Various Charges required for New Connection application

(i) Application processing charges [Non-Refundable]

Sr. No. Connected Load Application Processing Fee


1 Connected load Up to 2 KW Rs.50
2 Above 2 kW Rs.25 per kW or part thereof subject to the
max. of Rs.20,000/-

Part thereof means in case applied load is 4.5 KW for domestic, the Application
processing fee required will be Rs 50 x 5 = 250.

(ii) Advance Consumption Deposit [ACD] for New Connections:

Sr. No. Category of consumer Rs/KW or part thereof * of the


connected load
1 Domestic Supply 750
2 Non-Domestic Supply 1000
3 HT Industrial Supply [ Above 50 KW 1000
4 LT Industrial Supply [ Up to 50 KW] 1000
5 Agriculture Tube-well Supply 100
6 Public Water works 1500
7 Lift Irrigation 1000
8 MITC 1000
9 Street Lighting 2000
10 Railway Traction 1500
11 DMRC 1500
12 Bulk Supply 1000
13 Bulk Domestic Supply 750
[70 KW and above at 11 KV or above voltage]
14 Independent Hoarding /Decorative Lightning 2000
15 Temporary Metered Supply 4 times the ACD of respective
category.
Notes:-

(a) Extension of Load: - Incase of consumers who are sanctioned additional connected
load, the ACD be got deposited for the additional connected load.
(b) Part thereof means in case applied load is 4.5 KW for domestic, the ACD required
will be Rs 750 x 5 = 3750.
(iii) Metering charges

Sr. No. Particular Applicable charges


Meter Security Charges
1. Meter security for single phase Nigam meter Rs.600
2 Meter security for three phase whole current Rs. 1400
Nigam meter
3 3-phase LT-CT meter Rs.1600
4 11 KV CT-PT consumer meter Rs.2200
5 LT-CT Meter (with Inbuilt CTs & Modem) Rs 12500
Meter Cub-Board / Meter Box / Metering cubicle charges
1 MCB for single phase meter Rs.250
2 MCB for three phase whole current meter Rs.350
3 LT-CT meter box Rs.2000
4 HT Cubical meter box Rs.17000
CT-PT Charges
1 LT- CTs [set of 4] Rs 400 Per CT and
Rs.1600 for Set of 4 CTS
2 11 KV CTs [set of 3] Rs.2500 per CT and
Rs.7500 for set of 3 CTs.
3 11 KV PT Rs.7600
Meter Testing Charges
1 Single phase meter Rs.90
2 Three phase whole current meter Rs.330
3 HT meter Rs.2000
4 LT-CT Meter with Rs 660
in-built CTs
5 LT-CTs [set of 4] Rs.165 per CT and
Rs.660 for set of 4 CTs.
6 11 KV CT (set of 3) Rs.550 per CT and
Rs.1650 for set of 3 CTs
7 11 KV CT-PT combined unit Rs.2500
8 Testing of 11 KV PT Rs.1000
Meter Installation Charges
1 Single phase meter Rs.100
2 Three phase meter Rs.200
3 Three phase LT-CT meter & In-built CT Meter Rs 500
4 Three phase HT-PT meter Rs 1050
(iv) Service Connection Charges
(a) Fixed Service Connection charges

Sr. Category of consumer Fixed Service Connection For Length exceeding


No. charges Up to length of 150 150 Meters, the
Meters additional service
connection charges
would be as under
1 Domestic Supply
(a) Single Phase up to 2 KW Rs 200 per KW or part thereof  For applied Loads up
(b) Single Phase [>2 KW and Up to 5KW] Rs 500 per KW or part thereof to 50KW:- Rs 175
(c) Three Phase [>5KW] Rs 1000 per KW or part thereof per meter
2 Non-Domestic Supply
(a) Single phase Up to 5 KW Rs 1000 per KW or part thereof  For loads greater
(b) Three phase [> 5 KW] Rs 2000 per KW or part thereof than 50 KW:- Rs 250
3 HT Industrial Supply [ Above 50 KW] Rs 2000 per KVA of contract per meter
demand or part thereof
4 LT Industrial Supply [ Up to 50 KW] Rs 2000 per KW or part thereof
5 Bulk Supply Rs 2000 per KW or part thereof
6 Bulk Supply (Domestic) Rs 2000 per KW of connected
load or part thereof
7 Public Water works , Lift Irrigation, MITC
DMRC, Railway Traction , Independent
Hoarding /Decorative Lightning
(i) Up to 50KW[LT] Rs 2000 per KW or part thereof
(ii) > 50 KW [HT] Rs 2000 per KW of connected
or part thereof

(c) In the following categories, the fixed service connection charges and additional
connection service connection charges are not applicable

 Agriculture Pumping (AP) supply - Actual Cost filled by SDO office


 Street Light - Actual Cost filled by SDO office
(d) For supply at 11 KV :- The applicable service connection charges would be the
highest of the following :-

1) Service connection charges as per provisions contained in clause (a)


2) Actual cost of service line. In case the line emanates from sub-station
then the actual cost shall also includes cost of breaker.
(e) For supply at voltages greater than 11 KV :- The applicable service connection
charges would be the highest of the following :-

1) Service connection charges as per provisions contained in clause (a)


2) Actual cost of service line and proportionate cost of main line and bay
up to the sub-station. In case the line emanates from sub-station then
the consumer shall bear the complete cost of line including the bay
and breaker.