Grade 15 Grade 20

Date Structure Location


1-Sep-2018 CCT Raft Concrete Grid 5-9

1-Sep-2018 CWR Raft Concrete at 1/6/K/G

1-Sep-2018 Chemical Building Pipe treanch wall inner side 1st lift Grid (3-5)
Column concrete at Gellery H/11, H/12, H/13,
1-Sep-2018 RSF H/14, H/15
1-Sep-2018 Filter Annex Column concrete at

2-Sep-2018 Chemical Building Pipe treanch wall outer side 1st lift Grid (3-5)

2-Sep-2018 CCT Column concrete C10,C11,C12


Part C Screed concrete & B7 Drain pit screed
2-Sep-2018 Pulsatube 16
concrete
3-Sep-2018 RSF Double wall 10/11 2nd lift

3-Sep-2018 Pulsatube B6 Drain pit screed concrete 1.25

3-Sep-2018 Centrifuge Building Plinth Beam Screed concrete 1.25

3-Sep-2018 RSF 18/B Column shaft concre


Column shaft concrete at A+2.8m/2, B+2.75m/2,
4-Sep-2018 Filter Annex
A/1, A/3-3.65m, D/1+2.5m, D/2-1.9m, A/1+4.2m, B/2
4-Sep-2018 RSF Stair Case at Between Grid 17a & 18

4-Sep-2018 CCT Column concrete at B/13

4-Sep-2018 Chemical Building Retaining wall 1st step

4-Sep-2018 Chemical Building Plinth Beam concrete at Grid 1/(B-C)

4-Sep-2018 Chemical Building E1 Column footing concrete

4-Sep-2018 TWPH Plum concrete at Grid (1-5)/(B-C) 76

4-Sep-2018 RSF Column Footing Concrete at A/2, A/4

4-Sep-2018 RSF Column Footing Level Concrete at A/3, A/9 1.7

4-Sep-2018 CWR Plum concrete 3.5

5-Sep-2018 CCT Wall at grid A/(1-3) 1st lift

5-Sep-2018 Chemical Building Pipe Trench wal at Grid 1 to 1+1m

5-Sep-2018 CWR Screed concrete at Grid (7-9)/(K-L) 5


5-Sep-2018 CCT Buffle wall at Grid B/(3-4) & C/(4-5)
Gallery B wall at Grid G/(8-10) & Wall between
5-Sep-2018 RSF
Grid 8+2.1m
5-Sep-2018 CWR Column Concrete at D/2, D/3, D/4, E/5, F/5

5-Sep-2018 Pulsatube Wall concrete at Grid B/(1-3)


Screed Concrete at part C Grid (D-D-1.5m)/(13-
5-Sep-2018 Pulsatube 11.5
16)
6-Sep-2018 CWR Ground Beam Concrete at Grid G/(11-14)

6-Sep-2018 Sludge Thickner D4 Chamber wall 2nd lift


Thickened sludge Drain chamber wall 1st lift
6-Sep-2018 storage Tank
6-Sep-2018 RSF Column level concrete at A/15, A/16, A/17 5.25

6-Sep-2018 Filter Annex Column Concrete at A/2, D/1


Plum concrete at Grid (7-9)/(J-L) & (11-15)/(C-
6-Sep-2018 CWR 33
D)
6-Sep-2018 121 Distribution chamber screed at C&D 4

Chemical Building Screed concrete for retaining wall at Grid (1-2)


6-Sep-2018 4.75
and floor slab at Grid (2-7)
Overflow channer 2nd part + overflow
6-Sep-2018 RSF chamber wall 2nd lift at Grid (21+4.75 - 22)/ (B-
D)
7-Sep-2018 Pulsatube 2nd stage encase concrete at Grid (B+2m-C-2m)/ 7
(13-14)
Filter Gallery A Raft concrete at Grid (1-5)/(E-
7-Sep-2018 RSF H)
7-Sep-2018 RSF Gallery D slab 16.96MSL at Grid (16-20)/(E-H)
column footing levelling concrete at Grid A/12,
7-Sep-2018 RSF 1
A/13
7-Sep-2018 Pulsatube Pile Buildup concrete D/22

7-Sep-2018 CWR Raft Concrete at 11/15/G/K

7-Sep-2018 TWPH Plum Concrete at Grid (A-B)/(5-8) 78

8-Sep-2018 RSF Wall 3 Grid (D-E) 1st lift and Column B/3, B/8

8-Sep-2018 Filter Annex Column B/1, C/1, A+2.85/1, B+2.75/1, C+2.85/1

8-Sep-2018 CCT Outer wall 1st lift at Grid 1/(C-E)


2nd stage encase concrete at Grid (B+2.5m-C-
9-Sep-2018 Pulsatube 6
2.5m
)/(12-14)
9-Sep-2018 CWR Screed concrete at Grid (7-9)/(K-L) 1.5

9-Sep-2018 RSF Column footing at A/7, A/9


9-Sep-2018 Chemical Building Retaining wall 2nd lift Grid (2-7)

9-Sep-2018 Chemical Building Column footing at A7


Wall 19a 3rd lift & Column footing concrete at
9-Sep-2018 RSF A/12, A/13
9-Sep-2018 RSF Level concrete for Column footing at A/18 1.25

9-Sep-2018 CCT Wall concrete at B/(1-3)

9-Sep-2018 CWR Screed concrete at (C-D)/(13-15) 1.3

9-Sep-2018 TWPH Pit Screed concrete at (A-A1)/(1-2) 2.2

9-Sep-2018 Pulsatube Wall concrete at D/(4-6)

10-Sep-2018 CWR Screed Concrete at Grid (C-D)/(14-15) 3.5

10-Sep-2018 Pulsatube Screed Concrete at Grid (B-B+2m)/(13-16) 14

Chemical Building Screed concrete for floor slab at Grid (A-B)/(2-


10-Sep-2018 4
5)
10-Sep-2018 RSF Column concrete at B/5, B/6, A/2, A/4

10-Sep-2018 Filter Annex Column concrete at (A+2.8/3-2.95)

10-Sep-2018 RSF Level concrete for column footing 1.5

11-Sep-2018 CCT Doka wall E/(3-5)

11-Sep-2018 Pulsatube Raft D

12-Sep-2018 Sludge Thickner Tank B Wall 1st lift

12-Sep-2018 CCT Wall concrete at Grid C/(2-3)

12-Sep-2018 Chemical Building Screed concrete at floor slab at Grid (A-C)/(1-2) 1.6

12-Sep-2018 RSF Wall 1 Grid (D-E) 1st Lift

12-Sep-2018 CWR Column Concrete at Grid (1-6)/(G-K)

12-Sep-2018 RSF Wall 12 with slope slab Grid (D-E) 2nd lift

12-Sep-2018 Chemical Building A7 Column concrete 1st lift


Columns in G/16, G/17, G/18, G/19, G/20 &
12-Sep-2018 RSF 18a wall 3rd lift from D to E & Wall G Grid (6-8)
13-Sep-2018 CWR Wall C/(1-6) 1st lift

13-Sep-2018 TWPH Drain Pit Screed between Grid 1 & 2 1

13-Sep-2018 Pulsatube Screed concrete at Part C Grid (B-D)/(13-16) 2


14-Sep-2018 TWPH Plum Concrete 53
Wall H Grid (8-10) 1st Lift & Wall 20 at Grid (B-
14-Sep-2018 RSF D)
14-Sep-2018 PTC Doka Wall at Grid D/(6a-8)

14-Sep-2018 CCT Wall 1/(A-C) 1st Lift

14-Sep-2018 CWR Wall G/(3-6) 1st Lift

14-Sep-2018 Centrifuge Building Plint Beam (A-E)/(1-3)

14-Sep-2018 Chemical Building Retaining wall 3rd lift at Grid (2-7)

14-Sep-2018 RSF Wall E 3rd lift from Grid (13-15)

14-Sep-2018 Pulsatube Kicker concreting at Grid (3-4)/(B-D)

14-Sep-2018 Pulsatube B6 and B7 Drain pit Base concrete

14-Sep-2018 RSF Wall 8a & 9a 2nd lift + slope slab


Column footing at A/18, A/17, A/14, A/10-11 &
14-Sep-2018 RSF Column concrete at A/9, A/7, A/12
14-Sep-2018 RSF Levelling Concrete in A/5-6

14-Sep-2018 RSF Grid (5-6) double wall 1st lift

14-Sep-2018 Chemical Building Screed concrete for tank Grid (1-3) 4.5

16-Sep-2018 CWR Raft Concrete at 6/11/K/G

20-Sep-2018 CCT Wall 1st lift at Grid C/(3-4)


Columns 16.96 MSL to Roof beam level at
20-Sep-2018 RSF H/16, H/17, H/18, H19,H/20
20-Sep-2018 Chemical Building Screed for floor slab Grid (A-B)/(3-4) 2.25

21-Sep-2018 Electrical Room-931 Screed for footing at A4 & A5 1.5

22-Sep-2018 CCT Plum Concrete for footing in B11, B12 5

22-Sep-2018 Chemical Building Column shaft 1st lift at

Centrifuge Building Column shaft 1st lift concrete at B1, C1, D1, E1,
22-Sep-2018 & E2
22-Sep-2018 Electrical Room-931 Plum concrete for footing at C5 & D5 2

Chemical Building Screed concrete for retaining wall base


22-Sep-2018 0.9
between Grid 1-2
22-Sep-2018 Pulsatube Doka Wall 1st lift at Grid D/(9-11)

22-Sep-2018 CCT Doka Wall 1st lift at Grid A/(3-5)


23-Sep-2018 Pulsatube Screed concrete at Grid D/(16-16a) 5

23-Sep-2018

18 345.2

TOTAL FOR SEPTEMBER 1789.3 CUM

For the September


Grade 15 Grade 20 Grade 25 Grade 30 Grade 35A
18 345.2 41.7 0 1384.4
Grand Total
Grade 15 Grade 20 Grade 25 Grade 30 Grade 35A
72.45 3734.15 210.15 285.9 4115.895
Grade
Grade 25 Grade 30 35A
117

188

1.5

3.5

16.75

0.25

2.8

1.5

7.75

0.5

10.7

0.3
2

6.5

3.25

1.75

0.75

47

35

164

8.5

1.5

7.1

2
7.25

1.75

4.5

4.25

0.75

0.2

335

24.1

2.3

6.75

4.5

0.5

13.5

14
9

7.5

5.5

5.5

2.5

4.5

4.5

16

219

2.5

1.25

0.1

9
41.7 0 1384.4

Grade 35A TOTAL


1789.3 CUM

Grade 35A
8418.545 CUM
For the September
Grade 15 Grade 20 Grade 25 Grade 30 Grade 35A TOTAL
18 345.2 41.7 0 1384.4 1789.3 CUM
Grand Total
Grade 15 Grade 20 Grade 25 Grade 30 Grade 35A
72.45 3734.15 210.15 285.9 4115.895 8418.545 CUM