Experienced Engineering Teams
Dedicated in-house engineering teams focused on providing engineering and design support for the planning and execution
of installation projects, also including FEED, etc:
• Front end engineering and design studies
• Installation analysis and calculations
• Seabed and soil geo-analysis
• Route designs and optimisation
• Cable design and manufacturing support
• Vessel and equipment layout planning
• Design and manufacturing support for installation
• equipment & subsea equipment
Skaggerak4 Interconnector
Global Tech 1 OWF
Pre-cut trenching
Array cable trenching
Western HVDC Link
Interconnector burial DolWin Beta Platform
Gode Wind
Robin Rigg OWF Walk-to-Work
Walk-to-Work
Array cable installation
DolWin Alpha Platform
Walney Ormonde OWF Export cable repair
Hornsea 1 OWF
Export cable burial Array cable installation
DolWin 1 Platform
Walney Extension OWF Export cable burial
Export cable installation
Alpha Ventus OWF
Race Bank OWF Array cable repair
Array cable installation Export cable burial
Export cable burial
Egmond Aan Zee OWF
Sheringham Shoal OWF Export cable repair
Walk-to-Work
Next Generation
6
Deepwater X-tree installation
Client: Tullow Ghana Ltd.
Location: Offshore Ghana, Jubilee and TEN field
Year: 2013-2016
Year: 2015
www.deepoceangroup.com 11
Diverless ACFM inspection
ACFM = Alternating Current Field Measurement Inspection
Innovation
https://www.youtube.com/watch?v=1ndeC1Ky90M#t=37.6958111
Pipeline
Visual mode - 615 km 3.1 km/h (0,85 m/s)
Acoustic mode - 1900 km 5.3 km/h (1.50 m/s)
(Several sections of 7.5 km/h ( 2.0 m/s) ~50km)
Route Survey
Pipeline Route - 285km 4.4 km/h (1.2 m/s)
Average 17km long lines - Max speed 5.25 km/h
Clients saving 1,5 day per every 15 days campaign
www.deepoceangroup.com 13
Trenching and Ploughing
https://www.youtube.com/watch?v=00BInc
https://deepoceangroup.com/assets/trenchers-ploughs/
Design, Fabrication and Operation – Subsea innovation
Clamp Handling Frame, Machining Unit and ROV Extension Arms
• System has been used at the Norne location – 380 meter water depth
• Replace divers and large and heavy tie-in tools like “Big Brother” etc.
• Half tie-in time at large bore compared to divers tie-in or other remote tools.
• Can be re-used for same pipe OD
• H-frame or similar alignment tool
Innovation – Bolt tie-in tool
Innovation – Bolt tie-in tool
• Pre-installed torque
tool
• Bolt initiation at swivel
flange (one end)
High ambitions – Deep knowledge