location 
Mspan YY  Span moment along Y-axis 
Msup YY  Moment along Y-axis at support location 
Vxx  Shear along X-axis 
Vyy  Shear along Y-axis 
Pcap  Axial capacity  
Mx cap  Moment capacity along X-axis 
My cap  Moment capacity along Y-axis 
Vxcap  Shear capacity along X-axis 
Vycap  Shear capacity along Y-axis 
 
 
 
 
 

DEEP EXCAVATION  238 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.15 Data entry: Heel blocks (passive heel blocks)
 
Concrete heel blocks are used as passive elements that transfer raker forces to soil. In DeepEX a 
heel block can be connected to one or more raker at the same time. DeepEX considers the net 
horizontal  force  balance  on  the  heel  block.    For  calculating  the  safety  factor  against  sliding, 
DeepEX calculates the active and passive earth forces on each heel block side. Passive and active 
earth forces are computed using an average surface angle according to Coulomb theory with no 
wall friction. Wall friction is ignored for heel blocks since the increased passive resistance can only 
be realized at considerably greater displacements. DeepEX does not consider the bearing capacity 
of a heel block in the vertical direction. 

Figure 3.15.1: Heel block with rakers 

Figure 3.15.2: Heel blocks data and heel block input 

DEEP EXCAVATION  239 

 
DEEPEX 2018 – USER’S MANUAL 
 
Then the acting raker forces on the heel block are summed and the available base shear resistance 
is computed.  

Heel block input includes:

Parameter Description 
Top width Btop  Heel block width at top 
Bottom width Bbot  Heel block width at base <= Btop 
Heel block height H  Heel block height 
Z  Heel block elevation at top 
X  X coordinate of heel block, refers to vertical face where active 
earth pressures are acting 
Passive on left side  If this option is selected, then the slanted face of the heel block 
is on the left side and the reference X point is on the right. 
Heel block is continuous   If  this  option  is  selected,  then  the  heel  block  is  treated  as 
continuous. Otherwise, the block is treated as a 3D shape. 
Horizontal spacing S  The horizontal spacing of 3D shaped heel blocks (non-continuous 
heel blocks) 
Length L  Heel block length (into page) for 3D shaped heel blocks. L<=S 
Base-soil  friction  ratio  (0  to  This is the ratio of the available concrete to soil friction ratio at 
1)  the  base.  The  parameter  is  used  to  compute  the  base  shear 
resistance due to soil friction. Typical values do not exceed 0.67 
(or 67% of available soil friction). 
Base adhesion ration (0 to 1)  In cohesive soils, adhesion can form between the heel block base 
and the base soil. Values of 0.5 is commonly used. Care should 
be taken that the entire heel block base is in compressive contact 
with the heel block. 
3D Wedge effect m3  m3  is  a  factor  that  increases  the  available  passive  resistance 
width to account for 3D effects (3D blocks). The factor increases 
the width on each side of the heel block by m3 x the heel block 
height.  Hence, the passive width is taken as: 
s.pass = L + 2 * m3 * H <= S  
 

 
 
 

DEEP EXCAVATION  240 

 
DEEPEX 2018 – USER’S MANUAL 
 
3.16 Data entry: Waler supports
 
Waler supports are a new feature available from the 2012 version. Waler supports are used as 
lateral  supports  that  can  model  box  type  and  circular  shaped  lateral  braces  (in-plan).  Waler 
supports use wale sections and additional shape information that is defined in the Waler Support 
dialog. In the non-linear analysis 
 
DeepEX now includes the ability to include box type and circular waler supports. Very often, in 
smaller excavations a box type waler support may be used. In such a case, other types of supports 
may not be required as the box can be self-supporting through bending and axial forces. A waler 

support can be added by clicking on the    button on the Load/Supports menu, and then by 
selecting the wall where the waler support can be applied. Waler supports use waler sections for 
structural properties: 

Figure 3.16.1: Support data form for waler support 

By clicking on the edit button in the support form we can change the waler properties. The first 
selection should be on the waler type i.e. box type or circular. The choice of shape type affects 
structural and stiffness calculations. For box type walers, the equivalent stiffness is computed at 
the center of the span according to assumed bending shape and deflection shape for a uniform 
loaded beam (simple span or fixed ends). In each case, the used equations for computing the 

DEEP EXCAVATION  241 

 
DEEPEX 2018 – USER’S MANUAL 
 
waler spring stiffness and bending moments are presented within the input dialog according to 
the selected shape. The waler bending is examined at both the waler ends as well as at the waler 
span. 

For box type walers, the length L is used for calculating the bending moments, and the width B is 
used for computing the axial force on the examined waler. A separate model may be required if 
we need to examine the B side with the waler L & B dimensions reversed.  

Figure 3.16.2: Input dialog for box-type waler supports 

DEEP EXCAVATION  242 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 3.16.3: Input dialog for circular type waler supports 

The unsupported length is considering bending and bucking in the vertical axis where normally 
additional  vertical  support  is  provided.  If  no  additional  vertical  support  is  provided,  then  this 
dimension should be equal to the length L. 

For circular walers, the length L is used to define the number of elements within the circular waler 
arrangement. This length may be later adjusted during calculation time so that the waler sections 
fit within the prescribed shaft radius in an integer number (i.e. we cannot have 4.6 waler sections, 
that  would  have  to  be  rounded  to  5).  The  shaft  radius  can  be  computed  automatically  (the 
program looks for the excavation side) or can be input by the user. The equivalent stiffness is 
computed from radial action theory and is affected by the effective modulus of elasticity, the shaft 
radius, and waler section area. 

Because of setup and other issues, it is typical to use stiffness adjustments for waler supports 
especially for concrete sections. As such, the program includes two stiffness modification factors, 
one for concrete walers and one for steel walers. The factors are used to modify the assumed 
elasticity modulus for the specific waler support.  

Last,  eccentricity  issues  (due  to  construction  variations)  may  also  be  important  with  waler 
supports. For this reason, the program suggests an eccentricity in the horizontal axis of 3% or 
minimum 10cm (3 inch). This eccentricity is applied as an additional bending moment on the span 
section. These values can be modified according to user preferences. 

DEEP EXCAVATION  243 

 
DEEPEX 2018 – USER’S MANUAL 
 
Parameter Description 
Length L  The in-plan waler support length (into the page) 
Width B  The in-plan waler width (parallel to the x axis) 
Unsupported length  The unsupported length in the vertical axis 
Stiffness adjustments  Modification  of  the  modulus  of  elasticity  in  the  non-linear 
analysis to account for installation and other effects 
Eccentricity (%)  Minimum  eccentricity  for  axial  loads  in  X  direction  as  a 
percentage of the waler section depth 
Min. eccentricity  Minimum eccentricity for axial loads in X direction in inches or 
cm. 
Beam bending type  Option controls how waler support beam is treated. This option 
affects maximum positive and negative moments, as well as the 
beam stiffness. 
 
 
 

DEEP EXCAVATION  244 

 
DEEPEX 2018 – USER’S MANUAL 
 
 

 
 

CHAPTER 4: MODIFYING MODELS & VIEWING RESULTS


 

DEEP EXCAVATION  245 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.1 Modifying surface elevations
 
DeepEX  includes  powerful  features  and  versatile  options  for  modeling  surface  elevations  and 
sections. Elevations and points can be modified with the following options:
 

 Double click on a surface point: This gives the possibility to modify the point’s 
coordinates (Figure 4.1.1).
 

Figure 4.1.1: Modify single point’s coordinates. 

 Select to set a bench or slope surface (Figures 4.1.2 and 4.1.3 respectively), by clicking 
on the right selection at the Surface options button of the Model menu (Figure 4.1.4), or 
by right clicking on the model interface (Figure 4.1.5).  The forms that create the slope or 
bench surfaces are presented in paragraph 2.5.
 

Figure 4.1.2: Left slope surface. 

DEEP EXCAVATION  246 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.1.3: Left slope surface. 

Figure 4.1.4: Surface options. 

DEEP EXCAVATION  247 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.1.5: Right click on the model. 

The following options are available:

Icon Description 
Resets global surface levels 
Sets right surface level 
Sets left surface level 
 
Table of coordinates of surface points 
 
Create a bench on the left side 
 
  Create a slope on the left side 
  Create a bench on the right side 
  Create a slope on the right side 
Resets global surface levels 
 
Sets right surface level 
 
Sets left surface level 
 
 

DEEP EXCAVATION  248 

 
DEEPEX 2018 – USER’S MANUAL 
 
 By pressing the Table of coordinates selection of the surface options (Figure 4.1.4), the 
Table of coordinates dialog appears (Figure 4.1.6). This dialog contains the coordinates of 
all surface points. The user can then modify them here, and add or remove points within.
 

Figure 4.1.6: Table of coordinates dialog. 

 We can perform an excavation or a backfill operation from the icons of the toolbar at the 
left side of the screen (see paragraph 2.3.1). Then, by clicking on several points on the 
screen, the user can perform these operations (Figures 4.1.6 and 4.1.7). The backfill or 
excavation can be completed by pressing enter.
 

Figure 4.1.6: Excavation operation using the Excavation operation tool. 

DEEP EXCAVATION  249 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.1.7: Backfill operation using the Backfill operation tool. 

4.2 Adding supports graphically


 
Supports in DeepEX can be added graphically, that is the user has to draw the support first by 
selecting the appropriate tool. Instructions, on specific supports are provided in the following 
table.  
 
Toolbar
Description 
Icon

Adds a tieback support (you have to click at the main stage form to graphically add 
the tieback). A tieback can also be used to connect two walls. In this case the 
 
tieback will be treated as a tie rod. 

Adds a strut support (you have to click at the main stage form to graphically add the 
  support). Struts can also be used to connect two opposite walls. 

Adds a raker support. DeepEX treats rakers as inclined struts. WARNING: USER 
MUST ENSURE THAT THE RAKER FALLS OUTSIDE PASSIVE ZONE OF INFLUENCE FOR 
RAKERS TO BE PRACTICALLY EFFECTIVE. DEEP DOES NOT AUTOMATICALLY ADJUST 
  RAKER REACTIONS IF A RAKER FALLS WITHIN THE PASSIVE ZONE. HOWEVER, FOR 
SLOPE STABILITY, DEEP WILL IGNORE A RAKER IF IT ENTIRELY FALLS WITHIN THE 
SEARCH SURFACE (OR CIRCLE) 

Adds a slab support (you have to click at the main stage form to graphically add the 
  support). Slabs can also be used to connect two opposite walls. 

DEEP EXCAVATION  250 

 
DEEPEX 2018 – USER’S MANUAL 
 
Adds a fixed support (you have to click at the main stage form to graphically add 
  the support). 

Adds a spring support(you have to click at the main stage form to graphically add 
  the support). 

Example: Add a Tieback


Step 1: Click on Add a tieback Icon
Step 2: Click location on wall (Figure 4.2.1)
Step 3: Click second point of tieback (end point in soil).
Step 4: The Support Edit dialog appears. Refine the new tieback support and click the OK
button.
The support is successfully inserted to the model (Figure 4.2.2). To change the supports
properties, double click on the support, or select it from the tree menu.

         
Figure 4.2.1: Click on the wall (step 2).                         Figure 4.2.2: Placed tieback. 

DEEP EXCAVATION  251 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following figures present a tieback connecting two walls, a slab and a strut support. To install 
these supports, the steps of the previous example have to be followed. 

Figure 4.2.3: A tieback connecting two walls. 

Figure 4.2.4: A slab connecting two walls. 

Figure 4.2.4: A strut connecting two walls. 

DEEP EXCAVATION  252 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.3 Adding Surcharges Graphically
 
Surcharges and line loads in DeepEX can be added graphically. The user has to draw the surcharge 
first  by  selecting  the  appropriate  tool.  Instructions,  on  specific  supports  are  provided  in  the 
following table. DeepEX uses equations by DM7.2, Poulos & Davis, and Kelvin to calculate the 
horizontal surcharge stress q on the wall. The methods and are most appropriate for loads on 
horizontal  surfaces,  but  is  most  cases  yield  satisfactory  results  for  non-level  surfaces.  DeepEX 
integrates the horizontal and the vertical component of each surcharge. You can vary the load 
magnitudes for the same surcharge for different stages. 

Adds a Surface Surcharge. A Surface surcharge is a strip surcharge that 
can have its elevation changed for different stages (automatically 
adjusted to the surface elevation) but has always the same horizontal 
coordinates. The surcharge can have both a horizontal and a vertical 
component. 
  You need to define a surcharge by two points (this creates a default 1.0 
kPa load). Then in order to modify the surcharge, double click on it and 
the Edit Distributed Load dialog appears. 

Adds a Surface Line Load. Surface line loads are treated in the same way 
as surface surcharges. To modify a Surface Line Load, double click on it. 
Adds a Wall Surcharge. A Wall surcharge is a strip surcharge applied 
directly on the wall.  
You need to define a wall surcharge by clicking on two points on 
  the wall (this creates a default 1.0 kPa load). Then in order to modify the 
surcharge, double click on it and the Edit Surcharge dialog appears. 

Adds a Wall Line Load. Surface line loads are treated in the same way as 
wall surcharges. To modify a Surface Line Load, double click on it. 
Adds a three-dimensional footing load. Once you select the button then 
you must click on the main form at the location where you want the center 
  of the footing to be. Then the edit footing form automatically launches, 
and you can specify all the parameters for this footing load. 
 

DEEP EXCAVATION  253 

 
DEEPEX 2018 – USER’S MANUAL 
 
Example: Adding a Surcharge
Step 1: Click on Add a Surface Surcharge icon (Figure 4.3.1)
Step 2: Click first location for surcharge (Figure 4.3.2)
Step 3: Click second location for surcharge (Figure 4.3.3)
Step 4: Double click on new surcharge at form to launch the Surcharge Edit menu and refine
the new surcharge.
The surcharge is successfully inserted to the model (Figure 4.3.4). To change the supports
properties, double click on the support, or select it from the tree menu.

              
Figure 4.3.1: Add a surcharge tool (step 1).            Figure 4.3.2: Select first point (step 2). 

        
Figure 4.3.3: Select end point (step 3).                   Figure 4.3.4: Placed surcharge 

DEEP EXCAVATION  254 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.4 Viewing Results on Main Form

Once a project is analyzed, results can be viewed on screen by selecting one or more of the 
Toolbar Icons shown below. Full icon description and associated examples are also shown in the 
following Exhibits. 
 

Icon Description 

  Shows the Wall embedment Safety Factors 

  Shows the Global Slope Factor of Safety 

  Shows the Global Slope Factor of Safety Contours 

  Shows the results for slope stability slices 

Shows all slope stability results 
 

  Draws the bending moment diagram of the wall on the main model screen. 

  Draws the shear force diagram of the wall on the main model screen. 

  Draws the axial force diagram of the wall on the main model screen. 

  Draws the wall deflections on the main model screen. 

Draws the Surface settlements on the main model screen. 
 

Shows the support reactions on the main model screen. 
 

Shows the combined capacity ratio (Moment and Axial force) on the main 
  model screen. 

Shows the moment capacity ratio on the main model screen. 
 

  Shows the shear capacity ratio on the main model screen. 

  Shows the structural capacity on the main model screen. 

  Shows the wall moment capacity on the main model screen. 

DEEP EXCAVATION  255 

 
DEEPEX 2018 – USER’S MANUAL 
 
  Shows the wall shear capacity on the main model screen. 

  Draws the effective horizontal soil pressure on the main model screen. 

  Draws the total vertical stress on the main model screen. 

  Draws the effective vertical stress on the main model screen. 

  Draws the net total wall pressures on the main model screen. 

  Draws the wall surcharge on the main model screen. 

  Draws the seismic pressures on the main model screen. 

  Draws the net water pressure on the main model screen. 

  Draws the water pressure on walls 

Hydraulic gradient 
 

Shows Minimum – Maximum values on the diagrams. 
 

Shows  envelope  of  moments  and  support  reactions  when  moments  or 
  support reaction results are displayed. 

Loads the result tables. 
 

  Shows the water pressure shadings. 

  Draws the water head shadings. 

  Draws the water head grid. 

  Shows the hydraulic safety factor. 

  Draws the total vertical stress shadings 

  Draws the effective vertical stress shadings 

 
 
 

DEEP EXCAVATION  256 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following figures show some typical on screen output diagrams and results. Output results 
can be visible only if the given problem has been analyzed. Feel free to explore the functionality 
of these toolbars. DeepEX can stack the result diagram axes so this way multiple results can be 
visible at the same time for direct comparison. However, you should try to keep the output as 
simple as possible. 

Figure 4.4.1: Viewing the critical slope stability rupture surface

Figure 4.4.2: Typical moment diagram.


 

DEEP EXCAVATION  257 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.4.3: Typical shear diagram.

Figure 4.4.4: Support reactions.


 

DEEP EXCAVATION  258 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.4.5: Wall deflection.

Figure 4.4.6: Surface settlement.


 

DEEP EXCAVATION  259 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.4.7: Effective horizontal soil pressures (limit equilibrium).


 

Figure 4.4.8: Water pressures.


 

DEEP EXCAVATION  260 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.5 Report Options (Printed Reports)
Once  a  project  is  analyzed,  full  analysis  reports  can  be  generated  by  selecting  the  Reports  – 
Options option at the Report tab. By selecting this, we can modify the included output sections. 
On the left side of the dialog, we can select which design sections and stages will be included in 
the  current  report  (Figure  4.5.1).  From  the  Available  Report  Sections  area,  we  can  select  the 
results and options that shall be included (Figure 4.5.2). We can also drag and drop these items 
at the Report Format area (Figure 4.5.3).  Next, the user can select to see a preview of the report 
and export it in a word or PDF format at the area indicate in Figure 4.5.3.

Figure 4.5.1: The included Design Sections area.

Figure 4.5.2: The Available Report Sections area.

DEEP EXCAVATION  261 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.5.3: The Report Format area and the preview and export buttons. 


 
 

DEEP EXCAVATION  262 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.6 Footing Loads (3-Dimensional Loads)
In many cases the effects of three dimensional loads on the wall have to be evaluated. In DeepEX 
footings can be used to define three dimensional loads that can vary in magnitude for any desired 
stage.  DeepEX  offers  a  number  of  useful  alternatives  for  evaluating  the  effect  of  three-
dimensional loading on excavation walls. The theoretical solutions of elasticity are truly applicable 
for  level  surfaces,  however,  in  the  absence  of  any  other  exact  closed  form  solution  many 
practicing  engineers  use  these  methods  for  non-level  ground  surfaces.  Caution  should  be 
exercised, and the limitations recognized when dealing with non-level surfaces.
Parameter Description 

X  The x coordinate of the footing (center) 
The y coordinate of the footing (out-of-plane) or 3D coordinate at the 

footing center. 
Elevation (the elevation is automatically adjusted for surface footings) at 

the current surface elevation for each stage. 
T  Footing thickness (not used for calculations) 
Bx  Footing width along X axis. 
By  Footing width along Y axis (out-of-plane, or into screen) 
Θ  Counter clockwise in-plan footing rotation in degrees. 
L  Column length (graphical) 
Select this option to model the footing as a point load for calculating lateral 
surcharges.  When selected, the following options are available: 
 Use default program equations
With this option the Boussinesq solution is used when the footing is 
at the surface, and Mindlin's solution is used when the footing is 
below the surface. A Poisson’s ratio of 0.25 is used.
 Use Boussinesq solution (flexible walls, x m loads) 
Treat footing as   Use Terzaghi method (considers rigid walls and Hwall) 
point load   Use DB33/T1008-2014 solution (uses m=2 for rigid walls) 
 
When this option is not selected, then DeepEX uses the Holl 1940 solution 
for rectangular loads as outlined in Poulos & Davis, 1974.  
This solution is independent of the Poisson’s ratio. The method is 
applicable for loads that are on a level surface, however, in the absence of 
a detailed closed form solution for rectangular loads beneath the ground 
surface Holl's solution is also used for loads beneath the ground surface. 
Select this option if you want to average the load over the maximum 
support spacing. With this option DEEP averages the surcharge from (y - 
Average load 
maximum support spacing/2) to (y+maximum support spacing/2). The 
over support 
surcharge is calculated every Dyw increment. A minimum of nMin intervals 
spacing 
are used. 
 

DEEP EXCAVATION  263 

 
DEEPEX 2018 – USER’S MANUAL 
 
DX  (Not used in this version) 
DY  (Not used in this version) 
nMin  Minimum number of intervals along y axis for computing stresses.  
Interval for calculating stresses when load is averaged over maximum 
Dyw 
support length. 
 

Figure 4.6.1: The footing options dialog General tab.


 

DEEP EXCAVATION  264 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 4.6.2: The footing options dialog Advanced 0ptions.

DEEP EXCAVATION  265 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.7 Buildings, Building Wizard and Building Damage Assessment Module
 
Excavations are often constructed next to existing buildings that can potentially exert significant 
loads on the retaining system. Thus, building loads have to be properly accounted for. Estimating 
building loads can be a very time-consuming effort. DeepEX can  make such estimations much 
easier with the building wizard option.  

To create a new building simply select the option from the loads drop down option in the General 
tab of DeepEX and click on the desired point where you want to add the building. Once we do so 
the building wizard launches as shown below: 

Figure 4.7.1: General building dimensions.

Parameter/Icon Description 

  Adds a three-dimensional building 

Xo  The right x coordinate of the building (center)

The y coordinate of the footing (out-of-plane) or 3D coordinate at the 
Yo 
footing center. 

Grade Elevation  Elevation of the ground floor. 

Θ  Building rotation. 

DEEP EXCAVATION  266 

 
DEEPEX 2018 – USER’S MANUAL 
 
Width along X axis Building width along the x axis direction. 

Width along Y axis  Building width along the y axis direction (out of plane)  

Number of superstructure floors including the ground floors not including 
nF 
the building roof. 

nFb 
Number of basement floors (below grade elevation)
Building height H  Building height above grade elevation 

Basement depth 
Basement depth to top of footings (bottom of base slab) 
Hb 

Number of 
Number of building columns in X direction 
columns in X 

Number of 
Number of building columns in Y direction 
columns in Y 

Figure 4.7.2: Floor loads and options.

DEEP EXCAVATION  267 

 
DEEPEX 2018 – USER’S MANUAL 
 
Parameter/Icon Description 

Floor Live load  Live load on each floor (may be different for basement floors) 

DEEP does not automatically calculate the dead load of each floor based 
on the thickness. While such a calculation is easy it is felt that a proper 
Floor Dead load  estimation of the floor dead load has to be manually performed and must 
include many items such a tiling etc. that are outside the scope of the 
current version of DEEP. A different dead load can be included for the 
basement floors.

Floor Thickness  Floor thickness for graphical reasons only 

Check this option to use floor beams under each side of each floor 
Use floor beams  between columns. The dead load of each floor beam is calculated based on 
its density and section area. 

Floor beam Bx  Building width along the x axis direction. 

Floor beam By  Building width along the y axis direction (out of plane)  

Floor beam  The section area can be manually changed to include hollow beams and 
Section area  non-rectangular shapes. This area is used for dead load calculations. 

Floor beam  The floor beam density is initially set equal to the concrete density. You 
density.  may use a different density to simulate other materials. 

All loads in DeepEX are eventually transferred to rectangular footings. While not every footing in 
the real world is rectangular, this simplification captures most cases. The 3rd tab gives the option 
to define the footing dimensions (Figure 4.7.3). Please note that DeepEX assumes that all footings 
are made of concrete and calculates the dead load of each footing based on its dimension. Also, 
DeepEX gives the option to include grade beams that connect all building footings. 

DEEP EXCAVATION  268 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.7.3: Footing options for buildings.

Parameter/Icon Description 

X  Width along X axis footing dimension 

Y  Width along Y axis footing dimension

Thickness  Footing thickness 

Use grade beams  Check this option to use grade beams to connect footings 

Grade beam Bx  Grade beam width along the x axis direction. 

Grade beam By  Grade beam width along the y axis direction (out of plane)  

Use mat 
foundation for  Check this option to use a mat foundation for this building 
building 

DEEP EXCAVATION  269 

 
DEEPEX 2018 – USER’S MANUAL 
 
Floor  loads  are  eventually  transferred  to  footings  with  the  help  of  building  columns.  Column 
dimensions and other parameters can be defined from the 4th tab (Figure 4.7.4). 

Figure 4.7.4: Building column options.

Parameter/Icon Description 

Bx  Width along X axis column dimension 

By  Width along Y axis column dimension

Radius  Column radius (if the circular columns option is selected) 

Section Area  The section area of the column 

Material  The material of the column 

Density  The density of the column  

 Most buildings have walls. In order to better simulate building loads, DeepEX gives you the option 
to simulate different exterior, interior and basement walls. Wall loads are calculated from the wall 
area times the density. The open wall space can be used to simulate doors, windows, and other 
openings that do not have any dead load. 

DEEP EXCAVATION  270 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.7.5: Building wall options. 

Here the user has the following options: 

 Building has exterior basement walls. If the user checks this option, he can define the walls 
thickness and density, as well as the wall’s color. 
 Building has exterior superstructure walls. If the user checks this option, he can define the 
walls thickness and density, as well as the wall’s color. 
 Building has interior walls and partitions. If the user checks this option, he can define the 
walls thickness and density, as well as the wall’s color. 
 
 
In the advanced tab (Figure 4.7.6 below), we have the option to include relief load calculations. 
By checking this option, DeepEX removes the effect of soil’s dead load on the surcharge stresses 
since this soil is removed in order to create the basement. This is done with elastic solutions by 
averaging the vertical stresses on all building corners. 

DEEP EXCAVATION  271 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.7.6: Advanced building options. 

Building footings can be edited by right clicking on them from the plan view (Figure 4.7.7). If a 
footing  is  moved  or  its  dimensions  changed,  and  building  loads  will  be  changed  (if  the  user 
decides to do so). All column loads are calculated based on approximate tributary areas from each 
supported floor. At the same time, the building will be saved is a long format since it is not fully
rectangular.  

Finally, on the bottom of the Building Wizard dialog, user can define if any of the exterior walls is 
continuous, as well some additional damage assessment options. User can define whether the 
damage assessment will not be performed, as well as if it is going to be based on the selected 
design section or an already created 3D Model (3D Frame Analysis module should be purchased 
for this option to be available). 

 
Figure 4.7.7: Building Damage Assessment options. 

DEEP EXCAVATION  272 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.8 Surcharge load options

By selecting the option  in the loads drop down menu of the General tab of 
DeepEX, we can define the method that the surcharges (linear or distributed) will be considered 
in the limit equilibrium analysis method. The software offers the following options: 
1. Elasticity equations 
2. Two-way distribution angle, as presented in Figure 4.8.1. 

 
Figure 4.8.1: Two-way distribution angle approach for surcharge effects. 
3.   One-way distribution angle, as presented in Figure 4.8.2. 

 
Figure 4.8.2: One-way distribution angle approach for surcharge effects. 
4. One-way distribution angle from soil PHI. 

DEEP EXCAVATION  273 

 
DEEPEX 2018 – USER’S MANUAL 
 
In the Elastic load options dialog (Figure 4.8.3) user can choose the external load analysis method, 
define the angle and the elastic parameter m, as well as choose to use equations with wall rigidity 
when applicable.  

 
Figure 4.8.3: Load analysis method dialog. 
 
 
 
 
 
 
 
 
 
 
 
 
 
EXAMPLE

DEEP EXCAVATION  274 

 
DEEPEX 2018 – USER’S MANUAL 
 
We present a case with a single vertical load surcharge, applied on 5ft distance from a diaphragm 
wall,  analyzed  in  DeepEX.  We  created  3  identical  design  sections.  The  surcharge  has  been 
considered in each case as described in the following table: 
Design Section Surcharge analysis method
1  Elasticity equations 
2  Two-way distribution angle 
3  One-way distribution angle 
 
Figure  4.8.4  presents  the  model  of  the  problem,  also  containing  the  soil  and  wall  properties. 
Figures 4.8.5 to 4.8.7 present the surcharge diagrams in each design section. 

 
Figure 4.8.4: Model in DeepEX. 
 
 
 

DEEP EXCAVATION  275 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 4.8.5: Surcharge on wall diagram – Elasticity equations. 

 
Figure 4.8.6: Surcharge on wall diagram – Two-way distributed method. 

 
Figure 4.8.7: Surcharge on wall diagram – One-way distributed method. 
 

DEEP EXCAVATION  276 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.9 Project cost module
 
As previously mentioned, the DeepEX cost module is not supposed to produce an exact project 
cost. The main idea behind the module is to be able for each individual to quickly evaluate the 
effect on pricing of various alternatives. Cost profile can be customized and stored in a database. 
Taking  into  consideration  as  many  parameters  as  possible,  DeepEX  produces  a  1st  order 
approximate cost estimate.  The following figures and tables present the various options available 
within the cost estimation options dialog:
- City Multipliers: Basic city and country cost multipliers 
A cost multiplier is a factor that can account for local city or state variations compared to 
the  standard  database.  These  factors  are  expressed  as  percentages.  In  most  cases  one 
should use 100%. 
 

Figure 4.9.1: City multipliers tab page. 


 
Define the Country, State and City name 
Add the area Zip Code 
Define partial cost multipliers for material and installation, or a total one 
Choose the currency for the cost estimation 
Define the conversion factor from Dollars to selected currency 
Choose to refresh currency list 
Option to convert values when changing currency 
Option to load a DeepEX Cost file 
Option to save a DeepEX Cost file 

DEEP EXCAVATION  277 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Wall: Cost data for wall construction works (installation and materials). 

Figure 4.9.2: Wall tab page. 


This tab page includes the following options: 
 
Define costs for soldier piles (driven piles, drilled in piles, lagging cost) and pile diameter 
Define costs for diaphragm wall (trenching soil, trenching rock, concrete Tremie) and wall depth 
Define costs for driven sheet piles (leave in peace, extract and salvage) and wall depth 
Define costs for secant pile walls (tangent piles, secant piles) and wall depth 
Define the soldier pile lagging cost 
Define the sheet pile material cost 
Define the diaphragm wall material cost 
Option include a multiplier for obstructions 
Option use size cost factors 
Option to allow or not values smaller than 1 for size cost factors 
Option to select from database (see Figure 4.8.3) 
 

DEEP EXCAVATION  278 

 
DEEPEX 2018 – USER’S MANUAL 
 
If we choose to select costs from database, the dialog in Figure 4.8.3 appears. In this dialog we 
can select the wall type, crew number and costs from the available database. 

Figure 4.9.3: Costs database.

- Tiebacks: Installation and material costs for ground anchors (tiebacks).

Figure 4.9.4: Tiebacks tab page. 

DEEP EXCAVATION  279 

 
DEEPEX 2018 – USER’S MANUAL 
 
This tab page includes the following options: 
 
Define soil type and drilling cost 
Option include a multiplier for obstructions 
Define rock type and drilling cost 
Option use size cost factors 
Option use cost for each header assembly 
Define strand type and cost 
Define grout material and installation cost and grout overpour 
Option to select from database 
 

- Struts: Material and installation costs for struts (and rakers).

Figure 4.9.5: Struts tab page. 

This tab page includes the following options: 
Define cost for low strength and high strength struts 
Define installation cost 
Option to select from database 
Steel material costs defined here are also used for other steel members when appropriate. 

DEEP EXCAVATION  280 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Slabs: Installation and material costs for slab supports.

Figure 4.9.6: Slabs tab page. 

This tab page includes the following options: 
 
Define cost for materials (reinforcement, concrete and multiplier for ties) 
Define installation cost for concrete and reinforcement 
Option to use conventional or top down slab construction 
Define multiplier for diaphragm wall reinforcement installation 
Option to select from database 
 

DEEP EXCAVATION  281 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Wales: Installation costs for steel wale beams and supports. 

Figure 4.9.7: Wales tab page. 

This tab page includes the following options: 
 
Option to include total wale cost for each support 
Define wale weight per unit length 
Define installation cost 
Option to select from database 
 

DEEP EXCAVATION  282 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Excavation: Installation costs for excavation and backfilling works. 

Figure 4.9.8: Excavation tab page. 


This tab page includes the following options: 
 
Define costs for soil, rock, haul and backfill installation 
Define volume expand percentage 
Option to use compaction 
Option to select from database 
Option to use excavation cost multiplier 
Option use size cost factors 
Define soil contamination and multipliers 
Define contamination cost multiplier 
 

DEEP EXCAVATION  283 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Dewatering: Installation and operation costs for dewatering (approximate).

Figure 4.9.9: Dewatering tab page. 


This tab page includes the following options: 
 
Option to include or ignore dewatering costs 
Define volume expand percentage 
Option to include pump costs 
Option to define number of pumps 
Option to use number of wells per pump 
Option to include dewatering wells 
Define well length 
Define well costs (material and installation) 
Option to use wall spacing 
Option to define number of wells 
 

DEEP EXCAVATION  284 

 
DEEPEX 2018 – USER’S MANUAL 
 
- Calculations: Overall cost options for mobilization, profit, etc.

Figure 4.9.10: Calculations tab page. 


This tab page includes the following options: 
 
Option to use mobilization cost 
Option to use overhead and profit 
Option use contingency allowance 
Option to use global cost multiplier 
Option to report cost for lengths 
Define wall perimeter 
Define bracing perimeter 
Define excavation perimeter 
Define construction time 
 

Finally, we can 

 Set cost settings as default 
 Open default cost settings 

DEEP EXCAVATION  285 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.10 3D Model in DeepEX (3D Frame Analysis Module)
The frame module enables you to design excavations supported by walers, struts and tiebacks. 
The 3D definitions consist of an external project perimeter and an excavation perimeter. A wall 
perimeter  is  typically  assigned  to  the  excavation  perimeter,  with  the  possibility  of  assigning  a 
different wall section (relating to a design section) on each wall segment (between nodes). Walers 
are attached to wall segments, and different loads along the waler from different design sections 
can  be  defined.  Once  the  walers  are  in  place,  struts  can  be  drawn  between  walers  and  the 
excavation shoring can be analyzed. Based on your analysis results, DeepEX will pick up the load 
from each design section and figure out reactions and stress checks on walers and struts. 

The frame module works better for box shaped excavations, additional modelling maybe required 
for re-entrant corners or special conditions. Some simplifying assumptions are made regarding 
how axial loads are distributed. Currently the software does not include any reductions in axial 
force in walers due to static friction or other effects.  

In order to use the 3D Model feature of DeepEX, we first need to create at least one design section 
in DeepEX with two walls, loads and all design stages. Next, we can use the 3D wizard of DeepEX 
in order to create a 3D model of the site.  The easiest way to create a model is to use the 3D 
wizard: 

After creating a model (ideally with two walls), press the button   to launch the 3D Model 
Wizard dialog (Figures 4.10.1 to 4.10.5).  

DEEP EXCAVATION  286 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Perimeter to Use tab 

The first step would be to select if the existing perimeter will be used or if a new perimeter 
will be defined. For better viewing results on the model use a greater DX view (length on 
x axis). 

Figure 4.10.1: Perimeter to use tab of 3D model wizard 

This dialog provides the following options:

Parameter Description 
3D Perimeter  Option to use Excavation Perimeter or Project Perimeter 
Option  to  create  new  3D  Creates  new  3D  Perimeter  according  to  spacing  and  reference 
perimeter and nodes  point, defined by user  
Reference point coordinates  Defines the coordinates of the reference point 
Spacing DX and DY  Defines  the  horizontal  and  vertical  spacing  of  the  rectangular 
excavation site 
Q  Rotation angle for excavation 

DEEP EXCAVATION  287 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Design Section tab 

Figure 4.10.2: Design Section tab of 3D model wizard 

In this dialog we can define the design section and the wall section for creating the 3D model. 
The  design  section  is  used  to  generate  all  supports,  stages  and  excavation  surfaces.  The  wall 
section is used to generate the wall properties of the 3D model. In addition, here we can define 
the location of the first strut from corner as a percentage of the support spacing.

 Wall Perimeter tab 

Figure 4.10.3: Wall perimeter tab of 3D model wizard 

DEEP EXCAVATION  288 

 
DEEPEX 2018 – USER’S MANUAL 
 
In this dialog we can define the wall perimeter that will be used in the 3D model.  Currently only 
an existing wall perimeter can be modified. 

 Topographical tab 

Figure 4.10.4: Topographical tab of 3D model wizard 

In this dialog we can define the excavation surface that will be used. There is an option to create 
a new 3D surface. In addition, here we can choose to reset all node and variable node elevations.

 OK tab 

Figure 4.10.5: OK tab of 3D model wizard 

DEEP EXCAVATION  289 

 
DEEPEX 2018 – USER’S MANUAL 
 
In  this  dialog  we  can  define  the  initial  stage  number,  where  the  generated  wall  will  be  first 
activated. It is recommended to always use stage 0 as the initial stage.  

Figure 4.10.6: 3D model 

The following table presents the basic control options of the frame analysis module:

ITEM DESCRIPTION 
Creates a 2D plan of the 3D model, according to the selected 
parameters 
Switches between Black/white and Normal model coloring for better 
  definition 

Calculates the 3D frame 
 
Selects the support level to preview in the model screen. The show 
support lowest level option to show the lowest stage at the current 
  stage. 

Adds a strut support in the selected support level 
 
Adds a tieback support in the selected support level 
 
Explodes the model. After this action we can modify each structural 
  member by double clicking on it 
Optimizes all objects. This option can be used since the model is 
  calculated 
Cuts a linear item (wall, waler) 
 
Refreshes the model stages and properties 
 

DEEP EXCAVATION  290 

 
DEEPEX 2018 – USER’S MANUAL 
 
After the 3D model is created, we can modify the parameters of individual supports and walers, 
erase them or add new items in the model. 

By double-clicking on a waler support, the waler supports dialog appears (Figure 4.10.7). 

 
Figure 4.10.7.a: The Waler Data dialog and tab 

A waler must be assigned a name, an elevation, a wall perimeter, and a wall segment. Once a 
waler is assigned a wall segment, the start and end nodes of the waler must be selected. Also, we 
can  define  the  waler  section  type  (steel  member,  concrete  or  hydraulic),  as  well  as  the  waler 
section properties. 

A waler must be connected to another waler at each end in order to reproduce a box type reaction 
behavior. The following connection options are available: 

 Connect the waler to another waler 
 Free end loaded by next wall 
 Free end (no reaction) 
 Not connected 
The Support Index, tells the program which support (from the assigned wall perimeter) is used 
for the primary loading (absence of any additional loading patterns).  

Finally, we can define whether or not we will include reductions in axial force due to the interface 
frictions, as well as the unsupported length in vertical directions. 

DEEP EXCAVATION  291 

 
DEEPEX 2018 – USER’S MANUAL 
 
In Tab B, loading patterns can be specified along the waler length to create more complex loading 
conditions. The activations of the waler can be controlled from Tab C. 

Figure 4.10.7.b: Waler loading patterns options 

Figure 4.10.7.c: Stage activations for waler 

DEEP EXCAVATION  292 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following options are available in this dialog:

Parameter Description 
Name  Defines the waler name 
Elevation  Defines the waler elevation 
Waler section  Defines the waler section (it can be edited) 
Wall perimeter  Defines the wall perimeter 
Wall Segment  Defines the wall segment 
Start node  Defines the start node and the connected waler 
End node  Defines the end node and the connected waler 
Support index  Defines the support index 
Load Patterns  Option to use load patterns (add/delete patterns in the list) 
Design section  Defines the design section from which to create the pattern 
Support index  Defines the support index 
Starting At / Ending At  Defines the load length 
Activation stage  Defines the stage in which the waler is activated 
Show full calculations  Creates and opens an XML file with all calculations for the waler 
support (the model has to be calculated) 
 

By double-clicking on a strut or raker support, the 3D struts and rakers dialog appears (Figure 
4.10.8).  

Figure 4.10.8: The 3D struts and rakers dialog. 

DEEP EXCAVATION  293 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following options are available in this dialog:

Parameter Description 
Name  Defines the strut or raker name 
Strut section  Defines the strut or raker section (it can be edited) 
Wale Segment  Defines the wale segment on the start and end node of the strut 
Wale node  Defines the wale node for the start and end node of the strut 
Offset along wale  Defines the strut offset along the start and end waler 
Activation stage  Defines the stage in which the support is activated 
 
By double-clicking on a tieback support, the 3D anchors dialog appears (Figure 4.10.9).  

Figure 4.10.9: The 3D Anchors dialog. 

The following options are available in this dialog:

Parameter Description 
Name  Defines the tieback name 
Tieback section  Defines the tieback section 
Angle Z  Defines the vertical angle of the tieback 
Angle XY  Defines the horizontal angle of the tieback 
Auto follow angle  Option to follow the angle automatically when a wale segment is 
used 
Lfree  Defines the free length of the tieback support 
Lfixed  Defines the fixed length of the tieback support 
Use wale segment  Defines the used wale segment 
Offset along wale from node  Defines the tieback offset along the waler, from a specific waler 
node 
Use general node  Option to use a general node 
Specify end point  Option to specify an end point for the end of the tieback (used in 
cases that the tieback horizontally connects two opposite walls) 
 

DEEP EXCAVATION  294 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Nodes 

By  double-clicking  on  the  nodes  items,  the  3D  Nodes  dialog  appears  (Figure  4.10.10).  In  this 
dialog, we can add, delete or modify the coordinates of the 3D nodes. In DeepEX there are 2 types 
of 3D Nodes: The fixed Nodes with all coordinates fixed and the variable nodes with fixed X and 
Y coordinates and variable Z coordinate that can be changed in each stage. The variable nodes 
are used to design the 3D surfaces. 

Figure 4.10.10: The 3D Nodes and the Variable 3D Nodes dialogs.

 3D Perimeters 

By double-clicking on the perimeter items, the 3D Perimeters dialog appears (Figure 4.10.11). In 
this dialog, we can add, delete or modify the perimeters with the use of the created 3D nodes. 

Figure 4.10.11: The 3D Perimeters dialog.

DEEP EXCAVATION  295 

 
DEEPEX 2018 – USER’S MANUAL 
 
 3D Surfaces 

By double-clicking on the surface items, the 3D Surfaces dialog appears (Figure 4.10.12). In this 
dialog, we can add, delete or modify the surfaces with the use of the created 3D perimeters. 

Figure 4.10.12: The 3D Surfaces dialog. 

The following table describes the parameters that are available in this dialog. 

Parameter Description 
Name  Defines the name of the selected surface 
Add New 3D  Adds a new surface 
Surface 
Delete 3D Surface  Deletes selected surface 
Is Natural Surface  Option that this is a natural surface 
Is Excavation  Option that this is an excavation surface 
Surface 
Include a  Option to include a perimeter in the surface. User can choose from the 
perimeter in the  created perimeters 
surface 
Use wall perimeter  Option to use a wall perimeter offset. User can choose from the created 
offset  perimeters 
User Z for Var  Define the elevation of the variable nodes 
Node 
User Z for all  Define the elevation of all nodes 
Nodes 
User Z for Nodes  Define the elevation of perimeter fixed nodes in each stage 
per stage 

DEEP EXCAVATION  296 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Wall perimeters 

By double-clicking on the wall perimeter items, the wall perimeters and segments dialog appears 
(Figure 4.10.13). In this dialog, we can modify the wall segments with the use of the created wall 
sections in the created design sections. 

Figure 4.10.13: The Wall Perimeters and Segments dialog.

When one wall segment is double clicked on the 2D project plan the following dialog appears: 

DEEP EXCAVATION  297 

 
DEEPEX 2018 – USER’S MANUAL 
 
Here, we can change the assigned design section and wall for the wall segment. We can choose 
to use a different design section for this wall segment or assign the same design section and wall 
for the whole wall perimeter. 

The following table describes the parameters that are available in this dialog.

Parameter Description 
Name  Defines the name of the selected wall perimeter 
New  Adds a new wall perimeter 
Delete  Deletes selected wall perimeter 
Design section  Defines the design section in order to use the created wall sections 
Wall  Defines the wall section that will be used in all segments (initially) 
Use perimeter only  Option to use only surface or excavation perimeter 
Node 1  Start node of the specific wall segment 
Node 2  End node of the specific wall segment 
Toe type  Defines the Toe length 
L1 - L2  Lengths. Used if the option to use User defined Toe Type is selected 
Custom design section  Option to use a different wall section from a different (or even the 
same) design section 
Activate  Option to use user defined activations for the wall perimeter for the 
construction stages 
 

DEEP EXCAVATION  298 

 
DEEPEX 2018 – USER’S MANUAL 
 
 Results
Since  the  model  is  calculated,  we  can  calculate  the  3D  frame,  pressing  on  the  button 

  in  the  3D  tab.  When  the  3D  Frame  calculation  is  succeeded,  the  3D  Frame 
calculation summary dialog appears.  

 3D Frame Calculation Summary – Summary tab 

Figure 4.10.14: 3D Frame Calculation Summary – Summary tab 

This  tab  presents  the  summary  results  for  all  walers  and  supports.  Here  we  can  review  the 
member elevation, moment, shear force, axial force, Ratio and section. 

 3D Frame Calculation Summary – Wale results and Strut results tabs
These tabs present the same tables as in Summary tab, but only for the selected items.  

DEEP EXCAVATION  299 

 
DEEPEX 2018 – USER’S MANUAL 
 
 3D Frame Calculation Summary – Cost estimate 
This tab presents the cost estimation for all model items. The following options are available: 

    - Cost vs. Stage 

 
Figure 4.10.14: 3D Frame Calculation Summary – Cost Estimate tab – Cost vs. Stage 

These  tables  summarize  the  total  estimated  cost,  wall  cost,  tieback  cost,  strut  cost,  slab  cost, 
excavation  cost,  dewatering  cost  and  cost  index  for  each  construction  stage  for  the  full  3D 
excavation.  

    - Wall costs  

 
Figure 4.10.15: 3D Frame Calculation Summary – Cost Estimate tab – Wall costs 

DEEP EXCAVATION  300 

 
DEEPEX 2018 – USER’S MANUAL 
 
Figure  4.10.15  presents  all  estimated  material  and  installation  costs  for  the  wall  construction. 
While Figure 4.10.16 presents the summary for support costs and quantities. 

    - Support costs 

 
Figure 4.10.16: 3D Frame Calculation Summary – Cost Estimate tab – Support costs 

    - Walers costs 

 
Figure 4.10.17: 3D Frame Calculation Summary – Cost Estimate tab – Walers costs

DEEP EXCAVATION  301 

 
DEEPEX 2018 – USER’S MANUAL 
 
Figure 4.10.17 presents the cost estimation summary for all walers (if present). Figure 4.10.18 
summarizes the costs for all excavation and backfill procedures, for each construction stage. 

    - Excavation costs 

 
Figure 4.10.18: 3D Frame Calculation Summary – Cost Estimate tab – Excavation costs 

    - Dewatering costs 

 
Figure 4.10.19: 3D Frame Calculation Summary – Cost Estimate tab – Dewatering costs

DEEP EXCAVATION  302 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.11 Export drawings in DXF (DXF Module)
The Export drawings to DXF module enables you to export all 2D sections to DXF, saving you a 
respected amount of time and effort. The software exports all design sections, wall sections and 
top site view to DXF. User can easily manage the export font size through a robust dialog. 

Figure 4.11.1: Export to DXF – Design Sections tab. 

In the Design Sections tab of the export to DXF dialog, user can create the DXF files containing 
the  DXF  drawings  for  each  stage  of  the  selected  design  section.  The  following  options  are 
available: 

 Select Design Section 
 Select Stage 
 Option to render inactive supports 
 Option to render dimensions 
 Option to render soil 
 Option to Render boring 
 Option to render all stages (this selection deactivates the Select stage option and activates 
the number of columns). 
 Set the scale 
 

DEEP EXCAVATION  303 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.11.2: Export to DXF – Wall Sections tab. 

In the Wall Sections tab of the export to DXF dialog, user can review and export to DXF all created 
wall  sections  that  are  included  in  the  model.  There  is  the  option  to  show  extended  wall 
information on the model. 

DEEP EXCAVATION  304 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.11.3: Export to DXF – Sketch View tab. 

In the sketch view tab of the export to DXF dialog, user can create the DXF files containing the 
sketch view of each stage of the selected design section. The following options are available: 

 Option to render inactive supports 
 Option to highlight new supports 
 Option to render all stages (this selection deactivates the Select stage option and activates 
the number of columns). 
 Option to show/hide elevation axes 
 

DEEP EXCAVATION  305 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.11.4: Export to DXF – Results diagrams tab. 


In the results diagrams tab of the export to DXF dialog, user can create the DXF files containing various 
results diagrams of each stage of the selected design section. The following options are available: 
 Option to consolidate pressure diagrams 
 Option keep uniform pressure scale 
 Option to render all stages (this selection deactivates the Select stage option and activates the 
number of columns). 
 Option to place diagrams after cut off 
 Option to show/hide elevation axes 
By pressing the button , user can choose which diagrams should be included in the 
model. The following options are available: 

 
 

DEEP EXCAVATION  306 

 
DEEPEX 2018 – USER’S MANUAL 
 
By  pressing  the  button ,  the  DXF  view  settings  dialog  appears.  Figures  4.11.5  to  4.11.9  below 
present the various options. 

Figure 4.11.5: DXF view settings – General settings. 

DEEP EXCAVATION  307 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.11.6: DXF view settings – Design Sections options. 

DEEP EXCAVATION  308 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.11.7: DXF view settings – Wall sections options. 

DEEP EXCAVATION  309 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.11.8: DXF view settings – Sketch view options. 

DEEP EXCAVATION  310 

 
DEEPEX 2018 – USER’S MANUAL 
 

Figure 4.11.9: DXF view settings – Pressures view options. 

DEEP EXCAVATION  311 

 
DEEPEX 2018 – USER’S MANUAL 
 
4.12 Gravity walls in DeepEX (Gravity walls module)
 
DeepEX  offers  the  possibility  to  use  a  gravity  retaining  wall.  This  option  is  available  with  the 
additional Gravity Wall module. User has the flexibility to create basic types of retaining walls 
such as full  gravity or with stem. Flexural, reinforcement can  be included where ever desired. 
Keep in mind that a gravity wall can also be used as a pier or an abutment wall with piles.  

The use of gravity wall in the model can be defined in the “Edit wall data” dialog of DeepEX (Figure 
4.12.1). When the Gravity wall module is activated, there appears the option “Use gravity wall 
section”. 

The “Edit wall data” dialog appears when user double-clicks on  the wall in the Model area of 
DeepEX. 

 
Figure 4.12.1: The Edit wall data dialog with “Use gravity wall section” option. 

Then this option is selected, user should press on the button . This will cause 
the “Retaining wall data” dialog to appear (Figure 4.12.2). Here user can define the retaining wall 
dimensions and reinforcement. 

DEEP EXCAVATION  312 

 
DEEPEX 2018 – USER’S MANUAL 
 

 
Figure 4.12.2: Retaining Wall Data Dialog 

Depending on the selected wall type on the left side of this dialog, several dimension properties 
are available to be defined (Table 4.12.1). The reference coordinate for a gravity wall is taken as 
the left most corner of the stem (or top of wall). This coordinate is defined from the main wall 
data dialog. 

Table 4.12.1: Dimension properties 

Height  Total wall height (excluding the key if used) 
Base  Total base wall width 
Top width  Top of the wall width 
Dist. To top left corner  Distance to top left corner from the far-left side of the wall 
Heel thick  Base thickness on the driving side 
Toe width  Distance from the end of the main wall body to the end of the wall toe 
Toe thick  Base thickness on the resisting side 
 

DEEP EXCAVATION  313 

 
DEEPEX 2018 – USER’S MANUAL 
 
The following retaining wall types are available in DeepEX: 

Wall type 0  Wall type 1  Wall type 2  Wall type 3  Wall type 4 

Wall type 5  Wall type 6  Wall type 7  Wall type 8  Wall type 9 

   

Wall type 10  Wall type 11  Wall type 12 

 
Symbol/Option Description
Use key  Select this option in order to use a passive key under the wall 
Drain back face  Drains back wall face when the water table is above the wall base 
 
Calculate Driving Pressures from edge of wall: In the default mode, stability safety factors are 
calculated  from  soil  and  other  pressures  directly  acting  on  the  driving  wall  sides.  While  this 
assumption gives very good, approximate results, in theory the driving horizontal pressures can 
be taken at the wall edge. By selecting this option, safety factors are calculated by pressures acting 
directly on a vertical wall edge that is defined from the left most base coordinate if pressures are 
driving from left to right or the right most coordinate if pressures are driving from right to left. If
this option is selected, then driving soil pressures on this vertical edge are always taken as
Active or At-rest.

The reinforcement data table enables the use of reinforcing bars on each wall face. Please note 


that DeepEX does not account for development lengths and reinforcement bending. It is the final 
responsibility of the engineer to decide how reinforcement has to be bent, cut, or shaped for 