Concrete Compressive Strength Test Results Summary of G-30(BP)

[ DATA part ]:

Supplying Concrete for Site: ITD/CP-02 Batching Plant Number of Samples N 187

Concrete Design Strength: G-30 (BP) fc = 30 N/mm2 Upper control limit (CL+3×S) UCL: 50.5 N/mm2

Calibration Equation:Y=0.9942X Correcion Formula: a= 0.9942 Upper warning limit (CL+2×S) UWL: 49.5 N/mm2

First Compressive strength test for 28 days: 01/07/2018 Central limit CL 47.7 N/mm2

Last Compressive strength test for 28 days: 31/07/2018 Lower warning limit (CL-2×S) LWL: 45.9 N/mm2

Lower control limit (CL-3×S) LCL: 45.0 N/mm2

Standard deviation S 0.91 N/mm2

Coefficient of variation Cv 0.019

Concre 28 days Compressive Strength of Concrete Cylinders


Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m 3
KN KN KN KN N/mm 2
N/mm 2
N/mm 2
N/mm2 N/mm2

1 6/3/2018 T-2018-432 30.0 Workshop Area SP064 7/1/2018 861.2 849.1 48.5 47.8 48.2
2 6/3/2018 T-2018-433 26.0 Workshop Area SP185 7/1/2018 822.9 891.5 46.3 50.2 48.3
3 6/3/2018 T-2018-434 33.0 B32 P037 7/1/2018 814.5 828.6 45.8 46.6 46.2
4 6/3/2018 T-2018-435 28.0 Workshop Area SP228 7/1/2018 852.7 861.9 48.0 48.5 48.3
5 6/4/2018 T-2018-436 30.0 Workshop Area SP068 7/2/2018 827.2 851.7 46.5 47.9 47.2
6 6/4/2018 T-2018-437 30.0 B32 P062A 7/2/2018 841.2 827.3 47.3 46.5 46.9
7 6/4/2018 T-2018-439 30.0 Workshop Area SP063 7/2/2018 867.1 882.7 48.8 49.7 49.3
8 6/4/2018 T-2018-440 30.0 Workshop Area SP050 7/2/2018 879.1 893.2 49.5 50.3 49.9
9 6/4/2018 T-2018-441 26.0 Workshop Area SP309 7/2/2018 859.2 877.6 48.3 49.4 48.9
10 6/5/2018 T-2018-443 31.5 Workshop Area SP120 7/3/2018 867.9 848.0 48.8 47.7 48.3

Page 1 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

11 6/5/2018 T-2018-444 28.0 B32 P003 7/3/2018 818.0 836.9 46.0 47.1 46.6
12 6/5/2018 T-2018-445 28.0 Workshop Area SP049 7/3/2018 842.8 829.2 47.4 46.7 47.1

Page 2 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

13 6/5/2018 T-2018-446 19.5 Workshop Area SP048 7/3/2018 878.6 859.4 49.4 48.4 48.9
14 6/5/2018 T-2018-447 30.0 Workshop Area SP062 7/3/2018 819.7 839.8 46.1 47.2 46.7
15 6/5/2018 T-2018-448 Workshop Area SP032 7/3/2018 841.8 851.6 47.4 47.9 47.7
16 6/5/2018 T-2018-451 30.0 Workshop Area SP138 7/3/2018 874.3 881.4 49.2 49.6 49.4
17 6/6/2018 T-2018-452 23.0 Workshop Area SP311 7/4/2018 863.2 845.4 48.6 47.6 48.1
18 6/6/2018 T-2018-454 36.0 B32 P019 7/4/2018 873.9 894.2 49.2 50.3 49.8
19 6/6/2018 T-2018-455 31.0 Workshop Area SP097 7/4/2018 863.9 848.7 48.6 47.7 48.2
20 6/6/2018 T-2018-456 31.0 Workshop Area SP030 7/4/2018 881.6 873.9 49.6 49.2 49.4
21 6/6/2018 T-2018-459 30.5 Workshop Area SP106 7/4/2018 841.0 864.2 47.3 48.6 48.0
22 6/6/2018 T-2018-460 32.0 B32 P040 7/4/2018 851.1 872.4 47.9 49.1 48.5
23 6/6/2018 T-2018-461 32.0 Workshop Area SP055 7/4/2018 872.4 847.3 49.1 47.7 48.4
24 6/6/2018 T-2018-462 29.5 Workshop Area SP313 7/4/2018 816.6 837.5 45.9 47.1 46.5
25 6/7/2018 T-2018-464 33.0 Workshop Area SP144 7/5/2018 867.6 848.7 48.8 47.7 48.3
26 6/7/2018 T-2018-465 33.0 Workshop Area SP026 7/5/2018 823.9 846.8 46.4 47.6 47.0
27 6/7/2018 T-2018-467 34.0 B32 P118 7/5/2018 828.5 837.2 46.6 47.1 46.9

Page 3 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

28 6/7/2018 T-2018-468 30.0 Workshop Area SP104 7/5/2018 812.0 827.1 45.7 46.5 46.1
29 6/7/2018 T-2018-469 30.0 Workshop Area SP303 7/5/2018 835.7 816.2 47.0 45.9 46.5
30 6/7/2018 T-2018-471 31.2 Workshop Area SP099 7/5/2018 852.3 865.7 48.0 48.7 48.4
31 6/8/2018 T-2018-472 34.0 B32 P004 7/6/2018 820.4 829.3 46.2 46.7 46.5
32 6/8/2018 T-2018-473 30.0 Workshop Area SP316 7/6/2018 812.3 821.2 45.7 46.2 46.0
33 6/8/2018 T-2018-474 31.0 Workshop Area SP140-2 7/6/2018 836.2 844.1 47.0 47.5 47.3
34 6/8/2018 T-2018-475 34.0 Workshop Area SP031 7/6/2018 810.1 824.2 45.6 46.4 46.0
35 6/8/2018 T-2018-477 30.0 Workshop Area SP057 7/6/2018 815.4 820.1 45.9 46.1 46.0
36 6/8/2018 T-2018-478 26.0 Workshop Area SP318 7/6/2018 829.3 842.4 46.7 47.4 47.1
37 6/8/2018 T-2018-479 32.0 B32 P020 7/6/2018 844.1 832.3 47.5 46.8 47.2
38 6/9/2018 T-2018-482 33.0 Workshop Area SP059 7/7/2018 836.2 843.9 47.0 47.5 47.3
39 6/9/2018 T-2018-484 35.0 B32 P039 7/7/2018 840.4 829.2 47.3 46.7 47.0
40 6/9/2018 T-2018-485 28.0 Workshop Area SP029 7/7/2018 816.7 823.6 45.9 46.3 46.1
41 6/9/2018 T-2018-486 29.0 Workshop Area SP310 7/7/2018 812.0 829.6 45.7 46.7 46.2
42 6/9/2018 T-2018-487 29.5 Workshop Area SP027 7/7/2018 834.0 839.7 46.9 47.2 47.1
43 6/9/2018 T-2018-488 35.0 Workshop Area SP142 7/7/2018 847.6 842.0 47.7 47.4 47.6
44 6/9/2018 T-2018-490 24.0 Workshop Area SP315 7/7/2018 812.6 822.9 45.7 46.3 46.0
45 6/9/2018 T-2018-491 33.0 B32 P014 7/7/2018 853.8 841.6 48.0 47.3 47.7
46 6/9/2018 T-2018-493 35.0 Workshop Area SP090 7/7/2018 829.3 831.6 46.7 46.8 46.8
47 6/9/2018 T-2018-494 33.0 Workshop Area SP033 7/7/2018 841.1 877.6 47.3 49.4 48.4
48 6/10/2018 T-2018-496 34.0 B32 P005 7/8/2018 843.9 862.7 47.5 48.5 48.0
49 6/10/2018 T-2018-497 32.0 Workshop Area SP141 7/8/2018 827.7 860.4 46.6 48.4 47.5

Page 4 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

50 6/10/2018 T-2018-499 32.5 Workshop Area SP025 7/8/2018 836.6 847.2 47.1 47.7 47.4

Page 5 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

51 6/10/2018 T-2018-500 23.5 Workshop Area SP317 7/8/2018 827.6 842.0 46.6 47.4 47.0
52 6/10/2018 T-2018-504 30.0 Workshop Area SP103 7/8/2018 864.2 829.0 48.6 46.6 47.6
53 6/10/2018 T-2018-505 35.0 B32 P047 7/8/2018 859.7 832.6 48.4 46.8 47.6
54 6/10/2018 T-2018-506 33.0 B32 P042 7/8/2018 834.4 821.9 46.9 46.2 46.6
55 6/11/2018 T-2018-507 32.5 Workshop Area SP248 7/9/2018 874.1 846.3 49.2 47.6 48.4
56 6/11/2018 T-2018-509 27.5 Stabling Shed TP02 7/9/2018 843.0 857.9 47.4 48.3 47.9
57 6/11/2018 T-2018-510 33.0 Workshop Area SP058 7/9/2018 827.6 839.2 46.6 47.2 46.9
58 6/11/2018 T-2018-512 33.0 Workshop Area SP028 7/9/2018 816.2 824.2 45.9 46.4 46.2
59 6/11/2018 T-2018-514 32.5 Workshop Area SP056 7/9/2018 842.6 837.9 47.4 47.1 47.3
60 6/11/2018 T-2018-518 32.5 Workshop Area SP061 7/9/2018 861.2 848.3 48.5 47.7 48.1
61 6/12/2018 T-2018-520 22.5 Stabling Shed TP01 7/10/2018 813.4 832.7 45.8 46.8 46.3
62 6/12/2018 T-2018-521 33.5 B32 P013 7/10/2018 843.0 858.9 47.4 48.3 47.9
63 6/12/2018 T-2018-522 35.0 Workshop Area SP148 7/10/2018 837.6 864.1 47.1 48.6 47.9
64 6/12/2018 T-2018-523 30.0 Workshop Area SP205 7/10/2018 879.7 889.2 49.5 50.0 49.8
65 6/12/2018 T-2018-524 33.0 Workshop Area SP102 7/10/2018 811.8 827.6 45.7 46.6 46.2
66 6/12/2018 T-2018-527 33.0 Workshop Area SP024 7/10/2018 859.2 840.7 48.3 47.3 47.8
67 6/12/2018 T-2018-528 46.0 Workshop Area SP046 7/10/2018 862.3 849.6 48.5 47.8 48.2
68 6/13/2018 T-2018-530 35.0 B32 P006 7/11/2018 814.2 826.4 45.8 46.5 46.2
69 6/13/2018 T-2018-531 32.5 Workshop Area SP143 7/11/2018 862.3 848.6 48.5 47.7 48.1
70 6/13/2018 T-2018-532 34.0 Workshop Area SP162 7/11/2018 851.2 842.4 47.9 47.4 47.7
71 6/13/2018 T-2018-533 32.0 Workshop Area SP054 7/11/2018 816.7 837.3 45.9 47.1 46.5
72 6/13/2018 T-2018-534 35.0 B32 P011 7/11/2018 827.6 853.4 46.6 48.0 47.3

Page 6 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

73 6/13/2018 T-2018-535 34.5 Workshop Area SP105 7/11/2018 842.0 831.9 47.4 46.8 47.1
74 6/13/2018 T-2018-536 34.5 Workshop Area SP053 7/11/2018 829.2 812.7 46.7 45.7 46.2
75 6/14/2018 T-2018-537 33.5 Workshop Area SP147 7/12/2018 869.5 879.8 48.9 49.5 49.2
76 6/14/2018 T-2018-538 25.0 Workshop Area SP312 7/12/2018 804.3 817.6 45.3 46.0 45.7
77 6/21/2018 T-2018-539 30.5 Workshop Area SP089 7/19/2018 819.7 839.1 46.1 47.2 46.7
78 6/21/2018 T-2018-540 32.5 Workshop Area SP060 7/19/2018 823.8 857.3 46.3 48.2 47.3
79 6/21/2018 T-2018-541 31.0 B32 P041 7/19/2018 814.9 850.7 45.8 47.9 46.9
80 6/21/2018 T-2018-542 28.0 Workshop Area SP045 7/19/2018 831.5 859.1 46.8 48.3 47.6
81 6/21/2018 T-2018-543 36.0 Workshop Area SP023 7/19/2018 814.9 844.7 45.8 47.5 46.7
82 6/21/2018 T-2018-544 31.0 B32 P111 7/19/2018 832.4 801.7 46.8 45.1 46.0
83 6/21/2018 T-2018-545 31.0 Workshop Area SP314 7/19/2018 804.3 827.7 45.3 46.6 46.0
84 6/21/2018 T-2018-546 28.0 Workshop Area SP101 7/19/2018 854.3 833.2 48.1 46.9 47.5
85 6/22/2018 T-2018-547 35.0 Workshop Area SP043 7/20/2018 829.2 822.4 46.7 46.3 46.5
86 6/22/2018 T-2018-548 36.4 B32 P007 7/20/2018 839.6 842.3 47.2 47.4 47.3
87 6/22/2018 T-2018-549 30.0 Workshop Area SP139 7/20/2018 836.2 819.6 47.0 46.1 46.6
88 6/22/2018 T-2018-550 35.0 Workshop Area SP298 7/20/2018 851.1 846.3 47.9 47.6 47.8
89 6/22/2018 T-2018-551 35.0 Workshop Area SP161 7/20/2018 849.6 853.1 47.8 48.0 47.9
90 6/22/2018 T-2018-552 32.0 Workshop Area SP136 7/20/2018 832.7 841.3 46.8 47.3 47.1
91 6/23/2018 T-2018-553 32.5 B32 P031 7/21/2018 819.0 827.6 46.1 46.6 46.4
92 6/23/2018 T-2018-554 32.5 Workshop Area SP273 7/21/2018 831.2 838.6 46.8 47.2 47.0
93 6/23/2018 T-2018-555 32.0 Workshop Area SP044 7/21/2018 812.7 823.9 45.7 46.4 46.1
94 6/23/2018 T-2018-556 32.0 Workshop Area SP100 7/21/2018 841.6 834.2 47.3 46.9 47.1

Page 7 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

95 6/23/2018 T-2018-557 35.0 B32 P012 7/21/2018 859.9 839.7 48.4 47.2 47.8
96 6/23/2018 T-2018-558 35.0 Workshop Area SP305 7/21/2018 863.5 849.2 48.6 47.8 48.2
97 6/23/2018 T-2018-559 33.0 Workshop Area SP135 7/21/2018 862.1 865.1 48.5 48.7 48.6
98 6/23/2018 T-2018-560 32.0 Workshop Area SP302 7/21/2018 862.9 852.6 48.5 48.0 48.3
99 6/24/2018 T-2018-561 35.0 Workshop Area SP115 7/22/2018 845.8 849.6 47.6 47.8 47.7
100 6/24/2018 T-2018-562 35.0 Workshop Area SP137 7/22/2018 851.6 843.0 47.9 47.4 47.7
101 6/24/2018 T-2018-563 35.0 B32 P044 7/22/2018 862.7 850.2 48.5 47.8 48.2
102 6/24/2018 T-2018-564 31.0 Workshop Area SP306 7/22/2018 837.8 855.2 47.1 48.1 47.6
103 6/24/2018 T-2018-565 32.0 Workshop Area SP134 7/22/2018 872.3 853.0 49.1 48.0 48.6
104 6/24/2018 T-2018-566 34.5 Workshop Area SP297 7/22/2018 848.2 859.3 47.7 48.3 48.0
105 6/24/2018 T-2018-567 33.0 Workshop Area SP132 7/22/2018 869.0 854.2 48.9 48.1 48.5
106 6/24/2018 T-2018-568 34.0 Workshop Area SP112 7/22/2018 872.6 863.2 49.1 48.6 48.9
107 6/24/2018 T-2018-571 32.5 Workshop Area SP022 7/22/2018 842.7 873.9 47.4 49.2 48.3
108 6/24/2018 T-2018-572 31.5 Workshop Area SP272 7/22/2018 850.2 877.4 47.8 49.4 48.6
109 6/25/2018 T-2018-573 32.5 Workshop Area SP133 7/23/2018 851.8 844.7 47.9 47.5 47.7
110 6/25/2018 T-2018-574 35.0 B32 P008 7/23/2018 866.9 869.3 48.8 48.9 48.9
111 6/25/2018 T-2018-575 33.0 Workshop Area SP304 7/23/2018 876.6 857.0 49.3 48.2 48.8
112 6/25/2018 T-2018-576 32.0 Workshop Area SP071 7/23/2018 864.2 871.3 48.6 49.0 48.8
113 6/25/2018 T-2018-578 34.0 Workshop Area SP085 7/23/2018 872.2 843.4 49.1 47.4 48.3
114 6/25/2018 T-2018-579 35.0 Workshop Area SP131 7/23/2018 854.2 862.6 48.1 48.5 48.3
115 6/25/2018 T-2018-580 32.0 Workshop Area SP299 7/23/2018 839.7 862.3 47.2 48.5 47.9

Page 8 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

116 6/25/2018 T-2018-581 30.0 Workshop Area SP020 7/23/2018 839.3 847.6 47.2 47.7 47.5
117 6/25/2018 T-2018-582 32.0 B32 P032 7/23/2018 864.9 849.6 48.7 47.8 48.3
118 6/26/2018 T-2018-583 31.0 Workshop Area SP301 7/24/2018 865.7 843.2 48.7 47.4 48.1
119 6/26/2018 T-2018-584 32.0 Workshop Area SP128 7/24/2018 835.1 821.9 47.0 46.2 46.6
120 6/26/2018 T-2018-585 33.0 B32 P043 7/24/2018 866.0 846.3 48.7 47.6 48.2
121 6/26/2018 T-2018-586 31.0 Workshop Area SP070 7/24/2018 821.1 847.3 46.2 47.7 47.0
122 6/26/2018 T-2018-587 32.0 Workshop Area SP084 7/24/2018 851.4 828.1 47.9 46.6 47.3
123 6/26/2018 T-2018-588 35.0 Workshop Area SP296 7/24/2018 837.1 858.4 47.1 48.3 47.7
124 6/26/2018 T-2018-591 32.5 Workshop Area SP130 7/24/2018 861.7 818.9 48.5 46.1 47.3
125 6/26/2018 T-2018-592 33.0 B32 P010 7/24/2018 827.1 856.9 46.5 48.2 47.4
126 6/26/2018 T-2018-593 33.0 Workshop Area SP150 7/24/2018 837.9 859.3 47.1 48.3 47.7
127 6/27/2018 T-2018-594 33.0 Workshop Area SP295 7/25/2018 864.2 849.4 48.6 47.8 48.2
128 6/27/2018 T-2018-595 33.0 Workshop Area SP126 7/25/2018 862.9 847.5 48.5 47.7 48.1
129 6/27/2018 T-2018-596 32.0 Workshop Area SP086 7/25/2018 858.2 862.9 48.3 48.5 48.4
130 6/27/2018 T-2018-597 31.0 Workshop Area SP069 7/25/2018 842.4 867.4 47.4 48.8 48.1
131 6/27/2018 T-2018-598 40.0 B32 P046 7/25/2018 878.0 866.2 49.4 48.7 49.1
132 6/27/2018 T-2018-599 35.0 Workshop Area SP271 7/25/2018 872.3 852.7 49.1 48.0 48.6
133 6/27/2018 T-2018-601 33.0 Workshop Area SP129 7/25/2018 839.2 856.4 47.2 48.2 47.7
134 6/27/2018 T-2018-604 32.0 Workshop Area SP300 7/25/2018 844.0 859.3 47.5 48.3 47.9
135 6/27/2018 T-2018-605 33.0 B32 P029 7/25/2018 835.7 849.2 47.0 47.8 47.4
136 6/28/2018 T-2018-607 30.0 Workshop Area SP149 7/26/2018 857.0 802.1 48.2 45.1 46.7

Page 9 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

137 6/28/2018 T-2018-608 35.0 Workshop Area SP081 7/26/2018 849.5 846.6 47.8 47.6 47.7
138 6/28/2018 T-2018-609 32.0 Workshop Area SP109 7/26/2018 862.4 892.2 48.5 50.2 49.4
139 6/28/2018 T-2018-610 28.0 Workshop Area SP225 7/26/2018 858.7 810.0 48.3 45.6 47.0
140 6/28/2018 T-2018-611 35.0 Workshop Area SP127 7/26/2018 871.9 859.2 49.1 48.3 48.7
141 6/28/2018 T-2018-613 34.0 B32 P021 7/26/2018 847.6 872.7 47.7 49.1 48.4
142 6/28/2018 T-2018-616 32.0 Workshop Area SP184 7/26/2018 879.4 859.0 49.5 48.3 48.9
143 6/28/2018 T-2018-617 34.5 Workshop Area SP182 7/26/2018 872.9 861.4 49.1 48.5 48.8
144 6/28/2018 T-2018-619 31.0 Workshop Area SP124 7/26/2018 880.4 870.6 49.5 49.0 49.3
145 6/29/2018 T-2018-621 33.0 B32 P045 7/27/2018 861.9 859.2 48.5 48.3 48.4
146 6/29/2018 T-2018-622 35.0 Workshop Area SP180 7/27/2018 870.1 863.9 49.0 48.6 48.8
147 6/29/2018 T-2018-623 35.0 Workshop Area SP270 7/27/2018 870.1 869.4 49.0 48.9 49.0
148 6/29/2018 T-2018-624 32.0 Workshop Area SP083 7/27/2018 856.9 863.2 48.2 48.6 48.4
149 6/29/2018 T-2018-625 35.0 Workshop Area SP223 7/27/2018 849.4 868.2 47.8 48.8 48.3
150 6/29/2018 T-2018-626 33.5 Workshop Area SP221 7/27/2018 854.2 861.8 48.1 48.5 48.3
151 6/29/2018 T-2018-627 28.0 Workshop Area SP036 7/27/2018 879.2 822.0 49.5 46.2 47.9
152 6/29/2018 T-2018-628 33.0 B32 P009 7/27/2018 826.2 818.6 46.5 46.1 46.3
153 6/29/2018 T-2018-629 32.5 Workshop Area SP121 7/27/2018 830.8 866.2 46.7 48.7 47.7
154 6/29/2018 T-2018-630 31.5 Workshop Area SP183 7/27/2018 840.6 810.9 47.3 45.6 46.5
155 6/30/2018 T-2018-632 33.0 Workshop Area SP268 7/28/2018 874.2 853.9 49.2 48.0 48.6
156 6/30/2018 T-2018-633 32.0 Workshop Area SP039 7/28/2018 847.2 870.6 47.7 49.0 48.4
157 6/30/2018 T-2018-634 35.0 B32 P030 7/28/2018 863.0 850.7 48.6 47.9 48.3

Page 10 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

158 6/30/2018 T-2018-635 35.0 Workshop Area SP217 7/28/2018 839.6 859.0 47.2 48.3 47.8
159 6/30/2018 T-2018-636 27.0 Workshop Area SP125 7/28/2018 867.2 856.9 48.8 48.2 48.5
160 6/30/2018 T-2018-638 29.0 Workshop Area SP219 7/28/2018 869.1 852.7 48.9 48.0 48.5
161 6/30/2018 T-2018-640 33.0 B32 P048 7/28/2018 850.5 862.7 47.8 48.5 48.2
162 6/30/2018 T-2018-641 28.0 Workshop Area SP122 7/28/2018 842.4 852.7 47.4 48.0 47.7
163 7/1/2018 T-2018-642 37.0 Workshop Area SP265 7/29/2018 869.1 852.0 48.9 47.9 48.4
164 7/1/2018 T-2018-643 34.0 Workshop Area SP078 7/29/2018 842.2 863.5 47.4 48.6 48.0
165 7/1/2018 T-2018-644 33.0 B32 P022 7/29/2018 839.7 847.2 47.2 47.7 47.5
166 7/1/2018 T-2018-645 32.5 Workshop Area SP263 7/29/2018 851.2 872.6 47.9 49.1 48.5
167 7/1/2018 T-2018-646 33.0 Workshop Area SP035 7/29/2018 863.2 844.6 48.6 47.5 48.1
168 7/1/2018 T-2018-648 31.0 Workshop Area SP264 7/29/2018 846.7 859.5 47.6 48.4 48.0
169 7/1/2018 T-2018-649 35.0 B32 P028 7/29/2018 873.2 862.4 49.1 48.5 48.8
170 7/1/2018 T-2018-650 33.5 Workshop Area SP165 7/29/2018 863.0 869.6 48.6 48.9 48.8
171 7/2/2018 T-2018-653 30.5 Workshop Area SP266 7/30/2018 849.7 857.2 47.8 48.2 48.0
172 7/2/2018 T-2018-654 32.0 B32 P047 7/30/2018 862.1 849.3 48.5 47.8 48.2
173 7/2/2018 T-2018-655 35.0 Workshop Area SP123 7/30/2018 867.2 852.3 48.8 48.0 48.4
174 7/2/2018 T-2018-656 28.0 Workshop Area SP177 7/30/2018 870.2 863.6 49.0 48.6 48.8
175 7/2/2018 T-2018-657 33.5 B32 P024 7/30/2018 847.9 862.6 47.7 48.5 48.1
176 7/2/2018 T-2018-658 33.5 Workshop Area SP269 7/30/2018 842.4 852.7 47.4 48.0 47.7
177 7/2/2018 T-2018-660 2.0 Stabling Shed Test Pile 7/30/2018 821.6 840.9 46.2 47.3 46.8
178 7/2/2018 T-2018-661 31.5 Workshop Area SP181 7/30/2018 866.9 880.3 48.8 49.5 49.2

Page 11 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

179 7/2/2018 T-2018-662 22.0 Workshop Area SP049 7/30/2018 859.2 872.2 48.3 49.1 48.7
180 7/3/2018 T-2018-663 28.0 Workshop Area SP262 7/31/2018 871.4 833.7 49.0 46.9 48.0
181 7/3/2018 T-2018-664 35.0 Workshop Area SP179 7/31/2018 819.5 849.4 46.1 47.8 47.0
182 7/3/2018 T-2018-665 35.0 Workshop Area SP082 7/31/2018 852.7 831.4 48.0 46.8 47.4
183 7/3/2018 T-2018-666 34.0 B32 P027 7/31/2018 823.2 851.7 46.3 47.9 47.1
184 7/3/2018 T-2018-667 28.0 Workshop Area SP267 7/31/2018 831.5 857.2 46.8 48.2 47.5
185 7/3/2018 T-2018-668 35.0 Workshop Area SP176 7/31/2018 825.9 861.7 46.5 48.5 47.5
186 7/3/2018 T-2018-669 33.0 Workshop Area SP037 7/31/2018 867.2 843.5 48.8 47.5 48.2
187 7/3/2018 T-2018-674 21.0 Workshop Area SP049 7/31/2018 858.9 842.6 48.3 47.4 47.9

Standerd Deviasion S= 0.91 M7 = 41.4 N/mm2 M28 = 47.7 N/mm2

M7-2.0*(S)>L7= 39.6 N/mm2 > L7=L28X86.8%= 25.8 N/mm2

M28-2.0*(S)>L28= 45.9 N/mm2 > L28= 30.0 N/mm2

Y= Average Cylinder strength at 7 days/Average Cylinder strength at 28 days= 86.8 %

Comments: - The Test Result of 7 days and 28 days Concrete grade 30(BP) Complies as per Specification Vol. 3-2, Part-2,

Clause 2.1.5 & 2.1.6

Zhou Hong Imtiaz Ahmed Shang Qinfeng


Lab Engineer QC Engineer on behalf of
Date Date Wang Wenliang
QA Manager

Page 12 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Date

Page 13 of 25
Concrete Compressive Strength Test Results Summary of G-25(P)

[ DATA part ]:

Supplying Concrete for Site: ITD/CP-02 Batching Plant Number of Samples N 29

Concrete Design Strength: G-25 (P) fc = 30 N/mm2 Upper control limit (CL+3×S) UCL: 44.1 N/mm2

Calibration Equation:Y=0.9942X Correcion Formula: a= 0.9942 Upper warning limit (CL+2×S) UWL: 41.7 N/mm2

First Compressive strength test for 28 days: 01/07/2018 Central limit CL 37.0 N/mm2

Last Compressive strength test for 28 days: 31/07/2018 Lower warning limit (CL-2×S) LWL: 32.3 N/mm2

Lower control limit (CL-3×S) LCL: 30.0 N/mm2

Standard deviation S 2.35 N/mm2

Coefficient of variation Cv 0.063

Concre 28 days Compressive Strength of Concrete Cylinders


Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
1 6/4/2018 T-2018-438 16.0 Retaining Wall 0+805-0+823 Vertical Wall 7/2/2018 697.9 711.5 39.3 40.0 39.7
2 6/4/2018 T-2018-442 5.0 Retaining Wall 0+927-0+932 Vertical Wall 7/2/2018 734.3 749.2 41.3 42.2 41.8
3 6/5/2018 T-2018-449 30.0 Retaining Wall 0+548-0+566 Base 7/3/2018 716.1 732.9 40.3 41.2 40.8
4 6/6/2018 T-2018-453 30.0 Retaining Wall 0+607-0+623 Base 7/4/2018 668.7 692.6 37.6 39.0 38.3
5 6/6/2018 T-2018-458 16.0 Retaining Wall 0+494-0+512 Vertical Wall 7/4/2018 697.2 681.4 39.2 38.3 38.8
6 6/6/2018 T-2018-463 28.5 Retaining Wall 0+264-0+282 Base 7/4/2018 678.6 649.2 38.2 36.5 37.4
7 6/7/2018 T-2018-466 36.0 Retaining Wall 0+769-0+787 Vertical Wall 7/5/2018 699.8 697.2 39.4 39.2 39.3
8 6/7/2018 T-2018-470 16.0 Retaining Wall 0+969-0+987 Vertical Wall 7/5/2018 598.7 587.1 33.7 33.0 33.4
9 6/8/2018 T-2018-476 26.0 Retaining Wall 0+000-0+012 Vertical Wall 7/6/2018 715.1 722.2 40.2 40.6 40.4
10 6/9/2018 T-2018-483 16.0 Retaining Wall 0+264-0+282 verticalwall 7/7/2018 613.8 607.6 34.5 34.2 34.4
11 6/9/2018 T-2018-489 24.0 Retaining Wall 0+589-0+607 Base 7/7/2018 621.7 616.3 35.0 34.7 34.9

Page 14 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
12 6/9/2018 T-2018-492 16.0 Retaining Wall 0+476-0+494 Base 7/7/2018 688.2 694.4 38.7 39.1 38.9
13 6/10/2018 T-2018-495 30.0 Retaining Wall 0+404-0+422 Base 7/8/2018 611.2 619.8 34.4 34.9 34.7
14 6/10/2018 T-2018-498 32.5 Retaining Wall 0+553-0+571 Base 7/8/2018 709.6 673.2 39.9 37.9 38.9
15 6/10/2018 T-2018-503 16.0 Retaining Wall 0+733-0+751 Vertical Wall 7/8/2018 616.9 624.8 34.7 35.2 35.0
16 6/11/2018 T-2018-508 16.0 Retaining Wall 0+264-0+282 Vertical Wall 7/9/2018 611.6 624.2 34.4 35.1 34.8

Page 15 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
17 6/11/2018 T-2018-511 30.0 Retaining Wall 0+571-0+589 Bass 7/9/2018 707.9 664.2 39.8 37.4 38.6
18 6/11/2018 T-2018-513 16.0 Retaining Wall 0+512-0+530 Vertical Wall 7/9/2018 636.6 622.4 35.8 35.0 35.4
19 6/12/2018 T-2018-519 16.0 Retaining Wall 0+643-0+661 Bass 7/10/2018 619.6 627.3 34.9 35.3 35.1
20 6/12/2018 T-2018-525 14.9 Retaining Wall 0+000-0+012 Vertical Wall 7/10/2018 613.6 626.4 34.5 35.2 34.9
21 6/12/2018 T-2018-529 16.0 Retaining Wall 0+530-0+548 Vertical Wall 7/10/2018 609.0 620.6 34.3 34.9 34.6
22 6/27/2018 T-2018-603 30.0 Retaining Wall 0+282-0+300 Vertical Wall 7/25/2018 651.4 672.2 36.6 37.8 37.2
23 6/28/2018 T-2018-618 19.5 Retaining Wall 0+575-0+593 Vertical Wall 7/26/2018 650.7 662.0 36.6 37.2 36.9
24 6/30/2018 T-2018-631 30.0 Retaining Wall 0+305-0+323 Base 7/28/2018 649.7 638.2 36.6 35.9 36.3
25 6/30/2018 T-2018-639 16.0 Retaining Wall 0+625-0+643 Vertical Wall 7/28/2018 610.2 621.6 34.3 35.0 34.7
26 7/2/2018 T-2018-652 16.5 Retaining Wall 0+287-0+305 Vertical Wall 7/30/2018 620.2 631.6 34.9 35.5 35.2
27 7/3/2018 T-2018-670 16.5 Retaining Wall 0+593-0+611 Vertical Wall 7/31/2018 624.7 617.2 35.1 34.7 34.9
2nd Lift 0+863-0+881
28 7/3/2018 T-2018-671 27.5 Retaining Wall
Vertical Wall 7/31/2018 687.6 714.4 38.7 40.2 39.5

29 7/3/2018 T-2018-672 30.0 Retaining Wall 0+323-0+341 Vertical Wall 7/31/2018 700.7 689.2 39.4 38.8 39.1

Standerd Deviasion S= 2.35 M7 = 33.5 N/mm2 M28 = 37.0 N/mm2

M7-2.0*(S)>L7= 28.8 N/mm2 > L7=L28X90.5%= 22.6 N/mm2

M28-2.0*(S)>L28= 32.3 N/mm2 > L28= 25.0 N/mm2

Y= Average Cylinder strength at 7 days/Average Cylinder strength at 28 days= 90.5 %

Comments: - The Test Result of 7 days and 28 days Concrete grade 25(P) Complies as per Specification Vol. 3-2, Part-2,

Clause 2.1.5 & 2.1.6

Page 16 of 25
Concre 28 days Compressive Strength of Concrete Cylinders
Date of
Lab Ref. te Component of Date of
Sl no Concrete Location Load Strength Remark
No. Volum Structure Testing Average
pouring e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Zhou Hong Imtiaz Ahmed Shang Qinfeng
Lab Engineer QC Engineer on behalf of
Date Date Wang Wenliang
QA Manager
Date

Page 17 of 25
Concrete Compressive Strength Test Results Summary of G-15(B)

[ DATA part ]:

Supplying Concrete for Site: ITD/CP-02 Batching Plant Number of Samples N 23

Concrete Design Strength: G-15 (B) fc = 30 N/mm2 Upper control limit (CL+3×S) UCL: 28.7 N/mm2

Calibration Equation:Y=0.9942X Correcion Formula: a= 0.9942 Upper warning limit (CL+2×S) UWL: 27.4 N/mm2

First Compressive strength test for 28 days: 01/07/2018 Central limit CL 24.9 N/mm2

Last Compressive strength test for 28 days: 31/07/2018 Lower warning limit (CL-2×S) LWL: 22.4 N/mm2

Lower control limit (CL-3×S) LCL: 21.1 N/mm2

Standard deviation S 1.26 N/mm2

Coefficient of variation Cv 0.051

28 days Compressive Strength of Concrete Cylinders


Concr
Date of
Lab Ref. ete Component of Date of Load Strength
Sl no Concrete Location
No. Volum Structure Testing Average
pouring
e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
0+643-0+661 Lean
1 6/5/2018 T-2018-450 16.0 Retaining Wall
Concrete 7/3/2018 421.0 445.6 23.7 25.1 24.4

2 6/6/2018 T-2018-457 5.0 B32 Lean Concrete 7/4/2018 432.6 426.2 24.3 24.0 24.2

3 6/8/2018 T-2018-480 30.0 B33 Lean Concrete 7/6/2018 510.4 484.1 28.7 27.2 28.0

4 6/8/2018 T-2018-481 30.0 B32 Lean Concrete 7/6/2018 496.2 506.8 27.9 28.5 28.2

5 6/10/2018 T-2018-501 16.0 B34 A Lean Concrete 7/8/2018 451.0 444.7 25.4 25.0 25.2

6 6/10/2018 T-2018-502 28.5 B32 Lean Concrete 7/8/2018 441.1 449.8 24.8 25.3 25.1
10D 11D 12D Lean
7 6/11/2018 T-2018-515 36.0 B32
Concrete 7/9/2018 450.1 466.8 25.3 26.3 25.8

8 6/11/2018 T-2018-517 16.0 Retaining Wall 0+282-0+300 Lean Concrete 7/9/2018 429.6 447.1 24.2 25.2 24.7

Page 18
28 days Compressive Strength of Concrete Cylinders
Concr
Date of
Lab Ref. ete Component of Date of Load Strength
Sl no Concrete Location
No. Volum Structure Testing Average
pouring
e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

9 6/12/2018 T-2018-526 26.0 B32 Rebar yard lean concrete 7/10/2018 432.6 446.9 24.3 25.1 24.7

10 6/24/2018 T-2018-569 16.0 B33 Lean Concrete 7/22/2018 475.6 451.2 26.8 25.4 26.1

11 6/24/2018 T-2018-570 24.0 B33 Steel factory 7/22/2018 445.6 462.1 25.1 26.0 25.6

Page 19
28 days Compressive Strength of Concrete Cylinders
Concr
Date of
Lab Ref. ete Component of Date of Load Strength
Sl no Concrete Location
No. Volum Structure Testing Average
pouring
e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

12 6/25/2018 T-2018-577 16.0 B33 Lean Concrete 7/23/2018 452.3 442.4 25.4 24.9 25.2

13 6/26/2018 T-2018-590 30.0 B34 A 100+120 C C casting 7/24/2018 444.1 430.8 25.0 24.2 24.6

14 6/27/2018 T-2018-602 32.5 B33 C C casting 7/25/2018 401.2 426.3 22.6 24.0 23.3

15 6/28/2018 T-2018-606 16.0 Retaining Wall 0+302-0+320 Lean Concrete 7/26/2018 430.1 429.9 24.2 24.2 24.2

16 6/28/2018 T-2018-612 16.0 Retaining Wall 0+302-0+320 Lean Concrete 7/26/2018 440.2 399.9 24.8 22.5 23.7

17 6/28/2018 T-2018-614 30.0 B34 A lean concrete 7/26/2018 410.3 420.1 23.1 23.6 23.4

18 6/28/2018 T-2018-615 16.0 Retaining Wall 0+318-0+336 Lean Concrete 7/26/2018 420.7 444.1 23.7 25.0 24.4

19 6/29/2018 T-2018-620 16.0 B33 lean concrete 7/27/2018 406.3 416.2 22.9 23.4 23.2

20 7/1/2018 T-2018-647 14.9 B32 Lean Concrete 7/29/2018 450.2 431.7 25.3 24.3 24.8
0+395-0+413 Lean
21 7/1/2018 T-2018-651 16.0 Retaining Wall
Concrete, CC 7/29/2018 440.2 432.0 24.8 24.3 24.6

22 7/2/2018 T-2018-659 30.0 B33 Lean Concrete 7/30/2018 430.2 442.4 24.2 24.9 24.6

23 7/3/2018 T-2018-673 19.5 Retaining Wall 0+341-0+359 Lean Concrete 7/31/2018 439.7 423.8 24.7 23.8 24.3

Standerd Deviasion S= 1.26 M7 = 22.2 N/mm2 M28 = 24.9 N/mm2

M7-2.0*(S)>L7= 19.7 N/mm2 > L7=L28X89.2%= 13.4 N/mm2

M28-2.0*(S)>L28= 22.4 N/mm2 > L28= 15.0 N/mm2

Y= Average Cylinder strength at 7 days/Average Cylinder strength at 28 days= 89.2 %

Comments: - The Test Result of 7 days and 28 days Concrete grade 15(B) Complies as per Specification Vol. 3-2, Part-2,

Page 20
28 days Compressive Strength of Concrete Cylinders
Concr
Date of
Lab Ref. ete Component of Date of Load Strength
Sl no Concrete Location
No. Volum Structure Testing Average
pouring
e 1 2 3 4 1 2 3 4
m3 KN KN KN KN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

Clause 2.1.5 & 2.1.6

Zhou Hong Imtiaz Ahmed Shang Qinfeng


Lab Engineer QC Engineer on behalf of
Date Date Wang Wenliang
QA Manager
Date

Page 21
Strength Test Results Summary of G-15(B)

Remark

Page 22
Remark

Page 23
Remark

Page 24
Remark