You are on page 1of 10

JOB No. DOC. No. Rev.

0-5151-20 S-900-1670-581 1

DATE 11 - SEP - 2012 SHEET 1 OF 10


PREP’D Y.Fujita
CHK’D S.Kuritsubo
APP'D G.Kitagawa

INSPECTION AND TEST PLAN


FOR
ROTATING MACHINERY
(PUMPS AND AIR COMPRESSORS)

Donggi Senoro LNG Project


FOR CONSTRUCTION

REV. Date Page DESCRIPTION PRE’D CHK’D APP’D


0 11 Sep 2012 ALL FOR REVIEW Y.Fujita S.Kuritsubo G.Kitagawa
1 3 Oct 2012 3, 6, 7, 10 FOR CONSTRUCTION Y.Fujita S.Kuritsubo G.Kitagawa

D R A
N
I 04-OC 12
T - 2 0
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-581 <Rev.1>
INSPECTION & TEST PLAN FOR ROTATING MACHINERY SHEET 2 OF 10
(PUMPS AND AIR COMPRESSORS)

Contents

1. SCOPE …………………………………………………………………………….…… 3

2. REFERENCE…………………………………..………….…………………………………………………….… 3

3. RESPONSIBILITIES ……………………...……………………………………………………………… …… 3

4. ABBREVIATIONS IN ATTACHED SCOPE OF TEST & INSPECTION..……………….. 3

5. SCOPE OF INSPECTION & TEST…………………………………………………………….……….. 5

D R A
N
I 04-OC 12
T - 2 0
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-581<Rev.1>
INSPECTION & TEST PLAN FOR ROTATING MACHINERY SHEET 3 OF 10
(PUMPS AND AIR COMPRESSORS)

1. SCOPE
This Inspection and Test Plan describes the scope of test & inspection items and their
Report Form for pumps and air compressor packages to be installed for DSLNG
Project.
In case a vendor’s installation manual and/or procedure is issued for certain
machinery, such manual and /or procedure shall be the priority in application to such
machinery over any provision in this specification.

2. REFERENCE DOCUMENTS

(1) S-900-1540-002: Project Quality Control Procedure for Field Construction Work
(2) S-900-1540-101: Quality Control Requirements to Subcontractor
(3) S-900-1540-102: Nonconformity Control Procedure for Construction Work
(4) S-900-1540-105: Quality Record Handling Procedure for Construction Work
(5) S-900-1358-015: Application for Grouting of Rotating Equipment
(6) S-900-3150-002: Construction Specification for Installation of Rotating
Equipment
(7) V-2158-101-A-801: Installation, Operation and Maintenance Manual for Pot
Type (for 041-P-1001A/B & 071-P-1002A/B)
(8) V-2158-101-A-803: Installation, Operation and Maintenance Manual for
Removable Type (for 071-P-1001A/B/S)
(9) V-2158-102-A-801: Installation Manual for Model VPCS & VPCH (for
041-P-1006A/B, 051-P-1001, 074-P-1001, 074-P-1002, 076-P-1001A/B)
(10) V-2158-102-A-802: Installation Manual for Model UCW (for 062-P-1001A/B/C)
(11) V-2158-102-A-803: Installation Manual for Model VPS (for 062-P-1003)
(12) V-2158-103-A-801: Installation, Operation & Maintenance Manual, Diesel Fire
Water Pump (for 068-P-1001 B)
(13) V-2158-103-A-802: Installation, Operation & Maintenance Manual, Electric
Fire Water Pump (for 068-P-1001 A)
(14) V-2158-103-A-803: Installation, Operation & Maintenance Manual, Jockey
Pumps (for 068-P-1002 / 1002 S)
(15) V-2158-104-A-801: Installation, Operation and Maintenance Manual (for
041-P-1003A/B, 041-P-1005A/B & 062-P-1002)
(16) V-2158-105-A-801: Installation, Operation and Maintenance Manual (For
Reverse Circulation Type / 041-P-1002A/B & 041-P-1004A/B)
(17) V-2158-105-A-802: Installation, Operation and Maintenance Manual (For
Basic Type / 064-P-1002A/B, 064-P-1003A/B, 077-P-1001 & 087-P-1012)
(18) V-2158-106-A-801: Installation, Operation and Maintenance Manual (for
087-P-1001A/B, 087-P-1002A/B, 087-P-1003A/B, 087-P-1004A/B,
087-P-1005A/B, 068-P-1003/1004, 068-P-1003S)
(19) Installation, Operation and Maintenance Manual (for 065-C-1001 A/B/C)

3. RESPONSIBILITIES

D R A
N
I 04-OC 12
T - 2 0
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-581<Rev.1>
INSPECTION & TEST PLAN FOR ROTATING MACHINERY SHEET 4 OF 10
(PUMPS AND AIR COMPRESSORS)

3.1 All inspection and testing shall be conducted by Subcontractor and witnessed by
Contractor and/or Owner’s inspector in accordance with ITP Table during
installation.

3.2 Subcontractor submits notification for inspection or test with “Notification for
Inspection” (NFI) as specified in S-900-1540-101.

3.3 Subcontractor shall inspect the all items and sign off the inspection or test reports
and submit to Contractor with satisfactory results in accordance with ITP Table
during installation.

3.4 Soon after completion of witness inspection, all participants shall review inspection
record prepared by Subcontractor using specified format and make signature on
the record. Also, the result of inspection as below shall be recorded in NFI with
signature of all parties.

3.5 For inspection by document review specified in applicable ITP, inspection record
shall be prepared and submitted by Subcontractor in timely manner for Contractor
and/or Owner’s review.

4. ABBREVIATIONS IN ATTACHED SCOPE OF INSPECTION AND TEST PLAN

For “Scope of Inspection”, the following abbreviation is specified for each party;
• H (Hold Point) : Subcontractor is not allowed to proceed with the test/inspection
unless a written release is issued by Contractor and/or Owner. Subcontractor shall
submit inspection notification to Contractor.
• W (witness Point) : Subcontractor can proceed with the test/inspection when
Contractor’s and/or Owner’s inspector is not present at the notified time.
Subcontractor shall submit inspection notification to Contractor and/or Owner.
• IW (Initial Witness) : Subcontractor is requested to notify Contractor and/or Owner of
the initial inspection date and time. Subcontractor can proceed with the
test/inspection when Contractor’s and/or Owner’s inspector is not present at the
notified date and time. Subsequent test/inspection will not be witness unless any
deficiencies are found at the initial inspection.
• M(Monitoring) : Subcontractor is not requested to notify Contractor and/or Owner.
Contractor’s and/or Owner’s inspector will monitor construction condition, workman
ship, and test/inspection during his visit or periodical inspection
• R (Record Review) : Subcontractor shall provide Contractor and/or Owner with
certificates, reports, and records as applicable for review and confirmation.
• I : Execution of inspection
• F : Full, ex, “FW” means “Full Witness”, “FI” means “Full Inspection”
• S : Spot, ex, “SW” means “Spot Witness”, “SI” means “Spot Inspection” including
100% review of inspection report

D R A
N
I 04-OC 12
T - 2 0
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-581<Rev.1>
INSPECTION & TEST PLAN FOR ROTATING MACHINERY SHEET 5 OF 10
(PUMPS AND AIR COMPRESSORS)

• P : Preparation of inspection report


• OR : Official Record for Owner and Contractor
• IR : Internal Review for Contractor and Subcontractor

5. SCOPE OF INSPECTION AND TEST

Form No. Title

DS-58-002-1: FIST ALIGNMENT OF ROTARY EQUIPMENT

DS-58-003-1: FINAL ALIGNMENT OF ROTARY EQUIPMENT

DS-58-004-1: VERIFICATION OF CONFORMITY

D R A
N
I 04-OC 12
T - 2 0
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-581 <Rev.1>
INSPECTION & TEST PLAN FOR ROTATING MACHINERY (PUMPS AND AIR COMPRESSORS) SHEET 6 OF 10

Witness By
Report

Contractor
Report

contractor

Company
Ref Site Inspection Item Reference Requirement Review Remarks
Form

Sub-
OR / IR

1 Material Receiving Packing List NA RIR IR NA FI/P NA


Preparation
1) Foundation Check
2) Dimension Related Vendor
Related Vendor Documents CVL Handover
2 3) Elevation Documents IR FI/P W SW
S-900-3150-002 Report
4) Cleaning of S-900-3150-002
Foundation
5) Anchor Box Locations
Related Vendor
Related Vendor Documents
3 Chipping and Padding Documents CONFORMITY IR FI/P W SW
S-900-3150-002
S-900-3150-002
Equipment Installation
Related Vendor
(1) Location Related Vendor Documents
4 Documents CONFORMITY IR FI/P W SW
(2) Elevation S-900-3150-002
S-900-3150-002
(3) Levelness
Related Vendor
Related Vendor Documents
5 Leveling Documents CONFORMITY IR FI/P W SW
S-900-3150-002
S-900-3150-002
Related Vendor
Related Vendor Documents
Documents
6 Grouting S-9001358-015 CONFORMITY IR FI/P W SW
S-9001358-015
S-900-3150-002
S-900-3150-002

D R A
N
I 04-OCT 12
- 2 0
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-581 <Rev.1>
INSPECTION & TEST PLAN FOR ROTATING MACHINERY (PUMPS AND AIR COMPRESSORS) SHEET 7 OF 10

Witness By
Report

Contractor
Report

contractor

Company
Ref Site Inspection Item Reference Requirement Review Remarks
Form

Sub-
OR / IR

Related Vendor
First (Preliminary) Related Vendor Documents
7 Documents DS-58-002-1 OR FI/P H W
Alignment (before piping) S-900-3150-002
S-900-3150-002
Auxiliary Equipment
Installation Related Vendor
Related Vendor Documents
8 (1) Location Documents CONFORMITY IR FI/P W SW
S-900-3150-002
(2) Elevation S-900-3150-002
(3) Levelness
Related JGC Document Related JGC Document
9 Piping Installation CONFORMITY IR FI/P W SW
(ISO Drawing) (ISO Drawing)
Related Vendor
Related Vendor Documents
10 Second (Final) alignment Documents DS-58-003-1 OR FI/P H W
S-900-3150-002
S-900-3150-002

D R A
N
I 04-OCT 12
- 2 0
DSLNG Project Job No. : 0-5151-20
INSPECTION & TEST PLAN FOR ROTATING MACHINERY Doc No. :S-900-1670-581<Rev.1>
-RE1R 
'6/1*3URMHFW
(PUMPS AND AIR COMPRESSORS) 'RF1R65HY!
SHEET 8 OF 10
,163(&7,21 7(673/$1)25527$7,1*0$&+,1(5< 3DJHRI

NCP Project Company Doc. No.: NCP-00-Q2-WS-1120


Inspection and Test Plan for Rotating Machine Contractor Job Code: 0-4848-20
REPORT No.: Contractor Doc. No.: S-0000-1540-120 <C05>
Page 17 of 23

INSPECTION REPORT
First Alignment of Rotary Equipment FORM DS-58-002-1
5000-507

Item Index Drawing Area Measuring instuments

TYPE OF ALIGNMENT STAGE OF ALIGNMENT

Rim & Face Alignment : Reverse Alignment ; Preliminary ; Final :


Alignment between : Pump & motor Pipe flange aligned ? : 0°
Alignment tolerance : 0.1mm (1500RPM) Designated Gasket :
270° 90°
Legend
ALIGNMENT WITH-OUT PIPE ALIGNMENT WITH PIPE
180°

A E

D B H F

C G
Fixed m/c Moving m/c
Suction side (mm) Discharge side (mm)
Pipe strain (< 0.05mm) 0° 90° 0° 90°

N
A B

Distance Between Shaft Ends Required Actual Moving m/c


and Coupling hub in 'mm' Tolerance : as per vendor spec. C D

Readings in ; mm mil : Soft Foot in 'mm'


Rotation of coupling viewed from driver side ; cw ccw : A
Fasterners tightened and acceptable ; O.K. NA : B
C
Note : A maximum of only 5 shims of SS material are allowed under each foot. D
Remarks : All deviations are within allowable limits. Tolerance :+0.05mm

Inference: Equipment released for Piping / Further activities

ACCEPTANCE Sub-Contractor JGC NCP

Name

Position

Signature

Date
D R A
N
I 04-OC 12
T - 2 0

5000507
DSLNG Project Job No. : 0-5151-20
INSPECTION & TEST PLAN FOR ROTATING MACHINERY Doc No. :S-900-1670-581<Rev.1>
-RE1R 
'6/1*3URMHFW
(PUMPS AND AIR COMPRESSORS) 'RF1R65HY!
SHEET 9 OF 10
,163(&7,21 7(673/$1)25527$7,1*0$&+,1(5< 3DJHRI

NCP Project Company Doc. No.: NCP-00-Q2-WS-1120


Inspection and Test Plan for Rotating Machine Contractor Job Code: 0-4848-20
REPORT No.: Contractor Doc. No.: S-0000-1540-120 <C05>
Page 18 of 23

INSPECTION REPORT
Final Alignment of Rotary Equipment FORM DS-58-003-1
5000-508

Item Index Drawing Area Measuring instuments

TYPE OF ALIGNMENT Final Alignment

Rim & Face Alignment : Reverse Alignment ; Final ;


Alignment between : Pump & motor Pipe flange aligned ? ; 0°
Alignment tolerance : 0.1mm (1500RPM) Designated Gasket ;
270° 90°
Legend
ALIGNMENT WITH-OUT PIPE ALIGNMENT WITH PIPE
180°

A E F J

D B I G M K
H F

C G H L
Fixed m/c Moving m/c Fixed m/c Moving m/c
Suction side (mm) Discharge side (mm)
Pipe strain (< 0.05mm) 0° 90° 0° 90°

Bolt tightening of Suction and Discharge Flange acceptable


N
A B

Distance Between Shaft Ends Required Actual Moving m/c


and Coupling hub in 'mm' Tolerance : as per vendor spec. C D

Readings in ; mm mil : Soft Foot in 'mm'


Rotation of coupling viewed from driver side ; cw ccw : A
Fasterners tightened and acceptable ; O.K. NA : B
C
Note : A maximum of only 5 shims of SS material are allowed under each foot. D
Remarks : All deviations are within allowable limits. Tolerance :+0.05mm

Inference: Equipment released for Piping / Further activities

ACCEPTANCE Sub-Contractor JGC NCP

Name
Position

Signature

Date

D R A
N
I 04-OC 12
T - 2 0

5000508
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-581<Rev.1>
INSPECTION & TEST PLAN FOR ROTATING MACHINERY SHEET 10 OF 10
(PUMPS AND AIR COMPRESSORS)

DS-58-004-1
Verification of Conformity

Contractor, Sub-Contractor and Vendor confirmed the conformity


between following document and applicable item.

Document Number: ____________________


Applicable Item: ____________________

Date Signature