1) Difference between air cooled and water cooled chiller
2) Criteria of chiller selection 3) Temp difference between inlet and outlet i.e. CHW/S and CHW/R 4) Types of Compressors, Condensers, Evaporators and Expansion Valves used 5) Schematic Layout i.e. chilled water piping layout 6) Criteria and specifications before ordering a chiller 7) Maximum recommended capacity to use air cooled chiller and why 8) What compressors are used in water cooled chillers and why 9) Why GI pipe is used from Chiller to Cooling Tower and MS pipe between Chiller to AHU 10) Describe the Valve package and use of all the associated accessories, fittings and fixtures. 11) What are different ways of power saving 12) What is bypass in chiller and operation of 3 way valve 13) What are sensors and controls and how are they configured 14) What insulation is used in CHW piping 15) What is piping and its types 16) What is pipe schedule 17) What is standard size of pipe length 18) How do you do cladding and where 19) What is saddle or guide 20) What is water testing during commissioning 21) What is pressure testing and how to perform it? What is standing and working pressure 22) What is chemical dosing and how to install it 23) What is pressure or expansion vessel and its use 24) What is LDP test 25) What are the criteria for a good welding and how to weld two metals 26) kinds of reducers are there 27) What is flange and gasket 28) What is dye spring, vibration pads, channels, angles, threaded rods etc 29) What preparation is done on pipe before insulation like primer paint… 30) How can the condensate heat be utilized in chiller 31) What is the weight of 1 ton of refrigerant 32) What is VFD and its use 33) What is the installation procedure for chiller 34) What observations are taken to consideration before commissioning ie pre commissioning 35) How is the chiller run after complete installation 36) What are the outlet source of chiller from evaporator side(AHU and FCU) 37) What is open loop and close loop system 38) What is GPM and how is it calculated in open and closed loop 39) How to do Pump head Calculation and what do you mean from equivalent length of pipe 40) How to calculate HP for pump motor 41) How to calculate pipe size 42) What is the velocity range in CHW pipe 43) What is power factor, EER, COP and SEER. How to increase the PF. 44) What kinds of pumps are used and what is single stage and multi stage pumps 45) What is the suction and discharge velocity of pump in fps 46) How do you install the pumps in parallel and in series 47) What is S curve 48) How does a motor start and what is starting and running current. 49) How to select cooling tower 50) What are terms associated to Cooling Tower like bleeding, drift etc 51) What is make up tank 52) What is AHU, FAHU, TFA and Heat Wheel Recovery System 53) Show Valve package with AHU and FCU 54) What is Fresh Air fan and Extract Air fan 55) What is the internal configuration of AHU 56) What is the criteria and specifications to select and order AHU 57) Describe All air system, air water system and all water system 58) What is the capacity range of AHU 59) On what basis is coil selection done by manufacturer 60) What are different types of fans, impellers and drives 61) What is dehumidifier and Air washer and when are they used 62) Describe cooling and dehumidification 63) What are the different processes in psychometric chart 64) What is psychometric chart and chart what does it show 65) What is dehumidification in the chart and how HR and RH relate to each other 66) How do you do Heat Load Calculation 67) What is BTU, BTU/Hr, CFM, TR, KW and their mutual relation; Temp: C = 5*(F-32)/9 68) What date and time is considered to be peak temp in India 69) What is Outdoor Daily Range an Correction Factor and degree Latitude 70) What is dehumidified rise, dehumidified cfm, ESHF, ADP 71) What is the approx coverage area for 1 TR cooling capacity of AC unit 72) What factors contribute to heating effect inside a closed space 73) What is sensible heat, latent heat; conduction, convection and radiation 74) What is ducting 75) What material is used for ducting and how to calculate its thickness in Gauge or mm 76) What is the standard size of GI sheet 77) What is scrap factor 78) How to calculate quantity of sheets required for ducting 79) How to calculate duct size 80) What is aspect ratio 81) What is the air velocity in duct for residence – main branch and sub branch 82) What should be the maximum friction loss in duct().1 ft/100 ft of straight duct) 83) What is equivalent duct length and what accessories and fittings cause this equivalent length 84) How to calculate the ESP. 85) What is TSP (TSP = ISP + ESP) 86) How to calculate the HP for fan blower 87) What is a damper and what kinds of dampers are there, their configuration and application. 88) What is VAV and its use 89) What insulation is done on duct and how cladding is done and where 90) What is diffuser and grille and how to select their size 91) What is acoustics and its unit 92) What is sound attenuator or silencer and what is duct liner. Where are they installed 93) What is a plenum and its use. What is its gauge(thickness) 94) What is offset, y connection, splitter connection in ducting 95) What is BOD, BOP, BOF, BOC and FFL 96) What is Air Change and how much do we consider it for residence/Appt, restaurants, Toilet, kitchen, Parking and Clean Rooms like OT 97) What is a Clean Room? Give Examples. 98) What is HEPA Filter and its tolerance. Where is it used 99) Describe different types of refrigeration system ie direct and indirect types. 100) How is testing performed for ducting ie smoke test and swab test 101) How do you perform air balancing thru Bell mouth and thru anemometer 102) What is District Cooling 103) How do you provide ventilation for Car parking, Kitchen, Toilet and AC rooms(in all water system) 104) What is staircase pressurization unit and its operation 105) What is grille velocity 106) What instrument is used to measure sound level (Sonometer) 107) What is the suction and discharge pressure of compressor in Vapour Compression Cycle 108) What equipments are used for gas charging(manometer, vaccum pump, N2, Oxy Acetylene, Refrigerant and pressure gauge). How gas charging is done 109) Describe Vapour compression cycle and the 3 laws of refrigeration 110) What is infiltration? 111) How to calculate the outside air(cfm) ----(No of people, per sq ft and air change) 112) What are different types of drawing from starting till end of the project 113) What is the procedure from start till completion and handing over of the project 114) What is site mobilization 115) What is costing estimation and BOQ 116) What is high side and low side of the work and associated equipments to that 117) Name few manufacturers. Suppliers for all the material used for project 118) List all the material used for project --- small and big 119) What is smoke extractor fan, induction fan and impulse fan for car parking ventilation 120) What is sprinkler, fire alarm system smoke detector, CCTV, public address. 121) What are the equipments in plumbing, fire fighting & Electrical? Some MEP knowhow 122) What are different types of projects like hospitals, residential, Villas…. 123) What is IR, RFI, VI, LOI, LOA, PO, POW(Progress of Work) 124) How is filing and documentation as well as In/Out correspondence done and meetings are carried out and minuted 125) How is Operation and Maintenance Manual prepared 126) How is billing being done. What is the thumb rule for ducting and piping work billing 127) How to prepare Program of Work(POW) thru Bar Chart, CPM Pert or MS Project 128) How to prepare the planning of work to be carried out on site. 129) Who prepares the work specifications, Schedules of equipments, List of approved Manufacturers …..(Consultant) 130) What are the responsibilities of Site Engineer, Project Designer, Coordinator, Planning, Quality Inspector, Site Inspector, Sales and Marketing etc 131) What is ASHRAE, ISHRAE, NFPA, BS, NBS, SMACNA, DW 143 etc 132) What is the concept of Green Technology 133) What are different methods for energy saving 134) Explain VRV/VRF system. What is heat pump, Inverter technology. Explain all 135) Explain refrigerants used. What is primary and secondary refrigerant 136) What is primary and secondary circuit in a chiller …(As per the multi compressors used) 137) What is BMS or BAS in Brief 138) What is geothermal, Vulcan Lockring and Chiller Beam technology 139) How is boiler configured in operation during winters? 140) What is the function of return Valve for heating 141) How is heating provided during winters ----(Thru heating element) 142) What is air curtain 143) What are the responsibilities of maintenance dept. ---- (Corrective and Preventive) 144) Explain civil terms like chasing, coring shuttering, rafting, excavation, skirting etc 145) Grinding M/c & grinding wheel, drilling M/c & drill bit, machining, surfacing, threading 146) Drawings: Affection plan layout, Tender, Shop, Revised Shop, GFC, Elevation, Sectional, Roof, Riser, AC/Piping/Ducting/Ventilation, RCP, Plant room, Valve package and other connection details as per specified standards, Setting Out, Foundation details(plinth), Builders work, Markup drawing and As Built Drawing 147) Variations, Penalties w.r.t. POW 148) Snag report and rectifications 149) Pre commissioning report and test run of all equipments 150) Time to time and final testing & Commissioning, filing, documentation and handing over of the project c/w As Built drawing and O & M Manual