DATE : 4 JULY 2009

MECHANICAL DEPARTMENT. PROJECT : MR. MOHAMMAD YOUSEF AL - MASRY

CAR PARKING VENTELATION CALCULATION *

DESCRIPTION VALUE UNIT

NUMBER OF CARS 76.00 CAR


HIGHT,H 10.00 FT
AREA OF PARKING,A 35000.00 M²
AREA OF PARKING,AF 376740.00 FT²
TIME OF CAR OPERATION, Ө 120.00 SEC
MAX CO2 LEVEL REQUIRED 25.00 PPM
OPERATION CARS AT PEAK 40.00 %
NUMBER OF OPERATION CARS AT PEAK, N 30.40 CAR
EMISSION RATE , E 700.00 GAL/HR
GENERATION RATE G 0.06 g/hr.ft²
NORMALIZE VALUE OF GENERATION RATE ,GO 2.48 g/hr.ft²
F 2.28 -
C 0.0001363 CFM/FT²-S
VENTELATION RATE 0.04 CFM/FT²
REQUIRED AIR CHANGE /HR 0.22 ACH
AIR FLOW RATE 14035 CFM
STATIC PRESSURE 2.00 IN" W
FAN POWER 9.36 HP

* 1999 ASHRAE Application-A 12 Page ( 12.9 )

CALCULATED BY :

ENG / M.TAREK HAMED


AMMAD YOUSEF AL - MASRY

ATION *

I/O

INPUT
INPUT
INPUT
OUTPUT
RECOMMENDED
RECOMMENDED
RECOMMENDED
OUTPUT
AVERAGE
OUTPUT
RECOMMENDED
OUTPUT
RECOMMENDED
OUTPUT
OUTPUT
OUTPUT
INPUT
OUTPUT

LCULATED BY :

ENG / M.TAREK HAMED