INTRODUCTION:
ASSUMPTIONS:
Only sanitary sewer system is designed & the system is separate sewer system.
Wastewater is transported by gravity and discharged to STP.
A percentage of total average water demand in each zone is taken equal to wastewater flows
from that zone:
Industrial 90%
Residential 70%
Institutional 70%
Commercial 70%
Following peak factors are considered in wastewater calculation:
Industrial 2.1
Institutional 4.0
Commercial 1.8
Residential 3.34 [Figure]
Since new sewers were laid out, Manning’s n = 0.013 is used.
Minimum pipe size of 6 inch (150 mm) is used.
Minimum velocity for self cleansing is taken 2 ft/sec (0.6 m/s) & maximum velocity for
avoiding scouring of pipe is taken 10 ft/sec (3 m/s).
From the plan of the Industrial Village the layout of wastewater sewer network is prepared.
All the junctions (nodes) of branch sewers/main sewers with the Trunk sewer are identified and
marked.
Each sub area or service area (in hectors) contributing to each junction/node is calculated for
determining infiltration rate allowance for each sub area.
Design of Sanitary Waste Water System
From available contour diagram of the area, ground surface elevation at each node along the
trunk sewer trench line is found.
Sewer pipe invert elevation at each end (upper and lower) for each segment of pipe is found,
Invert elevation of sewer pipe at upper end = Ground Elevation – 2 m cover – Pipe thickness (50
mm) – Diameter of the pipe
Sewer pipe Crown elevation at each end is calculated,
Crown elevation of sewer pipe at upper end = Invert Elevation + Diameter of the pipe
Longitudinal profile showing details of ground elevation, tentative position of manholes,
invert crown etc. for all nodes is drawn.
MANHOLE POSITION
SAMPLE CALCULATION:
Here,
Line 4 consists of node 4 and node 5 and the contributing sub area is A6 which is a commercial
area. So the peak factor of this area is 1.8.
As the percentage of wastewater flow of commercial area is 70-80%,we assume
Percentage of average water demand to be considered for WW generation = 75%
Bank= 3.3m3/day
Shopping mall= 3.63 m3/day
Restaurant= 23.76 m3/day
Police station=3.168 m3/day
Parking lot = 0.083 m3/day
Fuel pump=.825 m3/day
Cinema hall= 5.445 m3/day
D/Dfull= 0.58
V/Vfull = 1.08
So, V = 1.08 * Vfull
= 1.08 * 0.652
= 0.704 m/s; which is greater than 0.6 m/s (minimum velocity)
So, pipe diameter is OK.
Calculation of Infiltration
Peak Total
Infiltration
Contributing Area Area Total Infiltration Cumulative
Line From To and Inflow
area (ft^2) (hectors) Area Factor Infiltration
(m^3/d)
(m^3/ha*d) (m^3/d)
A1 267900 2.490147
1 N1 N2 4.5034578 8.75 39.405 39.405
A2 216600 2.013311
A3 461775 4.292227
2 N2 N3 7.929153 8.75 69.380 108.785
A4 391275 3.636926
A7 774000 7.194378
5 N5 N6 9.0222524 8.75 78.945 231.385
A9 196650 1.827874
1 39.405 312.44 0.0041 0.0076 0.096 200 0.029 0.142 0.27 0.73 0.91 0.664 Ok
2 108.785 696.159 0.0093 0.0054 0.140 200 0.024 0.386 0.42 0.92 0.767 0.706 Ok
3 126.711 808.76 0.0108 0.0045 0.153 200 0.022 0.492 0.5 0.99 0.700 0.693 Ok
4 152.44 863.045 0.0118 0.0042 0.160 200 0.021 0.553 0.54 1.02 0.677 0.690 Ok
5 231.285 890.574 0.0130 0.0039 0.169 200 0.020 0.634 0.58 1.08 0.652 0.704 Ok
6 303.253 3569.098 0.0448 0.0036 0.272 300 0.058 0.772 0.65 1.11 0.821 0.911 Ok
Design of Sanitary Waste Water System
Elevation of Sewers
173.78 200 0.0054 27.5 26.75 25.48 24.54 2.02 2.206 25.23 24.29 25.43 24.49
64.02 200 0.0045 26.75 26.5 24.54 24.26 2.21 2.244 24.29 24.01 24.49 24.21
182.93 200 0.0042 26.5 25.5 24.26 23.49 2.24 2.012 24.01 23.24 24.21 23.44
125 200 0.0039 25.5 25.2 23.49 23 2.01 2.2 23.24 22.75 23.44 22.95
52.59 300 0.0036 25.2 25 23 22.81 2.2 2.189 22.75 22.46 22.95 22.76