Table of Contents
1 PURPOSE ................................................................................................................................................... 1
2 GLOSSARY ................................................................................................................................................ 2
6 REQUIRED CONDITIONS...................................................................................................................... 17
13 EQUIPMENT ............................................................................................................................................. 29
18 RECORDS................................................................................................................................................. 35
19 REPORTS ................................................................................................................................................. 37
A1 SOILS .................................................................................................................................................. 41
A2 MINERAL AGGREGATES, SAND, FILLERS ............................................................................................ 41
A3 CONCRETES ....................................................................................................................................... 42
A4 BITUMINOUS MATERIALS .................................................................................................................... 42
A5 BITUMENS ........................................................................................................................................... 42
1 Purpose
This document defines the manner in which construction products are accepted for the
purposes of constructing highways and carrying out works on public roads in Albania. They
deal comprehensively with the methods of conformity assessment and approval of
construction products, for the instances where there is no formal system of product
conformity already approved. These provisions do not apply to construction products that are
already accepted by established procedures.
This document also defines the manner in which site laboratories, within construction
projects occurring in Albania, must be established, organised and maintained. It deals
comprehensively with all necessary elements controlling system, staff and equipment. These
provisions do not apply to construction products that are already accepted by other
established procedures.
2 Glossary
Acceptance test. Test carried out for examining certain characteristics of construction
product during post-casting phase, in order to confirm or reject the existing evaluation of
construction product conformity with respect to the required characteristic present in pre-
casting phase.
Audit test. Occasional tests and measurement with which randomly selected samples or
locations are subject to verification, whether or not the results obtained by conformity tests
are actually accurate.
Authorised laboratory personnel. Authorised laboratory personnel are experts that are
licensed by the Ministry of Public Works, Transport and telecommunications to carry out
laboratory tests.
Conformity control. The tasks, procedures and conformity tests performed within the
framework of internal control, for the purposes of conformity assessment.
Conformity test. Test intended for construction product’s conformity control that is
performed according to the testing plan within the factory and/or during the construction
product or construction semi-product casting.
Construction product. Every product used for the purpose of being incorporated into the
works.
Construction semi-product. A construction product that, in itself, is not fully suitable for the
intended use in construction works and that acquires the required characteristics only in the
post-casting phase.
External control/third party control. This comprises the activities performed by the Institute
of Standards and Technologies in Construction (ISTC), for the purposes of internal control
supervision, leading to construction product conformity attestation, or factory production
control, and/or cast-in construction product acceptance. It includes tasks, procedures,
external tests and measurements performed during the production phase and/or casting of
the construction product concerned.
Factory production control. This comprises the activities performed by the manufacturer
within the framework of internal control, for the purposes of production management within
the factory plant. These activities include tasks, procedures, production control tests and
measurements carried out during the production (preparation) of a construction product. Its
integral part is control, carried out within the factory plant, of the finished construction
product’s conformity with the requirements of the relevant technical specifications.
Identity control. An action taking place prior to casting of the construction product in
question, in order to verify, according to the criteria laid down in the technical specifications,
whether or not the results obtained in identity tests for certain product characteristics belong
to the same statistical population for which conformity has already been the subject to
assessment under internal control.
Identity test. A test performed for the purposes of identity control of a delivered construction
product.
Initial type test. A test performed to verify and confirm whether the required characteristics
have been achieved and whether the construction product in question is appropriate for the
envisaged use. Such a test is carried out prior to regular production or in the case of
significant changes in the origin of the components and/or their relations, as well as
significant changes in production method. Depending on the prescribed system of conformity
assessment, its implementation is either the responsibility of the manufacturer, the contractor
or the engineer.
Internal control (auto-control). This comprises the activities performed by the manufacturer
during the production phase within the factory plant and/or the contractor when casting the
construction product concerned on the building site. These activities are performed for the
purposes of product conformity management and assessment.
Laboratory. Technical organisation that during the construction phase carries out conformity
tests and fulfils the prescribed requirements.
Production control test. Testing and measurement that must be performed by the
manufacturer or contractor for the purposes of production management and conformity
control within the production plant and during the construction product casting.
Testing plan. A plan of the type, frequency, and number of conformity tests that must be
carried out during the preparation and/or casting of the construction product concerned, in
relation to the requirements laid down in the technical specifications or tender specifications.
Third party. Legal subject or authority recognised as independent with regard to the client,
contractor and construction product manufacturer concerned.
3 Product Acceptance
3.1 General
According to this document, any construction product should be accepted if it:
a. Can contribute to the fulfilment of essential technical requirements for the construction
works into which it is to be cast (i.e. safety, usability, durability and safe use of the
construction works);
Acceptance of any type of cast-in construction product is carried out by the engineer, as
defined in section Error! Reference source not found. of this document.
• For individual sections, segments or lots of cast-in construction products, when partial
acceptance is necessary for the continuation of construction works.
• On casting into construction works, pursuant to section 3.3 of this document, for
construction products that are regarded as suitable for their intended use only in post-
casting phase.
Construction products that are accepted for casting are those that:
The certificates listed below may be presented and recognised as proof of a construction
product’s conformity in accordance with the effective legislation or pursuant to this document:
The acceptance of imported construction products is subject to the provisions set out in
section 3.4 of this document.
• Verify whether the evidence of a construction product’s conformity or whether the report
of initial type test covers all the product’s characteristics required by the relevant
specifications; when deficiencies are identified, the engineer must request additional
evidence;
• When so required, perform appropriate identity tests on the proposal by the ISTC and
in accordance with general regulations on placing the construction products in question
on the market.
During regular delivery to construction site, the engineer, however, must as frequently as
appropriate:
• Perform identity tests if so prescribed for the product in question in the relevant
technical specifications or the regulation issued by the Ministry of Public Works,
Transport and Telecommunications, or tender specifications, or;
• Confirm the validity or reject the issued attestation of conformity, on the basis of on-
going conformity assessment.
• Completed internal and external controls during casting phase, in accordance with
section 4.4.2 of this document;
In the case of any deviations, the cast-in construction product must be rejected and must be
repaired or removed from the construction works and replaced by a new one. Rejection
criteria must be defined for the construction product in question or in tender specifications.
The ISTC must, for the acceptance of a specific type of cast construction product, draw a
report on conformity pursuant to section 4.5 of this document that must contain the decision
on approval or rejection of the product cast into construction works or into certain
components thereof (segments, layers, construction elements, etc.) in accordance with
acceptance planning.
Documents issued abroad are recognised as a basis for issuing a conformity certificate,
provided that the necessary conditions of technical requirements for construction products
and conformity assessment are fulfilled.
• Identity tests.
The sample for such tests must be delivered by the importer or taken on the manufacturer’s
premises by an authorised representative of the ISTC.
Acceptance procedures carried out during regular delivery are subject to the provisions of
section 3.2 of this document, while acceptance procedures carried out for the cast-in product
are subject to the provisions in section 3.3 of this document.
The ISTC may, upon the client’s consent, delegate to a sub-contractor – another competent
organisation – individual tasks concerning external control, nevertheless remaining fully
responsible for their proper and complete implementation. The ISTC, however, is not
permitted to delegate to the sub-contractor the drawing up of the report on the product’s
conformity evaluation, which serves as the basis for the acceptance of cast-in product and
the drafting of the final evaluation.
4.1 General
These provisions apply to building construction works on public roads in order to assess the
conformity of those construction products that are not subject to assessment of conformity
with this document and are also not subject to conformity approval pursuant to the relevant
regulations issued by the Ministry of Public Works, Transport and Telecommunications.
These provisions are, furthermore, intended for the purpose of accepting cast-in construction
products. They apply to:
• Construction semi-products;
Conformity assessment comprises internal control tasks and external control tasks, as
defined in section 4.3 of this document. Those particular above mentioned tasks which must
be performed for the purposes of conformity assessment of a certain construction product
depends, within the meaning of section 3.1 of this document, on the intended use of the
product in construction works, and particularly on the influence that the product concerned
must have on the fulfilment of essential technical requirements for the construction works into
which it is to be cast. The obligatory part of each system is factory production control or
construction work implementation control.
Assessment systems of type A and B (see Table 4.1 on page 12) are obligatory for
conformity assessment of those products that, when cast-in, must not only provide the
construction works with security but also fulfil other essential technical requirements for
construction works, as indicated in section 3.1 of this document.
Assessment systems of type C and D (see Table 4.1 on page 12) are appropriate for
conformity assessment of those products that, following the completion of casting process,
must, within the meaning of section 3.1 of this document, provide the construction works only
with individual essential technical characteristic for construction works or ensure a certain
type of use.
The conformity assessment system that is considered most appropriate for the purpose and
significance of the product for construction works into which it is cast, must be defined for the
product concerned or in the client’s tender specifications.
• Initial type test of the product or initial test performed on test field, when the two are
envisaged as the manufacturer or contractor’s obligation in the prescribed conformity
attestation system;
• Initial type test of the product, when such test is envisaged as the obligation of a third
party or the ISTC in the prescribed conformity attestation system;
• Audit tests performed on the samples that are randomly collected during factory
production control or on-site control, if so required by the prescribed conformity
attestation system.
When several small-scale construction works are involved that are built by the same
contractor under equal technological conditions, certain external control tasks may be
distributed over a larger number of the construction works. The results thus obtained may be
System
Internal control tasks External control tasks
code
- Initial type test
- Factory production control - Initial plant inspection and control system examination
A
- Production control tests - Constant internal control surveillance
- Audit tests
- Initial type test
- Factory production control
B - Initial plant inspection and control system examination
- Production control tests
- Constant internal control surveillance
- Initial type test - Internal control approval on the basis of:
C - Factory production control - Initial plant inspection and control system examination
- Production control tests - Constant internal control surveillance
- Initial type test Internal control approval on the basis of:
D - Factory production control - Initial plant inspection and control system examination
- Production control tests
System
Internal control tasks External control tasks
code
- Initial test on test field
- Casting/construction control - Initial inspection of machinery and control system
A
- Production control tests - Constant internal control surveillance
- Audit tests
- Initial test on test field
- Casting/construction control
B - Initial inspection of machinery and control system
- Production control tests
- Constant internal control surveillance
- Initial test on test field
- Initial inspection of machinery and control system
C - Casting/construction control
- Constant internal control surveillance
- Production control tests
- Initial test on test field
D - Casting/construction control - Initial inspection of machinery and control system
- Production control tests
Conformity evaluation is carried out for each product type. The evaluation may also cover
groups of certain product type possessing various nominal characteristics, provided that such
procedure is precisely defined.
For construction products that are made during construction process, conformity evaluation
is carried out either for cast-in construction product or, separately, for construction semi-
product, prepared in the factory plant. Separate evaluations are reasonable, in particular,
when the preparation and casting of construction product are implemented by different legal
subjects.
providing the basis for the statement of conformity in section 5.1 of this document, must be
prepared by the manufacturer upon prior approval by the ISTC of factory production control.
The report on conformity evaluation, providing the basis for the acceptance of the cast-in
construction product within the meaning of section 3.3 of this document, is prepared by the
ISTC.
The period of validity of the certificate is limited by production period, construction period or
the quantity of the construction product in question.
The ISTC may then, on the basis of the findings of constant internal control supervision
carried out in intervals – prescribed in the relevant document or tender specifications and
dependent on the scope and dynamics of production or construction works – do any of the
following:
• Confirm the validity of the issued verification of conformity, provided that constant
surveillance findings demonstrate that internal control is being implemented in
compliance with technical specifications requirements and that the established results
of conformity tests meet the prescribed criteria;
• Notify or warn the manufacturer or the contractor and demand corrective measures, if
surveillance findings show any non-conformities or discrepancies in internal control
implementation;
• Repeal the validity of the issued conformity attestation, in the case of repeated
occurrence of non-conformity.
On the basis of the certificate of internal control approval, the manufacturer issues a
statement of construction product’s conformity.
If conformity assessment requires the application of system type C, the engineer may, on the
basis of the findings of constant internal control supervision carried out in intervals –
prescribed in the relevant document or tender specifications and dependent on the scope
and dynamics of production or construction works – do any of the following:
• Confirm the validity of the certificate of internal control approval, provided that
surveillance findings again demonstrate that the internal control is being implemented
in compliance with the technical specifications requirements and that the established
results of conformity tests meet the prescribed criteria;
• Notify or warn the manufacturer or the contractor and demand corrective measures, if
surveillance findings show any non-conformities or discrepancies in internal control
implementation;
• Repeal the validity of the issued certificate of internal control approval, in the case of
repeated occurrence of non-conformity.
If the certificate of internal control approval is repealed, the manufacturer or the contractor
must immediately repeal the issued statement of construction product conformity.
6 Required Conditions
The implementation of these requirements is assessed and confirmed by the client on the
basis of a favourable expert opinion delivered by the Institute of Standards and Technologies
in Construction (ISTC).
The manufacturer is, as a rule, deemed competent for carrying out internal controls, provided
that the established factory production control system or on-site control system is in line with
the EN ISO 9001/2 standard and that also relevant requirements are taken into consideration
that are contained in the technical regulation covering the controlled construction product.
The competence of the laboratory conducting required identity tests for a certain construction
product as well as acceptance tests is evaluated and attested by the client, on the basis of:
If the manufacturer or the contractor alone is not sufficiently qualified for the fulfilment of the
required tasks, he may sub-contract their implementation in whole or in part to a competent
professional organisation or, as appropriate, may subcontract testing for conformity control to
a competent testing laboratory. In such instances, the manufacturer or the contractor must
first obtain consent from the client and from the ISTC.
• Disposes of the necessary equipment for testing the construction product being
subject to acceptance or conformity attestation;
Whether or not these requirements are fulfilled is assessed by the client who subsequently
recognises the competence to the ISTC, which operates as a recognised organisation
possessing the required competence.
For cast in situ construction products, the client may designate the General Roads
Directorate (GRD) laboratory, or a private laboratory, to ascertain whether the required
specifications have been met.
• Established discrepancies;
The final evaluation on suitability of a certain type of construction product for the intended
use may apply to several small-scale construction works, if the common quality control plan
for these works envisages.
Final evaluations on suitability of all cast-in construction products constitute a basis on which
the client may consequently accept and approve the construction works in question.
8.1 General
Site laboratory internal control tasks concerning a particular construction project may be
conducted by an organisational unit of the manufacturer or the contractor, on the basis it:
• Provides personnel, competent for the performance of prescribed test, inspection and
control tasks; and
• Provides appropriate space and all suitable facilities as well as all calibrated and
necessary testing and measuring equipment for carrying out the prescribed
conformity tests on the construction product in question.
The implementation of these requirements is assessed and confirmed by the client on the
basis of a favourable expert opinion delivered by a competent third party.
The site laboratory, whether provided by contractor or client, is deemed competent for
carrying out all inspection and testing, including all associated controls, provided that the
established control system or on-site control system is in line with an EN ISO 9001/2 relevant
standard and in line with relevant standards issued by the Accreditation Directorate of
Albania, and that also relevant requirements are taken into consideration that are contained
in the technical regulations covering the controlled construction project.
The competence of the laboratory conducting required identity and acceptance tests for a
certain construction project is evaluated and attested by the Ministry of Public Works,
Transport and Telecommunications, on the basis of effective accreditation pursuant to the
SIST EN 45001/17025/9000 standard, issued by the Accreditation Directorate of Albania,
that must cover all required tests for construction product conformity assessment.
If the contractor alone is not sufficiently qualified for the fulfilment of the required tasks, he
may sub-contract their implementation in whole or in part to a competent professional
organisation or, as appropriate, he may sub-contract testing for conformity control to a third-
party competent testing laboratory.
8.4 Issue
The manual must be issued by the resident laboratory manager, either through the contractor
or, if client owned, through the engineer’s representative, to set out the procedures to be
followed within the quality plan for the site materials laboratory.
8.5 Control
The materials engineer is both the quality manager and technical manager for the purposes
of control of the laboratory. He must have overall responsibility for the control of quality and
for implementing the quality policy in the laboratory.
The management of the laboratory is responsible for the provision of the laboratory services
in compliance with the required standards including all tests and calibrations.
All laboratory staff are required to comply at all times with the quality policy, manuals and
procedures as laid down and set out in the associated documentation.
The quality system, which must comprise at the minimum a quality manual plus appendices,
must include description of the management structure and procedures to be adopted in order
to ensure that data is obtained and documented in the laboratory to a consistently high
standard.
In order to meet this objective the laboratory quality system must be developed, maintained
and implemented in accordance with Albanian quality standards. Where Albanian quality
standards to not exist, the laboratory quality system must comply with all relevant
international quality and associated testing standards. In addition the laboratory must seek a
policy of continuous improvement.
It is the responsibility of all laboratory personnel to understand and apply at all times the
principles of the quality assurance system. Compliance is mandatory.
The materials engineer is responsible for ensuring that the quality system is developed to
apply the principles of quality assurance.
The laboratory quality system must be developed to apply the principles of quality assurance.
Requirements for quality executive must be a reporting function through the project manager.
• Supervision and timely verification actions carried out to implement any corrective
actions necessary;
• All activities and responsibilities for which an accreditation is held must be fully
documented. The materials engineer is fully responsible for this;
• All personnel must sign to verify their reading and understanding of the quality system
documents;
• The materials engineer must issue the laboratory quality manual for the project site
and may amend all procedures as required relating to the inspection and testing
work;
• Any permitted departures must be recorded. Departures must not contravene any
other contractual requirements;
• The laboratory must function as part of the construction site's supervision of the
works;
• The laboratory must provide inspection, sampling and testing services to the
temporary and permanent site works materials;
• The laboratory organisation chart must be prepared for the project and circulated;
A schedule of all minimal testing capabilities forms part of this document (see Appendix D).
• Ensuring the duties and responsibilities of the laboratory and its staff are effectively
discharged and arranging for any necessary staff training within the operational remit
of the laboratory;
• Liaising with and taking instructions from the project manager and other senior site
staff in respect of materials and their testing requirements;
The laboratory manager is responsible for the routine running of the laboratory and ensuring
that overall laboratory quality requirements are met on a day to day basis. The laboratory
manager must also act as technical manager. Duties and responsibilities include:
• Programming of laboratory and testing work and directing and training staff;
The senior technicians must be directly responsible for all daily inspections and sampling, as
well as their subsequent testing. This must include, at the very least:
• Completion of appropriate sampling certificates and entry of correct data and test
requirements into the sampling registers;
• Ensuring that samples and sub samples are properly identified as registered, are
marked and are correctly stored;
• Ensuring that the sampling and test procedures utilised comply with the specified
criteria and that the equipment is suitable for the test and properly calibrated;
• Ensuring timely and accurate completion and submission of worksheets and report
sheets;
Only the materials engineer is authorised to sign the laboratory report sheets and take
responsibility for their content.
It must be the laboratory policy to sample and test materials accurately and to report
accurately all findings and data without modification.
Test results must be disclosed as required by the overall construction works contract.
The laboratory must be manned at all times and when closed must be made secure so as to
prevent loss or unauthorised access.
• Action lists.
• Programming of audits;
• Staff training;
11.1 General
All staff must be employed according to the needs and requirements of the works contract,
i.e. by contractor or client.
11.2 Experience
All staff must have adequate and suitable qualifications and experience relevant to their
nominated position and responsibilities and duties.
11.3 Training
All staff must receive training and all records of training must be maintained. Staff must
receive competence training for all particular equipment usage and calibration as well as all
materials types and all sampling and testing regimes.
• Duplication tests;
• Adequate records.
12.1 Purpose
Internal quality audits must be carried out periodically to verify that the requirements of this
document are met and to highlight areas of necessary change or improvement.
Staff that carry out tests or internal calibrations must be subject to regular, periodical
examination. System audits must be undertaken by a trained auditor. All laboratory aspects
must be reviewed at least annually. Audits must be pre-programmed to suit the contract and
laboratory working regime.
12.2 Responsibility
Audits must be arranged by the materials engineer and carried out by trained laboratory staff
but not in those activities which are their own direct responsibility. Requirements for various
corrective actions must be verified by the same. System reviews must be managed by the
same in conjunction with the project manager. The materials engineer must maintain all
appropriate records.
12.3 Implementation
Audit and review must comply with the relevant international standard e.g. quality audit and
quality system review, in calibration and testing laboratories.
Test results and, where appropriate, any trend graphs of test data must be maintained and
regularly reviewed in accordance with the frequency of samples taken.
13 Equipment
Equipment must be checked and calibrated before being taken into service.
All tests affected by such equipment must be clearly identified and the tests carried out again
with alternative identical equipment. Original defective equipment must be marked as such
and removed to manufacturer for repair.
All equipment maintenance and operating instructions must be maintained by the laboratory
manager.
13.4 Monitoring
It must be a policy of the laboratory to ensure that equipment is protected as far as possible
from deterioration and abuse. It must be maintained, calibrated and regularly checked
between routine calibrations to ensure proper functioning.
Any equipment that suffers damage or provides suspect results must be withdrawn from
service.
14.1 Policy
All measurements taken during the course of accredited tests, in maintaining an appropriate
environment or, in the verification of equipment, must be traceable to known standards and
to satisfy the standards required by particular test standards. Implementation of the
calibration programme must be the direct responsibility of the laboratory manager.
14.3 Calibration
All calibration requirements must be managed by the materials engineer.
No equipment out of calibration (i.e. beyond its calibration date) must be used until re-
calibrated.
All instruments used for the purposes of calibration must only be used for this purpose.
All internal calibrations must normally be carried out with equipment calibrated to a figure of
ten times the required accuracy. All uncertainties of test measurement must be stated where
appropriate.
The materials engineer must ensure that all laboratory procedures reflect the method stated
in the current applicable standard. All the latest copies must be held in the library.
Any variation to the accepted standard or test procedures must be authorised in writing.
15.2 Availability
All methods, procedures, standards and specifications relevant to the work of the laboratory
must be made available to all staff.
No methods, specifications, standards or the like may be changed without the consent of the
project manager for the works contract. If approved, they must be approved in writing only. If
changes are required, the procedure should go to the technical secretariat of ARDACS (for
further information on departures, please refer to ARCS 1).
16.1 Accommodation
The laboratory environment must be maintained to comply with current Albanian legislation
for all staff needs and also be suitable for all required testing and storage activities.
Any requirements for special environmental conditions must be met and maintained.
16.2 Records
The laboratory environment records must be adequately maintained. Additionally, external
site conditions must be similarly recorded.
16.3 Access
The laboratory must be kept locked at all times when unattended. In no cases must
unauthorised persons be permitted to access testing areas.
16.4 Housekeeping
The laboratory and all its equipment must be kept in a clean and tidy condition at all times, to
ensure that all tests can be carried out effectively and without contamination of the specimen
under test.
All items received that are not immediately tested must be moved to a satisfactory storage
area.
Original material states must be maintained, with samples being preserved in airtight bags or
similar.
Sampling at source must be undertaken only by trained and licensed staff. These staff must
ensure correct protocol in respect of bagging, identification, and transit.
18 Records
18.1 System
A record system must be maintained in the laboratory which must readily ensure that all data
is identified, readily accessible and the relevant records for any given sample are traceable
through sampling, testing, reporting, and report distribution.
• Sample registers;
• Worksheets;
• Report summaries;
• Sampling certificates.
• Job number;
• Dates of tests;
• Test results;
The above records must be entered onto sample registers, certificates, worksheets and
report summaries as appropriate
18.3 Protection
The records must be kept securely in offices under the charge of the laboratory manager.
18.4 Retention
The retention period for all records on file must be as set out in the works contract or in
legislation. If not so stated then records must be retained for a minimum of six years.
19 Reports
19.1 Policy
Test reports and summaries must be of acceptable format and suitable for their intended
purpose. They may only be used to present summarised results for which full individual and
traceable information is on record elsewhere in the laboratory.
All forms of report must be so presented as to be unambiguous. All sampling details must be
clear including reference to item or batch.
19.2 Authorisation
Reports must be issued to the materials engineer who must be responsible for ensuring their
completeness and accuracy. They must be endorsed by signature.
19.3 Supplementary
Reports must not be amended but may be superceded.
20.1 Policy
All written complaints must be recorded and addressed by the contractor, client or, third party
as appropriate by laboratory manager.
All complaints must be entered onto a register of complaints, together with anomalies, reply
references, and any corrective action that may be necessary.
21 Sub-contracting of Tests
21.1 Policy
The laboratory must normally undertake all normal tests for which it holds accreditation.
Where tests are outside this scope they must be sub-contracted to another accredited
laboratory in accordance with the contractor’s obligations under the contract.
Where this is not the case, the laboratory must carry out all necessary checks and
calibrations to ensure the suitability of the service or supply. A register must be maintained.
22 Particular Listings
22.1 Policy
The laboratory must hold detailed listings of the following:
• Schedule of sampling/testing;
• Authorised signatories;
• Complaints/anomalies register.
A1 Soils
Determination of:
• Moisture content;
• Liquid limit;
• Density;
• Particle density;
• Moisture content;
• Relative density;
• Water absorption.
A3 Concretes
Determination of:
• Slump;
• Compacting factor;
• Compressive strength.
A4 Bituminous Materials
• Method of test for density and compaction;
• Binder content;
• Aggregate grading.
A5 Bitumens
• Determination of needle penetration.
B1 Laboratory Manager
• General day to day running of the laboratory;
• Calibration schedules;
B2 Materials Engineer
• Also acts as technical manager/quality manager;
• Responsible to client;
• Responsible directly for all staff and their duties and actions;
• Administration.
B3 Senior Technician/engineer
• Responsible to the materials engineer for all sampling and testing;
• Ensures correctness of inspection, sampling and testing in accordance with correct
protocols, standards, procedures, specifications, including handling of test items,
storage and similar;
• Correctness of all results data and records;
• Training of junior staff.
• Date;
• Test details;
• Specification or standard;
• Sample number;
• Name of technician;
• Activity;
• Location;
• Compliance;
• Details of non-compliance.
C2 Non-conformity Report
• Non-conformity number;
• Report number;
• Date issued;
• Details of non-conformity;
• Classification of non-compliance;
• Confirmation.
• Location;
• Sample number;
• Mix reference;
• Concrete grade;
• Source/supplier;
• Location of pour;
• Location of sampling;
• Time;
• Measured slump;
• Temperature;
• Weather;
• Number of cubes;
• Mould reference;
• Method of compaction;
• Number of strokes;
• Duration of vibration;
• Location of manufacture;
• Time;
• Method;
• Period;
• Material specification;
• Date;
• Time;
• Method;
• Location;
• Description of material;
• Type;
• Nominal size;
• Ticket number;
• Mass, in kilograms;
• Remarks;
D5 Sampling of Soils
• Sample number;
• Date;
• Time;
• Description;
• Specification;
• Location of sample;
• Date;
• Supplier;
• Location on site;
• Source;
• Delivery details;
• Method of sampling;
• Time;
• Remarks;
EN 295-6:1995 Vitrified clay pipes and fittings and pipe joints for drains and sewers –
Part 6: Requirements for vitrified clay manholes
EN 295-10:2005 Vitrified clay pipes and fittings and pipe joints for drains and sewers –
Part 10: Performance requirements
EN 480-1:2007 Admixtures for concrete, mortar and grout – Test methods – Part 1:
Reference concrete and reference mortar for testing
EN 480-2:2006 Admixtures for concrete, mortar and grout – Test methods – Part 2:
Determination of setting time
EN 480-4:2006 Admixtures for concrete, mortar and grout – Test methods – Part 4:
Determination of bleeding of concrete
EN 480-5:2005 Admixtures for concrete, mortar and grout – Test methods – Part 5:
Determination of capillary absorption
EN 480-6:2005 Admixtures for concrete, mortar and grout – Test methods – Part 6:
Infrared analysis
EN 480-8:1997 Admixtures for concrete, mortar and grout – Test methods – Part 8:
Determination of the conventional dry material content
EN 480-10:1997 Admixtures for concrete, mortar and grout – Test methods – Part 10:
Determination of water soluble chloride content
EN 480-11:2005 Admixtures for concrete, mortar and grout – Test methods – Part 11:
Determination of air void characteristics in hardened concrete
EN 480-12:2005 Admixtures for concrete, mortar and grout – Test methods – Part 12:
Determination of the alkali content of admixtures
EN 480-13:2002 Admixtures for concrete, mortar and grout – Test methods – Part 13:
Reference masonry mortar for testing mortar admixtures
EN 480-14:2007 Admixtures for concrete, mortar and grout – Test methods – Part 14:
Determination of the effect on corrosion susceptibility of reinforcing
steel by potentiostatic electro-chemical test
EN 588-2:2002 Fibre cement pipes for drains and sewers – Part 2: Manholes and
inspection chambers
EN 934-3:2004 Admixtures for concrete, mortar and grout – Part 3: Admixtures for
mortar – Definitions, requirements, conformity, marking and labelling
EN 934-4:2002 Admixtures for concrete, mortar and grout – Part 4: Admixtures for
grout for pre-stressing tendons – Definitions, requirements,
conformity, marking and labelling
EN 934-4:2002 Admixtures for concrete, mortar and grout – Part 5: Admixtures for
sprayed concrete – Definitions, specifications and conformity criteria
EN 934-5:2003 Admixtures for concrete, mortar and grout – Part 5: Admixtures for
sprayed concrete – Definitions, requirements and conformity
EN 1317-1:1998 Road restraint systems – Part 1: Terminology and general criteria for
test methods
ENV 1317-4:2002 Road restraint systems – Part 4: Performance classes, impact test
acceptance criteria and test methods for terminals and transitions of
safety barriers
EN 1341:2002 Slabs of natural stone for external paving – Requirements and test
methods
EN 1342:2002 Sets of natural stone for external paving – Requirements and test
methods
EN 1343:2002 Kerbs of natural stone for external paving – Requirements and test
methods
EN 1436:2007 Road marking materials – Road marking performance for road users
EN 1463-1:2004 Road marking materials – Retro reflecting road studs – Part 1: Initial
performance requirements
EN 1463-2:2007 Road marking materials – Retro reflecting road studs – Part 2: Road
test performance specifications
EN 1793-1:1998 Road traffic noise reducing devices – Test method for determining
the acoustic performance – Part 1: Intrinsic characteristics of sound
absorption
EN 1793-2:1998 Road traffic noise reducing devices – Test method for determining
the acoustic performance – Part 2: Intrinsic characteristics of
airborne sound insulation
EN 1793-3:1998 Road traffic noise reducing devices – Test method for determining
the acoustic performance – Part 3: Normalised traffic noise spectrum
CEN/TS 1793-5:2003 Road traffic noise reducing devices – Test method for determining
the acoustic performance – Part 5: Intrinsic characteristics – In situ
values of sound reflection and airborne sound insulation
CEN/TS 12390-10:2008 Testing hardened concrete – Part 10: Determination of the relative
carbonation resistance of concrete
EN 12697-1:2006 Bituminous mixtures – Test methods for hot mix asphalt – Part 1:
Soluble binder content
EN 12697-2:2007 Bituminous mixtures – Test method for hot mix asphalt – Part 2:
Determination of particle size distribution
EN 12697-3:2005 Bituminous mixtures – Test methods for hot mix asphalt – Part3:
Bitumen recovery: Rotary evaporator
EN 12697-4:2005 Bituminous mixtures – Test methods for hot mix asphalt – Part 4:
Bitumen recovery: Fractionating column
EN 12697-5:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 5:
Determination of the maximum density
EN 12697-6:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 6:
Determination of bulk density of bituminous specimens
EN 12697-7:2003 Bituminous mixtures – Test methods for hot mix asphalt – Part 7:
Determination of bulk density of bituminous specimens by gamma
rays
EN 12697-8:2003 Bituminous mixtures – Test methods for hot mix asphalt – Part 8:
Determination of the air voids content of bituminous specimen
EN 12697-9:2003 Bituminous mixtures – Test methods for hot mix asphalt – Part 9:
Determination of the reference density
EN 12697-10:2002 Bituminous mixtures – Test methods for hot mix asphalt – Part 10:
Compactability
EN 12697-11:2006 Bituminous mixtures – Test methods for hot mix asphalt – Part 11:
Determination of the affinity between aggregate and bitumen
EN 12697-12:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 12:
Determination of the water sensitivity of bituminous specimens
EN 12697-13:2001 Bituminous mixtures – Test methods for hot mix asphalt – Part 13:
Temperature measurement
EN 12697-14:2001 Bituminous mixtures – Test methods for hot mix asphalt – Part 14:
Water content
EN 12697-15:2006 Bituminous mixtures – Test methods for hot mix asphalt – Part 15:
Determination of the segregation sensitivity
EN 12697-16:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 16:
Abrasion by studded tyres
EN 12697-17:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 17:
Particle loss of porous asphalt specimen
EN 12697-18:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 18:
Binder drainage from porous asphalt
EN 12697-19:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 19:
Permeability of specimen
EN 12697-20:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 20:
Indentation using cube or Marmust specimens
EN 12697-21:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 21:
Indentation using plate specimens
EN 12697-22:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 22:
Wheel tracking
EN 12697-23:2003 Bituminous mixtures – Test methods for hot mix asphalt – Part 23:
Determination of the indirect tensile strength of bituminous
specimens
EN 12697-24:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 24:
Resistance to fatigue
EN 12697-25:2006 Bituminous mixtures – Test methods for hot mix asphalt – Part 25:
Cyclic compression test
EN 12697-26:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 26:
Stiffness
EN 12697-27:2001 Bituminous mixtures – Test methods for hot mix asphalt – Part 27:
Sampling
EN 12697-28:2001 Bituminous mixtures – Test methods for hot mix asphalt – Part 28:
Preparation of samples for determining binder content, water content
and grading
EN 12697-29:2003 Bituminous mixtures – Test method for hot mix asphalt – Part 29:
Determination of the dimensions of a bituminous specimen
EN 12697-30:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 30:
Specimen preparation by impact compactor
EN 12697-31:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 31:
Specimen preparation by gyratory compactor
EN 12697-32:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 32:
Laboratory compaction of bituminous mixtures by a vibratory
compactor
EN 12697-33:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 33:
Specimen preparation slab compactor
EN 12697-34:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 34:
Marmust test
EN 12697-35:2007 Bituminous mixtures – Test methods for hot mix asphalt – Part 35:
Laboratory mixing
EN 12697-36:2003 Bituminous mixtures – Test methods for hot mix asphalt – Part 36:
Method for the determination of the thickness of a bituminous
pavement
EN 12697-37:2003 Bituminous mixtures – Test methods for hot mix asphalt – Part 37:
Hot sand test for the adhesivity of binder on precoated chippings for
HRA
EN 12697-38:2004 Bituminous mixtures – Test methods for hot mix asphalt – Part 38:
Common equipment and calibration
EN 12697-39:2005 Bituminous mixtures – Test methods for hot mix asphalt – Part 39:
Binder content by ignition
EN 12697-40:2006 Bituminous mixtures – Test methods for hot mix asphalt – Part 40: In
situ drainability
EN 12697-41:2005 Bituminous mixtures – Test methods for hot mix asphalt – Part 41:
Resistance to de-icing fluids
EN 12697-42:2006 Bituminous mixtures – Test methods for hot mix asphalt – Part 42:
Amount of coarse foreign matter in reclaimed asphalt
EN 12697-43:2005 Bituminous mixtures – Test methods for hot mix asphalt – Part 43:
Resistance to fuel
EN 12966-2:2005 Vertical road traffic signs – Part 2: Variable message signs – Initial
type testing
EN 12966-3:2005 Vertical road traffic signs – Part 3: Variable message signs – Factory
production control
EN 13036-1:2001 Road and air field surface characteristics – Test methods – Part 1:
Measurement of pavement surface macro texture depth using a
volumetric patch technique
EN 13043:2003 Aggregates for bituminous mixtures and surface dressings for roads,
airfields and other traffic areas
EN 13179-1:2001 Tests for filler aggregate used in bituminous mixtures – Part 1: Delta
ring and ball test
EN 13242:2006 Aggregates for unbound and hydraulically bound materials for use in
civil engineering work and road construction
EN 13286-40:2003 Unbound and hydraulically bound mixtures – Part 40: Test method
for the determination of the direct tensile strength of hydraulically
bound mixtures
EN 13286-41:2003 Unbound and hydraulically bound mixtures – Part 41: Test method
for the determination of the compressive strength of hydraulically
bound mixtures
EN 13286-42:2003 Unbound and hydraulically bound mixtures – Part 42: Test method
for the determination of the indirect tensile strength of hydraulically
bound mixtures
EN 13286-43:2003 Unbound and hydraulically bound mixtures – Part 43: Test method
for the determination of the modulus of elasticity of hydraulically
bound mixtures
EN 13286-44:2003 Unbound and hydraulically bound mixtures – Part 44: Test method
for the determination of the alpha coefficient of vitrified blast furnace
slag
EN 13286-45:2004 Unbound and hydraulically bound mixtures – Part 45: Test method
for the determination of the workability period of hydraulically bound
mixtures
EN 13286-46:2003 Unbound and hydraulically bound mixtures – Part 46: Test methods
for the determination of compactability, the moisture condition value
(MCV)
EN 13286-47:2004 Unbound and hydraulically bound mixtures – Part 47: Test method
for the determination of California bearing ratio, immediate bearing
index and linear swelling
EN 13286-48:2005 Unbound and hydraulically bound mixtures – Part 48: Test method
for the determination of degree of pulverisation
EN 13286-50:2005 Unbound and hydraulically bound mixtures – Part 50: Method for the
manufacture of test specimens of hydraulically bound mixtures using
Proctor equipment or vibrating table compaction
EN 13286-51:2005 Unbound and hydraulically bound mixtures – Part 51: Method for the
manufacture of test specimens of hydraulically bound mixtures using
vibrating hammer compaction
EN 13286-52:2005 Unbound and hydraulically bound mixtures – Part 52: Method for the
manufacture of test specimens of hydraulically bound mixtures using
vibrocompression
EN 13286-53:2005 Unbound and hydraulically bound mixtures – Part 53: Methods for
the manufacture of test specimens of hydraulically bound mixtures
using axial compression
ENV 13459-1:1999 Road marking materials – Quality control – Part 1: Sampling from
storage and testing
EN 13880-1:2003 Hot applied joint sealants – Part 1: Test method for the determination
of density at 25 °C
EN 13880-2:2003 Hot applied joint sealants – Part 2: Test method for the determination
of cone penetration at 25 °C
EN 13880-3:2003 Hot applied joint sealants – Part 3: Test method for the determination
of penetration and recovery (resilience)
EN 13880-4:2003 Hot applied joint sealants – Part 4: Test method for the determination
of heat resistance – Change in penetration value
EN 13880-5:2004 Hot applied joint sealants – Part 5: Test method for the determination
of flow resistance
EN 13880-6:2004 Hot applied joint sealants – Part 6: Test method for the preparation
of samples for testing
EN 13880-7:2003 Hot applied joint sealants – Part 7: Function testing of joint sealants
EN 13880-8:2003 Hot applied joint sealants – Part 8: Test method for the determination
of the change in weight of fuel resistance joint sealants after fuel
immersion
EN 13880-9:2003 Hot applied joint sealants – Part 9: Test method for the determination
of compatibility with asphalt pavements
EN 13880-10:2003 Hot applied joint sealants – Part 10: Test method for the
determination of adhesion and cohesion following continuous
extension and compression
EN 13880-11:2003 Hot applied joint sealants – Part 11: Test method for the preparation
of asphalt test blocks used in the function test and for the
determination of compatibility with asphalt pavements
EN 13880-12:2003 Hot applied joint sealants – Part 12: Test method for the manufacture
of concrete test blocks for bond testing (recipe methods)
EN 13880-13:2003 Hot applied joint sealants – Part 13: Test method for the
determination of the discontinuous extension (adherence test)
EN 14187-1:2003 Cold applied joint sealants – Part 1: Test method for the
determination of rate of cure
EN 14187-2:2003 Cold applied joint sealants – Part 2: Test method for the
determination of tack free time
EN 14187-3:2003 Cold applied joint sealants – Part 3: Test method for the
determination of self-levelling properties
EN 14187-4:2003 Cold applied joint sealants – Part 4: Test method for the
determination of the change in mass and volume after immersion in
test fuel
EN 14187-5:2003 Cold applied joint sealants – Part 5: Test method for the
determination of the resistance to hydrolysis
EN 14187-6:2003 Cold applied joint sealants – Part 6: Test method for the
determination of the adhesion/cohesion properties after immersion in
chemical liquids
EN 14187-7:2003 Cold applied joint sealants – Part 7: Test method for the
determination of the resistance to flame
EN 14187-8:2003 Cold applied joint sealants – Part 8: Test method for the
determination of the artificial weathering by UV-irradiation
EN 14187-9:2006 Cold applied joint sealants – Test methods – Part 9: Function testing
of joint sealants
EN 14188-1:2004 Joint fillers and sealants – Part 1: Specifications for hot applied
sealants
EN 14188-2:2005 Joint fillers and sealants – Part 2: Specifications for cold applied
sealants
EN 14188-3:2006 Joint fillers and sealants – Part 3: Specifications for preformed joint
seals