Mfar Constructions Pvt. Ltd. ITTINA ABBY
118839204.xlsx.ms_office JOB # 030
2. CONCRETE WORKS
Output Per
Sl.No Description of item Unit Skilled Unskilled
Day(8 Hours)
2.1.1 Foundation , Footing bases of Coluimns , Plinth beams Cum 1.00 15.00 9.00
2.1.2 Damp proof Course in specfied thicknesss Cum 1.00 12.00 8.00
2.2.1 Footing , Plinth Beams , and column pededtrals Cum. 1.00 10.00 7.50
2.2.2 Columns in all Shapes and all Levels Cum. 1.00 6.00 5.00
2.2.3 Roof Beams at all levels Cum. 1.00 9.00 7.50
2.2.4 Roof slabs at all levels and heights in any shapes Cum. 1.00 9.00 7.50
2.2.5 Sloped Chajja , Pardi Gutter Beam Concrete Cum.
2.2.6 Lintel at all levels Cum.
2.2.7 Cill Concrete at all levels Cum. 1.00 1.00 1.00
2.2.8 Staircase in all levels Cum. 1.00 9.00 7.00
2.2.9 Retaining wall , Drops , lift wall , Ribs upto 150mm thick Cum. 1.00 9.00 5.00
2.2.13 Starter concreting for water tank Rmt 1.00 1.00 20.00
2.3.1 Footing , Plinth Beams , and column pededtrals Cum. 1.00 4.00 30.00
2.3.4 Roof slabs at all levels and heights in any shapes Cum. 1.00 4.00 30.00
Page 2 of 11
Mfar Constructions Pvt. Ltd. ITTINA ABBY
118839204.xlsx.ms_office JOB # 030
74.39
7.44
1.49
Page 3 of 11
Mfar Constructions Pvt. Ltd. ITTINA ABBY
118839204.xlsx.ms_office JOB # 024
3. REINFORCEMENT WORKS
Output Per
Sl.No Description of item Unit Skilled Unskilled Day(8
Hours)
3.1.1 Up to 12mm Dia Bar ( For Residential Buildings ) MT 1.00 2.00 0.28
3.1.2 Above 12mm Dia Bar ( For Residential Buildings ) MT 1.00 2.00 0.30
Output Per
Sl.No Description of item Unit Skilled Unskilled Day(8
Hours)
4.1.1 Footing , Plinth Beams , and column pedestrals Sqm. 1.00 2.00 14.00
4.1.2 Columns in all Shapes and all Levels Sqm. 1.00 2.00 15.00
4.1.3.1 Roof Beams at all levels - shuttering Sqm. 1.00 2.00 20.00
4.1.4.1 Roof slabs at all levels and heights in any shapes - shuttering Sqm. 1.00 2.00 20.00
-
4.1.4.2 Sqm.
deshuttering
4.1.5 Sloped Chajja , Pardi Gutter Beam Concrete Sqm. 1.00 1.00 5.00
4.1.9 Retaining wall , Drops , lift wall , Ribs upto 150mm thick Sqm. 1.00 1.00 10.00
4.1.10 RCC Chajja / Lofts / Kitchen Platform / Counter slabs of 75mm thickSqm. 1.00 1.00 5.00
4.1.12 Staging for Columns Ist lift Sqm. 1.00 1.00 15.00
4.1.15 Scaffolding using horizontals and verticals pipes Sqm. 1.00 1.00 50.00
4.2.2 Columns in all Shapes and all Levels Sqm. 1.00 1.00 5.00
4.2.9 Retaining wall , Drops , lift wall , Ribs upto 150mm thick Sqm. 1.00 1.00 20.00
683.84
56.99
3.80
1053.20
52.66
26.33
2.63
Mfar Constructions Pvt. Ltd. Project : Ittina Abby
118839204.xlsx.ms_office Job No. 30
5. MASONRY WORKS
Output Per
Description of item Unit Skilled Unskilled Day(8
Hours)
5.2.1 Granite / Size Stone Masonry in foundation Cum 1.00 1.00 2.00
5.2.2 Granite / Size Stone Masonry for plinth Cum 1.00 1.00 2.00
5.2.6 200mm thick Solid Block Masonry Cum 1.00 1.00 1.70
5.2.7 100mm thick Solid Block Masonry Sqm 1.00 1.00 8.50
5.2.8 150mm thick Solid Block Masonry Sqm 1.00 1.00 8.50
5.2.9 Size stone Masonry with Pointing Sqm 1.00 1.00 1.50
5.2.11 200mm thick Hollow Block Masonry Cum 1.00 1.00 1.90
5.2.12 100mm thick Hollow Block Masonry Sqm 1.00 1.00 9.50
5.2.13 150mm thick Hollow Block Masonry Sqm 1.00 1.00 9.50
5.2.14 Extra over 5.2.1 for rough dressing in one side No 1.00 30.00
5.2.16 Extra over 5.2.1 for rough dressing in both sides No 1.00 20.00
5.2.19 Design Work in 4" /6" Block for Elevation Treatment Sqm 1.00 1.00 5.00
5.2.20 Shifting Blocks From Storage Area to Upper floors Per No. 1.00 40.00
Page 7 of 11
Mfar Constructions Pvt. Ltd. Project : Ittina Abby
118839204.xlsx.ms_office Job No. 30
6. Plastering Works
Output Per
Sl.No Description of item Unit Skilled Unskilled Day(8
Hours)
Page 8 of 11
Mfar Constructions Pvt. Ltd. Project : Ittina Abby
118839204.xlsx.ms_office Job No.: 30
Page 9 of 11
Mfar Constructions Pvt.Ltd 118839204.xlsx.ms_office ITTINA ABBY
JOB#030
9. PAINTING WORKS
Output Per
Sl.No Description of item Unit Skilled Unskilled
Day(8 Hours)
With Tools