You are on page 1of 5

date RATE, mm/d DAYS Monthly Total Annula Total= 58.

19803 inches
1/1/1996 1.2 31 37.2
2/1/1996 2.07 29 60.03 14 RATE, mm/d
3/1/1996 1.35 31 41.85 12
4/1/1996 3.02 30 90.6
5/1/1996 3.6 31 111.6 10
6/1/1996 11.14 30 334.2 8
7/1/1996 8.27 31 256.37
8/1/1996 8.27 31 256.37 6
9/1/1996 3.9 30 117 4
10/1/1996 2.7 31 83.7
11/1/1996 1.83 30 54.9 2
12/1/1996 1.11 31 34.41 0
1/1/1997 1/1/1996 3/1/1996 5/1/1996 7/1/1996 9/1/1996
, mm/d

RATE, mm/d

7/1/1996 9/1/1996 11/1/1996


INSTRUCTIONS SCREEN CAPTURE

General problem: monthly ET rates


from a published paper look "odd" and
you want to check the annual ET in
units that are comprehensible to you.

Create a dummy table of dates and


rates in the units of the published
paper, mm/d.

Type 1/1/96 into cell A2 and 2/1/96 into


cell A3.

Highlight cells A2:A3. Grab lower, right


corner. Drag to fill through cell A14.

Type 1 into cell B2.

Calculate days/month in column C by


typing "=A3-A2" in cell C2.

Compute monthly total in column D by


typing "=B2*C2" in cell D2.

Highlight cells B2:D2. Double-click


lower, right corner.

Delete cells B14:c14.

Highlight cells A1:B13.

Create a column chart.


Find annual total in inches.

Type "=SUM(D2:D13)/25.4" in cell G1.

Import image of chart.

Select chart area. Right click to select


"Format Plot Area."

Select "Fill Effects…"

Select the "Picture" tab.

Press the "Select Picture.." button.

Find the directory where the


spreadsheet "Digitize_from_Picture-in-
a-Chart.xls" resides.

Select the JPEG


"DigitizeThisPix_of_ScrewyET.jpg" as
the background image.

Select the Y-axis so the scale can be


forced to match the scale in the JPEG
which ranges from 0 to 14 mm/d.
Uncheck the auto scale of the Y-axis
and specify a minimum of 0 and a
maximum of 14.

For each month:

Grab end of column. Move up or down


to match black boxes of 1996
estimates.

Annual rate totals 58 inches.

You might also like