Professional Documents
Culture Documents
Document
Material Submittal [MAR]-"M" MECHANICAL
Updated 10/7/2018
DOC Description Date to Date from Duration Status
Trade Rev # Consult. Consult. D1 D2 APP ANN Resubmit Rejected
M011 Two Hour Fire Rated Insulation Section (15890) 0 11/15/2017 12/5/2017 20 X
Document
Material Submittal [MAR]-"E" ELECTRICAL
Updated 10/7/2018
DOC Description Date to Date from Duration Status
Trade Rev # Consult. Consult. D1 D2 APP ANN Resubmit Rejected
Document
Documents Transmittal [DT] - "E" Electrical
Updated 10/7/2018
Description Date to Date from Duration Status
DOC Trade Rev # Consult. Consult. D1 D2 APP ANN Resubmit Rejected
DT
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING
DT
Project: SPEARS 88
Project Manager: TRUSTHOLD DEVELOPMENT GROUP
Consultant: ASYA ARCHITECTS
Contractor: NATCON ENGINEERING AND CONTRACTING
Document
Shop Drawings Submittals [SDS] - "M" Mehcanical
Updated 10/7/2018
Description Date to Date from Duration Status
Rev
DOC Trade Dwg # Consult. Consult. D1 D2 APP ANN Resubmit Rejected
#
Document
Shop Drawings Submittals [SDS] - "E" Electrical
Updated 10/7/2018
Description Date to Date from Duration Status
Rev
DOC Trade Dwg # Consult. Consult. D1 D2 APP ANN Resubmit Rejected
#
M01 Drainage & rain water pipes laid in raft at level 40.44 0 12/11/2017 12/11/2017 0
FIR
M02 Drainage & rain water pipes laid in raft at level 41.3 0 12/15/2017 12/15/2017 0