Understand The Tension


Adjusters can help with disaster assessment of post-tensioned reinforced concrete structures.

April 1, 2015 by Derek Gibson, Project Engineer; and Philip Sarvinis, Managing Principal, Building Science and
Restoration practice, Read Jones Christoffersen

Tweet Share Share Shar Print this page

Post-tensioned reinforced concrete – Yup, that’s a mouthful. Most insurance professionals are familiar
with conventional reinforced concrete (rebar) used to construct slabs, walls, columns and piers. But how
does concrete reinforced with post-tensioning steel differ from the conventional system? And what are the
unique post-disaster considerations for this type of construction?

Post-tensioned concrete was first developed in the late 1950s in Europe. Over the years, it has been used
in parking garages, bridges, storage facilities, stadium/grandstands, offices and apartment buildings to
create structures using less concrete and with fewer cracks. Post-tensioned concrete is generally more
versatile than conventional reinforced concrete, but it has benefits and disadvantages.

For example, it requires fewer support beams and columns, thus offering greater design flexibility. It also
uses thinner slabs (less concrete) with overall lower building weight. However, post-tensioned reinforced
concrete is a more complex structural system that is susceptible to deterioration from moisture. It is also
vulnerable to tendon breakage and sudden ruptures, which necessitates more frequent inspections.

There are two basic types of post-tensioning systems – unbonded and bonded. Unbonded post-tensioned
systems typically comprise a series of high strength steel strands formed by 7 braided wires packed in the
grease-filled plastic sheathing, which forms a tendon. Bonded post-tensioned systems are composed of
steel strands that become encased in the poured concrete (no sheathing or grease) and are typically
stressed before the concrete is placed. In North America, unbonded systems are more commonly used in
building structures; as such, this article focuses on this method.

Unbonded post-tensioned concrete is an “active” technique of reinforcing concrete whereas conventional


steel reinforcement (rebars) is considered a “passive” method. The post-tensioning tendon with the plastic
sheathing is placed into the formwork and then the concrete is poured around it. After the concrete has
sufficiently cured/hardened, the steel tendons are drawn tight (stressed) by a hydraulic jack placed at one
or both ends of the tendon. Then, the steel tendons are secured by steel-casted anchoring systems at
each end and grouted.

https://www.claimscanada.ca/understand-the-tension/ 2/4
10/14/2018 Understand The Tension - Claims CanadaClaims Canada

The tendon ends when locked/secured engage the concrete by a steel cast anchoring system and
transfers the tensile force in the tendon into a compressive force in the concrete. This intentionally
compresses the concrete structural member (i.e. slab, beam). Because of this “active” reinforcement
method, it is inherently more dangerous in a post-accident or post-disaster situation should the structure
become damaged. The tendons could de-stress and shoot out of the end of the slab or out of the surface
or underside of the slab, which would not only affect the structures integrity but also cause potential
injuries or fatalities.

An insurer’s concern should start with proper knowledge if a structure is post-tensioned and then the
proper assessment and remediation of damage post-tensioned tendons should a catastrophic event occur
or in case of accidental overloading. However, during renovation work, a contractor may inadvertently drill
through a concrete slab cutting through a stressed steel tendon, potentially causing injury as well as
creating a structural deficiency (see image below).

The biggest concern with post-tensioning, aside from physical damage, is exposure to moisture. If
moisture gains access into the sheathing, the protective grease will break down and the high strength
steel strands could suffer stress cracking. In older post-tensioned structures, if water gains access into the
system through leaking walls, roofing systems, balcony slabs or failed garage membranes, the strands
will experience corrosion (which may or may not be excluded from an insurance claim).

In a flood, assessment and remediation efforts on a post-tensioned structure should go beyond the visible
surface elements of the structure. The tendon sheathings could become contaminated and lead to tendon
corrosion or allow contaminants into the tendon sheathings. Cleaning up and drying the exterior of the
concrete structure is not enough to remediate the flood damage in post-tensioned structures.

After fire exposure, the steel tendons could be heat damaged and, as such, no longer capable of carrying
the required tensile force. Assessment of fire damaged post-tensioned concrete structures will involve
observing many of the tell-tale signs indicating concrete damage from fire or heat to that of conventional
reinforced concrete. These include pink/red discoloration (determined to be from iron content in aggregate
oxidizing in documented studies) of the concrete if it was exposed to a fire above 300deg. C, surface
crumbling and layer separation called spalling and delamination.

Signs of fire damage unique to post-tensioned concrete structures would be tendons undergoing
relaxation and a loss of strength, melted plastic sheathings on tendons or contaminated water containing
chemicals from fire suppression activities becoming trapped inside the tendons. This could affect the
condition of the tendons. Under normal circumstances, cutting a hole in a post-tensioned concrete slab
has to be done with great care and usually with the aid of non-destructive techniques, such as x-raying or
Ferroscanning.

During fire suppression activities, fire fighters, unaware that a roof slab or apartment building is post-
tensioned, may cut holes through roof decks for venting. A tendon under high tensile force could be
severed causing injury to those nearby or compromising the structural integrity of the roof slab. As such, it
is crucial for fire-fighting departments to be aware if a building structure is post-tensioned due to the
inherent risks with these systems.

https://www.claimscanada.ca/understand-the-tension/ 3/4
10/14/2018 Understand The Tension - Claims CanadaClaims Canada

Accidental overloading could involve a loaded concrete truck or large garbage truck accessing a
suspended parking garage slab or podium deck surrounding a building with no vehicle height barrier or
signage. Overloading could also occur from building debris collapsing onto or piling up on the post
tensioned slab such as during a fire.

It is important for insurance adjusters to know whether their insured’s building/structure has post-
tensioned concrete for risk management. In a catastrophic event (fire, flood, vehicle impact into a
structure) adjusters are the representatives of their insured client and often the first to speak with
emergency personnel. Merely mentioning that the structure is post-tensioned could be seen as vital risk
management step to prevent a property loss from turning into a much greater disaster.

In post-fire forensic investigations, a forensic structural engineer experienced with post-tensioned


concrete would provide invaluable assistance to a fire investigator. Working in conjunction, they may even
complement each other efforts to achieve their own objectives.

Forensic investigation of damaged post tensioned structures requires special techniques and expertise.
Repair/rehabilitation also poses challenges unique to the construction industry that requires a level of
flexibility, creativity and ingenuity beyond normal design and construction. Canada Mortgage and Housing
Corporation (CMHC) commissioned a report entitled Investigation Protocol for Evaluation of Post-
Tensioned Buildings, which provides a basis for forensic investigation of damaged post tensioned
concrete structures.

Since the early 1980s, Read Jones Christoffersen Ltd. (RJC) has developed assessment and
rehabilitation techniques for post tensioned concrete structures at risk. Through assessment and
monitoring of several hundred structures across North America, RJC has gained unique insights in
predicting the performance of these types of structures and responding with repair and protection
programs.

Derek Gibson, B.Eng, P.Eng., is a Project Engineer with Read Jones Christoffersen Ltd. (RJC)
specializing in forensic engineering. Philip S
arvinis, B.A.Sc., P.Eng., is the Managing Principal of the Building Science and Restoration practice areas
in RJC’s Toronto office and President of the Building and Concrete Restoration Association of Ontario.