You are on page 1of 67

BNBM HOUSE

Utilize Resource Serve Construction

- 2018-
CONTENTS

C o m p any P ro f i le

Product & Service

Product Performance

Create Benefits

Project Case
 Central Enterprises directly supervised by  Birthplace of the Chinese new-type

SASAC building material industry

 Eight Consecutive Year among Fortune  The largest new type building materials

Global 500, Rank 243rd. product base in China

 No.1 in China in building materials  The world's leading integrated building

enterprises materials operators


Largest ready-mixed
Largest cement producer
concrete producer
Total assets
530 million tons 460 million cubic meters
RMB 591.5 Billion

Revenue
Largest rotor
Largest gypsum board
RMB 302.1 Billion blade producer

Total employees 2.18 billion square meter 16GW

221,000 Leading the international


Largest glass fiber producer cement engineering market
and International market for
2.2 million tons waste heat power generation
 CNBM Group signed the agreement with Schneider
Electric Group (France)

 CNBM Group signed the agreement with AGN Group


(Germany)
 The Prime Minister Keqiang Li of
The People’s Republic of China
with CNBM
 President of The Republic of Cape Verde
with CNBM
 President of The Republic of
Guinea-Bissau with CNBM
 President of the Oriental
Republic of Uruguay with  President of the Republic of
CNBM Argentina with CNBM

 President of the Republic of Sierra


Leone with CNBM
 President of the Republic of Zambia
with CNBM
 Established in 2002, committed to the new housing

business all the time.

 The Platform for new type house business, one of the most

important strategies of CNBM.

 Own more than 160 patents, and advanced new-housing

technology with proprietary intellectual property rights.

 Perfect Production base layout, 5 established and operating

bases nationally scattered.


1979

Deng Xiaoping visited BNBM


in Beijing.
2002

“ State Housing Industrialization


Base ”authorized by the
Ministry of Construction
2013
2009

Beijing Base Heilongjiang


Base
2011

Sichuan Base
Jiangsu Base

2012
2009
Beijing, Sichuan, Hainan, Jiangsu, 2012
Heilongjiang Production Base
Hainan Base
Supporting industrial layout
2011

As the core editor company for the


industrial standard in 2011.
More than 160 items of patent.
2013

“Zero-energy consumption”
house

No.5 in the world in “2013


international Solar Decathlon”
“Most comfortable” Award
2017

The first batch national


Industrialization Base
of prefabricated building
authorized by the Ministry of
Construction in China

Main editor for 《Standard


assessment of prefabricated
building》
2016

Energy Plus 5.0 House

Energy Plus 5.0 House,


constructed by energy-saving,
green, eco-friendly building
materials, represents the
combination of environment and
technology
New Energy

Besides of self energy consumption, rest of energy can be


transmitted.

Energy

Solar Plus5.0+
photovoltaic Methane

Wind Solar
power heating
Ground
source
heat-pump
CONTENTS

C o m p any P ro f i le

Product & Service

Product Performance

Create Benefits

Project Case
Low-rise buildings

Use studs of C-section and U-section to combine into house


components as wall plates, floor slabs and roof trusses.
This system applies for 3 layers and below buildings, such
as residential villas, town development, hotels, schools,
resort facilities and so forth.
Multi-storey
buildings

With steel frame as its main structure and steel stud as


its enveloping structure, this system is usually
applicable for the 6 layers or below of small & medium
buildings, such as residential house, apartment, hotel,
swimming pool, office building, hospital, school and
tourist facilities, etc.
Products

Villa Tourism Building

Public Building

Administration Building Beautiful Village


Material & Housing
Integration

Structure Stud Radiator Paint Water Pipes


Pipes

Gypsum Board
OSB Board

Rock Wool Fiber Cement Siding Fiber Cement Tile Doors& Windows
BNBM Products for
Landmark Projects

 World Financial  EXPO Shanghai  T3 Terminal Beijing


Center Shanghai

 National Stadium  National Aquatics Center  Venetian Macao Resort Hotel


Integration of Design,
Production and Construction

BM producer

Design Strategic
Cooperation Supplier

Building Design:
Grade A BM Supplier
Design
Production

Refined Decoration
精装一体化
Integration

Construction
Contract Sub-Contract Refined
Decoration

Save Your Energy Save Your Cost


Service

EPC Service

Material Loading Finance


Design Integration Shipping Instruction Turn-Key Service

EP Service

EPCF Service
CONTENTS

C o m p any P ro f i le

Product & Service

Product Performance

Create Benefits

Project Case
Environmental Friendly

Green Recycled
Environmental Friendly Material
Green Materials
Green Building Process
Green Application
Energy-efficiency
Recyclable
Green Building
Green Production
Green Transport

Green building industry chain in the whole life cycle


Fast Construction

Fast Construction Low labor cost High precision

Dry construction, easy Large scale prefabrication Prefabrication makes different

assembly. in factory, lower labor cost components precisely connected


to reduce the possibility of
on construction site.
mistakes and errors.

Day 2 Day 5 Day 8 Day 9 Day 13 Day 17


Earthquake resistant &
windproof

Meet the seismic intensity of 9 degree,


can withstand the 12 level typhoon

Light weight (about 30% of traditional


brick structure)

Use strong anti-earthquake connectors


at the connecting parts
Earthquake resistant &
windproof

The new type house seismic


experiment in Chongqing
University in 2017
Earthquake resistant &
windproof

 The situation of traditional house after  The situation of new type house after
the Jiuzhaigou earthquake in 2017 the Jiuzhaigou earthquake in 2017
Fire safety

Exterior wall materials and insulation


materials, full use of A-class non
combustible fireproof material

Exterior wall fireproof duration


for more than 2 hours

The inner wall fireproof


duration for more than 1 hour
Heat Insulation Ventilation
and Damp proof
Insulation
Layer

Sunray
Cool in Summer S W

Ground
reflection Warm Air Cold Air
sunray

Ventilation Ventilation
Layer Layer
Warm in Winter
Sound Insulation

multilayer wall consists


of different material with
different thicknesses

Sound insulation of external


wall is over 55db, and
sound insulation of internal
wall is about 52-53 db

Sound insulation standard


exceeds five-star hotels
Flexible layout

Mainly use exterior wall


as load-bearing walls

The thickness of the wall


is ½ of traditional wall,
and the inner area
increasing 10%

The flexible indoor layout


can be achieved
Beautiful Outview

Modern Style

Multiple Choices
Eco-beauty

Chinese Style American Style


Wild Application

Frigid zones Islands Tropics Desert Area Hills


CONTENTS

C o m p any P ro f i le

Product & Service

Product Performance

Create P
B re onfei fti t s

Project Case
One 150㎡ residential house can reduce use of
2.78 tons of standard coal, reduce consumption of
2 tons of steel and 200 tons of construction waste
and save 345,000 pieces of clay bricks.

Reduce Save
Save Save
Standard Clay
Steel waste
Coal Brick

2.78t 2t 200t 345,000pcs


1.1billion ㎡ residential housing can
reduce the use of 20.39 million tons of
standard coals, reduce consumption of
253 billion block of clay brick and
reduce the CO2 emission of 53 million
tons, and reduce the farmland damage Reduce Reduce Reduce
7.3 thousand hectare ecological farmland Resource CO2
damage damage Recycle Emission

*Data source:The statistical data of the new adding


traditional structure housing from the State Statistics
Bureau
Safety Faster
Performance Construction

Beautiful Comfortable
Appearance Living

Capital
Turnover

USING BNBM HOUSE


CONTENTS
目录

C o m p any P ro f i le

Product & Service

Product Performance

Create Benefits

PPrroojjeecctt CCaassee
More than 60
countries and regions

Company in Tanzania,
East Africa
1 Projects in Africa

Zambia Social Residential Houses

603,963 SQM
4527 houses
African Projects List

Construction Construction
No. Name of Project Construction Place Construction Status
Area(㎡) Period

1 Zambia Housing Project 603,963 Zambia Completed 2011-2013

2 Zambia Villa Project 2,300 Zambia Completed 2013

3 Zambia Living Base Project 1,930 Zambia In process 2014

Tanzania National Defense


4 5,983 Tanzania Completed 2012
College Project

Tanzania Military Officer


5 18,000 Tanzania Completed 2014
Housing Project
Construction Construction
No. Name of Project Construction Place Construction Status
Area(㎡) Period

Completed
6 Comoros School Project 1,200 Comoros 2009-2012

7 Comoros Project 760 Comoros Completed 2012

8 South Sudan Demo House 1,044 South Sudan Completed 2010

South Sudan Civil Servants Completed


9 8,975 South Sudan 2011
Housing Project

South Sudan Business Hotel


10 2,100 South Sudan Completed 2012
Project
Construction Construction
No. Name of Project Construction Place Construction Status
Area(㎡) Period

11 South Sudan Base Project 5,555 South Sudan Completed 2013

12 Kenya Project 1,420 Kenya Completed 2013

13 South Africa Demo House 210 South Africa In process 2014

14 Tonga Embassy Project 4,500 Tonga Completed 2014

15 Chad Villa 4,100 Chad Completed 2008

16 Equatorial Guinea Villa 315 Equatorial Guinea Completed 2008


Kitwe Public Construction Project in Zambia
Economic and Trade Cooperation Zone
In Sep., 2013, BNBM Homes
attended the Tanzania local
exhibition. The premier paid
high attention to the product.
It is also reported as the
frontpage headline by the
medium.

Tanzania Military Officer Project

Location:Dar-es-Salaam, Tanzania
Type:Residence
Structure System:Light Steel Structure
Finish Time:Year2013
Juba Villa in South Sudan
Juba Sunshine Grand Hotel in South Sudan
2 Projects in Europe

Denmark Project UK Lambert palace project

“EU Strategy Standard 2020” Runner up in UK Housing Excellence


Award in June 2015
Russian Veteran Apartment
3 Projects in America

American Housing Apartment in Venezuela


Venezuela Project

Project Completion
Venezuela Project

Project Completion
4 Projects in Asia
Shichengzhen Newtown Demonstration
Project in Miyun, Beijing

The First Green town Demonstration


Project in Beijing
Location: Jinghai, Tianjing
Type:Club Building
Structure System:Light Steel Structure
Finish Time:Year2004

Songjiang Villa Project, Tianjin


St. Andrews (Zhengzhou)Club Project

Location: Zhengzhou, Henan


Type:Golf Club
Structure System:Light Steel Structure
Finish Time:Year2005
Location: Shunyi, Beijing
Type:Commercial Building
Structure System:Light Steel Structure
Finish Time:Year2007

Shunyi Villa Project, Beijing


Desert Lotus Hotel Project in
Xiangshawan, Inner Mongolia

China's first green low-carbon


five-star hotel in the desert
Guang’an Newtown Project, Sichuan

The largest new house green town


project in China
Guang’an Newtown Project—Hostel, Sichuan

Rural leisure hostel


Guang’an Newtown Project——Village

Include square, houses, village committee, etc,


totally 50 houses
Custom made external wall color
Dali Commercial Villa, Yunnan Province
Green Town In Tsingdao

 German style
Papua New Guinea Residential Houses

5 Projects in Oceania
Totally 829 houses
Special design for island
Technology Changes Life
-Thanks-

BNBM HOUSE CO., LTD

You might also like