MASTER LIST OF DRAWING FOR BOP FOUNDATION AT BARAUNI

Sl No. Scope/Area Sub item no Sub Item Master Drawing List

A) Switch yard and Transformer Yard

1 20 MVA Station Transformer 1 20 MVA Station Transformer foundation-GA & RCC Detail
2 ST oil collection pit-GA & RCC Detail
3 Cable trenches-GA drawinw
4 cable trenches-RCC detail
2 132 KV Switch yard 1 Tower foundations-GA of different type of tower
2 Tower foundation-RCC detail of different type of tower
3 Rail cum Road-GA & RCC detail
4 Fencing/Boundary Wall-GA & Masonry detail
5 Boundary drain-GA & Masonry/RCC detail
6 Road & Ballast Filling- GA & Section detail
3 1250 Amp SF6 Circuit Breaker-5 nos 1 Circuit breaker(5 No.)-Foundation GA and RCC detail

B) Tube Well System


1 Pump foundation 1 Pump foundations-GA of pump foundation
2 Pump foundations-RCC details of pump foundation
3 Shed-Structural/Masonry shed details for pump foundation
2 600NB Header pipe 1 GA of pipe support for 600NB pipe
2 RCC details of pipe support foundations

C) Aeration System
1 DM Bld. (existing bld. To be used) 1 RCC/Masonry Modification drawing for DM Bld.
2 RCC/Masonry Modification drawing for Nutralizing pit
3 Schedule & Archi. Detail of Doors & Windows
4 Archi. Details of Flooring & Tiling
5 Archi. Details of Acid lining
6 RCC details for bracket for instalation of Monorail
2 Equipment foundation 1 Raw water trasnfer pump(4No.)-GA & RCC details of
2 Pressure Filters-GA & RCC details
3 Activated Carbon Filters-GA & RCC details
4 SAC foundations- 3 nos.-GA & RCC details
5 WAC foundations( 3 nos).-GA & RCC details
6 SBA foundations-(3 nos.)-GA & RCC details
7 f MC foundations(3 nos.)-GA & RCC details

8 Acid & Alkali unloading pumps foundation-GA & RCC details


9 Degasser Tower foundation-GA & RCC details
10 Acid storage tank foundation-GA & RCC details
11 Alkali storage tank foundation-GA & RCC details
12 DM Water Pump foundation-GA & RCC details
3 Interconnecting Piping 1 GA of pipe support for Interconnecting pipe
2 RCC details of pipe support foundations

D) Softning Plant
1 Softning Bld.(Existing bld. To be used) 1 RCC/Masonry Modification drawing for Softning Bld.
2 Schedule & Archi. Detail of Doors & Windows
3 Archi. Details of Flooring & Tiling
2 Equipment foundation 1 Soft water pump foundation(4 No.)-GA & RCC details
2 Pressure filter foundation(6 No.)-GA & RCC details
3 Softning unit foundation(6 No.)-GA & RCC details
4 Brine injection pump foundation(2 No.)-GA & RCC details
5 Salt saturation tank foundation-GA & RCC details
6 Fresh Brine measurement tank foundation-GA & RCC details
7 Spent Brine tank foundation-GA & RCC details

E) CW Chlorination Plant
1 CW Chlorination Building 1 Foundation GA drawing
2 RCC details of foundation
3 RCC details of Plinth beam
4 RCC details of Columns
5 RCC details of Floor beams
6 RCC details of Foor & roof
7 RCC details of Grade slab
8 Archi. Detail & schedule of Doors & Window
9 Archi. Detail of Plinth protection, Chajja & parapet
10 Plumbing & down commer details
11 Sanitary fixture details
12 Septik tank and masonry drain details
13 Masonry B/W, Plaster & painting details
14 Roof treatment & protection details
15 Archi. Detail of False celling work
2 Equipment foundation

F) Ventilation System
1 Air Washer Room 1 RCC/Masonry Modification drawing of Room at EL-0.0m- 2 no.
2 RCC/Masonry Modification drawing of Room at EL-19.0m- 2 no.
3 Archi. Detail for plaster,painting,flooring,tiling etc.
4 Archi. Detail for opening at different levels
2 Equipment foundation 1 Centrifugal pump foundation(8 No.)-GA & RCC details
2 Centrifugal fan foundation(4 No.)-GA & RCC details
G) Air Compressor
1 Equipment foundation 1 Skid foundation(5 No.)-GA & RCC details
2 Air Compressor foundation(5 No.)-GA & RCC details
3 Air dryer foundation(3 No.)-GA & RCC details
4 Air receiver foundation(5 No.)-GA & RCC details

I) LP dosing System
1 Equipment foundation 1 Skid foundation(4 No.)-GA & RCC details

J) Air Conditioning system


1 Air cond. Bld (Existing bld. To be used) 1 RCC/Masonry drawing of AHU Room
2 Archi. Detail for plaster,painting,flooring,tiling etc.
Archi. Detail of False celling details for Main control room, Baterry
3 charger room & ESP Control room
4 Archi. Detail for opening for AC duct at different levels
2 Equipment foundation 1 Chiller foundation(2 No.)-GA & RCC details
2 AHU foundation(3 No.)-GA & RCC details
3 Condenser water pump foundation(2 No.)-GA & RCC details
4 Cooling tower foundation(2 No.)-GA & RCC details
5 PAC foundation(2 No.)-GA & RCC details
6 Chilled water pump foundation(2 No.)-GA & RCC details

K) Ash Handling System


1 Vaccume pump House(14mX9mX6m) 1 Foundation GA drawing
2 RCC details of foundation
3 RCC details of Plinth beam
4 RCC details of Columns
5 RCC details of Floor beams
6 RCC details of Foor & roof
7 RCC details of Grade slab
8 Archi. Detail & schedule of Doors & Window
9 Archi. Detail of Plinth protection, Chajja & parapet
10 Plumbing & down commer details
11 Sanitary fixture details
12 Septik tank and masonry drain details
13 Masonry B/W, Plaster & painting details
14 Roof treatment & protection details
15 Archi. Detail of False celling work
16 RCC details for bracket for instalation of Monorail
2 Ash-Slurry pump House(22mX8mX6m) 1 Foundation GA drawing
2 RCC details of foundation
3 RCC details of Plinth beam
4 RCC details of Columns
5 RCC details of Floor beams
6 RCC details of Foor & roof
7 RCC details of Grade slab
8 Archi. Detail & schedule of Doors & Window
9 Archi. Detail of Plinth protection, Chajja & parapet
10 Plumbing & down commer details
11 Sanitary fixture details
12 Septik tank and masonry drain details
13 Masonry B/W, Plaster & painting details
14 Roof treatment & protection details
15 Archi. Detail of False celling work
16 RCC details for bracket for instalation of Monorail
3 MCC Control Room(20mX8mX5m) 1 Foundation GA drawing
2 RCC details of foundation
3 RCC details of Plinth beam
4 RCC details of Columns
5 RCC details of Floor beams
6 RCC details of Foor & roof
7 RCC details of Grade slab
8 Archi. Detail & schedule of Doors & Window
9 Archi. Detail of Plinth protection, Chajja & parapet
10 Plumbing & down commer details
11 Sanitary fixture details
12 Septik tank and masonry drain details
13 Masonry B/W, Plaster & painting details
14 Roof treatment & protection details
15 Archi. Detail of False celling work
4 Buffer Hopper(5mX5mX12m)-4 No. 1 Buffer Hopper-GA & RCC details of foundation
2 Buffer Hopper- RCC details of foundation
5 Ash slurry Sump(8mX5mX2m) 1 Ash slurry sump-GA & RCC details of Bottom Raft
2 Ash slurry sump- RCC details of Wall
6 Equipment Foundation 1 Vertical sump drain pump(50m3/hr-2 no.)-GA & RCC detail
2 Jet pump foundation(2 no.)-GA & RCC detail
3 Vaccum pump foundation(6 no.)-GA & RCC detail
4 Ash slurry pump foundation(2 no.)-GA & RCC detail
5 Air washer foundation(2 no.)-GA & RCC detail
6 Collecting tank tower foundation(2 no.)-GA & RCC detail
7 Clinker grinder foundation(4 no.)-GA & RCC detail
8 Ash water pump foundation(4 no.)-GA & RCC detail
9 Flushing water pump foundation(2 no.)-GA & RCC detail
10 Fluidizing blower foundation(2 no.)-GA & RCC detail
7 Pipe support (1 km pipe length) 1 Ash slurry cast basalt pipe-GA & layout of pipe support
2 Ash slurry cast basalt pipe-RCC details of foundation & pedestal
3 Ash slurry cast basalt pipe-RCC/structural detail of pipe support
8 Cable,Pipe tench,Road Crossing 1 GA & RCC detail of cable trenches
2 GA & RCC detail ofpipe trenches
3 GA & RCC detail of Hume pipe(NP2/NP3) road crossing
l) Fire Protection System
Fire Pump house(existing bld. To be
1 used) 1 RCC/Masonry drawing for Modification of Fire pump house
2 Archi. Detail for plaster,painting,flooring,tiling etc.
2 Equipment Foundation 1 Hydrant pump (electrical driven) foundation-GA & RCC details
2 Hydrant pump (diesel driven) foundation-GA & RCC details
3 Spray pump (electrical driven) foundation-GA & RCC details
4 Spray pump (diesel driven) foundation-GA & RCC details
5 Jokey pump foundation(2 nos)- GA & RCC details
6 Air compressor foundation(2 No.)-GA & RCC details
7 Service water pump foundation(2 No.)-GA & RCC details
8 Fuel Oil pump foundation(6 No.)-GA & RCC details
9 CW booster pump foundation(4 No.)-GA & RCC details
10 Foam pump- GA & RCC detail of Foam pump
3 Tank Foundation 1 Foam Tank- GA & RCC details of Foam tank foundation
4 Deluge Valve Chambers-20 nos. 1 Deluge valve chamber-GA & RCC detail of bottom raft
2 Deluge valve chamber-RCC detail of bottom raft
5 Pipe support 1 Hydrant pipe (2.5 KM)-GA & layout of pipe support
2 Hydrant pipe(2.5 KM)-RCC details of foundation & pedestal
3 Spray pipe (1.0 KM)-GA & layout of pipe support
4 Spray pipe(1 KM)-RCC details of foundation & pedestal
6 Road Crossing 1 GA & RCC detail of Hume pipe(NP2/NP3) road crossing